CN105610093B - Anchoring device and anchoring method - Google Patents
Anchoring device and anchoring method Download PDFInfo
- Publication number
- CN105610093B CN105610093B CN201610116274.6A CN201610116274A CN105610093B CN 105610093 B CN105610093 B CN 105610093B CN 201610116274 A CN201610116274 A CN 201610116274A CN 105610093 B CN105610093 B CN 105610093B
- Authority
- CN
- China
- Prior art keywords
- ground
- support
- wire
- anchoring
- support line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
- H02G1/04—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
技术领域technical field
本发明涉及地线检修设备技术领域,更具体地说,涉及一种锚固装置及锚固方法。The invention relates to the technical field of ground wire maintenance equipment, and more specifically, to an anchoring device and an anchoring method.
背景技术Background technique
在进行输电线路地线检修过程中,需要进行地线落线即使地线落至地面上后进行检修。目前,一般使用牵引工具牵引地线落至地面,在进行牵引前需在地面上埋设地锚,然后将牵引工具设置在地锚上,以此实现将牵引工具锚固在地面上。然而,很多作业是在多岩石地质的区域进行,此时在岩石地面上挖坑埋设地锚需要耗费较长时间且耗费大量的人力物力,工作效率极低。In the process of overhauling the ground wire of the transmission line, it is necessary to perform maintenance after the ground wire falls, that is, the ground wire falls on the ground. At present, a traction tool is generally used to pull the ground wire to the ground. Before the traction, a ground anchor needs to be buried on the ground, and then the traction tool is set on the ground anchor, so as to realize the anchoring of the traction tool on the ground. However, many operations are carried out in rocky geological areas. At this time, it takes a long time and a lot of manpower and material resources to dig a hole on the rocky ground to bury the ground anchor, and the work efficiency is extremely low.
综上所述,如何有效地解决锚固牵引工具时较费时费力的问题,是目前本领域技术人员急需解决的问题。To sum up, how to effectively solve the time-consuming and labor-intensive problem of anchoring the towing tool is an urgent problem for those skilled in the art.
发明内容Contents of the invention
有鉴于此,本发明的第一个目的在于提供一种锚固装置,该锚固装置的结构设计可以有效地解决锚固牵引工具时较费时费力的问题。本发明的第二个目的在于提供一种锚固方法,该锚固方法可以有效地解决锚固牵引工具时较费时费力的问题。In view of this, the first object of the present invention is to provide an anchoring device whose structural design can effectively solve the time-consuming and labor-intensive problem of anchoring the towing tool. The second object of the present invention is to provide an anchoring method, which can effectively solve the time-consuming and labor-intensive problem of anchoring the pulling tool.
为了达到上述目的,本发明提供如下技术方案:In order to achieve the above object, the present invention provides the following technical solutions:
一种锚固装置,包括:An anchoring device comprising:
固定在地面上的两个支架;Two brackets fixed to the ground;
架设在两个支架之间的支撑线,且所述支撑线的两端分别固定设置在两个所述支架上,牵引装置能够设置在所述支撑线上。The support line is erected between two supports, and the two ends of the support line are respectively fixedly arranged on the two supports, and the traction device can be arranged on the support line.
优选地,上述锚固装置中,所述支撑线的数量为多根,且所述牵引装置的数量为多个,每根所述支撑线上设置有一个所述牵引装置。Preferably, in the above-mentioned anchoring device, there are multiple supporting wires and multiple pulling devices, and one pulling device is provided on each supporting wire.
优选地,上述锚固装置中,多根所述支撑线之间设置有间隔棒。Preferably, in the above-mentioned anchoring device, spacer rods are arranged between the plurality of support wires.
优选地,上述锚固装置中,所述支撑线的数量为四根,并且四根所述支撑线分别为四分裂导线的四根分导线。Preferably, in the above-mentioned anchoring device, the number of the support wires is four, and the four support wires are respectively four sub-wires of the four-split wires.
优选地,上述锚固装置中,还包括设置在多根所述支撑线上的张力集中器,所述张力集中器包括连接环、一端挂接在所述连接环上的多个双钩紧线器以及分别与多个所述双钩紧线器的另一端连接的多个卡线器,多个所述卡线器能够分别卡设在多根支撑线上。Preferably, the above-mentioned anchoring device further includes a tension concentrator arranged on a plurality of the support wires, the tension concentrator includes a connecting ring, a plurality of double-hook wire tensioners with one end hooked on the connecting ring, and A plurality of wire grippers respectively connected to the other ends of the plurality of double-hook wire tighteners, and the plurality of wire grippers can be respectively gripped on a plurality of support wires.
优选地,上述锚固装置中,还包括钢锚线和通过支架固定的具有两个定滑轮的滑车,且两个所述定滑轮上下分布,所述地线和钢锚线分别与两个定滑轮的上侧配合,且钢锚线的一端与牵引装置连接,另一端与地线通过卡线器卡设在一起。Preferably, the above-mentioned anchoring device also includes a steel anchor wire and a pulley with two fixed pulleys fixed by a bracket, and the two fixed pulleys are distributed up and down, and the ground wire and the steel anchor wire are connected to the two fixed pulleys respectively. The upper side of the anchor wire is matched with the upper side, and one end of the steel anchor wire is connected to the traction device, and the other end is clamped together with the ground wire through the wire clamp.
优选地,上述锚固装置中,所述滑车的高度高于所述支撑线的高度。Preferably, in the above-mentioned anchoring device, the height of the pulley is higher than the height of the support line.
优选地,上述锚固装置中,所述牵引装置为手扳葫芦。Preferably, in the above-mentioned anchoring device, the traction device is a lever block.
一种锚固方法,包括步骤:An anchoring method, comprising the steps of:
固定支架,将两个支架固定在地面上;Fix the bracket, fix the two brackets on the ground;
架设支撑线,将支撑线架设在两个所述支架之间,且所述支撑线的两端分别固定设置在两个所述支架上;erecting a support line, erecting the support line between the two supports, and fixing the two ends of the support line on the two supports;
安装牵引装置,将牵引装置设置在所述支撑线上。A traction device is installed, and the traction device is arranged on said support line.
本发明提供的锚固装置包括支架和支撑线,其中支架的数量为两个,并且两个支架均固定在地面上。支撑线架设在两个支架之间,并且支撑线的两端分布固定设置在两个支架上,用于牵引地线落线的牵引装置能够设置在支撑线上。The anchoring device provided by the present invention includes a bracket and a support line, wherein the number of the brackets is two, and both brackets are fixed on the ground. The supporting wire is erected between the two brackets, and the two ends of the supporting wire are distributed and fixedly arranged on the two brackets, and the pulling device for pulling the ground wire to fall can be arranged on the supporting wire.
当需要在岩石地面上锚固牵引装置时,可以应用本发明提供的锚固装置,找到岩石周边容易安装支架的地面,然后将两个支架固定在岩石周边的地面上,并且需要锚固牵引装置的岩石地面位于两个支架之间,将支撑线的两端分别固定在两个支架上,并且需要锚固牵引装置的岩石地面位于支撑线的下方。如此可以把牵引装置设置在支撑线上,以此实现了把牵引装置锚固在了岩石地面的上方,进而可以实现地线落线作业。如此通过支架架设支撑线,避免了在岩石上挖坑,而是直接在岩石周边容易安装支架地面上进行支架安装,比如可以直接选择土地面设置支架,较省时省力,大大提高了作业效率以及安全性。When it is necessary to anchor the traction device on the rocky ground, the anchoring device provided by the present invention can be applied to find the ground where the bracket is easy to install around the rock, and then fix the two brackets on the ground around the rock, and the rocky ground that needs to anchor the traction device Located between the two brackets, fix the two ends of the support line on the two supports respectively, and the rocky ground that needs to anchor the traction device is located below the support line. In this way, the traction device can be arranged on the support line, so that the traction device is anchored above the rocky ground, and then the ground wire drop operation can be realized. In this way, the support line is erected through the bracket to avoid digging holes on the rock, but to install the bracket directly on the ground where the bracket is easy to install around the rock. safety.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1为本发明实施例提供的锚固装置的结构示意图;Fig. 1 is a schematic structural view of an anchoring device provided by an embodiment of the present invention;
图2为本发明实施例提供的张力集中器的结构示意图。Fig. 2 is a schematic structural diagram of a tension concentrator provided by an embodiment of the present invention.
在图1-2中:In Figure 1-2:
1-卡线器、2-滑车、2a-定滑轮、3-地线、4-手扳葫芦、5-钢锚线、6-支撑线、7-张力集中器、7a-连接环、7b-双钩紧线器、7c-卡线器、8-间隔棒。1-wire clamp, 2-pull block, 2a-fixed pulley, 3-ground wire, 4-lever hoist, 5-steel anchor wire, 6-support wire, 7-tension concentrator, 7a-connecting ring, 7b- Double hook tensioner, 7c-wire clamp, 8-spacer bar.
具体实施方式detailed description
本发明的第一个目的在于提供一种锚固装置,该锚固装置的结构设计可以有效地解决锚固牵引工具时较费时费力的问题。本发明的第二个目的在于提供一种锚固方法,该锚固方法可以有效地解决锚固牵引工具时较费时费力的问题。The first object of the present invention is to provide an anchoring device whose structural design can effectively solve the time-consuming and labor-intensive problem of anchoring the towing tool. The second object of the present invention is to provide an anchoring method, which can effectively solve the time-consuming and labor-intensive problem of anchoring the pulling tool.
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
请参阅图1,本发明实施例提供的锚固装置包括支架和支撑线6,其中支架的数量为两个,并且两个支架均固定在地面上。支撑线6架设在两个支架之间,并且支撑线6的两端分布固定设置在两个支架上,用于牵引地线3落线的牵引装置能够设置在支撑线6上。Please refer to FIG. 1 , the anchoring device provided by the embodiment of the present invention includes a bracket and a support wire 6 , wherein the number of brackets is two, and both brackets are fixed on the ground. The support line 6 is erected between the two supports, and the two ends of the support line 6 are distributed and fixedly arranged on the two supports, and the pulling device for pulling the ground line 3 down can be arranged on the support line 6 .
当需要在岩石地面上锚固牵引装置时,可以应用本发明实施例提供的锚固装置,找到岩石周边容易安装支架的地面,然后将两个支架固定在岩石周边的地面上,并且需要锚固牵引装置的岩石地面位于两个支架之间,将支撑线6的两端分别固定在两个支架上,并且需要锚固牵引装置的岩石地面位于支撑线6的下方。如此可以把牵引装置设置在支撑线6上,以此实现了把牵引装置锚固在了岩石地面的上方,进而可以实现地线3落线作业。如此通过支架架设支撑线6,避免了在岩石上挖坑,而是直接在岩石周边容易安装支架地面上进行支架安装,比如可以直接选择土地面设置支架,较省时省力,大大提高了作业效率以及安全性。When it is necessary to anchor the traction device on the rocky ground, the anchoring device provided by the embodiment of the present invention can be used to find the ground where the bracket is easy to install around the rock, and then fix the two brackets on the ground around the rock, and the anchorage of the traction device is required. The rocky ground is located between the two supports, and the two ends of the support line 6 are respectively fixed on the two supports, and the rocky ground that needs to anchor the traction device is located below the support line 6 . In this way, the traction device can be arranged on the support line 6, so that the traction device is anchored above the rocky ground, and then the ground wire 3 drop-off operation can be realized. In this way, the support line 6 is erected through the bracket, avoiding digging holes on the rock, but directly installing the bracket on the ground where the bracket is easy to install around the rock, for example, you can directly select the ground to install the bracket, which saves time and effort, and greatly improves the work efficiency. and security.
其中,牵引装置可以固定设置在支撑线6上,也可以与支撑线6滑动配合,即牵引装置能够沿着支撑线6滑动。Wherein, the traction device can be fixedly arranged on the support line 6 , or can be slidably matched with the support line 6 , that is, the traction device can slide along the support line 6 .
当需要使用多个牵引装置时,支撑线6的数量可以为多根,即将多根支撑线6均架设在两个支架之间,牵引装置的数量也为多个,并且每根支撑线6上设置有一个牵引装置。如此每个牵引装置对一根支撑线6施力,防止了支撑线6断裂,保证了该锚固装置的强度。当然,也可以仅设置一根支撑线6,在此不作限定。When it is necessary to use multiple traction devices, the number of support lines 6 can be multiple, that is, multiple support lines 6 are erected between two supports, and the number of traction devices is also multiple, and each support line 6 It is provided with a traction device. In this way, each traction device exerts force on a support wire 6, which prevents the support wire 6 from breaking and ensures the strength of the anchoring device. Of course, only one support line 6 may also be provided, which is not limited here.
