CN105735522A - 逆作业装配式剪力墙及施工方法 - Google Patents

逆作业装配式剪力墙及施工方法 Download PDF

Info

Publication number
CN105735522A
CN105735522A CN201610174731.7A CN201610174731A CN105735522A CN 105735522 A CN105735522 A CN 105735522A CN 201610174731 A CN201610174731 A CN 201610174731A CN 105735522 A CN105735522 A CN 105735522A
Authority
CN
China
Prior art keywords
shear wall
precast shear
wall
cast
steel bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610174731.7A
Other languages
English (en)
Inventor
王东辉
阎东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aerospace Constriction Group Co Ltd Shenyang Branch
Original Assignee
China Aerospace Constriction Group Co Ltd Shenyang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aerospace Constriction Group Co Ltd Shenyang Branch filed Critical China Aerospace Constriction Group Co Ltd Shenyang Branch
Priority to CN201610174731.7A priority Critical patent/CN105735522A/zh
Publication of CN105735522A publication Critical patent/CN105735522A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

一种逆作业装配式剪力墙及施工方法,其特征是:下部预制剪力墙由墙身、竖向钢筋、凹槽和支撑柱构成,上部预制剪力墙由墙身、竖向钢筋和抗剪键组成,上部预制剪力墙与下部预制剪力墙的竖向钢筋在凹槽内及现浇混凝土层内形成搭接。其施工方法是:①先将下部预制剪力墙1固定好,接着铺设楼板;②待其完成后安装上部预制剪力墙,使其置于支撑柱上,下部预制剪力墙和上部预制剪力墙的竖向钢筋在凹槽内形成搭接;③经过调平、调直、设置斜向支撑固定后,浇筑现浇混凝土层。本发明的优点是能有效保证新旧混凝土施工缝处的抗剪能力,并且大幅节约了由于钢筋套筒、螺旋筋及灌浆料等材料带来的工程造价。八边形凹槽能对其内部的竖向钢筋搭接起到约束作用。

Description

逆作业装配式剪力墙及施工方法
技术领域
本发明涉及建筑技术领域,特别是一种逆作业装配式剪力墙及施工方法。
背景技术
装配式剪力墙结构是把上部预制剪力墙与下部预制剪力墙通过特有技术连接起来的结构形式。与现浇结构相比,可以节省三材,且施工简便,能够缩短工期。装配式剪力墙结构兼具现浇和预制的特点,目前已经广泛应用于装配式结构中。我国相关国家标准对装配式剪力墙结构的设计和施工有明确的规定,但预制件的连接方式只局限于传统的套筒连接、螺旋筋约束浆锚及波纹管浆锚。传统的连接方式造价高、施工不方便,并且预制构件连接质量不易控制,因此在工程中受到很多限制。
现有的装配式剪力墙结构与传统现浇结构施工方式相同,待下部预制剪力墙安装完毕后铺设楼板,再浇筑楼板混凝土,待其混凝土强度达到要求后方可安装上部预制剪力墙并进行竖向钢筋的注浆等连接工作,上部预制剪力墙下端与下部构件的连接完全靠给钢筋注浆流出的灌浆料粘接起来,其抗剪强度低,并且造价高;预制构件生产时要把钢筋套筒、螺旋筋等置于模板内,也给构件加工带来了很大的麻烦。
发明内容
本发明的目的是提供一种可以提高预制预制剪力墙接缝抗剪能力和竖向钢筋连接质量,方便预制剪力墙安装和降低工程造价的逆作业装配式剪力墙及施工方法。
本发明是这样实现的,它包括下部预制剪力墙、上部预制剪力墙和现浇混凝土层,其特征是:下部预制剪力墙由墙身、竖向钢筋、凹槽和支撑柱构成,上部预制剪力墙由墙身、竖向钢筋和抗剪键组成,上部预制剪力墙与下部预制剪力墙的竖向钢筋在凹槽内及现浇混凝土层内形成搭接。
本发明的优点是下部预制剪力墙上端设置有八边形凹槽,凹槽内设有竖向甩出钢筋,上部预制剪力墙支撑于下部预制剪力墙的支撑柱上,其下端的甩出竖向钢筋插于八边形凹槽内,方形抗剪键顶部应埋于现浇混凝土层之内,这样就形成了现浇层里有预制墙体,预制墙体里有混凝土现浇层,能有效保证新旧混凝土施工缝处的抗剪能力,并且大幅节约了由于钢筋套筒、螺旋筋及灌浆料等材料带来的工程造价。八边形凹槽能方便预制构件的工厂加工工作,并对其内部的竖向钢筋搭接起到约束作用。
附图说明
以下结合附图对本发明做进一步的描述:
图1是逆作业装配式剪力墙连接示意图,
图2是图1沿A—A的剖面图,
图3是图1沿B—B的剖面图,
图4是图1沿C—C的剖面图,
图5是图1沿D—D的剖面图。
具体实施方式
如图1—5所示,该逆作业装配式剪力墙包括下部预制剪力墙1、下部预制剪力墙竖向钢筋2、支撑柱3、凹槽4、上部预制剪力墙5、上部预制剪力墙竖向钢筋6、抗剪键7、现浇混凝土层8、下部预制剪力墙墙身9和上部预制剪力墙墙身10、定位钢管11、定位钢筋12,它包括下部预制剪力墙1、上部预制剪力墙5和现浇混凝土层8,下部预制剪力墙1由墙身9、竖向钢筋2、凹槽4、定位钢管11和支撑柱3构成,上部预制剪力墙由墙身10、竖向钢筋6、定位钢筋12和抗剪键7组成,上部预制剪力墙5与下部预制剪力墙1的竖向钢筋2和竖向钢筋6在凹槽4及现浇混凝土层8内形成搭接。在上部预制剪力墙的下端设置有方形抗剪键7。抗剪键7完全置于现浇混凝土层8内,凹槽4为八边形,支撑柱3及抗剪键7为正方形,支撑柱3及抗剪键7的截面尺寸要小于剪力墙厚度。
其施工方法是:①先将下部预制剪力墙1固定好,接着铺设楼板;②待其完成后吊装上部预制剪力墙5,其下部定位钢筋12插于下部预制剪力墙1的定位钢管11内,避免上部预制剪力墙1发生滑移,并使其置于支撑柱3上,下部预制剪力墙1和上部预制剪力墙5的竖向钢筋2、6须于凹槽4内形成搭接;③经过调平、调直、设置斜向支撑固定后,浇筑同剪力墙强度等级相同现浇混凝土层8,从而形成钢筋的有效连接。
本连接方法的关键是下部和上部预制剪力墙竖向钢筋2、6须于凹槽4内形成搭接,凹槽4对其内现浇混凝土具有约束作用,能提高预制剪力墙竖向钢筋的握裹能力;抗剪键7应完全置于现浇混凝土层8内,这样预制剪力墙竖向钢筋搭接区域位于的现浇部分含有预制,能有效的保证新旧混凝土接触面的抗剪能力。

