CN105649637A - 一种盾构横通道平移接收施工工法 - Google Patents
一种盾构横通道平移接收施工工法 Download PDFInfo
- Publication number
- CN105649637A CN105649637A CN201610209118.4A CN201610209118A CN105649637A CN 105649637 A CN105649637 A CN 105649637A CN 201610209118 A CN201610209118 A CN 201610209118A CN 105649637 A CN105649637 A CN 105649637A
- Authority
- CN
- China
- Prior art keywords
- shield
- translation
- construction
- shielding machine
- transverse passage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 239000011248 coating agent Substances 0.000 claims abstract description 4
- 238000000576 coating method Methods 0.000 claims abstract description 4
- 238000007789 sealing Methods 0.000 claims abstract description 3
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 16
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 5
- 239000000314 lubricant Substances 0.000 claims description 3
- 238000005461 lubrication Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 7
- 230000005641 tunneling Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及一种盾构横通道平移接收施工工法,其包括如下施工步骤:1),完成盾构接收横通道结构施工;2),在盾构接收横通道底板铺设一层钢板,并进行固定;然后完成盾构基座安装以及洞口管片、洞口密封的安装;3),盾构设备掘进至盾构基座上设计的接收位置;4),在隧道内拆除盾构设备与后续台车的连接,并拆除螺旋输送机;5),在钢板上涂抹润滑涂层,在基座平移相反方向安装反力支撑点及千斤顶;6),进行盾构平移施工,联动调整千斤顶,使盾构基座整体平移,将盾构设备平移至盾构吊出井的解体位置处,完成盾构平移,进行后续盾构解体吊出作业。本发明具有工艺简单,施工方便,安全可靠等诸多优点。
Description
【技术领域】
本发明涉及一种盾构施工工法,具体涉及一种盾构横通道平移接收施工工法,属于盾构技术领域。
【背景技术】
盾构区间完成后,需要在暗挖横通道内接收盾构设备。然而,由于盾构设备体积及自重较大,在暗挖横通道内解体存在一定的风险。
因此,为解决上述技术问题,确有必要提供一种创新的盾构横通道平移接收施工工法,以克服现有技术中的所述缺陷。
【发明内容】
为解决上述问题,本发明的目的在于提供一种盾构横通道平移接收施工工法,其将盾构设备在横通道内平移至明挖竖井,然后再吊出。
为实现上述目的,本发明采取的技术方案为:一种盾构横通道平移接收施工工法,其包括如下施工步骤:
1),完成盾构接收横通道结构施工;
2),在盾构接收横通道底板铺设一层钢板,并进行固定;然后完成盾构基座安装以及洞口管片、洞口密封的安装;
3),盾构设备掘进至盾构基座上设计的接收位置;
4),在隧道内拆除盾构设备与后续台车的连接,并拆除螺旋输送机;
5),在钢板上涂抹润滑涂层,在基座平移相反方向安装反力支撑点及千斤顶;
6),进行盾构平移施工,联动调整千斤顶,使盾构基座整体平移,将盾构设备平移至盾构吊出井的解体位置处,完成盾构平移,进行后续盾构解体吊出作业。
本发明的盾构横通道平移接收施工工法进一步为:所述步骤2)中,盾构基座支撑于钢板上。
本发明的盾构横通道平移接收施工工法还可为:所述步骤6)中,所述盾构基座和千斤顶之间能安装顶铁以加长千斤顶行程;平移距离长时,能通过调整反力支撑点的位置,避免顶铁过长。
与现有技术相比,本发明具有如下有益效果:本发明的盾构横通道平移接收施工工法具有工艺简单,施工方便,安全可靠等诸多优点,其能将盾构设备在横通道内平移至明挖竖井,然后再吊出。
【附图说明】
图1是本发明的盾构横通道平移接收施工工法施工步骤1)的示意图。
图2是本发明的盾构横通道平移接收施工工法施工步骤2)的示意图。
图3是本发明的盾构横通道平移接收施工工法施工步骤3)的示意图。
图4-1是本发明的盾构横通道平移接收施工工法施工步骤4)的示意图。
图4-2是本发明的盾构横通道平移接收施工工法施工步骤4)完成后的示意图。
图5是本发明的盾构横通道平移接收施工工法施工步骤5)的示意图。
图6是本发明的盾构横通道平移接收施工工法施工步骤6)的示意图。
【具体实施方式】
请参阅说明书附图1至附图6所示,本发明为一种盾构横通道平移接收施工工法,其包括如下施工步骤:
1),完成盾构接收横通道结构1施工;
2),在盾构接收横通道1底板铺设一层钢板2,并进行固定,便于后续盾构平移减阻,便于施工;然后完成盾构基座3安装,盾构基座3支撑于钢板2上;以及完成洞口管片4、洞口密封5的安装等盾构接收施工前期工作;
3),盾构设备6掘进至盾构基座3上设计的接收位置;
4),在隧道内拆除盾构设备6与后续台车(未图示)的连接,并拆除螺旋输送机7,避免台车及螺旋输送机影响盾体平移;
5),在钢板2上涂抹润滑涂层8,在基座3平移相反方向安装反力支撑点9及千斤顶10;
6),进行盾构平移施工,联动调整千斤顶10,使盾构基座3整体平移,将盾构设备3平移至盾构吊出井11的解体位置处,完成盾构平移,进行后续盾构解体吊出作业。
其中,步骤6)中,盾构基座3和千斤顶10之间能安装顶铁12以加长千斤顶20行程;平移距离长时,通过调整反力支撑点9的位置,避免顶铁12过长。
以上的具体实施方式仅为本创作的较佳实施例,并不用以限制本创作,凡在本创作的精神及原则之内所做的任何修改、等同替换、改进等,均应包含在本创作的保护范围之内。
Claims (3)
1.一种盾构横通道平移接收施工工法,其特征在于:包括如下施工步骤:
1),完成盾构接收横通道结构施工;
2),在盾构接收横通道底板铺设一层钢板,并进行固定;然后完成盾构基座安装以及洞口管片、洞口密封的安装;
3),盾构设备掘进至盾构基座上设计的接收位置;
4),在隧道内拆除盾构设备与后续台车的连接,并拆除螺旋输送机;
5),在钢板上涂抹润滑涂层,在基座平移相反方向安装反力支撑点及千斤顶;
6),进行盾构平移施工,联动调整千斤顶,使盾构基座整体平移,将盾构设备平移至盾构吊出井的解体位置处,完成盾构平移,进行后续盾构解体吊出作业。
2.如权利要求1所述的盾构横通道平移接收施工工法,其特征在于:所述步骤2)中,盾构基座支撑于钢板上。
3.如权利要求1所述的盾构横通道平移接收施工工法,其特征在于:所述步骤6)中,所述盾构基座和千斤顶之间能安装顶铁以加长千斤顶行程;平移距离长时,能通过调整反力支撑点的位置,避免顶铁过长。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610209118.4A CN105649637A (zh) | 2016-04-06 | 2016-04-06 | 一种盾构横通道平移接收施工工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610209118.4A CN105649637A (zh) | 2016-04-06 | 2016-04-06 | 一种盾构横通道平移接收施工工法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105649637A true CN105649637A (zh) | 2016-06-08 |
Family
ID=56497146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610209118.4A Pending CN105649637A (zh) | 2016-04-06 | 2016-04-06 | 一种盾构横通道平移接收施工工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105649637A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593884A (zh) * | 2019-08-21 | 2019-12-20 | 中铁工程装备集团有限公司 | 一种联络通道掘进机 |
CN111550271A (zh) * | 2020-05-27 | 2020-08-18 | 中建八局轨道交通建设有限公司 | 竖井横通道内盾构负环管片的拆除方法 |
CN111810177A (zh) * | 2020-06-30 | 2020-10-23 | 中铁第六勘察设计院集团有限公司 | 一种基于双线路作业的地下拆卸tbm方法 |
CN114278315A (zh) * | 2021-11-26 | 2022-04-05 | 中铁十局集团第三建设有限公司 | 一种半盖挖车站盾构机井下整体平移方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102011596A (zh) * | 2010-11-29 | 2011-04-13 | 中铁三局集团有限公司 | 盾构始发或接收端头洞门维护工艺 |
CN104018842A (zh) * | 2014-05-04 | 2014-09-03 | 广东水电二局股份有限公司 | 一种盾构机到达掘进终点的接收结构及其接收方法 |
