CN105649637A - 一种盾构横通道平移接收施工工法 - Google Patents

一种盾构横通道平移接收施工工法 Download PDF

Info

Publication number
CN105649637A
CN105649637A CN201610209118.4A CN201610209118A CN105649637A CN 105649637 A CN105649637 A CN 105649637A CN 201610209118 A CN201610209118 A CN 201610209118A CN 105649637 A CN105649637 A CN 105649637A
Authority
CN
China
Prior art keywords
shield
translation
construction
shielding machine
transverse passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610209118.4A
Other languages
English (en)
Inventor
郭玉海
王全贤
蔡志勇
杨祥亮
张新全
杨冬梅
赵东华
刘宏涛
薛彦
李洪波
白冰
冀云
张济元
刘岩
刘勇强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201610209118.4A priority Critical patent/CN105649637A/zh
Publication of CN105649637A publication Critical patent/CN105649637A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种盾构横通道平移接收施工工法,其包括如下施工步骤:1),完成盾构接收横通道结构施工;2),在盾构接收横通道底板铺设一层钢板,并进行固定;然后完成盾构基座安装以及洞口管片、洞口密封的安装;3),盾构设备掘进至盾构基座上设计的接收位置;4),在隧道内拆除盾构设备与后续台车的连接,并拆除螺旋输送机;5),在钢板上涂抹润滑涂层,在基座平移相反方向安装反力支撑点及千斤顶;6),进行盾构平移施工,联动调整千斤顶,使盾构基座整体平移,将盾构设备平移至盾构吊出井的解体位置处,完成盾构平移,进行后续盾构解体吊出作业。本发明具有工艺简单,施工方便,安全可靠等诸多优点。

Description

一种盾构横通道平移接收施工工法
【技术领域】
本发明涉及一种盾构施工工法,具体涉及一种盾构横通道平移接收施工工法,属于盾构技术领域。
【背景技术】
盾构区间完成后,需要在暗挖横通道内接收盾构设备。然而,由于盾构设备体积及自重较大,在暗挖横通道内解体存在一定的风险。
因此,为解决上述技术问题,确有必要提供一种创新的盾构横通道平移接收施工工法,以克服现有技术中的所述缺陷。
【发明内容】
为解决上述问题,本发明的目的在于提供一种盾构横通道平移接收施工工法,其将盾构设备在横通道内平移至明挖竖井,然后再吊出。
为实现上述目的,本发明采取的技术方案为:一种盾构横通道平移接收施工工法,其包括如下施工步骤:
1),完成盾构接收横通道结构施工;
2),在盾构接收横通道底板铺设一层钢板,并进行固定;然后完成盾构基座安装以及洞口管片、洞口密封的安装;
3),盾构设备掘进至盾构基座上设计的接收位置;
4),在隧道内拆除盾构设备与后续台车的连接,并拆除螺旋输送机;
5),在钢板上涂抹润滑涂层,在基座平移相反方向安装反力支撑点及千斤顶;
6),进行盾构平移施工,联动调整千斤顶,使盾构基座整体平移,将盾构设备平移至盾构吊出井的解体位置处,完成盾构平移,进行后续盾构解体吊出作业。
本发明的盾构横通道平移接收施工工法进一步为:所述步骤2)中,盾构基座支撑于钢板上。
本发明的盾构横通道平移接收施工工法还可为:所述步骤6)中,所述盾构基座和千斤顶之间能安装顶铁以加长千斤顶行程;平移距离长时,能通过调整反力支撑点的位置,避免顶铁过长。
与现有技术相比,本发明具有如下有益效果:本发明的盾构横通道平移接收施工工法具有工艺简单,施工方便,安全可靠等诸多优点,其能将盾构设备在横通道内平移至明挖竖井,然后再吊出。
【附图说明】
图1是本发明的盾构横通道平移接收施工工法施工步骤1)的示意图。
图2是本发明的盾构横通道平移接收施工工法施工步骤2)的示意图。
图3是本发明的盾构横通道平移接收施工工法施工步骤3)的示意图。
图4-1是本发明的盾构横通道平移接收施工工法施工步骤4)的示意图。
图4-2是本发明的盾构横通道平移接收施工工法施工步骤4)完成后的示意图。
图5是本发明的盾构横通道平移接收施工工法施工步骤5)的示意图。
图6是本发明的盾构横通道平移接收施工工法施工步骤6)的示意图。
【具体实施方式】
请参阅说明书附图1至附图6所示,本发明为一种盾构横通道平移接收施工工法,其包括如下施工步骤:
1),完成盾构接收横通道结构1施工;
2),在盾构接收横通道1底板铺设一层钢板2,并进行固定,便于后续盾构平移减阻,便于施工;然后完成盾构基座3安装,盾构基座3支撑于钢板2上;以及完成洞口管片4、洞口密封5的安装等盾构接收施工前期工作;
3),盾构设备6掘进至盾构基座3上设计的接收位置;
4),在隧道内拆除盾构设备6与后续台车(未图示)的连接,并拆除螺旋输送机7,避免台车及螺旋输送机影响盾体平移;
5),在钢板2上涂抹润滑涂层8,在基座3平移相反方向安装反力支撑点9及千斤顶10;
6),进行盾构平移施工,联动调整千斤顶10,使盾构基座3整体平移,将盾构设备3平移至盾构吊出井11的解体位置处,完成盾构平移,进行后续盾构解体吊出作业。
其中,步骤6)中,盾构基座3和千斤顶10之间能安装顶铁12以加长千斤顶20行程;平移距离长时,通过调整反力支撑点9的位置,避免顶铁12过长。
以上的具体实施方式仅为本创作的较佳实施例,并不用以限制本创作,凡在本创作的精神及原则之内所做的任何修改、等同替换、改进等,均应包含在本创作的保护范围之内。

Claims (3)

1.一种盾构横通道平移接收施工工法,其特征在于:包括如下施工步骤:
1),完成盾构接收横通道结构施工;
2),在盾构接收横通道底板铺设一层钢板,并进行固定;然后完成盾构基座安装以及洞口管片、洞口密封的安装;
3),盾构设备掘进至盾构基座上设计的接收位置;
4),在隧道内拆除盾构设备与后续台车的连接,并拆除螺旋输送机;
5),在钢板上涂抹润滑涂层,在基座平移相反方向安装反力支撑点及千斤顶;
6),进行盾构平移施工,联动调整千斤顶,使盾构基座整体平移,将盾构设备平移至盾构吊出井的解体位置处,完成盾构平移,进行后续盾构解体吊出作业。
2.如权利要求1所述的盾构横通道平移接收施工工法,其特征在于:所述步骤2)中,盾构基座支撑于钢板上。
3.如权利要求1所述的盾构横通道平移接收施工工法,其特征在于:所述步骤6)中,所述盾构基座和千斤顶之间能安装顶铁以加长千斤顶行程;平移距离长时,能通过调整反力支撑点的位置,避免顶铁过长。
CN201610209118.4A 2016-04-06 2016-04-06 一种盾构横通道平移接收施工工法 Pending CN105649637A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610209118.4A CN105649637A (zh) 2016-04-06 2016-04-06 一种盾构横通道平移接收施工工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610209118.4A CN105649637A (zh) 2016-04-06 2016-04-06 一种盾构横通道平移接收施工工法

Publications (1)

Publication Number Publication Date
CN105649637A true CN105649637A (zh) 2016-06-08

Family

ID=56497146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610209118.4A Pending CN105649637A (zh) 2016-04-06 2016-04-06 一种盾构横通道平移接收施工工法

Country Status (1)

Country Link
CN (1) CN105649637A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593884A (zh) * 2019-08-21 2019-12-20 中铁工程装备集团有限公司 一种联络通道掘进机
CN111550271A (zh) * 2020-05-27 2020-08-18 中建八局轨道交通建设有限公司 竖井横通道内盾构负环管片的拆除方法
CN111810177A (zh) * 2020-06-30 2020-10-23 中铁第六勘察设计院集团有限公司 一种基于双线路作业的地下拆卸tbm方法
CN114278315A (zh) * 2021-11-26 2022-04-05 中铁十局集团第三建设有限公司 一种半盖挖车站盾构机井下整体平移方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011596A (zh) * 2010-11-29 2011-04-13 中铁三局集团有限公司 盾构始发或接收端头洞门维护工艺
CN104018842A (zh) * 2014-05-04 2014-09-03 广东水电二局股份有限公司 一种盾构机到达掘进终点的接收结构及其接收方法
CN104695971A (zh) * 2015-01-07 2015-06-10 同济大学 一种环形顶管施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011596A (zh) * 2010-11-29 2011-04-13 中铁三局集团有限公司 盾构始发或接收端头洞门维护工艺
CN104018842A (zh) * 2014-05-04 2014-09-03 广东水电二局股份有限公司 一种盾构机到达掘进终点的接收结构及其接收方法
CN104695971A (zh) * 2015-01-07 2015-06-10 同济大学 一种环形顶管施工方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
叶铭等: "复杂环境条件下盾构接收井的设计", 《隧道建设》 *
赵洪岩等: "浅析复杂场地盾构机井下平移吊装施工技术", 《北方工业大学学报》 *
赵胜: "无地面垂直条件邻接暗挖隧道侧置竖井式盾构转场关键技术", 《现代城市轨道交通》 *
陈恤良: "浅谈复杂条件下的盾构过站解体技术", 《建筑机械化》 *
黄云生: "盾构的平移解体技术", 《铁道建筑技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593884A (zh) * 2019-08-21 2019-12-20 中铁工程装备集团有限公司 一种联络通道掘进机
CN111550271A (zh) * 2020-05-27 2020-08-18 中建八局轨道交通建设有限公司 竖井横通道内盾构负环管片的拆除方法
CN111810177A (zh) * 2020-06-30 2020-10-23 中铁第六勘察设计院集团有限公司 一种基于双线路作业的地下拆卸tbm方法
CN111810177B (zh) * 2020-06-30 2022-04-08 中铁第六勘察设计院集团有限公司 一种基于双线路作业的地下拆卸tbm方法
CN114278315A (zh) * 2021-11-26 2022-04-05 中铁十局集团第三建设有限公司 一种半盖挖车站盾构机井下整体平移方法

Similar Documents

Publication Publication Date Title
CN105649637A (zh) 一种盾构横通道平移接收施工工法
CN106150512A (zh) 一种盾构接收用钢套筒反力车装置
CN105071604A (zh) 更换振动电机的装置及方法
CN106931273A (zh) 一种用于管道泄漏的堵漏设备
CN104314577B (zh) 隧道内盾构机拆装方法
CN104948204A (zh) 一种地铁隧道衬砌台车
CN103639644B (zh) 快速拆装大型液压机液压缸的方法
CN204476438U (zh) 用于隧道锚杆机施工的升降式台车
CN204295308U (zh) 钢轨钻孔用的夹具
CN106677790A (zh) 三环型断面隧道盾构机的双折臂型管片拼装机
CN204152523U (zh) 地铁隧道变化断面二衬施工便调式台车
CN204035223U (zh) 一种挤压机用挤压筒的调节装置
CN105817827A (zh) 可升降式输送辊道装置
CN203003608U (zh) 一种加工盾构机法兰内孔及端面的机床
CN103029009B (zh) 一种加工盾构机法兰内孔及端面的机床
CN105422139A (zh) 一种隧道水沟电缆槽台车
CN204053312U (zh) 一种钢管组焊装置
CN201982112U (zh) 一种施工拱顶钢架安装装置
CN104353964B (zh) 一种对表面复合修复后的活塞杆进行冷压处理的冷压装置
CN207161084U (zh) 一种盾构机中盾铰接环反力校正装置
CN205349356U (zh) 分离式隧道仰拱模板
CN204906129U (zh) 更换振动电机的装置
CN104315249A (zh) 管线工业化安装方法
CN204646308U (zh) 一种支架运输装置
CN216709489U (zh) 超薄型汽车电动摆正器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160608

WD01 Invention patent application deemed withdrawn after publication