Claims (5)

1.一种逆作业装配式剪力墙,它包括下部预制剪力墙、上部预制剪力墙和现浇混凝土层,其特征是:下部预制剪力墙由墙身、竖向钢筋、凹槽和支撑柱构成,上部预制剪力墙由竖向钢筋和抗剪键组成,上部预制剪力墙与下部预制剪力墙的竖向钢筋在凹槽内及现浇混凝土层内形成搭接。
2.根椐权利要求1所述的逆作业装配式剪力墙,其施工方法的特征是:
①、先将下部预制剪力墙固定好,然后铺设楼板;
②、待其完成后吊装上部预制剪力墙,其下部定位钢筋插于下部预制剪力墙的定位钢管内,避免上部预制剪力墙发生滑移,并使其置于支撑柱上,下部预制剪力墙和上部预制剪力墙的竖向钢筋须于凹槽内形成搭接;
③、经过调平、调直、设置斜向支撑固定后,浇筑同剪力墙强度等级相同现浇混凝土层,从而形成钢筋的有效连接。
3.根椐权利要求1所述的逆作业装配式剪力墙,其特征是:上部预制剪力墙的下端设置有方形抗剪键。
4.根椐权利要求1所述的逆作业装配式剪力墙,其特征是:抗剪键完全置于现浇混凝土层内。
5.根椐权利要求1所述的逆作业装配式剪力墙,其特征是:凹槽为八边形。
CN201610174731.7A 2016-03-25 2016-03-25 逆作业装配式剪力墙及施工方法 Pending CN105735522A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610174731.7A CN105735522A (zh) 2016-03-25 2016-03-25 逆作业装配式剪力墙及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610174731.7A CN105735522A (zh) 2016-03-25 2016-03-25 逆作业装配式剪力墙及施工方法

Publications (1)

Publication Number Publication Date
CN105735522A true CN105735522A (zh) 2016-07-06

Family

ID=56251377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610174731.7A Pending CN105735522A (zh) 2016-03-25 2016-03-25 逆作业装配式剪力墙及施工方法

Country Status (1)

Country Link
CN (1) CN105735522A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193623A (zh) * 2016-07-29 2016-12-07 刘祥锦 一种装配式混凝土结构施工方法
CN106245827A (zh) * 2016-08-30 2016-12-21 中建八局第四建设有限公司 一种剪力墙施工方法
CN106930430A (zh) * 2017-05-03 2017-07-07 承德绿建建筑节能科技有限公司 一种带露筋槽观察孔的墙体结构
CN108412079A (zh) * 2018-05-18 2018-08-17 华南理工大学 一种装配式剪力墙水平连接结构及施工方法
CN115182609A (zh) * 2022-06-23 2022-10-14 上海建工四建集团有限公司 剪力墙结构高层建筑逆向拆除水平传力系统及其使用方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5014825B2 (ja) * 2007-02-13 2012-08-29 旭化成建材株式会社 壁パネルの取付構造及び取付方法
CN102995745A (zh) * 2012-12-27 2013-03-27 沈阳易筑建材经销有限公司 采用钢筋搭接方式的装配整体式混凝土结构体系
JP5355272B2 (ja) * 2009-07-24 2013-11-27 クリオン株式会社 Alcパネル用アンカー金具およびalcパネル
CN104695589A (zh) * 2015-03-10 2015-06-10 东南大学 一种预制装配混凝土剪力墙拼缝处连接结构及方法
CN204844469U (zh) * 2015-07-15 2015-12-09 中国十七冶集团有限公司 预制剪力墙安装用预埋钢管孔定位装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5014825B2 (ja) * 2007-02-13 2012-08-29 旭化成建材株式会社 壁パネルの取付構造及び取付方法
JP5355272B2 (ja) * 2009-07-24 2013-11-27 クリオン株式会社 Alcパネル用アンカー金具およびalcパネル
CN102995745A (zh) * 2012-12-27 2013-03-27 沈阳易筑建材经销有限公司 采用钢筋搭接方式的装配整体式混凝土结构体系
CN104695589A (zh) * 2015-03-10 2015-06-10 东南大学 一种预制装配混凝土剪力墙拼缝处连接结构及方法
CN204844469U (zh) * 2015-07-15 2015-12-09 中国十七冶集团有限公司 预制剪力墙安装用预埋钢管孔定位装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193623A (zh) * 2016-07-29 2016-12-07 刘祥锦 一种装配式混凝土结构施工方法
CN106245827A (zh) * 2016-08-30 2016-12-21 中建八局第四建设有限公司 一种剪力墙施工方法
CN106930430A (zh) * 2017-05-03 2017-07-07 承德绿建建筑节能科技有限公司 一种带露筋槽观察孔的墙体结构
CN106930430B (zh) * 2017-05-03 2023-12-08 承德绿建建筑节能科技有限公司 一种带露筋槽观察孔的墙体结构
CN108412079A (zh) * 2018-05-18 2018-08-17 华南理工大学 一种装配式剪力墙水平连接结构及施工方法
CN115182609A (zh) * 2022-06-23 2022-10-14 上海建工四建集团有限公司 剪力墙结构高层建筑逆向拆除水平传力系统及其使用方法
CN115182609B (zh) * 2022-06-23 2023-06-23 上海建工四建集团有限公司 剪力墙结构高层建筑逆向拆除水平传力系统及其使用方法

Similar Documents

Publication Publication Date Title
CN107165272B (zh) 预应力装配式混凝土框架节点连接结构及其施工方法
WO2018219196A1 (zh) 一种装配式柱脚连接节点及其施工方法
CN104453015B (zh) 含螺旋筋约束的薄壁套筒钢筋搭接连接构件
WO2018219024A1 (zh) 一种外包钢板的装配式混凝土柱脚节点及其施工方法
CN105735522A (zh) 逆作业装配式剪力墙及施工方法
CN105781125B (zh) 一种装配式建筑的安装方法
CN103397696B (zh) 耐震、预制的钢筋桁架剪力墙混合结构建筑物
KR100788623B1 (ko) Pc기둥을 이용한 탑다운 공법
CN204126048U (zh) 牛腿型钢筋混凝土剪力墙连接销接点装配式建筑
CN109025064A (zh) 预制混凝土柱与柱装配式连接节点制作及安装方法
CN108005387A (zh) 一种装配式墙板与短肢剪力墙现浇主体同步施工方法
CN102839773B (zh) 带抗剪键的混凝土叠合板楼板、预制构造和施工方法
CN109024875A (zh) 一种装配式整体式混凝土构件及施工方法
CN108316513A (zh) 一种快速施工装配式剪力墙结构及其施工方法
US9523194B2 (en) Reinforced blockwork construction method
CN105971201A (zh) 一种装配式坡屋面及其施工方法
CN110206311B (zh) 一种方钢管柱加钢筋的夯土墙体构造方法
CN211421637U (zh) 一种预制天沟的连接结构
CN113374171A (zh) 一种再生块体混凝土预制装配式圈梁结构及其施工方法
CN111101645A (zh) 一种自就位加强型预制混凝土墙板、连接结构及施工方法
CN111173030A (zh) 预制夹心侧墙与预制叠合底板连接节点结构及其施工方法
CN212452765U (zh) 一种二墙合一式地下管廊结构
JP6553855B2 (ja) 建物の基礎構造、および、建物の基礎の施工方法
CN212053436U (zh) 一种带有自就位结构的加强型预制混凝土墙板及连接结构
CN108035489A (zh) 一种预制装配式混凝土柱-柱钢化连接节点

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160706