CN104695971A (zh) * | 2015-01-07 | 2015-06-10 | 同济大学 | 一种环形顶管施工方法 |
-
2016
- 2016-04-06 CN CN201610209118.4A patent/CN105649637A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102011596A (zh) * | 2010-11-29 | 2011-04-13 | 中铁三局集团有限公司 | 盾构始发或接收端头洞门维护工艺 |
CN104018842A (zh) * | 2014-05-04 | 2014-09-03 | 广东水电二局股份有限公司 | 一种盾构机到达掘进终点的接收结构及其接收方法 |
CN104695971A (zh) * | 2015-01-07 | 2015-06-10 | 同济大学 | 一种环形顶管施工方法 |
Non-Patent Citations (5)
Title |
---|
叶铭等: "复杂环境条件下盾构接收井的设计", 《隧道建设》 * |
赵洪岩等: "浅析复杂场地盾构机井下平移吊装施工技术", 《北方工业大学学报》 * |
赵胜: "无地面垂直条件邻接暗挖隧道侧置竖井式盾构转场关键技术", 《现代城市轨道交通》 * |
陈恤良: "浅谈复杂条件下的盾构过站解体技术", 《建筑机械化》 * |
黄云生: "盾构的平移解体技术", 《铁道建筑技术》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593884A (zh) * | 2019-08-21 | 2019-12-20 | 中铁工程装备集团有限公司 | 一种联络通道掘进机 |
CN111550271A (zh) * | 2020-05-27 | 2020-08-18 | 中建八局轨道交通建设有限公司 | 竖井横通道内盾构负环管片的拆除方法 |
CN111810177A (zh) * | 2020-06-30 | 2020-10-23 | 中铁第六勘察设计院集团有限公司 | 一种基于双线路作业的地下拆卸tbm方法 |
CN111810177B (zh) * | 2020-06-30 | 2022-04-08 | 中铁第六勘察设计院集团有限公司 | 一种基于双线路作业的地下拆卸tbm方法 |
CN114278315A (zh) * | 2021-11-26 | 2022-04-05 | 中铁十局集团第三建设有限公司 | 一种半盖挖车站盾构机井下整体平移方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105649637A (zh) | 一种盾构横通道平移接收施工工法 | |
CN106150512A (zh) | 一种盾构接收用钢套筒反力车装置 | |
CN105071604A (zh) | 更换振动电机的装置及方法 | |
CN106931273A (zh) | 一种用于管道泄漏的堵漏设备 | |
CN104314577B (zh) | 隧道内盾构机拆装方法 | |
CN104948204A (zh) | 一种地铁隧道衬砌台车 | |
CN103639644B (zh) | 快速拆装大型液压机液压缸的方法 | |
CN204476438U (zh) | 用于隧道锚杆机施工的升降式台车 | |
CN204295308U (zh) | 钢轨钻孔用的夹具 | |
CN106677790A (zh) | 三环型断面隧道盾构机的双折臂型管片拼装机 | |
CN204152523U (zh) | 地铁隧道变化断面二衬施工便调式台车 | |
CN204035223U (zh) | 一种挤压机用挤压筒的调节装置 | |
CN105817827A (zh) | 可升降式输送辊道装置 | |
CN203003608U (zh) | 一种加工盾构机法兰内孔及端面的机床 | |
CN103029009B (zh) | 一种加工盾构机法兰内孔及端面的机床 | |
CN105422139A (zh) | 一种隧道水沟电缆槽台车 | |
CN204053312U (zh) | 一种钢管组焊装置 | |
CN201982112U (zh) | 一种施工拱顶钢架安装装置 | |
CN104353964B (zh) | 一种对表面复合修复后的活塞杆进行冷压处理的冷压装置 | |
CN207161084U (zh) | 一种盾构机中盾铰接环反力校正装置 | |
CN205349356U (zh) | 分离式隧道仰拱模板 | |
CN204906129U (zh) | 更换振动电机的装置 | |
CN104315249A (zh) | 管线工业化安装方法 | |
CN204646308U (zh) | 一种支架运输装置 | |
CN216709489U (zh) | 超薄型汽车电动摆正器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160608 |
|
WD01 | Invention patent application deemed withdrawn after publication |