进一步地,多根支撑线6之间可以设置有间隔棒8,以此实现将多根支撑线6分离,便于牵引装置的设置。Further, a spacer bar 8 may be provided between the multiple support wires 6, so as to separate the multiple support wires 6 and facilitate the installation of the traction device.
具体地,支撑线6的数量可以为四根,并且四根支撑线6分别为四分裂导线的四根分导线。如此在两个支架之间架设四分裂导线即可,然后将多个牵引装置分别设置在四分裂导线的四根分导线上。另外,根据实际情况,支撑线6的数量也可以为六根,并且六根支撑线6分别为六分裂导线的六根分导线,在此不作限定。Specifically, the number of supporting wires 6 may be four, and the four supporting wires 6 are respectively four branch wires of the four split wires. In this way, it is enough to set up the four-split conductors between the two supports, and then a plurality of traction devices are respectively arranged on the four sub-conductors of the four-split conductors. In addition, according to the actual situation, the number of supporting wires 6 may also be six, and the six supporting wires 6 are respectively six sub-wires of the six-split wires, which are not limited here.
当然,支撑线6也可以钢丝绳等,在此不作限定。Certainly, the support wire 6 may also be a steel wire rope or the like, which is not limited here.
另外,如图2所示,该锚固装置还可以包括设置在多根支撑线上的张力集中器7,并且张力集中器7包括连接环7a、多个双钩紧线器7b以及多个卡线器7c,其中双钩紧线器7b的一端挂接在连接环7a上,多个双钩紧线器7b的另一端分别与多个卡线器7c连接,多个卡线器7c能够分别卡设在多根支撑线6上。如此当牵引装置对其中一根支撑线6施力时,张力集中器7会将力传递至其他支撑线6上,达到了将施力集中在多根支撑线上的目的,防止了单根支撑线6受力太大而断开的情况。牵引装置可以直接与连接环连接,以此实现多根支撑线6一起受力。In addition, as shown in Figure 2, the anchoring device can also include a tension concentrator 7 arranged on multiple support wires, and the tension concentrator 7 includes a connecting ring 7a, a plurality of double-hook wire tighteners 7b and a plurality of wire grippers 7c, wherein one end of the double-hook wire tightening device 7b is hooked on the connecting ring 7a, and the other ends of multiple double-hook wire tightening devices 7b are respectively connected to a plurality of wire clamps 7c, and multiple wire clamps 7c can be respectively clamped on multiple on the root support line 6. In this way, when the traction device exerts force on one of the support lines 6, the tension concentrator 7 will transfer the force to other support lines 6, achieving the purpose of concentrating the force on multiple support lines and preventing a single support The situation where the line 6 is broken due to too much force. The traction device can be directly connected with the connecting ring, so that multiple supporting wires 6 can be stressed together.
如图1所示,该锚固装置还包括钢锚线5和通过支架固定的具有两个定滑轮2a的滑车2,且两个定滑轮2a上下分布,即支架设置在地面上,然后将滑车2固定在支架上。地线3和钢锚线5分别与两个定滑轮2a的上侧配合,即地线3和钢锚线5分别与两个定滑轮2a的上侧滚动配合,并且钢锚线5的一端与牵引装置连接,钢锚线5的另一端与地线3通过卡线器1卡设在一起。即位于滑车2同一侧的地线3和钢锚线5通过卡线器1卡设在一起,滑车2的另一侧,钢锚线5与牵引装置连接,并且牵引装置对地线3进行牵引。如此,若地线3突然断开,由于地线3和钢锚线5通过卡线器1卡设在了一起,有钢锚线5的限制断开的地线3也不会肆意的掉落在难检修的区域。As shown in Figure 1, the anchoring device also includes a steel anchor wire 5 and a tackle 2 with two fixed pulleys 2a fixed by a bracket, and the two fixed pulleys 2a are distributed up and down, that is, the bracket is arranged on the ground, and then the tackle 2 fixed on the stand. The ground wire 3 and the steel anchor wire 5 cooperate with the upper sides of the two fixed pulleys 2a respectively, that is, the ground wire 3 and the steel anchor wire 5 respectively roll and cooperate with the upper sides of the two fixed pulleys 2a, and one end of the steel anchor wire 5 is matched with the upper side of the two fixed pulleys 2a. The traction device is connected, and the other end of the steel anchor wire 5 and the ground wire 3 are clamped together by the wire clamp 1. That is, the ground wire 3 and the steel anchor wire 5 located on the same side of the pulley 2 are clamped together by the wire gripper 1, and on the other side of the pulley 2, the steel anchor wire 5 is connected to the traction device, and the traction device pulls the ground wire 3 . In this way, if the ground wire 3 is suddenly disconnected, since the ground wire 3 and the steel anchor wire 5 are clamped together by the wire clamp 1, the ground wire 3 that is restricted by the steel anchor wire 5 will not fall indiscriminately. In difficult-to-access areas.
为防止卡线器1失效,还可以在卡线器1旁边设置将地线3和钢锚线5夹在一起的钢丝绳夹,在此不作限定。In order to prevent the wire clamp 1 from failing, a wire rope clamp clamping the ground wire 3 and the steel anchor wire 5 can also be arranged beside the wire clamp 1, which is not limited here.
进一步地,滑车2的高度应该高于支撑线6的高度,当然滑车2的高度也可以等于支撑线6的高度,在此不作限定。Further, the height of the trolley 2 should be higher than the height of the support line 6, of course, the height of the trolley 2 can also be equal to the height of the support line 6, which is not limited here.
其中,牵引装置可以为手扳葫芦4。Wherein, the traction device may be a lever hoist 4 .
本发明实施例还提供了一种锚固方法,包括步骤:The embodiment of the present invention also provides an anchoring method, comprising the steps of:
S1:固定支架,将两个支架固定在地面上;S1: Fix the bracket, fix the two brackets on the ground;
即选择岩石区域周边的合适地面,比如土地面,进行安装固定两个支架。That is, select a suitable ground around the rock area, such as the ground, and install and fix the two brackets.
S2:架设支撑线6,将支撑线6架设在两个支架之间,且所述支撑线6的两端分别固定设置在两个支架上;S2: erecting the support line 6, erecting the support line 6 between two supports, and fixing the two ends of the support line 6 on the two supports respectively;
即将支撑线6的两端分别固定在两个支架上。That is to fix the two ends of the support line 6 on the two supports respectively.
S3:安装牵引装置,将牵引装置设置在支撑线6上。S3: installing the traction device, setting the traction device on the support line 6 .
将能够牵引地线3的牵引装置设置在支撑线6上,具体地可以固定在支撑线6上,也可以滑动的设置在支撑线6上。The pulling device capable of pulling the ground wire 3 is set on the support line 6 , specifically, it can be fixed on the support line 6 or can be slidably set on the support line 6 .
该锚固方法中可以将两个支架固定在岩石周边的地面上,并且需要锚固牵引装置的岩石地面位于两个支架之间,并且需要锚固牵引装置的岩石地面位于支撑线6的下方。实现了把牵引装置锚固在了岩石地面的上方,进而可以实现地线3落线作业。如此通过支架架设支撑线6,避免了在岩石上挖坑,而是直接在岩石周边容易安装支架地面上进行支架安装,比如可以直接选择土地面设置支架,较省时省力,大大提高了作业效率以及安全性。In this anchoring method, two brackets can be fixed on the ground around the rock, and the rocky ground requiring the anchoring traction device is located between the two supports, and the rocky ground requiring the anchoring traction device is located below the support line 6 . It realizes that the traction device is anchored above the rocky ground, and then the ground wire 3 drop-off operation can be realized. In this way, the support line 6 is erected through the bracket, avoiding digging holes on the rock, but directly installing the bracket on the ground where the bracket is easy to install around the rock, for example, you can directly select the ground to install the bracket, which saves time and effort, and greatly improves the work efficiency. and security.
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。Each embodiment in this specification is described in a progressive manner, each embodiment focuses on the difference from other embodiments, and the same and similar parts of each embodiment can be referred to each other.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610116274.6A CN105610093B (en) | 2016-03-01 | 2016-03-01 | Anchoring device and anchoring method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610116274.6A CN105610093B (en) | 2016-03-01 | 2016-03-01 | Anchoring device and anchoring method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105610093A CN105610093A (en) | 2016-05-25 |
CN105610093B true CN105610093B (en) | 2018-01-30 |
Family
ID=55989737
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610116274.6A Active CN105610093B (en) | 2016-03-01 | 2016-03-01 | Anchoring device and anchoring method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105610093B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106486924B (en) * | 2016-10-31 | 2017-12-22 | 国网河南镇平县供电公司 | A kind of power circuit wire-binding device across river |
CN106549338B (en) * | 2016-11-25 | 2018-01-26 | 国网河南省电力公司平顶山供电公司 | A pole-holding lattice spanning frame on both sides of the expressway |
CN109612754B (en) * | 2018-11-30 | 2021-06-04 | 国电南瑞科技股份有限公司 | Climbing performance detection device for line robot |
CN112582961A (en) * | 2020-12-03 | 2021-03-30 | 广东电网有限责任公司湛江供电局 | Interim draw off mechanism of overhead line |
CN114614402B (en) * | 2022-03-29 | 2023-12-19 | 国网山西省电力公司临汾供电公司 | Electric wire holding device |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2920169B2 (en) * | 1990-08-31 | 1999-07-19 | 三和テッキ株式会社 | Outer ring expanding cam along and lock device |
CN1469017A (en) * | 2002-07-16 | 2004-01-21 | 石午江 | High slope rock-soil anchoring construction method and device |
SE527107C2 (en) * | 2004-05-24 | 2005-12-27 | Atlas Copco Rock Drills Ab | Procedure for rocking and rocking |
JP2007224623A (en) * | 2006-02-23 | 2007-09-06 | Chugoku Electric Power Co Inc:The | Extendable guy rod |
CN101859988B (en) * | 2010-03-12 | 2013-01-09 | 湖北省输变电工程公司 | Assembly type overhead construction process |
CN203296451U (en) * | 2013-06-06 | 2013-11-20 | 国家电网公司 | Pole straightening device |
CN204492311U (en) * | 2014-11-21 | 2015-07-22 | 广东电网有限责任公司电力科学研究院 | The detachable windproof bracing wire of a kind of distribution network overhead line electric pole |
CN204760902U (en) * | 2015-07-30 | 2015-11-11 | 国网山东省电力公司临沂供电公司 | Wire anchor installation specialized tool |
-
2016
- 2016-03-01 CN CN201610116274.6A patent/CN105610093B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105610093A (en) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105610093B (en) | Anchoring device and anchoring method | |
CN102444086B (en) | Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge | |
JP5812325B2 (en) | Electric wire tension reduction device and electric wire tension reduction method | |
CN204651779U (en) | A kind of anti-hopping releasing pulley being applicable to transmission line construction | |
JP5855523B2 (en) | 4 conductor transmission line insulator device replacement method and replacement device used for the method | |
CN107834434A (en) | Crossing method for the construction of transmission line of electricity tension stringing | |
CN109973130B (en) | Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand | |
CN109167302B (en) | A kind of wire end pulling method for tight-hanging construction of transmission line | |
JP2011241633A (en) | Construction method of pc structure and fitting for pc structure construction | |
CN104022459A (en) | 10 KV distribution line pole-mounted wire suspension device | |
CN214255445U (en) | Cable lifting sling and lifting equipment | |
CN112722734B (en) | Method for transporting heavy steel pipes with large calibers in pipe gallery | |
CN220317073U (en) | TRD shaped steel hoist and mount stability fixture and hoist thereof | |
CN104947953B (en) | A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing | |
CN102424327A (en) | Elevator device for installing submersible pump | |
CN206302092U (en) | Pulling tools for overhead transmission line cables | |
CN104113014A (en) | Upward carrying wire lifting trolley | |
CN209562017U (en) | A tight pulley block device | |
CN213202202U (en) | Light tower cable laying device | |
CN102477810A (en) | Steel pipe tower for transmission line and construction method thereof | |
JP4224584B2 (en) | Fastener for cable erection coil and method for fixing end of cable erection coil | |
CN214462561U (en) | Beam formwork fastening device | |
CN204754283U (en) | Interim pole is changed to 10KV transmission line cement pole | |
CN112993862B (en) | Wire tightening device for power construction | |
CN102554070A (en) | Simple straightening device for reinforcing bar coils |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |