CN105668423A - 一种集装箱吊装方法 - Google Patents
一种集装箱吊装方法 Download PDFInfo
- Publication number
- CN105668423A CN105668423A CN201610019658.6A CN201610019658A CN105668423A CN 105668423 A CN105668423 A CN 105668423A CN 201610019658 A CN201610019658 A CN 201610019658A CN 105668423 A CN105668423 A CN 105668423A
- Authority
- CN
- China
- Prior art keywords
- container
- truck
- lane
- double
- collection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/48—Automatic control of crane drives for producing a single or repeated working cycle; Program control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/46—Position indicators for suspended loads or for crane elements
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D1/00—Control of position, course, altitude or attitude of land, water, air or space vehicles, e.g. using automatic pilots
- G05D1/02—Control of position or course in two dimensions
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Mechanical Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Ship Loading And Unloading (AREA)
Abstract
Description
Claims (10)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510833432 | 2015-11-26 | ||
| CN2015108334325 | 2015-11-26 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105668423A true CN105668423A (zh) | 2016-06-15 |
| CN105668423B CN105668423B (zh) | 2017-10-10 |
Family
ID=56300224
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610019658.6A Expired - Fee Related CN105668423B (zh) | 2015-11-26 | 2016-01-13 | 一种集装箱吊装方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105668423B (zh) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108083113A (zh) * | 2016-11-21 | 2018-05-29 | 上海海勃物流软件有限公司 | 轨道吊自动化箱区自动操作管理系统 |
| CN112320600A (zh) * | 2020-11-18 | 2021-02-05 | 中交第一航务工程局有限公司 | 远程数字化塔吊陆地操控系统及其控制方法 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01236197A (ja) * | 1988-03-15 | 1989-09-21 | Ishikawajima Harima Heavy Ind Co Ltd | クレーンの荷役位置検出方法 |
| DE19713489A1 (de) * | 1997-03-19 | 1998-09-24 | Ke Kranbau Eberswalde Gmbh | Verladebrücke und Verfahren zum Umschlagen von Gütern, insbesondere an Schiffsanliegeplätzen |
| JPH11157777A (ja) * | 1997-05-23 | 1999-06-15 | Hitachi Ltd | コンテナクレーン |
| CN1764593A (zh) * | 2003-03-22 | 2006-04-26 | 诺尔起重系统有限公司 | 多小车集装箱起重机 |
| CN1792761A (zh) * | 2005-12-14 | 2006-06-28 | 上海振华港口机械(集团)股份有限公司 | 岸边起重机和堆场起重机间低架桥式小车转接装卸系统 |
| CN101923325A (zh) * | 2009-06-12 | 2010-12-22 | 上海振华重工(集团)股份有限公司 | 码头集卡引导系统及方法 |
| CN103459279A (zh) * | 2011-02-03 | 2013-12-18 | 工程咨询F·科氏公司 | 装卸起重机装置、集装箱码头以及装卸船只的方法 |
-
2016
- 2016-01-13 CN CN201610019658.6A patent/CN105668423B/zh not_active Expired - Fee Related
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01236197A (ja) * | 1988-03-15 | 1989-09-21 | Ishikawajima Harima Heavy Ind Co Ltd | クレーンの荷役位置検出方法 |
| DE19713489A1 (de) * | 1997-03-19 | 1998-09-24 | Ke Kranbau Eberswalde Gmbh | Verladebrücke und Verfahren zum Umschlagen von Gütern, insbesondere an Schiffsanliegeplätzen |
| JPH11157777A (ja) * | 1997-05-23 | 1999-06-15 | Hitachi Ltd | コンテナクレーン |
| CN1764593A (zh) * | 2003-03-22 | 2006-04-26 | 诺尔起重系统有限公司 | 多小车集装箱起重机 |
| CN1792761A (zh) * | 2005-12-14 | 2006-06-28 | 上海振华港口机械(集团)股份有限公司 | 岸边起重机和堆场起重机间低架桥式小车转接装卸系统 |
| CN101923325A (zh) * | 2009-06-12 | 2010-12-22 | 上海振华重工(集团)股份有限公司 | 码头集卡引导系统及方法 |
| CN103459279A (zh) * | 2011-02-03 | 2013-12-18 | 工程咨询F·科氏公司 | 装卸起重机装置、集装箱码头以及装卸船只的方法 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108083113A (zh) * | 2016-11-21 | 2018-05-29 | 上海海勃物流软件有限公司 | 轨道吊自动化箱区自动操作管理系统 |
| CN112320600A (zh) * | 2020-11-18 | 2021-02-05 | 中交第一航务工程局有限公司 | 远程数字化塔吊陆地操控系统及其控制方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105668423B (zh) | 2017-10-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102687483B1 (ko) | 컨테이너 터미널에서 시뮬레이션 기반의 알고리즘을 활용한 야드 크레인 작업 스케줄링 방법 | |
| CN109298699A (zh) | 一种智能化矿山系统 | |
| CN106553664B (zh) | 利用stp和ctc结合实现调车进路控制的方法与装置 | |
| KR101828832B1 (ko) | 클라우드 서비스를 이용한 하역계획 통합 제공 방법 | |
| CN203794476U (zh) | 岸桥装卸作业远程控制操作系统 | |
| Taner et al. | Layout analysis affecting strategic decisions in artificial container terminals | |
| US12378752B2 (en) | Heavy equipment hazard warning apparatus and system and method for use of same | |
| CN110827600A (zh) | 一种Mini自动化码头实验平台 | |
| KR101761364B1 (ko) | 컨테이너 항만 터미널 3d 모델링 방법 및 시스템 | |
| Maione et al. | A generalized stochastic Petri net approach for modeling activities of human operators in intermodal container terminals | |
| CN105668423B (zh) | 一种集装箱吊装方法 | |
| JP6818325B2 (ja) | 人工知能を活用したコンテナターミナルシステム | |
| CN101301982A (zh) | 轨道式集装箱起重机作业状态的图形化显示系统及方法 | |
| CN114037289A (zh) | 基于站场图形化的铁路车站货运作业管理系统 | |
| CN110968567B (zh) | 起重机货物三维位置信息数据库的智能构建方法及系统 | |
| Ezzahra et al. | Optimizing port operations: Synchronization, collision avoidance, and efficient loading and unloading processes | |
| Hasan | Decision support system for crane selection and location optimization on construction sites | |
| Bichou | Port Operations | |
| CN119515222A (zh) | 煤样转运方法、装置、设备、介质和产品 | |
| Leng et al. | The growing role of artificial intelligence in smart container ports: its application and future research directions | |
| JP6654040B2 (ja) | 作業指示システム | |
| Yan et al. | Performance analysis of a new type of automated container terminal | |
| CN110589328B (zh) | 基于仓储链的危险品仓库双叉车同时作业线路规划方法 | |
| Alho et al. | conversion to automated straddle carrier terminal | |
| CN116562713B (zh) | 一种应用于港口无人集卡的作业仿真测试方法及系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CB03 | Change of inventor or designer information |
Inventor after: Jiang Gongsheng Inventor after: Huang Hang Inventor after: Zhou Yanhua Inventor after: Gu Song Inventor after: Wang Jun Inventor after: Shen Lianhong Inventor after: Pu Xinping Inventor after: Zhao Long Inventor after: Ding Yi Inventor before: Jiang Gongsheng Inventor before: Huang Hang Inventor before: Zhou Yanhua Inventor before: Gu Song Inventor before: Wang Jun Inventor before: Shen Lianhong Inventor before: Pu Xinping Inventor before: Zhao Long Inventor before: Ding Yi |
|
| CB03 | Change of inventor or designer information | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171010 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |