CN105576835A - Intelligent energy saving control system - Google Patents

Intelligent energy saving control system Download PDF

Info

Publication number
CN105576835A
CN105576835A CN201610145490.3A CN201610145490A CN105576835A CN 105576835 A CN105576835 A CN 105576835A CN 201610145490 A CN201610145490 A CN 201610145490A CN 105576835 A CN105576835 A CN 105576835A
Authority
CN
China
Prior art keywords
intelligent
server
field monitoring
management
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610145490.3A
Other languages
Chinese (zh)
Inventor
丁勇吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHISHI GUOGAO ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
SHISHI GUOGAO ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHISHI GUOGAO ELECTRONIC TECHNOLOGY Co Ltd filed Critical SHISHI GUOGAO ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201610145490.3A priority Critical patent/CN105576835A/en
Publication of CN105576835A publication Critical patent/CN105576835A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00019Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using optical means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses an intelligent energy saving control system comprising a background management center, a server and at least one field monitoring center. The background management center is connected with the server. Each field monitoring center is internally provided with a switch, an information acquisition instrument, a field monitoring system, a storage battery monitoring system, an intelligent DC screen, intelligent detection equipment, an electric energy detector and a switching quantity and analog quantity collector. An SDH optical fiber ring network enters the switch. The information acquisition instrument is connected with the switch which is connected with the field monitoring system. The information acquisition instrument is respectively connected with the storage battery monitoring system, the intelligent DC screen, the intelligent detection equipment, the electric energy detector and the switching quantity and analog quantity collector. Multiple types of parameter information in a transformer substation can be monitored simultaneously, and data interaction of front-end monitoring data and management instructions and background master control data and operation instructions can be performed based on global support of the server so that monitoring and management performance of the whole intelligent monitoring system can be enhanced.

