CN105672328A - 注浆小导管抵抗土侧压力的h型钢基坑支护装置 - Google Patents

注浆小导管抵抗土侧压力的h型钢基坑支护装置 Download PDF

Info

Publication number
CN105672328A
CN105672328A CN201610107045.8A CN201610107045A CN105672328A CN 105672328 A CN105672328 A CN 105672328A CN 201610107045 A CN201610107045 A CN 201610107045A CN 105672328 A CN105672328 A CN 105672328A
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
stake
slip casting
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610107045.8A
Other languages
English (en)
Other versions
CN105672328B (zh
Inventor
杨锦涛
彭宝安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Yuanhe Engineering Co ltd
Original Assignee
Wuhan Chuangxian Patent Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Chuangxian Patent Technology Service Co Ltd filed Critical Wuhan Chuangxian Patent Technology Service Co Ltd
Priority to CN201610107045.8A priority Critical patent/CN105672328B/zh
Publication of CN105672328A publication Critical patent/CN105672328A/zh
Application granted granted Critical
Publication of CN105672328B publication Critical patent/CN105672328B/zh
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

<b>本发明注浆小导管抵抗土侧压力的</b><b>H</b><b>型钢基坑支护装置主要用于建筑施工领域基坑支护。它主要由桩(</b><b>1</b><b>)、分节钢板桩</b><b>(2)</b><b>、止水气囊</b><b>(3)</b><b>、“</b><b>U</b><b>”形槽</b><b>(4)</b><b>,止水条</b><b>(5)</b><b>、止水槽(</b><b>6</b><b>)、孔(</b><b>7</b><b>)、注浆小导管(</b><b>8</b><b>)、锚具(</b><b>9</b><b>)组成;由打桩机将本发明的多个桩(</b><b>1</b><b>)按设计要求从地面逐一打入地下设计标高,然后用专用压桩设备将每个桩(</b><b>1</b><b>)的分节钢板桩</b><b>(2)</b><b>压入,形成第一段支护</b><b>,</b><b>开挖第</b><b>一段深度的土方,安装注浆小导管(</b><b>8</b><b>)并注浆,再开挖第二段土方</b><b>,</b><b>如此循环施工直至完成基坑支护;依次拔出分节钢板桩</b><b>(2)</b><b>、拔出桩(</b><b>1</b><b>),支护系统拆除完成。</b>

Description

注浆小导管抵抗土侧压力的H型钢基坑支护装置
技术领域
本发明主要用于建筑工程施工领域基坑开挖支护使用。
背景技术
我国目前施工深基坑的开挖支护方法普遍有:地下连续墙、灌注桩、SMW桩、钢板桩、型钢桩等。地下连续墙支护深度大,止水效果好,但施工周期长,造价最高,不能重复利用;灌注桩同样造价高,需有止水措施配合使用,施工周期长,不能重复利用;SMW桩支护深度较大,止水效果较好,其中的型钢可以拔出重复利用,但深层搅拌桩不能拔出,造价仍较高;钢板桩虽然有止水功能,施工周期短,但遇到孤石或卵石夹层则无法打入,适用地层有限,且打入深度有限;型钢桩容易打入,可重复利用,施工周期短,但没有止水功能。
发明内容
本发明克服了上述问题,它结合了型钢桩和钢板桩的优点,施工周期短,可重复利用,费用低廉又具有止水功能。它由打桩机将本发明的多个桩(1)按设计要求从地面逐一打入或压入地下设计标高,然后在基坑支护的范围内开挖第一段深度的土方,一般1至2米,桩(1)的桩身会露出第一段土层外,在基坑内侧施工注浆小导管(8)并用锚具(9)固定,在露出土层外的两个桩(1)的桩身之间用专用压桩设备压入分节钢板桩(2),形成一个支护单元,用同样方法安装其余的支护单元完成第一段支护,继续开挖第二段土方,施工注浆小导管(8)及安装第二段支护,如此循环施工直至完成基坑支护;依次拔出分节钢板桩(2)、拔出注浆小导管(8)及拔出桩(1),支护系统拆除完成。
本发明是主要由桩(1)、分节钢板桩(2)、止水气囊(3)、“U”形槽(4),止水条(5)、止水槽(6)、孔(7)、注浆小导管(8)、锚具(9)组成;桩(1)直接选用H型钢或用钢板焊接而成,桩(1)的上下翼缘开有孔(7),“U”形槽(4)焊接在分节钢板桩(2)的上端,止水槽(6)焊接在分节钢板桩(2)的两侧,止水气囊(3)安装在分节钢板桩(2)的止水槽(6)内,止水条(5)安装在分节钢板桩(2)的“U”形槽(4)内,分节钢板桩(2)的左右两端的止水槽(6)插在相邻桩(1)的翼缘上,上节分节钢板桩(2)的下端插在下节分节钢板桩(2)的“U”形槽(4)内,注浆小导管(8)穿过桩(1)的孔(7)并打入需支护的土层中,用高压注浆的方法给注浆小导管(8)注浆,浆液凝固后与土层形成整体,注浆小导管(8)的内侧端用锚具(9)与桩(1)固定。
附图说明
附图标记说明:1-桩、2-分节钢板桩、3-止水气囊、4-“U”形槽、5-止水条、6-止水槽、7-孔、8-注浆小导管、9-锚具、10-需支护的土层。
图1是本发明的一个支护单元的水平剖面图。
图2是本发明的二个支护单元的水平剖面图。
图3是本发明分节钢板桩(2)的上下连接大样图。
图4是本发明分节钢板桩(2)的水平剖面大样图。
图5是本发明桩(1)的水平剖面大样图。
具体实施方式
下面结合附图说明本发明的具体实施方式
参见图1、图2、图3、图4、图5,先在平整的场地上按深基坑图纸设计边线逐一打入或压入本发明桩(1)至设计标高,如遇坚硬孤石,桩(1)难以打入时,可以避开孤石打入,在分节钢板桩(2)的止水槽(6)内安装止水气囊(3)同时在“U”形槽(4)内安装止水条(5),再将分节钢板桩(2)两端的止水槽(6)插入相邻桩(1)的翼缘板上,用专用的压桩设备将分节钢板桩(2)压入第一个施工段的土层,第一个单元的支护体系完成,用同样的方法完成其余单元的支护体系,这样第一个施工段的支护体系完成,然后开挖第一个施工段的土方,桩(1)的桩身在第一个施工段内露出土层外,将注浆小导管(8)插入桩(1)的孔(7)中并由机具将注浆小导管(8)打入土层中,用高压注浆的方法将注浆小导管(8)注入浆液,注入的浆液会和土层中的土颗粒混合,待浆液凝固后会和土体形成整体(这是土建工程中一种常见的加固土层的方法),本发明正是利用这种方法将注浆小导管(8)牢牢固定在土层中,再用锚具(9)将注浆小导管(8)与桩(1)固定,这样当支护的土层对桩(1)产生侧压力时,注浆小导管(8)会受到拉力阻止桩(1)发生位移,注浆小导管(8)沿桩(1)的桩身布置多个,会大大改善桩(1)的受力状态,桩(1)由传统的上部悬臂受力状态改变为多点铰支的受力状态,其受力均匀合理,结构断面可以设计得较小,节省钢材;用同样的方法安装第二个施工段的支护体系,开挖第二个施工段的土方,如此循环进行完成整个支护体系;当需要拆除支护时,先将桩(1)的内侧与地下建筑物外墙外壁之间做临时支撑,在支护系统与地下建筑物外墙外壁的空间内依次拔出分节钢板桩(2),然后在支护系统与地下建筑物外墙外壁的空间内回填土方,最后拔除桩(1)完成支护体系拆除。
需说明:1、第一个施工段的分节钢板桩(2)由第二个施工段的分节钢板桩(2)传递压入至第二个施工段,其余相同。2、如果由于孤石的影响,两个桩(1)的间距会与其它各桩的间距不一致,需调整分节钢板桩(2)的宽度,其余构件可以不变。3、压入分节钢板桩(2)如遇孤石或难以压入时,需配合人工挖出孤石后,继续压入。5、参见图1及图4,由于打入的相邻两个桩(1)的位置会有一定的偏差,止水槽(6)的宽度应满足容许桩(1)位置偏差的要求,止水气囊(3)充入压力空气,使止水气囊(3)充满止水槽(6)的空间内,防止地下水渗入基坑内。

Claims (2)

1.注浆小导管抵抗土侧压力的H型钢基坑支护装置,其特征是:它主要由桩(1)、分节钢板桩(2)、止水气囊(3)、“U”形槽(4),止水条(5)、止水槽(6)、孔(7)、注浆小导管(8)、锚具(9)组成;桩(1)直接选用H型钢或用钢板焊接而成,桩(1)的上下翼缘开有孔(7),“U”形槽(4)焊接在分节钢板桩(2)的上端,止水槽(6)焊接在分节钢板桩(2)的两侧,止水气囊(3)安装在分节钢板桩(2)的止水槽(6)内,止水条(5)安装在分节钢板桩(2)的“U”形槽(4)内,分节钢板桩(2)的左右两端的止水槽(6)插在相邻桩(1)的翼缘上,上节分节钢板桩(2)的下端插在下节分节钢板桩(2)的“U”形槽(4)内,注浆小导管(8)穿过桩(1)的孔(7)并打入需支护的土层中,用高压注浆的方法给注浆小导管(8)注浆,浆液凝固后与土层形成整体,注浆小导管(8)的内侧端用锚具(9)与桩(1)固定。
2.根据权利要求1所述的注浆小导管抵抗土侧压力的H型钢基坑支护装置,其特征是所述的止水气囊(3)充入压力空气,使止水气囊(3)充满止水槽(6)的空间内。
CN201610107045.8A 2016-02-28 2016-02-28 注浆小导管抵抗土侧压力的h型钢基坑支护装置 Withdrawn - After Issue CN105672328B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610107045.8A CN105672328B (zh) 2016-02-28 2016-02-28 注浆小导管抵抗土侧压力的h型钢基坑支护装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610107045.8A CN105672328B (zh) 2016-02-28 2016-02-28 注浆小导管抵抗土侧压力的h型钢基坑支护装置

Publications (2)

Publication Number Publication Date
CN105672328A true CN105672328A (zh) 2016-06-15
CN105672328B CN105672328B (zh) 2017-07-04

Family

ID=56306012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610107045.8A Withdrawn - After Issue CN105672328B (zh) 2016-02-28 2016-02-28 注浆小导管抵抗土侧压力的h型钢基坑支护装置

Country Status (1)

Country Link
CN (1) CN105672328B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629765A (zh) * 2019-09-29 2019-12-31 河南乾坤路桥工程有限公司 一种h型钢基坑用安全防护装置及防护方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2597545Y (zh) * 2003-01-14 2004-01-07 中铁大桥局集团第一工程有限公司工程机械厂 一种钢板桩
KR20040012360A (ko) * 2002-08-02 2004-02-11 최춘식 토류벽 시공에 있어서의 리프트 팩을 이용한 그라우팅 공법
CN202530441U (zh) * 2012-04-25 2012-11-14 上海智平基础工程有限公司 一种“u”形接口钢板桩
CN103469802A (zh) * 2013-09-29 2013-12-25 中国一冶集团有限公司 组合式格构钢架喷锚支护方法及其支护结构
CN203866845U (zh) * 2014-05-30 2014-10-08 深圳市金河建设集团有限公司 一种y型+u型组合钢板桩基坑支护结构
CN105064379A (zh) * 2015-08-29 2015-11-18 彭宝安 一种h型钢基坑支护装置及方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040012360A (ko) * 2002-08-02 2004-02-11 최춘식 토류벽 시공에 있어서의 리프트 팩을 이용한 그라우팅 공법
CN2597545Y (zh) * 2003-01-14 2004-01-07 中铁大桥局集团第一工程有限公司工程机械厂 一种钢板桩
CN202530441U (zh) * 2012-04-25 2012-11-14 上海智平基础工程有限公司 一种“u”形接口钢板桩
CN103469802A (zh) * 2013-09-29 2013-12-25 中国一冶集团有限公司 组合式格构钢架喷锚支护方法及其支护结构
CN203866845U (zh) * 2014-05-30 2014-10-08 深圳市金河建设集团有限公司 一种y型+u型组合钢板桩基坑支护结构
CN105064379A (zh) * 2015-08-29 2015-11-18 彭宝安 一种h型钢基坑支护装置及方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629765A (zh) * 2019-09-29 2019-12-31 河南乾坤路桥工程有限公司 一种h型钢基坑用安全防护装置及防护方法

