CN105649096A - 基坑降水备用兼观测井 - Google Patents

基坑降水备用兼观测井 Download PDF

Info

Publication number
CN105649096A
CN105649096A CN201511003397.0A CN201511003397A CN105649096A CN 105649096 A CN105649096 A CN 105649096A CN 201511003397 A CN201511003397 A CN 201511003397A CN 105649096 A CN105649096 A CN 105649096A
Authority
CN
China
Prior art keywords
pipe
chimney filter
well
fixed
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511003397.0A
Other languages
English (en)
Inventor
陆建生
乔华山
崔永高
张英英
李璞
王超
周亚宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Guanglian Environmental & Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Guanglian Environmental & Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Guanglian Environmental & Geotechnical Engineering Co Ltd filed Critical Shanghai Guanglian Environmental & Geotechnical Engineering Co Ltd
Priority to CN201511003397.0A priority Critical patent/CN105649096A/zh
Publication of CN105649096A publication Critical patent/CN105649096A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

一种基坑降水备用兼观测井,涉及土建施工技术领域,所解决的是减小水位测量误差及减小基坑周边环境影响的技术问题。该井包括从上至下依次串接的井管、滤管、沉淀管,及滤料层、粘土球层、回填土层;所述滤管从上至下分成三个管段,其中的滤管中段的管壁不透水,另两个管段的管壁透水,并且在滤管中段内同轴固定有一环形的挡板,挡板的上板面固定有一环形的下密封垫,所述滤管内设有潜水泵,潜水泵上固定有拉绳,潜水泵的下端固定有连接管,连接管上同轴套置有一环形的盖板,盖板的下板面固定有一环形的上密封垫。本发明提供的基坑降水备用兼观测井,既可以作为基坑降水观测井使用,又可以作为基坑降水备用井使用。

Description

基坑降水备用兼观测井
技术领域
本发明涉及土建施工技术,特别是涉及一种基坑降水备用兼观测井的技术。
背景技术
在深基坑开挖过程中,采用降水的方法降低开挖土层与可能引起基坑底板承压水突涌的含水层的地下水位是十分必要的。在软土地区深基坑工程因开挖深度深,一般采用管井降低含水层中的水位。为做到按需降水,在降水薄弱部位应设置观测井,同时考虑到施工安全储备的要求,应设置一定数量的备用井。目前基坑降水设计过程中,备用井一般直接兼做观测井,观测井井结构直接采用备用井井结构,而基坑降水过程中地下水处于明显的三维流状态,备用井作为观测井的直接结果是含水层层顶水位测量误差大,进而使得基坑涌水量增大,对基坑周边环境影响增加。
发明内容
针对上述现有技术中存在的缺陷,本发明所要解决的技术问题是提供一种水位测量误差小,能减少基坑涌水量,减少对基坑周边环境影响的基坑降水备用兼观测井。
为了解决上述技术问题,本发明所提供的一种基坑降水备用兼观测井,包括井管、滤管、沉淀管,所述滤管的上端管口与井管的下端管口对接,滤管的下端管口与沉淀管的上端管口对接,其特征在于:还包括包围住井管、滤管、沉淀管的滤料层、粘土球层、回填土层;
所述滤料层、粘土球层、回填土层从下至上依次层叠,且所述粘土球层高于滤管;
所述滤管从上至下分成三个管段,该三个管段从上至下依次分别为滤管上段、滤管中段、滤管下段,其中的滤管中段的管壁不透水,另两个管段的管壁透水,并且在滤管中段内同轴固定有一环形的挡板,所述挡板的外圈与滤管中段的内壁接合,挡板的上板面固定有一环形的下密封垫,所述下密封垫是围绕挡板环心一圈的环形垫;
所述滤管内设有能上下活动的潜水泵,潜水泵上固定有拉绳,拉绳的上端伸出井管的上端管口,潜水泵的下端固定有一竖直的连接管,连接管上同轴套置有一环形的盖板,所述盖板的内圈与连接管外壁接合,盖板的外径大于挡板的内径,盖板的下板面固定有一环形的上密封垫,所述上密封垫是围绕盖板环心一圈的环形垫,上密封垫位于下密封垫的正上方,并且上密封垫能随潜水泵下降至与下密封垫贴合。
本发明提供的基坑降水备用兼观测井,利用挡板及盖板对滤管的工作长度进行控制,在将滤管下段封堵的条件下可作为观测井使用,在滤管上段与滤管下段连通的条件下可作为降水备用井使用,满足了备用井和观测井不同功能的需求,并且测量误差小,能减少基坑涌水量,减少对基坑周边环境影响。
附图说明
图1是本发明实施例的基坑降水备用兼观测井的结构示意图;
图2是本发明实施例的基坑降水备用兼观测井作为观测井使用时,滤管的竖向剖视图;
图3是本发明实施例的基坑降水备用兼观测井作为备用井使用时,滤管的竖向剖视图。
具体实施方式
以下结合附图说明对本发明的实施例作进一步详细描述,但本实施例并不用于限制本发明,凡是采用本发明的相似结构及其相似变化,均应列入本发明的保护范围,本发明中的顿号均表示和的关系。
如图1-图3所示,本发明实施例所提供的一种基坑降水备用兼观测井,包括井管1、滤管2、沉淀管4,所述滤管2的上端管口与井管1的下端管口对接,滤管2的下端管口与沉淀管4的上端管口对接,其特征在于:还包括包围住井管1、滤管2、沉淀管4的滤料层91、粘土球层92、回填土层93;
所述滤料层91、粘土球层92、回填土层93从下至上依次层叠,且所述粘土球层92高于滤管2;
所述滤管2从上至下分成三个管段,该三个管段从上至下依次分别为滤管上段21、滤管中段22、滤管下段23,其中的滤管中段22的管壁不透水,另两个管段21、23的管壁透水,并且在滤管中段22内同轴固定有一环形的挡板71,所述挡板71的外圈与滤管中段22的内壁接合,挡板71的上板面固定有一环形的下密封垫72,所述下密封垫72是围绕挡板环心一圈的环形垫;
所述滤管内设有能上下活动的潜水泵3,潜水泵3上固定有拉绳5,拉绳5的上端伸出井管1的上端管口,潜水泵3的下端固定有一竖直的连接管8,连接管8上同轴套置有一环形的盖板61,所述盖板61的内圈与连接管8外壁接合,盖板61的外径大于挡板71的内径,盖板61的下板面固定有一环形的上密封垫62,所述上密封垫62是围绕盖板环心一圈的环形垫,上密封垫62位于下密封垫72的正上方,并且上密封垫能随潜水泵下降至与下密封垫贴合。
本发明实施例既可以作为基坑降水观测井使用,又可以作为基坑降水备用井使用;
如图2所示,作为基坑降水观测井使用,将潜水泵3下放至拉绳5不受力,此时上密封垫62随潜水泵下降至与下密封垫72贴合,此时在潜水泵自身重力作用下,上密封垫62与下密封垫72被压实,从而将挡板71的环心封堵住,确保滤管上段21与滤管下段23在管内无水力联系,使得滤管的工作长度缩短,只有滤管上段21及滤管中段22的上半部参与作业,从而确保井管内水位观测能准确反映含水层层顶水位埋深;
如图3所示,作为基坑降水备用井使用,利用拉绳5将潜水泵3上提至上密封垫62与下密封垫72分离,从而使得挡板71的环心开放,此时滤管上段21与滤管下段23连通,滤管的工作长度恢复至原始长度,此时可通过潜水泵抽出滤管下段对应含水层的地下水。

Claims (1)

1.一种基坑降水备用兼观测井,包括井管、滤管、沉淀管,所述滤管的上端管口与井管的下端管口对接,滤管的下端管口与沉淀管的上端管口对接,其特征在于:还包括包围住井管、滤管、沉淀管的滤料层、粘土球层、回填土层;
所述滤料层、粘土球层、回填土层从下至上依次层叠,且所述粘土球层高于滤管;
所述滤管从上至下分成三个管段,该三个管段从上至下依次分别为滤管上段、滤管中段、滤管下段,其中的滤管中段的管壁不透水,另两个管段的管壁透水,并且在滤管中段内同轴固定有一环形的挡板,所述挡板的外圈与滤管中段的内壁接合,挡板的上板面固定有一环形的下密封垫,所述下密封垫是围绕挡板环心一圈的环形垫;
所述滤管内设有能上下活动的潜水泵,潜水泵上固定有拉绳,拉绳的上端伸出井管的上端管口,潜水泵的下端固定有一竖直的连接管,连接管上同轴套置有一环形的盖板,所述盖板的内圈与连接管外壁接合,盖板的外径大于挡板的内径,盖板的下板面固定有一环形的上密封垫,所述上密封垫是围绕盖板环心一圈的环形垫,上密封垫位于下密封垫的正上方,并且上密封垫能随潜水泵下降至与下密封垫贴合。
CN201511003397.0A 2015-12-29 2015-12-29 基坑降水备用兼观测井 Pending CN105649096A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511003397.0A CN105649096A (zh) 2015-12-29 2015-12-29 基坑降水备用兼观测井

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511003397.0A CN105649096A (zh) 2015-12-29 2015-12-29 基坑降水备用兼观测井

Publications (1)

Publication Number Publication Date
CN105649096A true CN105649096A (zh) 2016-06-08

Family

ID=56477697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511003397.0A Pending CN105649096A (zh) 2015-12-29 2015-12-29 基坑降水备用兼观测井

Country Status (1)

Country Link
CN (1) CN105649096A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245661A (zh) * 2016-08-28 2016-12-21 神翼航空器科技(天津)有限公司 地下管及其埋设地下管的方法
CN106284388A (zh) * 2016-08-28 2017-01-04 神翼航空器科技(天津)有限公司 井管及其埋设井管的方法
CN109440795A (zh) * 2018-11-26 2019-03-08 上海建工七建集团有限公司 一种承压降水管井及其使用方法
CN110080248A (zh) * 2019-06-03 2019-08-02 河南城建学院 近水深基坑支护结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762696A (ja) * 1993-08-27 1995-03-07 Shimizu Corp 層別揚水装置およびこれを備えた井戸
CN101070704A (zh) * 2007-06-04 2007-11-14 上海地矿工程勘察有限公司 可控式一井分层降水施工方法
CN101363228A (zh) * 2008-05-23 2009-02-11 上海广联建设发展有限公司 一种同时用于疏干和减压降水的管井及其工艺
CN102518141A (zh) * 2011-12-19 2012-06-27 同济大学 一种分段控制的深基坑降水疏干-减压合成井
CN205387711U (zh) * 2015-12-29 2016-07-20 上海广联环境岩土工程股份有限公司 基坑降水备用兼观测井

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762696A (ja) * 1993-08-27 1995-03-07 Shimizu Corp 層別揚水装置およびこれを備えた井戸
CN101070704A (zh) * 2007-06-04 2007-11-14 上海地矿工程勘察有限公司 可控式一井分层降水施工方法
CN101363228A (zh) * 2008-05-23 2009-02-11 上海广联建设发展有限公司 一种同时用于疏干和减压降水的管井及其工艺
CN102518141A (zh) * 2011-12-19 2012-06-27 同济大学 一种分段控制的深基坑降水疏干-减压合成井
CN205387711U (zh) * 2015-12-29 2016-07-20 上海广联环境岩土工程股份有限公司 基坑降水备用兼观测井

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245661A (zh) * 2016-08-28 2016-12-21 神翼航空器科技(天津)有限公司 地下管及其埋设地下管的方法
CN106284388A (zh) * 2016-08-28 2017-01-04 神翼航空器科技(天津)有限公司 井管及其埋设井管的方法
CN106284388B (zh) * 2016-08-28 2019-04-05 神翼航空器科技(天津)有限公司 井管及其埋设井管的方法
CN109440795A (zh) * 2018-11-26 2019-03-08 上海建工七建集团有限公司 一种承压降水管井及其使用方法
CN109440795B (zh) * 2018-11-26 2024-04-02 上海建工七建集团有限公司 一种承压降水管井及其使用方法
CN110080248A (zh) * 2019-06-03 2019-08-02 河南城建学院 近水深基坑支护结构

Similar Documents

Publication Publication Date Title
CN105649096A (zh) 基坑降水备用兼观测井
CN102002959B (zh) 地下构筑物基底泄水装置及其布设方法
CN203768926U (zh) 一种地下室深井封堵装置
CN205444215U (zh) 气驱基坑降水系统
CN104805854A (zh) 一种潮汐环境下深水超长钢板桩围堰施工方法
CN209277184U (zh) 深基坑钻孔涌水冒砂封堵装置
CN201908323U (zh) 一种地下构筑物底板的泄水泄压装置
CN104563164A (zh) 一种地连墙接缝渗漏检测及注浆堵漏方法
CN102322074B (zh) 一种导管架基础结构及施工方法
CN205387711U (zh) 基坑降水备用兼观测井
CN105501396A (zh) 带倒刺的负压桶锚固装置、安装方法及漂浮式海上风电场
CN201794082U (zh) 局部深基坑降排水装置
CN109723071B (zh) 地下室底板后浇带内置双层钢桶降排水系统的施工方法
CN211498905U (zh) 带有井壁补偿的降压井
CN205444219U (zh) 基坑疏干兼减压的降水管井
CN109750684B (zh) 一种多用降水井结构及其制作方法
CN203284770U (zh) 暗埋式地下水回灌系统
CN207193934U (zh) 一种自升式平台八边形桩靴
CN210140838U (zh) 一种多用降水井结构
CN110616727B (zh) 深基坑坑内降压井
CN204662467U (zh) 地下结构降水井封水装置
CN208395840U (zh) 一种地下室集水井预防性泄水装置
CN110878557B (zh) 一种用于基坑降水的分层双向疏水方法
CN203213129U (zh) 可控逆止式排水器
CN103696485B (zh) 一种核岛排水装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160608

RJ01 Rejection of invention patent application after publication