CN105689448A - Planar rectification device for silicon-steel post - Google Patents
Planar rectification device for silicon-steel post Download PDFInfo
- Publication number
- CN105689448A CN105689448A CN201610258997.XA CN201610258997A CN105689448A CN 105689448 A CN105689448 A CN 105689448A CN 201610258997 A CN201610258997 A CN 201610258997A CN 105689448 A CN105689448 A CN 105689448A
- Authority
- CN
- China
- Prior art keywords
- silicon steel
- steel post
- grip block
- motor
- slide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D1/00—Straightening, restoring form or removing local distortions of sheet metal or specific articles made therefrom; Stretching sheet metal combined with rolling
- B21D1/06—Removing local distortions
- B21D1/10—Removing local distortions of specific articles made from sheet metal, e.g. mudguards
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/003—Positioning devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/02—Advancing work in relation to the stroke of the die or tool
- B21D43/04—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
- B21D43/12—Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by chains or belts
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Silicon Compounds (AREA)
- Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
Abstract
本发明公开了硅钢柱平面校正装置,其包括机座,在机座的下端安装有夹紧装置、传输装置和动力装置,及在机座顶部安装的气动液压机;夹紧装置包括支撑架左侧固定安装的第一夹持块,支撑架的右侧设置有第二夹持块;第二夹持块上固定安装有蜗杆;传输装置包括两块通过若干连接杆固定安装在一起的固定板,每块固定板上通过转轴活动地安装有至少两个传动轮上套设有传动履带,每块固定板上邻近基座的传动轮通过传动轴连接在一起,在传动轴上固定安装有传动齿轮;动力装置包括安装在机座内侧底座,底座上设置的第一滑轨上安装有电动机,电动机上安装有拨动电动机沿第一滑轨滑动的拨动杆;电动机的输出轴上套设有分别与传动齿轮和蜗杆啮合的主动齿轮。
The invention discloses a silicon steel column plane correction device, which includes a machine base, a clamping device, a transmission device and a power device are installed at the lower end of the machine base, and a pneumatic hydraulic machine is installed on the top of the machine base; the clamping device includes a support frame on the left side The first clamping block is fixedly installed, and the right side of the support frame is provided with a second clamping block; a worm screw is fixedly installed on the second clamping block; the transmission device includes two fixed plates fixedly installed together by a plurality of connecting rods, Each fixed plate is movably installed with at least two transmission wheels through a rotating shaft, and a transmission track is set on it. The transmission wheels adjacent to the base on each fixed plate are connected together through a transmission shaft, and a transmission gear is fixedly installed on the transmission shaft. The power device includes a base installed on the inner side of the machine base, a motor is installed on the first slide rail set on the base, and a toggle lever for moving the motor to slide along the first slide rail is installed on the motor; the output shaft of the motor is sleeved with a The drive gear meshes with the transmission gear and the worm respectively.
Description
技术领域 technical field
本发明涉及校正装置,具体涉及一种硅钢柱平面校正装置。 The invention relates to a correction device, in particular to a silicon steel column plane correction device.
背景技术 Background technique
为了便于硅钢柱的快速散热,在硅钢柱上焊接有一条形水槽以辅助硅钢柱热量的快速扩散,由于硅钢柱属于板材,在进行高温焊接时,硅钢柱很容易发生变形,致使未焊接水槽的侧面凹凸不平,严重影响正常的使用。 In order to facilitate the rapid heat dissipation of the silicon steel column, a strip-shaped water tank is welded on the silicon steel column to assist the rapid heat dissipation of the silicon steel column. Since the silicon steel column is a plate, the silicon steel column is easily deformed during high-temperature welding, resulting in the unwelded water tank. The side is uneven, which seriously affects the normal use.
为此,在硅钢柱完成水槽的焊接后,需要采用一个校正装置进行校正,目前在对硅钢柱进行校正时,由于设备比较简陋,工人只能采用手动将硅钢柱送入至两个夹块之间,通过手动旋转螺杆调节两个夹块之间的距离以夹紧硅钢柱,之后再采用千斤顶边对硅钢柱进行校正边手动移动硅钢柱;采用这种方式进行硅钢柱对硅钢柱进行校正时,校正效率低下且工人的劳动强度大。 For this reason, after the silicon steel column has been welded to the water tank, a calibration device is required for calibration. At present, when the silicon steel column is calibrated, due to the relatively simple equipment, workers can only manually send the silicon steel column between the two clamping blocks. During the period, adjust the distance between the two clamping blocks by manually rotating the screw to clamp the silicon steel column, and then use the jack to correct the silicon steel column while manually moving the silicon steel column; when using this method to correct the silicon steel column , the correction efficiency is low and the labor intensity of the workers is high.
