CN105619349A - Integrated workbench used for conveying, washing, dismounting and mounting unit brakes - Google Patents

Integrated workbench used for conveying, washing, dismounting and mounting unit brakes Download PDF

Info

Publication number
CN105619349A
CN105619349A CN201410606167.2A CN201410606167A CN105619349A CN 105619349 A CN105619349 A CN 105619349A CN 201410606167 A CN201410606167 A CN 201410606167A CN 105619349 A CN105619349 A CN 105619349A
Authority
CN
China
Prior art keywords
brake
base
dismount
clean
unit
Prior art date
Application number
CN201410606167.2A
Other languages
Chinese (zh)
Other versions
CN105619349B (en
Inventor
张国富
方宇
崔璀
张亚辉
李丰恩
Original Assignee
上海工程技术大学
上海赞库电子科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海工程技术大学, 上海赞库电子科技有限公司 filed Critical 上海工程技术大学
Priority to CN201410606167.2A priority Critical patent/CN105619349B/en
Publication of CN105619349A publication Critical patent/CN105619349A/en
Application granted granted Critical
Publication of CN105619349B publication Critical patent/CN105619349B/en

Links

Abstract

The invention relates to an integrated workbench used for conveying, washing, dismounting and mounting unit brakes. The integrated workbench comprises a base. A plurality of brake mounting tables are arranged on the base. Each brake mounting table comprises a rotary disk capable of rotating horizontally by 360 degrees. A brake mounting seat is arranged on each rotary disk. Each brake mounting seat comprises a fixed support, a connection part and a vertical overturn frame which is capable of rotating vertically by 90 degrees. The fixed supports, the connection parts and the vertical overturn frames are connected sequentially and correspondingly. The fixed supports are connected with the unit brakes. The connection parts are fixedly connected with the rotary disks correspondingly. Compared with the prior art, the integrated workbench has the advantages of saving of time and labor and the like.

Description

A kind of integral work table transported for unit brake, clean and dismount

Technical field

The present invention relates to a kind of unit brake and safeguard equipment, especially relate to a kind of integral work table transported for unit brake, clean and dismount.

Background technology

Along with the development of electrical technology, electric locomotive and Electric Multiple Unit start to substitute increasing diesel oil and gasoline train gradually. For electric locomotive, the performance state of its unit brake often affects it to a great extent and runs safety. In the un-wheeling repair and overhaul process of unit brake, existing unit brake transport stand is because of the problem of function singleness, generally require field personnel and frequently move the position of unit brake, so bring substantial amounts of additional workload, also reduce the overhaul efficiency of unit brake simultaneously.

Summary of the invention

Defect that the purpose of the present invention is contemplated to overcome above-mentioned prior art to exist and providing a kind of transports for unit brake, clean and the integral work table of dismounting.

The purpose of the present invention can be achieved through the following technical solutions:

A kind of integral work table transported for unit brake, clean and dismount, including base, described base is provided with multiple brake erecting bed, described brake erecting bed includes can 360 degree of rotating disks horizontally rotated, described rotating disk is provided with mounting seat of brake, described mounting seat of brake includes fixed support, connector and can 90 degree of flip vertical framves vertically rotated, described fixed support is connected by flip vertical frame and connector, described fixed support is connected with unit brake, and described connector is fixing with rotating disk to be connected.

Being additionally provided with parking brake bracket cylinder on described rotating disk, described parking brake bracket cylinder and mounting seat of brake be arranged in parallel.

Described brake erecting bed also includes the calibration spring catch for fixing turntable rotation angle.

Described susceptor surface is provided with bulk dirt row's small opening and multiple cleaning osculum, and described bulk dirt row's small opening is positioned at base central authorities, and described cleaning osculum is uniformly distributed in susceptor surface.

Described base includes multiple spikes, and described each spike is equipped with the adapter for connecting another workbench.

Described base is formed around grabbing for the hook of connecting hoisting device.

Described substructure height is 750 millimeters.

Compared with prior art, the invention have the advantages that

1) on each workbench, multiple unit brakes are mounted on rotating disk, each rotating disk is relatively independent, horizontal direction 360 �� can be realized rotate freely, rotary course is without interference, and vertical direction 90 �� upset can be realized, additionally, field worker can be as required, the fixing rotating disk in 4 positions, 90 ��, grade point position is realized, thus realizing the full angle operation to unit brake by calibration spring catch.

2) adapter can realize the stacking of workbench.

3) hook is grabbed and can be facilitated boom hoisting mobile working platform.

4) this equipment adopts ergonomic designs's principle, body of work platform height is designed as 750 millimeters, ensure that most staff can clean, dismount and omnidistance adopt stance to complete most of work, thus avoiding the work efficiency that long-time stoop labor causes to reduce and the problem such as actual bodily harm.

Accompanying drawing explanation

Fig. 1 is the structural representation of the present invention;

Fig. 2 is the first angled arrangement schematic diagram of brake erecting bed;

Fig. 3 is the second angled arrangement schematic diagram of brake erecting bed;

Fig. 4 is the third angle structural representation of brake erecting bed;

Wherein: 1, base, 3, unit brake, 11, osculum is cleaned, 12, spike is propped up, 13, spike, 14, hook grabs, 15, fence, 21, rotating disk, 22, fixed support, 23, flip vertical frame, 24, connector, 25, parking brake bracket cylinder, 26, calibration spring catch, 27, auxiliary bracket, 221, attaching nut.

Detailed description of the invention

Below in conjunction with the drawings and specific embodiments, the present invention is described in detail. The present embodiment is carried out premised on technical solution of the present invention, gives detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.

A kind of for unit brake transport, the integral work table cleaned and dismount, as shown in Figure 1, including base 1, base 1 is provided with multiple brake erecting bed, brake erecting bed includes can 360 degree of rotating disks horizontally rotated 21, rotating disk 21 is provided with mounting seat of brake, as shown in Figure 3, mounting seat of brake includes fixed support 22, connector 24 and can the flip vertical framves 23 of 90 degree vertical rotations, fixed support 22 is connected by flip vertical frame 23 and connector 24, fixed support 22, connector 24 and flip vertical frame 23 are sequentially connected with, fixed support 22 is connected with unit brake 3, connector 24 is fixing with rotating disk 21 to be connected.

Being additionally provided with parking brake bracket cylinder 25 on rotating disk 21, parking brake bracket cylinder 25 and mounting seat of brake be arranged in parallel.

Brake erecting bed also includes the calibration spring catch 26 for fixing rotating disk 21 anglec of rotation, and when rotating disk 21 rotates to set angle, calibration spring catch 26 can be fixed rotating disk 21 and not be rotated further by.

Base 1 surface is provided with bulk dirt row's small opening and multiple cleaning osculum 11, and bulk dirt row's small opening is positioned at base 1 central authorities, cleans osculum 11 and is uniformly distributed in base 1 surface.

Base 1 includes multiple spikes 12, each spike 12 is equipped with the adapter 13 for connecting another workbench, in the present embodiment, base 1 is square, the number propping up spike 11 is 4, during two workbench code heaps, four adapters 12 of top workbench are connected with four table angles of lower work platform respectively, and then realize the stacking of multiple workbench.

Base 1 is formed around grabbing 14 for the hook of connecting hoisting device.

As it is shown in figure 1, base 1 surface surrounding is additionally provided with fence 15 in the present embodiment, fence 15 can protect staff's personal safety.

As in figure 2 it is shown, flip vertical frame 23 is a flip vertical axle in the present embodiment.

As in figure 2 it is shown, brake erecting bed also includes auxiliary bracket 27, fixed support 22 is provided with two attaching nuts 221 for fixed cell brake 3. After unit brake 3 is connected with fixed support 22 by attaching nut, it is placed on auxiliary bracket 27 and parking brake bracket cylinder 25, as shown in Figure 4, when flip vertical frame 23 overturns to fixed support 22 horizontal positioned, unit brake 3 vertically erects, as shown in Figures 2 and 3, flip vertical frame 23 overturn to fixed support 22 vertically place time, unit brake 3 vertically erects and lies in a horizontal plane on auxiliary bracket 27 and parking brake bracket cylinder 25.

Unit brake 3 can carry out horizontal 360-degree respectively under the drive of rotating disk 21 and flip vertical frame 23 and rotate and vertical 90 degree of upsets. Any position of unit brake 3 can be assembled and the operation such as cleaning by staff. Transport is pulled down to system shop from bogie from unit brake 3, arrive again and unit brake 3 is carried out, disassembles, maintains, assembles, finally transport bogie general assembly place back, in this course, except needing to be adjusted to special test platform except unit brake 3 test job and carrying out, all the other all workings can complete on this integration work platforms. The field worker that existing unit brake 3 transport stand function singleness causes can be avoided frequently to move problems such as the physical demands brought unit brake 3 position is excessive and synthetic operation efficiency is low.

Claims (7)

1. the integral work table for unit brake transport, cleaning and dismounting, including base, it is characterized in that, described base is provided with multiple brake erecting bed, described brake erecting bed includes can 360 degree of rotating disks horizontally rotated, described rotating disk is provided with mounting seat of brake, described mounting seat of brake includes fixed support, connector and can 90 degree of flip vertical framves vertically rotated, described fixed support is connected by flip vertical frame and connector, described fixed support is connected with unit brake, and described connector is fixing with rotating disk to be connected.
2. a kind of integral work table transported for unit brake, clean and dismount according to claim 1, it is characterised in that being additionally provided with parking brake bracket cylinder on described rotating disk, described parking brake bracket cylinder and mounting seat of brake be arranged in parallel.
3. a kind of integral work table transported for unit brake, clean and dismount according to claim 1, it is characterised in that described brake erecting bed also includes the calibration spring catch for fixing rotating disk.
4. a kind of integral work table transported for unit brake, clean and dismount according to claim 1, it is characterized in that, described susceptor surface is provided with bulk dirt row's small opening and multiple cleaning osculum, described bulk dirt row's small opening is positioned at base central authorities, and described cleaning osculum is uniformly distributed in susceptor surface.
5. a kind of integral work table transported for unit brake, clean and dismount according to claim 1, it is characterized in that, described base includes multiple spikes, described each spike is equipped with the adapter for connecting another table base surface, and then realizes the stacking of multiple workbench.
6. a kind of integral work table transported for unit brake, clean and dismount according to claim 1, it is characterised in that described base is formed around grabbing for the hook of connecting hoisting device.
7. a kind of integral work table transported for unit brake, clean and dismount according to claim 1, it is characterised in that described substructure height is 750 millimeters.
CN201410606167.2A 2014-10-31 2014-10-31 A kind of integral work table for unit brake transport, cleaning and dismounting CN105619349B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410606167.2A CN105619349B (en) 2014-10-31 2014-10-31 A kind of integral work table for unit brake transport, cleaning and dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410606167.2A CN105619349B (en) 2014-10-31 2014-10-31 A kind of integral work table for unit brake transport, cleaning and dismounting

Publications (2)

Publication Number Publication Date
CN105619349A true CN105619349A (en) 2016-06-01
CN105619349B CN105619349B (en) 2018-02-27

Family

ID=56034888

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410606167.2A CN105619349B (en) 2014-10-31 2014-10-31 A kind of integral work table for unit brake transport, cleaning and dismounting

Country Status (1)

Country Link
CN (1) CN105619349B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108640025A (en) * 2018-04-04 2018-10-12 上海工程技术大学 A kind of city rail vehicle unit brake attaching/detaching apparatus

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3206318A1 (en) * 1982-02-22 1984-10-31 Werkstattmoebel Zubehoer Gmbh Repair and assembly table for preferably electrical equipment
CN202357139U (en) * 2011-11-30 2012-08-01 麦克维尔空调制冷(苏州)有限公司 Assembly workbench capable of driving work-piece to overturn and rotate
CN203062754U (en) * 2012-12-07 2013-07-17 张小亭 Multifunctional workbench for brake assembly
CN203221479U (en) * 2013-04-24 2013-10-02 周明华 Rotating working platform
CN203680104U (en) * 2013-08-28 2014-07-02 苏州上洋机电科技有限公司 Adjustable locating device
CN204235518U (en) * 2014-10-31 2015-04-01 上海工程技术大学 A kind of for unit brake transport, cleaning and the integral work table of dismounting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3206318A1 (en) * 1982-02-22 1984-10-31 Werkstattmoebel Zubehoer Gmbh Repair and assembly table for preferably electrical equipment
CN202357139U (en) * 2011-11-30 2012-08-01 麦克维尔空调制冷(苏州)有限公司 Assembly workbench capable of driving work-piece to overturn and rotate
CN203062754U (en) * 2012-12-07 2013-07-17 张小亭 Multifunctional workbench for brake assembly
CN203221479U (en) * 2013-04-24 2013-10-02 周明华 Rotating working platform
CN203680104U (en) * 2013-08-28 2014-07-02 苏州上洋机电科技有限公司 Adjustable locating device
CN204235518U (en) * 2014-10-31 2015-04-01 上海工程技术大学 A kind of for unit brake transport, cleaning and the integral work table of dismounting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108640025A (en) * 2018-04-04 2018-10-12 上海工程技术大学 A kind of city rail vehicle unit brake attaching/detaching apparatus

Also Published As

Publication number Publication date
CN105619349B (en) 2018-02-27

Similar Documents

Publication Publication Date Title
JP5993959B2 (en) Method and apparatus for mounting a rotor hub on a wind turbine
CN104029153B (en) For the Omni-mobile frock of revolving shell Product Assembly
CN103224191B (en) Front and rear cover on-line spreader of high-top twin truck cab
US9309008B2 (en) Aircraft engine module handling assembly
CN202542734U (en) Glass hoisting and installing device
CN101947783B (en) Multifunctional aloft-work mechanical arm
CN101920914A (en) Vehicle-type upper rotating tower crane
CN203045155U (en) Vibrating disc type laser welding tool
CN106430026B (en) Electric power overhaul workbench and its system
JP5283716B2 (en) Suspension device for power lines
CN202673195U (en) Device for connecting drill pipes with three-joint unit
CN102671877B (en) Automatic cleaning device of monitoring camera
CN204355986U (en) A kind of bent-arm vacuum absorbing and hoisting machine
CN203373026U (en) Assistant lifting device for roller exchanging of mill table
CN102416933B (en) Construction machinery chassis and supporting leg supporting device thereof
US20140140795A1 (en) Apparatus for transporting commercial and industrial appliance units
WO2012051828A1 (en) Fan integral installing rotary hold-lifting mechanism
CN204024005U (en) Assembly type suspension platform
CN104528609A (en) Bridge type operation platform
CN204868049U (en) Dress contact spring autoplant
CN203471507U (en) Automatic aluminum row loading and unloading manipulator for crystal polishing and grinding system
CN204799471U (en) Hub tipping arrangement that sprays paint
CN202657846U (en) Turning device for concrete prefabricated member
CN102079040A (en) Movable type rotatable assembling platform
US20120118846A1 (en) Assembling an auxiliary lifting unit on a mobile crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

Termination date: 20181031