CN105673941A - Bidirectional impulsion-bearing type fixing support for steam stand pipes and installation method - Google Patents

Bidirectional impulsion-bearing type fixing support for steam stand pipes and installation method Download PDF

Info

Publication number
CN105673941A
CN105673941A CN201610140135.7A CN201610140135A CN105673941A CN 105673941 A CN105673941 A CN 105673941A CN 201610140135 A CN201610140135 A CN 201610140135A CN 105673941 A CN105673941 A CN 105673941A
Authority
CN
China
Prior art keywords
horizontal support
steam
bearing
building
vertical tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610140135.7A
Other languages
Chinese (zh)
Inventor
王坚安
葛兰英
潘建
汤毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Installation Engineering Group Co Ltd
Original Assignee
Shanghai Installation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Installation Engineering Group Co Ltd filed Critical Shanghai Installation Engineering Group Co Ltd
Priority to CN201610140135.7A priority Critical patent/CN105673941A/en
Publication of CN105673941A publication Critical patent/CN105673941A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L59/00Thermal insulation in general
    • F16L59/02Shape or form of insulating materials, with or without coverings integral with the insulating materials

Abstract

The invention discloses a bidirectional impulsion-bearing type fixing support for steam stand pipes and an installation method, and relates to the technical field of engineering system debugging. The bidirectional impulsion-bearing type fixing support for the steam stand pipes and the installation method aim to solve the problem that the operation safety and the stability of pipeline systems are influenced because the pipe expansion compensation directions are uniform in existing installation projects of the steam stand pipes and the compensation thrust is large. The fixing support comprises a rectangular frame type horizontal frame body, a heat insulation sleeve and an inclined strut, wherein one end of the horizontal frame body is vertically and fixedly connected to a concrete bearing wall of a building, and the other end of the horizontal frame body is fixed to a concrete bearing floor of the building; the heat insulation sleeve is arranged on the outer sides of the steam stand pipes in a sleeving mode; the inclined strut is fixedly arranged between the concrete bearing wall of the building and the horizontal frame body. The installation method comprises the steps of 1, providing the fixing support; 2, fixedly installing the fixing support on the concrete bearing floor of the building and arranging a compensator on each of the steam stand pipes on the upper side and the lower side of the fixing support; and 3, repeating the step 2 until fixation construction of the steam stand pipes and the concrete bearing floor of each floor of the building is completed.

Description

A kind of two-way opposite-flushing type steam fixing bracket of vertical tube and installation method
Technical field
The present invention relates to engineering system debugging technique field, particularly to a kind of two-way opposite-flushing type steam fixing bracket of vertical tube and installation method.
Background technology
In architectural engineering steam standpipe installation process, usually by fixed support, pipeline is fixed on concrete bearing floor and wall, but, due to medium temperature and the pressure impact on tube wall in the temperature of surrounding air and pipe, cause expanding with heat and contract with cold of pipeline, for straight line standpipe, its pipeline expand with heat and contract with cold when being subject to the restriction of two fixing points, it is likely to produce sizable stress and thrust, causes pipeline and support bracket fastened destruction. In order to solve foregoing problems, generally in steam standpipe installation process, except natural compensation, carry out artificial compensation also by adding compensator. In traditional installation, often installing a compensator every about 20 meters on pipeline, the direction of compensation of pipeline is consistent. But, in high-rise building, due to pipeline superelevation, overlength, overweight, if the direction of compensation of pipeline is consistent, it will produce to compensate the thrust-augmented phenomenon of superposition, thus affecting the operation safety of whole tubing and stable. Therefore, how to provide a kind of simple in construction, easy for installation and meet pipe load, compensation and displacement request, reduce two-way opposite-flushing type steam fixing bracket of vertical tube and the installation method of pipe vibration, be that those skilled in the art need badly and solve the technical problem that.
Summary of the invention
The direction compensated for pipe expansion in existing steam standpipe installing engineering is consistent, cause compensating thrust big, what affect tubing runs safety and stable problem, it is an object of the invention to provide and a kind of disclosure satisfy that pipe load, compensation and displacement request and simple in construction, two-way opposite-flushing type steam fixing bracket of vertical tube easy for installation and installation method.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of two-way opposite-flushing type steam fixing bracket of vertical tube, including:
One horizontal support body, described horizontal support body is two cross bars and the rectangular frame of two montant compositions, fix vertical with building concrete bearing wall of one end of described horizontal support body is connected, and the other end of described horizontal support body is fixed on the concrete bearing floor of building;
One thermal insulation casing, described thermal insulation casing is sheathed on outside described steam standpipe, and described thermal insulation casing is embedded in described level frame body;
A pair diagonal brace, one end of described diagonal brace is fixedly installed on the building concrete bearing wall above described horizontal support body, and the other end of described diagonal brace and described horizontal support body are connected away from one end upper surface of building concrete bearing wall is fixing.
Further, each junction of described thermal insulation casing and described horizontal support body is equipped with reinforcement attached plate, and described reinforcement attached plate is between described steam standpipe and described horizontal support body.
Further, described thermal insulation casing is equipped with two pairs of bearing ribs longitudinally docked with each junction of described horizontal support body, and the both sides that described bearing rib is adjacent are fixed with described thermal insulation casing and horizontal support body respectively and are connected.
Further, of vertically-adjacent two pairs of described bearing rib symmetries are located in the upper and lower both sides of described montant.
Further, described horizontal support body passes through expansion bolt, fixation steel plate is fixing with building concrete bearing wall is connected, and described fixation steel plate is parallel with described building concrete bearing wall.
Further, described cross bar and montant are made by channel-section steel or I-steel.
Further, described reinforcement attached plate is cut open by D325 × 8 seamless steel pipe and is made.
Present invention also offers the installation method of a kind of two-way opposite-flushing type steam fixing bracket of vertical tube, comprise the steps:
One, providing steam fixing bracket of vertical tube standby, described fixed support includes a horizontal support body, a thermal insulation casing and a pair diagonal brace;
Two, on building concrete load-bearing floor, a described fixed support is fixedly mounted, the steam standpipe of the upper and lower both sides of described fixed support respectively arranges a compensator, described thermal insulation casing is made to be sheathed on the outside of described steam standpipe, being embedded in described level frame body outside described thermal insulation casing, described diagonal brace is arranged between building concrete bearing wall and horizontal support body;
Three, repeating said steps two, successively complete the fixing construction of described steam standpipe and building each layer concrete load-bearing floor from the bottom to top.
Further, described compensator is FlexbleJoint or slip-type expansion joint.
Useful the having the technical effect that of the present invention
One, the two-way opposite-flushing type steam fixing bracket of vertical tube of the present invention, including a horizontal support body, horizontal support body is two cross bars and the rectangular frame of two montant compositions, fix vertical with building concrete bearing wall of one end of horizontal support body is connected, and the other end of horizontal support body is fixed on the concrete bearing floor of building, one thermal insulation casing, described thermal insulation casing is sheathed on outside described steam standpipe, and described thermal insulation casing is embedded in described level frame body, a pair diagonal brace, one end of diagonal brace is fixedly installed on the building concrete bearing wall above horizontal support body, and the other end of diagonal brace and horizontal support body are connected away from one end upper surface of building concrete bearing wall is fixing. the two-way opposite-flushing type steam fixing bracket of vertical tube of the present invention, it is arranged at the adjacent locations place that each floor steam standpipe of building intersects with concrete bearing floor, support bracket fastened bottom is fixing with concrete bearing floor to be connected, support bracket fastened side is fixing with building concrete bearing wall to be connected, also a pair compensator is set in support bracket fastened upper and lower lateral symmetry, thus producing the two-way pulling force that liquidates, make under the combined effect of fixed support and compensator, except there is traditional fixed support and bear downward pipeline gravity and impulse force, pipe expansion impulse force upwards and downward pipe expansion impulse force can also be born, the safety of effective guarantee fixed support and steam vertical tube structure load.
Two, the installation method of this two-way opposite-flushing type steam fixing bracket of vertical tube, first, it is provided that steam fixing bracket of vertical tube is standby; Secondly, building concrete load-bearing floor fixedly mounts a fixed support, the steam standpipe of the upper and lower both sides of fixed support respectively arranges a compensator, thermal insulation casing is made to be sheathed on the outside of steam standpipe, being embedded in level frame body outside thermal insulation casing, diagonal brace is arranged between building concrete bearing wall and horizontal support body; Finally, repeat abovementioned steps, successively complete the fixing construction of steam standpipe and building each layer concrete load-bearing floor from the bottom to top. The installation method of the two-way opposite-flushing type steam fixing bracket of vertical tube of the present invention is easy and simple to handle, it is possible to safely and efficiently for the fixed installation of steam standpipe in high-rise building, have dissemination preferably.
Accompanying drawing explanation
Fig. 1 is the elevation of the two-way opposite-flushing type steam fixing bracket of vertical tube of one embodiment of the invention;
Fig. 2 is the floor map of the two-way opposite-flushing type steam fixing bracket of vertical tube of one embodiment of the invention;
Fig. 3 is the scheme of installation of the two-way opposite-flushing type steam fixing bracket of vertical tube of one embodiment of the invention.
In figure:
The horizontal support body of 10-, 11-cross bar, 12-montant; 20-building concrete bearing wall; 30-concrete bearing floor; 40-thermal insulation casing; 50-steam standpipe; 60-diagonal brace; 70-compensator; 80-strengthens attached plate; 90-bearing rib.
Detailed description of the invention
The two-way opposite-flushing type steam fixing bracket of vertical tube of one and the installation method that the present invention are proposed below in conjunction with the drawings and specific embodiments are described in further detail. According to description below, advantages and features of the invention will be apparent from. Hereinafter by cited embodiment in conjunction with accompanying drawing, technology contents and the feature of the present invention will be described in detail. Need to additionally illustrating, accompanying drawing all adopts the form simplified very much and all uses non-ratio accurately, only in order to convenience, the purpose aiding in illustrating the embodiment of the present invention lucidly. For sake of convenience, described below " on ", the upper and lower direction of D score and accompanying drawing consistent, but this can not become the restriction of technical solution of the present invention.
Embodiment one
The two-way opposite-flushing type steam fixing bracket of vertical tube of the present invention is described in detail in conjunction with Fig. 1 to Fig. 3, including a horizontal support body 10, horizontal support body 10 is two cross bars 11 and the rectangular frame of two montant 12 compositions, fix vertical with building concrete bearing wall 20 of one end of horizontal support body 10 is connected, and the other end of horizontal support body 10 is fixed on the concrete bearing floor 30 of building; One thermal insulation casing 40, thermal insulation casing 40 is sheathed on outside steam standpipe 50, and thermal insulation casing 40 is embedded in horizontal support body 10; A pair diagonal brace 60, one end of diagonal brace 60 is fixedly installed on the building concrete bearing wall 20 above horizontal support body 10, and the other end of diagonal brace 60 and horizontal support body 10 are connected away from one end upper surface of building concrete bearing wall 20 is fixing.
Specifically, fixed support is only for bearing the vertical load such as pipeline gravity of steam standpipe 50, and to bear along the axial thrust of steam standpipe 50 pipeline, bears the side direction horizontal load intersected with conduit axis direction. In order to offset the pipe expansion impulse force that the side direction horizontal load produced in steam standpipe 50 running produces, affect the operation safety of steam standpipe 50, generally on steam standpipe 50, (about 20 meters) arrange a compensator 70 at spacing intervals, for compensating pipe expansion impulse force, thus the compensation direction of each compensator 70 is consistent.But, when steam standpipe 50 is installed in high-rise building, due to whole pipeline superelevation, overlength, overweight, if arranging compensator 70 in the conventional mode, because compensating superposition by producing bigger thrust, thus affecting the safe operation of whole tubing. in order to ensure steam standpipe 50 safety, stably run, except arranging fixed support on concrete bearing floor, this fixed support is arranged at the adjacent locations place that each floor steam standpipe 50 of building intersects with concrete bearing floor 30, support bracket fastened bottom is fixing with concrete bearing floor 30 to be connected, support bracket fastened side is fixing with building concrete bearing wall 20 to be connected, also a pair compensator 70 is set in support bracket fastened upper and lower lateral symmetry, thus producing the two-way pulling force that liquidates, make under the combined effect of fixed support and compensator, except there is traditional fixed support and bear downward pipeline gravity and impulse force, pipe expansion impulse force upwards and downward pipe expansion impulse force can also be born, the safety of effective guarantee fixed support and steam standpipe 50 structural load.
Preferably, in order to increase the connectivity robustness of fixed support and steam standpipe 50, ensure that the properly functioning of steam standpipe 50, each junction of thermal insulation casing 40 and horizontal support body 10 are equipped with reinforcement attached plate 80, strengthen attached plate 80 and be located between steam standpipe 50 and horizontal support body 10. And, reinforcement attached plate 80 is cut open by D325 × 8 seamless steel pipe and is made, and draws materials conveniently, makes simple, and stickiness is good.
Preferably, in order to strengthen support bracket fastened stability further, bear vertical bidirectional propulsion, each junction of thermal insulation casing 40 and horizontal support body 10 is equipped with two pairs of bearing ribs 90, the both sides that bearing rib 90 is adjacent are fixed be connected with thermal insulation casings 40 and horizontal support body 10 respectively, these two pairs of bearing ribs 90 are vertically coaxial docking and are clamped by montant 12, thus strengthening support bracket fastened vertical applied force stability. It is to say, in vertical direction, lay respectively at two pairs of bearing rib 90 clampings symmetrical above and below adjacent above and below horizontal support body montant 12, such that it is able to bear Inflationary momentum from top to bottom and Inflationary momentum from the bottom up.
It is preferred that in order to ensure support bracket fastened firmly installing property, horizontal support body 10 is connected by expansion bolt is fixing with building concrete bearing wall 20. Certainly, in order to strengthen the mounting stability between expansion bolt and building concrete bearing wall 20, it is provided with fixation steel plate between expansion bolt and building concrete bearing wall 20, fixation steel plate is parallel with building concrete bearing wall 20, and expansion bolt embeds in building concrete bearing wall 20 through fixation steel plate. Generally, expansion bolt can adopt M16 chemical anchoring expansion bolt, and intensity is high, stable, be not easy to extract. The steel plate that fixation steel plate can adopt thickness to be 12mm is made. Fixing connection between shaped steel is entirely welding. Especially, this fixation steel plate can also the pre-buried setting when construction building thing concrete bearing body of wall 20.
It is preferred that in order to draw materials conveniently, save cost, cross bar 11 and montant 12 for production technique support body 10 are made by channel-section steel or I-steel. Channel-section steel can select Two bors d's oeuveres 14# channel-section steel, if standpipe bore increases to D426 × 10, D530 × 10, can select Two bors d's oeuveres 16# channel-section steel, Two bors d's oeuveres 18# channel-section steel or corresponding I-steel, thus increasing support bracket fastened holding capacity.
Embodiment two
Continue with referring to figs. 1 to Fig. 3, describe the installation method of the two-way opposite-flushing type steam fixing bracket of vertical tube of the embodiment of the present invention in detail.
The installation method of two-way opposite-flushing type steam fixing bracket of vertical tube, comprises the steps:
Step one, offer steam fixing bracket of vertical tube are standby, and fixed support includes horizontal support body 10, thermal insulation casing 40 and a pair diagonal brace 60.
Step 2, on building concrete load-bearing floor 30 fixedly mount a fixed support, the steam standpipe 50 of the upper and lower both sides of fixed support respectively arranges a compensator 70, thermal insulation casing 40 is made to be sheathed on the outside of steam standpipe 50, being embedded at outside thermal insulation casing 40 in horizontal support body 10, diagonal brace 60 is arranged between building concrete bearing wall 20 and horizontal support body 10.
Step 3, repetition step 2, successively complete the fixing construction of steam standpipe 50 and building each layer concrete load-bearing floor 30 from the bottom to top.
In sum, the two-way opposite-flushing type steam fixing bracket of vertical tube of the present invention, it is arranged at the adjacent locations place that each floor steam standpipe of building intersects with concrete bearing floor, support bracket fastened bottom is fixing with concrete bearing floor to be connected, support bracket fastened side is fixing with building concrete bearing wall to be connected, also a pair compensator is set in support bracket fastened upper and lower lateral symmetry, thus producing the two-way pulling force that liquidates, make under the combined effect of fixed support and compensator, except there is traditional fixed support and bear downward pipeline gravity and impulse force, pipe expansion impulse force upwards and downward pipe expansion impulse force can also be born, the safety of effective guarantee fixed support and steam vertical tube structure load. the installation method of this two-way opposite-flushing type steam fixing bracket of vertical tube, first provide steam fixing bracket of vertical tube standby, secondly on building concrete load-bearing floor, fixedly mount a fixed support, the steam standpipe of the upper and lower both sides of fixed support respectively arranges a compensator, thermal insulation casing is made to be sheathed on the outside of steam standpipe, being embedded in level frame body outside thermal insulation casing, diagonal brace is arranged between building concrete bearing wall and horizontal support body, finally repeat abovementioned steps, successively complete the fixing construction of steam standpipe and building each layer concrete load-bearing floor from the bottom to top.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, any change that the those of ordinary skill in field of the present invention does according to the disclosure above content, modification, belongs to the protection domain of claims.

Claims (9)

1. a two-way opposite-flushing type steam fixing bracket of vertical tube, it is characterised in that including:
One horizontal support body, described horizontal support body is two cross bars and the rectangular frame of two montant compositions, fix vertical with building concrete bearing wall of one end of described horizontal support body is connected, and the other end of described horizontal support body is fixed on the concrete bearing floor of building;
One thermal insulation casing, described thermal insulation casing is sheathed on outside described steam standpipe, and described thermal insulation casing is embedded in described level frame body;
A pair diagonal brace, one end of described diagonal brace is fixedly installed on the building concrete bearing wall above described horizontal support body, and the other end of described diagonal brace and described horizontal support body are connected away from one end upper surface of building concrete bearing wall is fixing.
2. two-way opposite-flushing type steam fixing bracket of vertical tube according to claim 1, it is characterized in that, each junction of described thermal insulation casing and described horizontal support body is equipped with reinforcement attached plate, and described reinforcement attached plate is between described steam standpipe and described horizontal support body.
3. two-way opposite-flushing type steam fixing bracket of vertical tube according to claim 1, it is characterized in that, each junction of described thermal insulation casing and described horizontal support body is equipped with two pairs of bearing ribs, and the both sides that described bearing rib is adjacent are fixed with described thermal insulation casing and horizontal support body respectively and are connected.
4. two-way opposite-flushing type steam fixing bracket of vertical tube according to claim 3, it is characterised in that of vertically-adjacent two pairs of described bearing rib symmetries are located in the upper and lower both sides of described montant.
5. two-way opposite-flushing type steam fixing bracket of vertical tube according to claim 1, it is characterized in that, described horizontal support body passes through expansion bolt, fixation steel plate is fixing with building concrete bearing wall is connected, and described fixation steel plate is parallel with described building concrete bearing wall.
6. two-way opposite-flushing type steam fixing bracket of vertical tube according to claim 1, it is characterised in that described cross bar and montant are made by channel-section steel or I-steel.
7. two-way opposite-flushing type steam fixing bracket of vertical tube according to claim 2, it is characterised in that described reinforcement attached plate is cut open by D325 × 8 seamless steel pipe and is made.
8. the installation method of the two-way opposite-flushing type steam fixing bracket of vertical tube according to any one of claim 1 to 7, it is characterised in that comprise the steps:
One, providing steam fixing bracket of vertical tube standby, described fixed support includes a horizontal support body, a thermal insulation casing and a pair diagonal brace;
Two, on building concrete load-bearing floor, a described fixed support is fixedly mounted, the steam standpipe of the upper and lower both sides of described fixed support respectively arranges a compensator, described thermal insulation casing is made to be sheathed on the outside of described steam standpipe, being embedded in described level frame body outside described thermal insulation casing, described diagonal brace is arranged between building concrete bearing wall and horizontal support body;
Three, repeating said steps two, successively complete the fixing construction of described steam standpipe and building each layer concrete load-bearing floor from the bottom to top.
9. two-way opposite-flushing type steam fixing bracket of vertical tube according to claim 8, it is characterised in that described compensator is FlexbleJoint or slip-type expansion joint.
CN201610140135.7A 2016-03-11 2016-03-11 Bidirectional impulsion-bearing type fixing support for steam stand pipes and installation method Pending CN105673941A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610140135.7A CN105673941A (en) 2016-03-11 2016-03-11 Bidirectional impulsion-bearing type fixing support for steam stand pipes and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610140135.7A CN105673941A (en) 2016-03-11 2016-03-11 Bidirectional impulsion-bearing type fixing support for steam stand pipes and installation method

Publications (1)

Publication Number Publication Date
CN105673941A true CN105673941A (en) 2016-06-15

Family

ID=56307633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610140135.7A Pending CN105673941A (en) 2016-03-11 2016-03-11 Bidirectional impulsion-bearing type fixing support for steam stand pipes and installation method

Country Status (1)

Country Link
CN (1) CN105673941A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107101045A (en) * 2017-06-02 2017-08-29 安徽奥睿德科技发展有限公司 A kind of four-way for fixed riser supports anti-rock support

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006283814A (en) * 2005-03-31 2006-10-19 Hitachi Kokusai Electric Inc Fixing structure of pipe
CN201764119U (en) * 2010-06-22 2011-03-16 北京城建安装工程有限公司 Lining plastic steel pipe fixing device
CN202532096U (en) * 2012-03-23 2012-11-14 十堰巨迪金属管业有限公司 Connecting pipe for exhaust gas recirculation (EGR) system
CN202791158U (en) * 2012-04-26 2013-03-13 中建一局集团安装工程有限公司 Lower-temperature horizontal pipeline fixing support
CN104315256A (en) * 2014-10-22 2015-01-28 中国华西企业股份有限公司安装工程公司 Attached cantilever load-bearing support for vertical large-aperture perpendicular pipelines
CN204358263U (en) * 2014-11-22 2015-05-27 苏州耀洲金属制品有限公司 Trailing arm derrick type pipeline elevator
CN205446939U (en) * 2016-03-11 2016-08-10 上海市安装工程集团有限公司 Two -way offset formula steam riser fixed bolster

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006283814A (en) * 2005-03-31 2006-10-19 Hitachi Kokusai Electric Inc Fixing structure of pipe
CN201764119U (en) * 2010-06-22 2011-03-16 北京城建安装工程有限公司 Lining plastic steel pipe fixing device
CN202532096U (en) * 2012-03-23 2012-11-14 十堰巨迪金属管业有限公司 Connecting pipe for exhaust gas recirculation (EGR) system
CN202791158U (en) * 2012-04-26 2013-03-13 中建一局集团安装工程有限公司 Lower-temperature horizontal pipeline fixing support
CN104315256A (en) * 2014-10-22 2015-01-28 中国华西企业股份有限公司安装工程公司 Attached cantilever load-bearing support for vertical large-aperture perpendicular pipelines
CN204358263U (en) * 2014-11-22 2015-05-27 苏州耀洲金属制品有限公司 Trailing arm derrick type pipeline elevator
CN205446939U (en) * 2016-03-11 2016-08-10 上海市安装工程集团有限公司 Two -way offset formula steam riser fixed bolster

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107101045A (en) * 2017-06-02 2017-08-29 安徽奥睿德科技发展有限公司 A kind of four-way for fixed riser supports anti-rock support

Similar Documents

Publication Publication Date Title
CN105604185B (en) A kind of earthquake-resistant structure support connection structure and attaching method thereof
CN105972313B (en) One kind is across base pit engineering conduit wiring suspension method and overhung construction
CN103603632A (en) Underwater basal disc connecting floating production system and subsea pipeline
CN103276676B (en) Traffic guidance display screen frame
CN205446939U (en) Two -way offset formula steam riser fixed bolster
CN105673941A (en) Bidirectional impulsion-bearing type fixing support for steam stand pipes and installation method
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN103103925B (en) Combined H-shaped steel column bracket
CN102359185A (en) Connecting structure of large steel structural member and concrete member and construction method
CN102425227B (en) Hanging system for large-diameter sewage pipeline
CN106321978A (en) Adjustable pipe support
CN210567041U (en) Vibration-damping and anti-seismic support hanger
CN205444889U (en) Support arrangement for horizontal prefabricated component
CN205677114U (en) Installation node for assembled inside casing light partition wall
CN209604683U (en) Multi-pipeline fixes bracket
CN204345070U (en) A kind of mounting system for horizontal steel tube
CN210558761U (en) Butt joint node additionally provided with elevator shaft
CN203855988U (en) Post-cast strip steel pipe supporting structure
CN202769631U (en) Pipeline supporting and hanging structure
CN102926554B (en) Steel hanging seat shuttering supporting and construction method thereof
CN205688446U (en) A kind of steel pipe crossover node being applicable to foundation pit enclosure structure
CN205857227U (en) A kind of wind power generation stepped hyollow foundation support
CN109780330A (en) The fixed bracket of multi-pipeline and its construction method
CN208981347U (en) Single-pile foundation and offshore wind turbine with the single-pile foundation
CN204287566U (en) Lower sheave autocollimation device

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160615

WD01 Invention patent application deemed withdrawn after publication