发明内容 Contents of the invention
针对现有技术中的上述不足,本发明提供了一种硅钢柱平面校正装置,其能够快速、省力地实现对硅钢柱进行校正。 In view of the above-mentioned deficiencies in the prior art, the present invention provides a silicon steel column plane correction device, which can quickly and labor-savingly realize the correction of the silicon steel column.
为了达到上述发明目的,本发明采用的技术方案为: In order to achieve the above-mentioned purpose of the invention, the technical scheme adopted in the present invention is:
提供一种硅钢柱平面校正装置,其包括机座,在机座的下端安装有用于对硅钢柱进行夹紧的夹紧装置、用于对硅钢柱进行传输的传输装置及用于给夹紧装置和传输装置提供动力的动力装置;在机座的顶部安装有对夹持在夹紧装置上的硅钢柱进行校平的气动液压机; A silicon steel column plane correction device is provided, which includes a machine base, and a clamping device for clamping the silicon steel column, a transmission device for transmitting the silicon steel column, and a clamping device for clamping the silicon steel column are installed at the lower end of the machine base. The power device that provides power with the transmission device; a pneumatic hydraulic press that levels the silicon steel column clamped on the clamping device is installed on the top of the base;
夹紧装置包括固定安装在机座上的支撑架,支撑架的左侧固定安装有第一夹持块;支撑架的右侧设置有用于与第一夹持块相配合对硅钢柱进行夹紧的第二夹持块;第二夹持块上固定安装有与动力装置配合、用于带动第二夹持块沿支撑架滑动的蜗杆; The clamping device includes a support frame fixedly installed on the machine base. The left side of the support frame is fixedly equipped with a first clamping block; The second clamping block; the second clamping block is fixedly installed with a worm that cooperates with the power device and is used to drive the second clamping block to slide along the support frame;
传输装置包括两块通过若干连接杆固定安装在一起的固定板,每块固定板上通过转轴活动地安装有至少两个传动轮,传动轮上套设有传动履带;每块固定板上邻近基座的传动轮通过传动轴连接在一起,在传动轴上固定安装有一与动力装置配合的传动齿轮; The transmission device includes two fixed plates that are fixedly installed together through a number of connecting rods. At least two transmission wheels are movably installed on each fixed plate through a rotating shaft, and the drive wheels are covered with drive tracks; each fixed plate is adjacent to the base The transmission wheels of the seat are connected together through a transmission shaft, and a transmission gear matched with the power device is fixedly installed on the transmission shaft;
动力装置包括安装在机座内侧的底座,底座上设置的第一滑轨上安装有电动机,电动机上安装有拨动电动机沿第一滑轨滑动的拨动杆;电动机的输出轴上套设有在拨动杆拨动下、分别与传动齿轮和蜗杆啮合的主动齿轮。 The power device includes a base installed on the inner side of the machine base, a motor is installed on the first slide rail set on the base, and a toggle rod is installed on the motor to move the motor to slide along the first slide rail; the output shaft of the motor is sleeved with a The driving gear is respectively engaged with the transmission gear and the worm under the toggle of the toggle lever.
本发明的有益效果为:本装置在对硅钢柱进行校平时,通过拨动杆带动安装在第一滑轨上的电动机能够分别实现硅钢柱的自动夹紧和传输,不需要工人手动将硅钢柱拖入夹紧装置,再手动调节硅钢柱的夹紧度,从而降低了工人的劳动强度;在整个过程都是采用自动化实现,从而提高了生产效率。 The beneficial effects of the present invention are: when the device is leveling the silicon steel column, the motor installed on the first slide rail can be driven by the toggle rod to realize the automatic clamping and transmission of the silicon steel column respectively, without the need for workers to manually place the silicon steel column Drag it into the clamping device, and then manually adjust the clamping degree of the silicon steel column, thereby reducing the labor intensity of the workers; the entire process is realized by automation, thereby improving production efficiency.
附图说明 Description of drawings
图1为硅钢柱平面校正装置的侧视图。 Fig. 1 is a side view of a silicon steel column plane correction device.
图2为硅钢柱平面校正装置的俯视图。 Fig. 2 is a top view of the silicon steel column plane correction device.
图3为硅钢柱平面校正装置的机座部分的主视图。 Fig. 3 is a front view of the base part of the silicon steel column plane correction device.
其中,1、机座;101、条形槽;102、弧形槽;2、夹紧装置;201、支撑架;202、第一夹持块;203、限位槽;204、第二夹持块;205、蜗杆;206、第二滑轨;207、复位弹簧;3、气动液压机;301、第三滑轨;302、滑块;303、顶部横梁;304、气管;305、气缸;306、活塞杆;307、校正凸起;308、压块; Among them, 1. machine base; 101. strip groove; 102. arc groove; 2. clamping device; 201. support frame; 202. first clamping block; 203. limit groove; 204. second clamping Block; 205, worm; 206, the second slide rail; 207, return spring; 3, pneumatic hydraulic press; 301, the third slide rail; 302, slide block; 303, top beam; 304, air pipe; 305, cylinder; 306, Piston rod; 307, correction protrusion; 308, pressing block;
4、传输装置;401、传动履带;402、传动轮;403、固定板;404、传动齿轮;405、连接杆;406、转轴;5、动力装置;501、拨动杆;502、圆盘;503、手柄;504、导向孔;505、电动机;506、第一滑轨;507、底座;508、主动齿轮。 4. Transmission device; 401, transmission track; 402, transmission wheel; 403, fixed plate; 404, transmission gear; 405, connecting rod; 406, rotating shaft; 503, handle; 504, guide hole; 505, motor; 506, first slide rail; 507, base; 508, driving gear.
具体实施方式 detailed description
下面对本发明的具体实施方式进行描述,以便于本技术领域的技术人员理解本发明,但应该清楚,本发明不限于具体实施方式的范围,对本技术领域的普通技术人员来讲,只要各种变化在所附的权利要求限定和确定的本发明的精神和范围内,这些变化是显而易见的,一切利用本发明构思的发明创造均在保护之列。 The specific embodiments of the present invention are described below so that those skilled in the art can understand the present invention, but it should be clear that the present invention is not limited to the scope of the specific embodiments. For those of ordinary skill in the art, as long as various changes Within the spirit and scope of the present invention defined and determined by the appended claims, these changes are obvious, and all inventions and creations using the concept of the present invention are included in the protection list.
参考图1,图1示出了硅钢柱平面校正装置的侧视图;图2示出来了硅钢柱平面校正装置的俯视图。如图1和图2所示,该硅钢柱平面校正装置包括机座1,在机座1的下端安装有用于对硅钢柱进行夹紧的夹紧装置2、用于对硅钢柱进行传输的传输装置4及用于给夹紧装置2和传输装置4提供动力的动力装置5;在机座1的顶部安装有对夹持在夹紧装置2上的硅钢柱进行校平的气动液压机3。 Referring to FIG. 1, FIG. 1 shows a side view of the silicon steel column plane correction device; FIG. 2 shows a top view of the silicon steel column plane correction device. As shown in Figures 1 and 2, the silicon steel column plane correction device includes a base 1, a clamping device 2 for clamping the silicon steel column, a transmission device for transmitting the silicon steel column are installed at the lower end of the base 1 The device 4 and the power device 5 for providing power to the clamping device 2 and the transmission device 4; on the top of the base 1, a pneumatic hydraulic machine 3 for leveling the silicon steel column clamped on the clamping device 2 is installed.
本装置在对硅钢柱进行校平时,通过动力装置5就能够分别实现硅钢柱的自动夹紧和传输,不需要工人手动将硅钢柱拖入夹紧装置2,再手动调节硅钢柱的夹紧度,从而降低了工人的劳动强度;在整个过程都是采用自动化实现,从而提高了生产效率。 When the device is leveling the silicon steel column, the automatic clamping and transmission of the silicon steel column can be realized through the power device 5, without the need for workers to manually drag the silicon steel column into the clamping device 2, and then manually adjust the clamping degree of the silicon steel column , thereby reducing the labor intensity of workers; the whole process is realized by automation, thereby improving production efficiency.
如图1所述,夹紧装置2包括固定安装在机座1上的支撑架201,支撑架201的左侧固定安装有第一夹持块202;支撑架201的右侧设置有用于与第一夹持块202相配合对硅钢柱进行夹紧的第二夹持块204;第二夹持块204上固定安装有与动力装置5配合、用于带动第二夹持块204沿支撑架201滑动的蜗杆205。 As shown in Figure 1, the clamping device 2 includes a support frame 201 fixedly installed on the machine base 1, the left side of the support frame 201 is fixedly equipped with a first clamping block 202; A clamping block 202 cooperates with the second clamping block 204 for clamping the silicon steel column; the second clamping block 204 is fixedly installed with the power unit 5 for driving the second clamping block 204 along the support frame 201 Sliding worm 205 .
传输装置4包括两块通过若干连接杆405固定安装在一起的固定板403,每块固定板403上通过转轴406活动地安装有至少两个传动轮402,传动轮402上套设有传动履带401;每块固定板403上邻近基座的传动轮402通过传动轴连接在一起,在传动轴上固定安装有一与动力装置5配合的传动齿轮404。 The transmission device 4 includes two fixed plates 403 that are fixedly installed together through a plurality of connecting rods 405. At least two transmission wheels 402 are movably installed on each fixed plate 403 through a rotating shaft 406. The transmission wheels 402 are covered with transmission tracks 401. The transmission wheel 402 adjacent to the base on each fixed plate 403 is connected together through a transmission shaft, and a transmission gear 404 that cooperates with the power unit 5 is fixedly installed on the transmission shaft.
动力装置5包括安装在机座1内侧的底座507,底座507上设置的第一滑轨506上安装有电动机505,电动机505上安装有拨动电动机505沿第一滑轨506滑动的拨动杆501;电动机505的输出轴上套设有在拨动杆501拨动下、分别与传动齿轮404和蜗杆205啮合的主动齿轮508。 The power unit 5 includes a base 507 installed on the inside of the base 1, a motor 505 is installed on the first slide rail 506 provided on the base 507, and a toggle lever for the toggle motor 505 to slide along the first slide rail 506 is installed on the motor 505 501 ; the output shaft of the motor 505 is sleeved with a drive gear 508 that is respectively engaged with the transmission gear 404 and the worm 205 under the toggle of the toggle lever 501 .
采用本方案的校正装置对硅钢柱平面进行校正的具体过程为: The specific process of correcting the silicon steel column plane by using the correction device of this scheme is as follows:
将需要校正的硅钢柱放置在传动履带401上,启动电动机505,通过拨动杆501,电动机505在拨动杆501和第一滑轨506的作用下,向着传动齿轮404的方向运动,直至主动齿轮508与传动齿轮404啮合,停止拨动拨动杆501,传动履带401上的硅钢柱在主动齿轮508与传动齿轮404的作用下向着夹紧装置2方向移动。 Place the silicon steel column to be calibrated on the transmission track 401, start the motor 505, and through the toggle lever 501, the motor 505 moves towards the direction of the transmission gear 404 under the action of the toggle lever 501 and the first slide rail 506 until the active The gear 508 is meshed with the transmission gear 404, and the toggle lever 501 is stopped, and the silicon steel column on the transmission track 401 moves toward the clamping device 2 under the action of the driving gear 508 and the transmission gear 404.
当硅钢柱到达夹紧装置2位置时,拨动拨动杆501使主动齿轮508与传动齿轮404分离,使电动机505向着蜗杆205方向运动,直至主动齿轮508与蜗杆205啮合时,停止拨动拨动杆501,第二夹持块204在蜗杆205和主动齿轮508的作用下,向着第一夹持块202方向运动,当硅钢柱被第一夹持块202和第二夹持块204夹紧之后,启动气动液压机3对硅钢柱不平整的面进行校正;与此同时,拨动拨动杆501使主动齿轮508与传动齿轮404再次啮合,这样以达到整根硅钢柱不平整的面的校正。 When the silicon steel column reaches the position of clamping device 2, toggle the toggle lever 501 to separate the driving gear 508 from the transmission gear 404, and make the motor 505 move towards the direction of the worm 205 until the driving gear 508 meshes with the worm 205, then stop the toggle The moving rod 501, the second clamping block 204 moves toward the first clamping block 202 under the action of the worm 205 and the driving gear 508, when the silicon steel column is clamped by the first clamping block 202 and the second clamping block 204 After that, start the pneumatic hydraulic machine 3 to correct the uneven surface of the silicon steel column; at the same time, move the toggle lever 501 to make the driving gear 508 mesh with the transmission gear 404 again, so as to achieve the correction of the uneven surface of the entire silicon steel column .
在对硅钢柱进行校正时,每完成一根硅钢柱的校正后,都需要关闭气动液压机3;若是一根硅钢柱校正完成后,还有其他硅钢柱需要校正,可以直接将其他硅钢柱放置在传输履带401上;若是后面无其他需要校正的硅钢柱,通过拨动杆501使主动齿轮508与蜗杆205分离,使主动齿轮508既不与蜗杆205接触也不与传动齿轮404啮合,之后再关闭电动机505,不过此处也可以先关闭电动机505后,再控制主动齿轮508与蜗杆205分离。 When calibrating the silicon steel column, after each silicon steel column is calibrated, the pneumatic hydraulic machine 3 needs to be turned off; if a silicon steel column is calibrated and there are other silicon steel columns to be calibrated, other silicon steel columns can be directly placed on the On the transmission crawler 401; if there is no other silicon steel column to be corrected behind, the driving gear 508 is separated from the worm 205 through the toggle lever 501, so that the driving gear 508 is neither in contact with the worm 205 nor meshed with the transmission gear 404, and then closed The motor 505, but here also can first close the motor 505, and then control the driving gear 508 to separate from the worm screw 205.
在本发明的一个实施例中,如图1和图3所示,在机座1的侧板上开设有一用于蜗杆205端部导向的导向孔504(导向孔504的直径略大于蜗杆205端部的直径),由于蜗杆205的一端处于自由状态,设置导向孔504后可以避免主动齿轮508带动螺杆运动时,蜗杆205出现晃动影响动力的稳定传输。 In one embodiment of the present invention, as shown in Fig. 1 and Fig. 3, offer a guide hole 504 for guiding the end of the worm 205 on the side plate of the machine base 1 (the diameter of the guide hole 504 is slightly larger than that of the end of the worm 205 Since one end of the worm 205 is in a free state, setting the guide hole 504 can prevent the worm 205 from shaking and affecting the stable transmission of power when the driving gear 508 drives the screw to move.
由于第二夹持块204通过蜗杆205和动力装置5的配合来实现对硅钢柱的夹紧,蜗杆205主要通过蜗杆205上的啮合齿与主动齿轮508配合带动第二夹紧块实现硅钢柱的夹紧,电动机505在进行动力传输时,一般其只向着一个方向旋转,而要实现硅钢柱从夹紧装置2上取下来,就需要将电动机505设置成既能正转又能反转,而采用这样的电动机505在带动两个装置时需要来回的切换非常的麻烦,且控制成本也比较高。 Since the second clamping block 204 realizes the clamping of the silicon steel column through the cooperation of the worm screw 205 and the power device 5, the worm screw 205 mainly drives the second clamping block to realize the clamping of the silicon steel column through the cooperation of the meshing teeth on the worm screw 205 and the driving gear 508. Clamping, when the motor 505 is performing power transmission, it generally only rotates in one direction, and to realize the removal of the silicon steel column from the clamping device 2, it is necessary to set the motor 505 to be able to rotate both forward and reverse, and It is very troublesome to switch back and forth when using such a motor 505 to drive the two devices, and the control cost is relatively high.
为了实现硅钢柱快速地从夹紧装置2上的分离,本方案在导向孔504的下端开设有与其连通、用于卡紧蜗杆205端部的弧形卡槽,第一夹持块202与第二夹持块204之间连接有一带动第二夹持块204复位的复位弹簧207。 In order to realize the rapid separation of the silicon steel column from the clamping device 2, in this solution, an arc-shaped slot communicating with the guide hole 504 and used to clamp the end of the worm 205 is provided at the lower end of the guide hole 504. The first clamping block 202 and the second clamping block A return spring 207 is connected between the two clamping blocks 204 to drive the second clamping block 204 to reset.
这样设置后,将硅钢柱夹紧后,将蜗杆205的端部卡入弧形卡槽内,以避免主动齿轮508与蜗杆205分离后,在还没实现硅钢柱的校正时,第二夹持块204在复位弹簧207作用下远离第一夹持块202,达不到硅钢柱的夹紧;当需要将硅钢柱从夹紧装置2上取下时,将蜗杆205的端部从弧形卡槽中移动到导向孔504内,第二夹持块204在复位弹簧207作用下远离第一夹持块202,从而实现硅钢柱的快速取出。 After setting in this way, after the silicon steel column is clamped, the end of the worm 205 is snapped into the arc-shaped slot, so as to prevent the driving gear 508 from being separated from the worm 205, when the silicon steel column has not been corrected, the second clamp The block 204 is away from the first clamping block 202 under the action of the back-moving spring 207, and the clamping of the silicon steel column cannot be reached; The groove moves into the guide hole 504, and the second clamping block 204 is moved away from the first clamping block 202 under the action of the return spring 207, thereby realizing the rapid removal of the silicon steel column.
如图1所示,实施时,为了便于在狭窄的空间内,既能实现夹紧装置2的安装又能实现动力装置5的安装,而又不出现夹紧装置2和动力装置5之间的相互干扰,本方案将支撑架201安装在底座507的左侧,且支撑架201的右侧端面与主动齿轮508的端面之间存在一间隙。 As shown in Figure 1, during implementation, in order to facilitate the installation of the clamping device 2 and the power device 5 in a narrow space, there is no gap between the clamping device 2 and the power device 5. Mutual interference, in this solution, the support frame 201 is installed on the left side of the base 507 , and there is a gap between the right end surface of the support frame 201 and the end surface of the driving gear 508 .
在本发明的一个实施例中,支撑架201的右端安装有一第二滑轨206,第二夹持块204卡装在第二滑轨206上,并通过蜗杆205带动第二夹持块204在第二滑轨206上滑动。设置第二滑轨206后,可以快速地实现硅钢柱的夹紧,另外由于摩擦力比较小,相对比较省力。 In one embodiment of the present invention, a second slide rail 206 is installed on the right end of the support frame 201, and the second clamping block 204 is clamped on the second slide rail 206, and the second clamping block 204 is driven by the worm 205 on the slide on the second slide rail 206. After the second slide rail 206 is provided, the clamping of the silicon steel column can be realized quickly, and in addition, because the frictional force is relatively small, it is relatively labor-saving.
由于在进行硅钢柱不平的面的校正时,会给硅钢柱一个比较大的向下的压力,为了保证硅钢柱的稳定性,在第一夹持块202和第二夹持块204相对的侧面上均开设有与硅钢柱上的槽体侧楞相配合的限位槽203。限位槽203设置之后,夹紧装置2能够给硅钢柱一个向上的支撑力,从而保证了硅钢柱在校正时的稳定性。 Since the correction of the uneven surface of the silicon steel column will give the silicon steel column a relatively large downward pressure, in order to ensure the stability of the silicon steel column, on the opposite sides of the first clamping block 202 and the second clamping block 204 There are limit slots 203 that match the sides of the slots on the silicon steel columns. After the limit groove 203 is set, the clamping device 2 can give an upward supporting force to the silicon steel column, thereby ensuring the stability of the silicon steel column during correction.
另外,由于第二夹持块204需要安装第二滑轨206上,为了保证第一夹持块202和第二夹持块204的限位槽203位于同一平面上,第二夹持块204的高度小于第一夹持块202高度,两者的外形可以设置成一致。 In addition, since the second clamping block 204 needs to be installed on the second slide rail 206, in order to ensure that the limiting grooves 203 of the first clamping block 202 and the second clamping block 204 are located on the same plane, the second clamping block 204 The height is smaller than the height of the first clamping block 202, and the shapes of the two can be set to be consistent.
如图3所示,在实施时,可以在机架的侧板上开设有用于活动安装拨动杆501端部的条形槽101,在条形槽101的两端和中部均开设有用于拨动拨动杆501时,使主动齿轮508准确与蜗杆205和传动齿轮404啮合的弧形槽102。 As shown in Figure 3, during implementation, a bar-shaped groove 101 for movably installing the end of the toggle lever 501 can be provided on the side plate of the frame, and the two ends and the middle part of the bar-shaped groove 101 are provided with bars for dialing. When the toggle lever 501 is moved, the driving gear 508 is accurately engaged with the arc groove 102 of the worm 205 and the transmission gear 404 .
条形槽101和弧形槽102的相互配合可以在拨动拨动杆501时,使主动齿轮508准确地与传动齿轮404或蜗杆205啮合,避免盲目拨动出现费时,降低效率的问题。 The mutual cooperation of the bar-shaped groove 101 and the arc-shaped groove 102 can make the driving gear 508 mesh with the transmission gear 404 or the worm 205 accurately when the toggle lever 501 is moved, so as to avoid the time-consuming and efficiency-reducing problems of blind turning.
由于拨动杆501为一根横截面积比较小的圆棒,不是很方便工人拿握,在实施时,本方案优选在拨动杆501的末端固定安装有一圆盘502,圆盘502上设置有便于拨动拨动杆501的手柄503。 Since the toggle lever 501 is a round bar with a relatively small cross-sectional area, it is not very convenient for workers to hold. The handle 503 that is convenient to toggle the toggle lever 501 is arranged.
如图1所示,本方案的气动液压机3可以包括安装在夹紧装置2正上方机座1的顶部横梁303上的气缸305,气缸305的活塞杆306上设置有用于对硅钢柱进行校正的压块308,气缸305通过气管304与外部的空压机连接。 As shown in Figure 1, the pneumatic hydraulic machine 3 of the present solution may include a cylinder 305 installed on the top crossbeam 303 of the base 1 directly above the clamping device 2, and a piston rod 306 of the cylinder 305 is provided with a cylinder for correcting the silicon steel column. The briquetting block 308 and the air cylinder 305 are connected with an external air compressor through an air pipe 304 .
由于硅钢柱在焊接时,部分平面会出现受热不均匀,使部分平面的变形相对比较严重,即部分平面凸起的幅度比较大,为了确保给这些面一个较大的压力,本方案优选在压块308上通过沉头螺钉固定安装有一块校正凸起307。 When the silicon steel column is welded, some planes will be heated unevenly, which makes the deformation of some planes relatively serious, that is, the amplitude of some plane protrusions is relatively large. A correction protrusion 307 is fixedly installed on the block 308 by a countersunk head screw.
这样设置后,可以在遇到变形较大的平面时,通过沉头螺钉安装上校正凸起307,当变形比较小时,也可以取下校正凸起307。 After setting in this way, when encountering a plane with large deformation, the correction protrusion 307 can be installed through the countersunk head screw, and the correction protrusion 307 can also be removed when the deformation is relatively small.
在本发明的一个实施了中,具体参考图1,在机座1的顶部横梁303上设置有一第三滑轨301,机座1的侧板上设置有电机;气缸305通过其底部设置的滑块302安装在第三滑轨301上;滑块302上设置的螺母与设置在电机输出轴上的丝杆相配合。 In one implementation of the present invention, with specific reference to Fig. 1, a third slide rail 301 is arranged on the top beam 303 of the machine base 1, and a motor is arranged on the side plate of the machine base 1; The block 302 is installed on the third slide rail 301; the nut provided on the slide block 302 cooperates with the screw mandrel arranged on the output shaft of the motor.
第三滑轨301和滑块302可以使气缸305在一定宽度范围内移动,这样设置之后,若出现较宽的硅钢柱需要进行校正时,可以通过灵活地移动气缸305来应对不同型号的硅钢柱的校正。 The third slide rail 301 and the slider 302 can make the cylinder 305 move within a certain width range. After such setting, if a wider silicon steel column needs to be corrected, the cylinder 305 can be flexibly moved to deal with different types of silicon steel columns. correction.
综上所述,本校正装置在进行硅钢柱校正时,不需要工人手动将硅钢柱拖入夹紧装置2,再手动调节硅钢柱的夹紧度,从而降低了工人的劳动强度;在整个过程都是采用自动化实现,从而提高了生产效率。 To sum up, when the calibration device performs silicon steel column calibration, workers do not need to manually drag the silicon steel column into the clamping device 2, and then manually adjust the clamping degree of the silicon steel column, thereby reducing the labor intensity of the workers; All are realized by automation, thus improving production efficiency.
以上实施例的说明只是用于帮助理解本发明的方法及其核心思想。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以对本发明进行若干改进和修饰,这些改进和修饰也落入本发明权利要求的保护范围内。 The descriptions of the above embodiments are only used to help understand the method and core idea of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610258997.XA CN105689448B (en) | 2016-04-25 | 2016-04-25 | Silicon steel post plane correction device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610258997.XA CN105689448B (en) | 2016-04-25 | 2016-04-25 | Silicon steel post plane correction device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105689448A true CN105689448A (en) | 2016-06-22 |
| CN105689448B CN105689448B (en) | 2017-08-29 |
Family
ID=56216534
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610258997.XA Active CN105689448B (en) | 2016-04-25 | 2016-04-25 | Silicon steel post plane correction device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105689448B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106903566A (en) * | 2017-04-17 | 2017-06-30 | 四川科星药业有限公司 | A kind of silicon steel post plane correction, burr remover |
| CN106927185A (en) * | 2017-05-17 | 2017-07-07 | 四川合电气科技有限公司 | Conveyor type silicon steel post plane correction device |
| CN116727492A (en) * | 2023-06-25 | 2023-09-12 | 陕西建工第一建设集团有限公司 | Welding channel steel correcting device for steel structure building |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1133649A (en) * | 1997-07-15 | 1999-02-09 | Ishikawajima Harima Heavy Ind Co Ltd | Transfer press crossbar interference prevention device |
| CN101549366A (en) * | 2009-05-15 | 2009-10-07 | 伊顿(宁波)流体连接件有限公司 | A pad flatter |
| CN102397914A (en) * | 2011-11-18 | 2012-04-04 | 江苏中核利柏特股份有限公司 | Machine for strengthening welding deformation of steel plate |
| CN202803835U (en) * | 2012-08-31 | 2013-03-20 | 陕西通力专用汽车有限责任公司 | Gantry leveling mechanism |
| CN203592018U (en) * | 2013-11-28 | 2014-05-14 | 湖北金鹏机械有限公司 | Axle housing plane correcting device |