Also Published As

Publication number Publication date
CN105672328B (zh) 2017-07-04

Similar Documents

Publication Publication Date Title
CN105840207B (zh) 一种穿越浅埋偏压松散堆积体大跨度隧道综合进洞结构施工方法
CN106499413B (zh) 一种浅埋偏压段隧道地层加固施工方法
US8974152B2 (en) Polymer grouting method for constructing vertical supporting system
CN110043264B (zh) 一种顶进预制矩形竖井结构型式的施工方法
CN105780779A (zh) 外设压密注浆的拉森钢板桩复合支护结构及其使用方法
CN103924602B (zh) 深厚软土基坑施工方法
CN106013151A (zh) 一种连续桩墙施工方法及其所用的施工装置
CN105064379B (zh) 一种h型钢基坑支护装置及方法
CN105756091B (zh) 一种控制邻近建筑物变形的地铁车站基坑施工方法
CN204253056U (zh) 一种盾构机进出洞洞口加固结构
CN102733413A (zh) 一种运营地铁隧道沉降控制方法
CN108532586A (zh) 一种停车库用地下连续墙的施工方法
CN101597904A (zh) 一种防水板桩围堰及其施工方法
CN102116028A (zh) 一种木排桩支护开挖核心筒区域土方的方法及结构
CN202559375U (zh) 一种h型钢地下连续墙基坑支护结构
CN202559363U (zh) 一种钢结构地下连续墙基坑支护结构
CN207159990U (zh) 一种组合钢结构支护桩
CN109853604A (zh) 一种静压水力冲吸沉井施工方法
CN203729309U (zh) 组合双排桩联合竖向预应力锚杆支护体系
CN205382942U (zh) 既有设施下多层地下空间幕架式暗挖施工的支护结构
CN101886384A (zh) 真空强夯同步法
CN105484270B (zh) 一种毗邻深基坑高陡老旧毛石挡土墙加固保护施工方法
CN107326896A (zh) 一种组合钢结构支护桩及施工方法
CN105113513B (zh) 一种防渗水基坑支护结构及施工方法
CN105672328A (zh) 注浆小导管抵抗土侧压力的h型钢基坑支护装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161012

Address after: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China

Applicant after: QINGDAO LANTIAN CHUANGXIAN TECHNOLOGY SERVICE CO.,LTD.

Address before: 430064, Wuhan, Hubei province Hongshan District lion mountain street, school 84, 73, 7, 2 room

Applicant before: WUHAN CHUANGXIAN PATENTED TECHNOLOGY SERVICES CO.,LTD.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190725

Address after: 330200 No. 136 Agricultural Trade West Road, Liantang Town, Nanchang County, Nanchang City, Jiangxi Province

Patentee after: Jiangxi Yuanhe Engineering Co.,Ltd.

Address before: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China

Patentee before: QINGDAO LANTIAN CHUANGXIAN TECHNOLOGY SERVICE CO.,LTD.

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20170704

Effective date of abandoning: 20230227

AV01 Patent right actively abandoned

Granted publication date: 20170704

Effective date of abandoning: 20230227

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned