CN105735155A - Bridge mid-span droop reinforcing device and construction method thereof - Google Patents
Bridge mid-span droop reinforcing device and construction method thereof Download PDFInfo
- Publication number
- CN105735155A CN105735155A CN201610275592.7A CN201610275592A CN105735155A CN 105735155 A CN105735155 A CN 105735155A CN 201610275592 A CN201610275592 A CN 201610275592A CN 105735155 A CN105735155 A CN 105735155A
- Authority
- CN
- China
- Prior art keywords
- hawser
- bridge
- rope
- fixing
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/06—Arrangement, construction or bridging of expansion joints
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710024569.5A CN106836024B (en) | 2016-04-29 | 2016-04-29 | Across sagging bracing means construction method in a kind of bridge |
CN201610275592.7A CN105735155B (en) | 2016-04-29 | 2016-04-29 | Bridge mid-span droop reinforcing device and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610275592.7A CN105735155B (en) | 2016-04-29 | 2016-04-29 | Bridge mid-span droop reinforcing device and construction method thereof |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710024569.5A Division CN106836024B (en) | 2016-04-29 | 2016-04-29 | Across sagging bracing means construction method in a kind of bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105735155A true CN105735155A (en) | 2016-07-06 |
CN105735155B CN105735155B (en) | 2017-04-12 |
Family
ID=56287679
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710024569.5A Active CN106836024B (en) | 2016-04-29 | 2016-04-29 | Across sagging bracing means construction method in a kind of bridge |
CN201610275592.7A Expired - Fee Related CN105735155B (en) | 2016-04-29 | 2016-04-29 | Bridge mid-span droop reinforcing device and construction method thereof |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710024569.5A Active CN106836024B (en) | 2016-04-29 | 2016-04-29 | Across sagging bracing means construction method in a kind of bridge |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106836024B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836024A (en) * | 2016-04-29 | 2017-06-13 | 郑悦 | Across sagging bracing means and its construction method in a kind of bridge |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108914786B (en) * | 2018-06-15 | 2020-03-27 | 上海中测行工程检测咨询有限公司 | Hollow slab beam hinge joint repair interval determination method and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200184684Y1 (en) * | 1999-12-29 | 2000-06-01 | 박재만 | Apparatus to prevent the negative moment of a bridge |
KR20060042667A (en) * | 2004-11-10 | 2006-05-15 | 주식회사 금영이엔지 | Deflection prevention structure of multi span continuous beam and construction method |
KR100699413B1 (en) * | 2006-05-02 | 2007-03-23 | 삼표이앤씨 주식회사 | Channel bridge construction method with deflection correction |
KR20070087822A (en) * | 2005-12-22 | 2007-08-29 | 레인보우스케이프주식회사 | H-beam girder structure |
JP3141002U (en) * | 2008-02-06 | 2008-04-17 | 東京ファブリック工業株式会社 | Fall bridge prevention device |
CN101942812A (en) * | 2009-07-09 | 2011-01-12 | 北京公科固桥技术有限公司 | Bridge reinforcing method |
CN204875563U (en) * | 2015-09-02 | 2015-12-16 | 东北林业大学 | Bridge reinforcing apparatus based on polyurethane cement and prestressed wire rope |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100637849B1 (en) * | 2004-03-13 | 2006-10-25 | 박병준 | Beam reinforcement method and its reinforcing device using beam lower steel curve placement method |
CN201250387Y (en) * | 2008-08-31 | 2009-06-03 | 沧州中井水利工程有限公司 | Bridge strengthening construction device |
CN102926333B (en) * | 2012-12-04 | 2014-12-03 | 成都博睿基桥梁技术有限责任公司 | External prestressed reinforcement structure for old bridge and construction method thereof |
CN105297640B (en) * | 2015-10-22 | 2016-09-14 | 王壹帆 | A kind of assembled slab bridge external prestressing applying method |
CN106836024B (en) * | 2016-04-29 | 2018-07-20 | 深圳市第一建筑工程有限公司 | Across sagging bracing means construction method in a kind of bridge |
-
2016
- 2016-04-29 CN CN201710024569.5A patent/CN106836024B/en active Active
- 2016-04-29 CN CN201610275592.7A patent/CN105735155B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200184684Y1 (en) * | 1999-12-29 | 2000-06-01 | 박재만 | Apparatus to prevent the negative moment of a bridge |
KR20060042667A (en) * | 2004-11-10 | 2006-05-15 | 주식회사 금영이엔지 | Deflection prevention structure of multi span continuous beam and construction method |
KR20070087822A (en) * | 2005-12-22 | 2007-08-29 | 레인보우스케이프주식회사 | H-beam girder structure |
KR100699413B1 (en) * | 2006-05-02 | 2007-03-23 | 삼표이앤씨 주식회사 | Channel bridge construction method with deflection correction |
JP3141002U (en) * | 2008-02-06 | 2008-04-17 | 東京ファブリック工業株式会社 | Fall bridge prevention device |
CN101942812A (en) * | 2009-07-09 | 2011-01-12 | 北京公科固桥技术有限公司 | Bridge reinforcing method |
CN204875563U (en) * | 2015-09-02 | 2015-12-16 | 东北林业大学 | Bridge reinforcing apparatus based on polyurethane cement and prestressed wire rope |
Non-Patent Citations (1)
Title |
---|
张彦: "大跨度预应力混凝土刚构线形控制", 《广东土木与建筑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836024A (en) * | 2016-04-29 | 2017-06-13 | 郑悦 | Across sagging bracing means and its construction method in a kind of bridge |
Also Published As
Publication number | Publication date |
---|---|
CN105735155B (en) | 2017-04-12 |
CN106836024B (en) | 2018-07-20 |
CN106836024A (en) | 2017-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103088750B (en) | Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof | |
US8695142B2 (en) | Partially and fully earth-anchored cable-stayed bridges using main-span prestressing unit and method of constructing the same | |
CN110359359B (en) | Supporting structure for pouring box girder zero blocks and construction process thereof | |
CN102561191A (en) | Integral lifting system and construction method for arch bridge ribs | |
CN203080400U (en) | Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables | |
CN108999088A (en) | A kind of construction method of cable-stayed bridge | |
CN111074795A (en) | Construction method for pouring continuous beam in cantilever mode spanning existing railway | |
CN106012872A (en) | Dorsal-funiculus-free cable-stayed reinforcing system of continuous rigid frame bridge and construction method | |
CN111622126A (en) | Construction method of high-altitude vertical manned channel in high mountain rock area | |
CN106835981A (en) | A kind of self-balance type inhaul cable anchorage structure suitable in bridge pier and bridge tower | |
CN104652244B (en) | A kind of Suspension bridge structure for reinforcing PSC Continuous Box Girder Bridge and construction method | |
CN205443901U (en) | Suspension bridge laterally stable wind brace system | |
CN105735155A (en) | Bridge mid-span droop reinforcing device and construction method thereof | |
CN114104990A (en) | Cable crane steel pipe assembling type cable buckle integrated tower construction process | |
CN105735154A (en) | Bridge droop reinforcing device and construction method thereof | |
CN105220609B (en) | Combined beam self-anchored suspension bridge and construction process thereof | |
CN110185179B (en) | Self-resetting building structure and construction method of prefabricated suspended floor | |
CN207244425U (en) | Part earth anchored suspension bridge | |
CN218479026U (en) | Pedestrian suspension bridge without side cable and anchorage | |
CN106120573A (en) | Multispan cable-carried arch bridge self-balancing button over strait hangs construction method | |
CN112281622B (en) | Temporary suspension cable trestle and construction method thereof | |
CN205171343U (en) | Combination beam self anchored suspension bridge | |
CN103485271B (en) | A prestressed cable truss bridge for pedestrians in mountainous rural areas | |
CN209011132U (en) | A kind of fixed foundation pit berm structure of assembled two point | |
CN106968178A (en) | A kind of cable-stayed type suspension bridge main girder construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Cao Shasha Inventor after: Tian Zhibin Inventor after: Zhang Bo Inventor after: Li Xiaoqiang Inventor after: Wang Zhengting Inventor after: Zhang Zhiqiang Inventor after: Guo Zhiwei Inventor after: Gu Jie Inventor after: Shao Yanmei Inventor after: Wang Debin Inventor before: Zheng Yue |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170310 Address after: 075000 Zhangjiakou District, Hebei, Xuanhua Road, No. 8 Applicant after: Cao Shasha Address before: 616250 Sichuan Province, Liangshan Yi Autonomous Prefecture Jinyang County town of West 42 world No. 1 unit 2 Building No. 6 Applicant before: Zheng Yue |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 |
|
CF01 | Termination of patent right due to non-payment of annual fee |