| CN104369027A (en) * | 2014-11-24 | 2015-02-25 | 苏州市福迈精密机械有限公司 | Electric clamp used for numerical control machine tool |
| CN205599703U (en) * | 2016-04-25 | 2016-09-28 | 四川合一电炉科技有限公司 | Silicon steel post plane correcting unit |
-
2016
- 2016-04-25 CN CN201610258997.XA patent/CN105689448B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1133649A (en) * | 1997-07-15 | 1999-02-09 | Ishikawajima Harima Heavy Ind Co Ltd | Transfer press crossbar interference prevention device |
| CN101549366A (en) * | 2009-05-15 | 2009-10-07 | 伊顿(宁波)流体连接件有限公司 | A pad flatter |
| CN102397914A (en) * | 2011-11-18 | 2012-04-04 | 江苏中核利柏特股份有限公司 | Machine for strengthening welding deformation of steel plate |
| CN202803835U (en) * | 2012-08-31 | 2013-03-20 | 陕西通力专用汽车有限责任公司 | Gantry leveling mechanism |
| CN203592018U (en) * | 2013-11-28 | 2014-05-14 | 湖北金鹏机械有限公司 | Axle housing plane correcting device |
| CN104369027A (en) * | 2014-11-24 | 2015-02-25 | 苏州市福迈精密机械有限公司 | Electric clamp used for numerical control machine tool |
| CN205599703U (en) * | 2016-04-25 | 2016-09-28 | 四川合一电炉科技有限公司 | Silicon steel post plane correcting unit |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106903566A (en) * | 2017-04-17 | 2017-06-30 | 四川科星药业有限公司 | A kind of silicon steel post plane correction, burr remover |
| CN106927185A (en) * | 2017-05-17 | 2017-07-07 | 四川合电气科技有限公司 | Conveyor type silicon steel post plane correction device |
| CN116727492A (en) * | 2023-06-25 | 2023-09-12 | 陕西建工第一建设集团有限公司 | Welding channel steel correcting device for steel structure building |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105689448B (en) | 2017-08-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205341594U (en) | Flat tub of bending machine | |
| CN103769781B (en) | A kind of automatic welding device of grid steel reinforcement cage | |
| CN102615455B (en) | Inner and outer circle welding benches for sheet of heat exchanger | |
| CN208696666U (en) | A kind of rack spot welding device | |
| CN205599703U (en) | Silicon steel post plane correcting unit | |
| CN105689448B (en) | Silicon steel post plane correction device | |
| CN203738214U (en) | Automatic movable welding device | |
| CN209754327U (en) | Welding device for metal tube machining | |
| CN103639641B (en) | Automatic outer circle welding device of heat exchanger plate sheet | |
| CN114393841B (en) | Plastic steel door and window rapid Assembly equipment | |
| CN203649780U (en) | External circle automatic welding device of heat exchanger sheets | |
| CN103659018B (en) | Heat exchanger plate inner circle automatic welding device | |
| CN214639356U (en) | Steel pipe bending device is used in electric bicycle production | |
| DE112014000879T5 (en) | Fast toast roaster and method of controlling the same | |
| CN204321498U (en) | Reel welder | |
| CN203649692U (en) | Automatic welding device for grating steel reinforcement cage | |
| CN209550748U (en) | Pipe cutting positioning mechanism | |
| CN107900151A (en) | A kind of multiaxis automatic feeding bender | |
| CN206415820U (en) | A kind of mash welder weld holder | |
| CN207615417U (en) | A kind of sheet metal apparatus for bending | |
| CN207567542U (en) | A kind of large format images cutting machine | |
| CN220427382U (en) | A kind of construction steel bar welding clamping device | |
| CN205584845U (en) | Mushroom bed cultivates material tiling device | |
| CN214980622U (en) | Pipeline installation positioner | |
| CN105058774B (en) | Honeycomb duct bonder |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 642150 Hongguang Village, Hongguang Town, Longchang County, Neijiang, Sichuan Applicant after: SICHUAN HEYI ELECTRICAL TECHNOLOGY CO.,LTD. Address before: 642150 Hongguang Village, Hongguang Town, Longchang County, Neijiang, Sichuan Applicant before: SICHUAN HEYI ELECTRIC FURNACE TECHNOLOGY Co.,Ltd. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Silicon steel column plane correction device Granted publication date: 20170829 Pledgee: Industrial and Commercial Bank of China Longchang Branch Pledgor: SICHUAN HEYI ELECTRICAL TECHNOLOGY CO.,LTD. Registration number: Y2025980064423 |