Description

Intelligent energy-saving control system
Technical field
The present invention relates to the technical field such as intelligent management, data monitoring, specifically, is a kind of intelligent energy-saving control system, for the intelligent management control of electrical quantity monitoring.
Background technology
The electric utility of China is advanced by leaps and bounds, and power automation level improves day by day, and electric substation is unattended, and management mode is progressively promoted.In order to ensure electrical production safe and highly efficient operation, improving the electric power safety level of production further, long-range real-time detection being carried out to the running status of substation facilities and just seems especially necessary.On the other hand, along with deepening continuously of power system reform, explore the demand that novel equipment Managing Model and Strategies of Maintenance become power supply enterprise's production management innovation, power supply unit maintenance just progressively changes into based on repair based on condition of component from the pattern based on periodic inspection.Gather and issue real-time equipment running status information, promptness and the accuracy of plant maintenance and maintenance can be improved, saving operation expense, increase economic efficiency.
Intelligent management (IntelligentManagement, be called for short IM) is that artificial intelligence and management science, knowledge engineering and multidisciplinary, many technology such as system engineering, computing technique and the communication technology, soft project and information engineering etc. be combined with each other, interpenetrate and new technology, a new disciplines producing.How its research improves the level of intelligence of computer management system, and the design theory of intelligent management system, method and actualizing technology.Intelligent management is the new trend of modern management science technical development.Intelligent management system is at management information system (ManagementInformationSystem, be called for short MIS), the office automation system (OffeceAu-tomationSystem is called for short OAS), DSS (DecisionSupportSystem, be called for short DSS) function i ntegration, Integration ofTechnology basis on, the Method and Technology such as using artificial intelligent expert system, knowledge engineering, pattern recognition, artificial neural net, carries out the computer management system of a new generation of intellectuality, integrated, concert rationality, Design and implementation.
Summary of the invention
The object of the present invention is to provide a kind of intelligent energy-saving control system, design based on intelligent management control technology, many kinds of parameters information in electric substation can be monitored simultaneously; And support based on the server overall situation, front end Monitoring Data and supervisory instruction, backstage master control data and operational order are carried out data interaction, promotes the monitoring management performance of whole intelligent monitor system.
The present invention is achieved through the following technical solutions:
A kind of intelligent energy-saving control system, comprises back-stage management center, server, at least one field monitoring center, described back-stage management center connection server, and described server connects field monitoring center by SDH optical fiber ring network; Intracardiacly in described field monitoring be provided with switch, information acquiring instrument, Field Monitoring System, Monitored System of Industrial Storage Cell, intelligent d. c screen, intelligent detection equipment, electric flux detector, switching value and analog quantity acquiring device, described SDH optical fiber ring network enters switch, described information acquiring instrument connects switch, described switch connects Field Monitoring System, and described information acquiring instrument connects Monitored System of Industrial Storage Cell, intelligent d. c screen, intelligent detection equipment, electric flux detector, switching value and analog quantity acquiring device respectively.
To better implement the present invention, further, intracardiacly in described field monitoring gate control system, air-conditioning, watch-dog is also provided with, described switching value and analog quantity acquiring device connection door access control system, air-conditioning and watch-dog respectively.
To better implement the present invention, further, intracardiacly in described back-stage management be provided with operational system, production and operation system, management decision system, described server connects operational system, described production and operation system connection server, described server connection management decision system.
To better implement the present invention, further, described server adopts tide NF5280M3 server.
The present invention compared with prior art, has the following advantages and beneficial effect:
(1) the present invention is based on intelligent management control technology and design, many kinds of parameters information in electric substation can be monitored simultaneously; And support based on the server overall situation, front end Monitoring Data and supervisory instruction, backstage master control data and operational order are carried out data interaction, promotes the monitoring management performance of whole intelligent monitor system.
(2) the present invention can gather the much information such as such as DC current values, storage battery value, electric energy value, ambient parameter information that front end is to be monitored and transmit timely, makes corresponding O&M strategy, migration efficiency and management strategy in order to back-stage management center.
(3) the present invention can the simultaneously multiple field monitoring center of monitoring management, carry out integrated management, realize when center controls multinode function, and effectively complete resource consolidation, make the equipment operation of each on-the-spot node keep optimum state, thus the electrification systems improving whole monitored management is in and a kind ofly stablize good operational regime.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme of the embodiment of the present invention, be briefly described to the accompanying drawing used required in embodiment below, be to be understood that, the following drawings illustrate only some embodiment of the present invention, therefore the restriction to scope should be counted as, for those of ordinary skill in the art, under the prerequisite not paying creative work, other relevant accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is structure chart of the present invention.
Fig. 2 is field monitoring centre junction composition of the present invention.
Embodiment
Below in conjunction with specific embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited thereto.
Embodiment 1:
As Fig. 1, shown in 2, the present invention proposes intelligent energy-saving control system, can be comprehensive, long-range to high voltage equipment insulation checkout gear, UPS monitoring running state device, DC power supply supervising device, batteries patrols and examines monitoring device, harmonic wave on-Line Monitor Device, arc suppression coil supervising device, voltage monitoring instrument, transformer oil on-Line Monitor Device, small current neutral grounding device, protection manage computer system, intelligent battery charge and discharge device, electric substation's fire-proof and theft-proof device, gate inhibition, the serial equipments such as air-conditioning equipment or system carry out monitoring or/and management and control, comprise back-stage management center, server, at least one field monitoring center, described back-stage management center connection server, described server connects field monitoring center by SDH optical fiber ring network, intracardiacly in described field monitoring be provided with switch, information acquiring instrument, Field Monitoring System, Monitored System of Industrial Storage Cell, intelligent d. c screen, intelligent detection equipment, electric flux detector, switching value and analog quantity acquiring device, described SDH optical fiber ring network enters switch, described information acquiring instrument connects switch, described switch connects Field Monitoring System, and described information acquiring instrument connects Monitored System of Industrial Storage Cell, intelligent d. c screen, intelligent detection equipment, electric flux detector, switching value and analog quantity acquiring device respectively.
When designing use, information acquiring instrument is by the various data utilizing switch to be issued at back-stage management center in SDH optical fiber ring network or instruction issuing and carry out the collection of corresponding data, Field Monitoring System then carries out video monitoring to scene, and is delivered in back-stage management intracardiac by switch through SDH optical fiber ring network by monitored data.
Intracardiacly in field monitoring be provided with the Monitored System of Industrial Storage Cell, intelligent d. c screen, intelligent detection equipment, electric flux detector, switching value and the analog quantity acquiring device that are connected with information acquiring instrument, each parameter monitoring of such as storage battery control for completing, the information monitoring such as parameter screen display, temperature humidity of direct current and control, the detection of electric flux, switching value and analog quantity the parameter information such as monitoring.
Can timely the much information such as such as DC current values, storage battery value, electric energy value, ambient parameter information that front end is to be monitored be gathered and be transmitted, make corresponding O&M strategy, migration efficiency and management strategy in order to back-stage management center.
Design based on intelligent management control technology, many kinds of parameters information in electric substation can be monitored simultaneously; And support based on the server overall situation, front end Monitoring Data and supervisory instruction, backstage master control data and operational order are carried out data interaction, promotes the monitoring management performance of whole intelligent monitor system.
Embodiment 2:
The present embodiment is at the enterprising one-step optimization in the basis of above-described embodiment, to better implement the present invention, further, as shown in Figure 1, 2, intracardiacly in described field monitoring be also provided with gate control system, air-conditioning, watch-dog, described switching value and analog quantity acquiring device connection door access control system, air-conditioning and watch-dog respectively, switching value and analog quantity acquiring device effectively can carry out parameter acquisition and function control to gate control system, air-conditioning and watch-dog.
Embodiment 3:
The present embodiment is at the enterprising one-step optimization in the basis of above-mentioned any embodiment, to better implement the present invention, further, as shown in Figure 1, 2, intracardiacly in described back-stage management be provided with operational system, production and operation system, management decision system, described server connects operational system, described production and operation system connection server, described server connection management decision system.
Design use time, intracardiacly in back-stage management to be provided with: for the operational system of maintenance operation overhaul of the equipments process, be convenient to form O&M strategy, assign maintenance instruction, notice maintenance person safeguards relevant device; For the production and operation system of the production and operation scheduling such as command scheduling, equilibrium of supply and demand scheduling; For the formation of the management decision system of on-the-spot guidance strategy.
The various policy datas that operational system, production and operation system and management decision system are formed will carry out data interaction in server, server carries out overall situation support, front end Monitoring Data and supervisory instruction, backstage master control data and operational order are carried out data interaction, promotes the monitoring management performance of whole intelligent monitor system.
Embodiment 4:
The present embodiment is at the enterprising one-step optimization in the basis of above-mentioned any embodiment, and to better implement the present invention, further, described server adopts tide NF5280M3 server.
Tide NF5280M3 server has following characteristic:
CPU series: Xeon E5 series, Intel;
Core cpu: six cores;
Bus specification: QPI7.2GT/s;
CPU model: XeonE5-2620v2;
CPU frequency: 2.5GHz;
Three grades of buffer memory: 15M;
Standard configuration CPU number: 2;
Board chip set: IntelC600;
Host slot: 1 × PCI-E3.0x16; 4 × PCI-E3.0x8;
Type of memory: DDR3;
Standard configuration internal memory: 4 × 16GREGISTEREDDDR3 internal memory;
Memory bank number: 24;
Maximum memory capacity: 768GB;
Hard-disk interface type: SAS;
Standard configuration hard disk: 6 × 10000 turns of 2.5 cun of SAS600G;
The rotation speed of hard disk: 10000 turns;
CD-ROM drive: SLIMDVD CD writer;
Standard interface: 4 × RJ45 network interface; 8 × USB interface (2 preposition, and 4 rearmounted, and 2 built-in); 1 × USB interface (rearmounted); 2 × serial ports (1 rearmounted, and 1 built-in)
Network interface card: 2 × 1000M Ethernet card;
Power supply: duplicate supply-NF5280M3.
The present invention is based on intelligent management control technology and design, many kinds of parameters information in electric substation can be monitored simultaneously; And support based on the server overall situation, front end Monitoring Data and supervisory instruction, backstage master control data and operational order are carried out data interaction, promotes the monitoring management performance of whole intelligent monitor system.
The present invention can gather the much information such as such as DC current values, storage battery value, electric energy value, ambient parameter information that front end is to be monitored and transmit timely, makes corresponding O&M strategy, migration efficiency and management strategy in order to back-stage management center.
The present invention can the simultaneously multiple field monitoring center of monitoring management, carry out integrated management, realize when center controls multinode function, and effectively complete resource consolidation, make the equipment operation of each on-the-spot node keep optimum state, thus the electrification systems improving whole monitored management is in and a kind ofly stablize good operational regime.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. an intelligent energy-saving control system, is characterized in that: comprise back-stage management center, server, at least one field monitoring center, described back-stage management center connection server, and described server connects field monitoring center by SDH optical fiber ring network; Intracardiacly in described field monitoring be provided with switch, information acquiring instrument, Field Monitoring System, Monitored System of Industrial Storage Cell, intelligent d. c screen, intelligent detection equipment, electric flux detector, switching value and analog quantity acquiring device, described SDH optical fiber ring network enters switch, described information acquiring instrument connects switch, described switch connects Field Monitoring System, and described information acquiring instrument connects Monitored System of Industrial Storage Cell, intelligent d. c screen, intelligent detection equipment, electric flux detector, switching value and analog quantity acquiring device respectively.
2. intelligent energy-saving control system according to claim 1, is characterized in that: intracardiacly in described field monitoring be also provided with gate control system, air-conditioning, watch-dog, described switching value and analog quantity acquiring device connection door access control system, air-conditioning and watch-dog respectively.
3. intelligent energy-saving control system according to claim 1, it is characterized in that: intracardiacly in described back-stage management be provided with operational system, production and operation system, management decision system, described server connects operational system, described production and operation system connection server, described server connection management decision system.
4. intelligent energy-saving control system according to claim 1, is characterized in that: described server adopts tide NF5280M3 server.
CN201610145490.3A 2016-03-15 2016-03-15 Intelligent energy saving control system Pending CN105576835A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610145490.3A CN105576835A (en) 2016-03-15 2016-03-15 Intelligent energy saving control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610145490.3A CN105576835A (en) 2016-03-15 2016-03-15 Intelligent energy saving control system

Publications (1)

Publication Number Publication Date
CN105576835A true CN105576835A (en) 2016-05-11

Family

ID=55886648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610145490.3A Pending CN105576835A (en) 2016-03-15 2016-03-15 Intelligent energy saving control system

Country Status (1)

Country Link
CN (1) CN105576835A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102545386A (en) * 2012-01-12 2012-07-04 浙江大学 Automatic power grid scheduling system of intelligent unattended substations
CN202634082U (en) * 2012-06-27 2012-12-26 国家电网公司 On-line monitoring and early warning system for direct-current equipment of substations
CN103747212A (en) * 2014-01-04 2014-04-23 国网四川省电力公司信息通信公司 Realization method of transformer substation video monitoring system integrating motive power environment monitoring data
CN103779960A (en) * 2013-10-30 2014-05-07 国家电网公司 Intelligent switching station integrated monitoring system
CN104052151A (en) * 2014-05-14 2014-09-17 国家电网公司 Intelligent auxiliary comprehensive monitoring and D5000 comprehensive linkage platform of transformer substation
CN105376534A (en) * 2015-11-17 2016-03-02 国网山东曲阜市供电公司 Integrated electric power information communication monitoring platform based on wireless transmission technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102545386A (en) * 2012-01-12 2012-07-04 浙江大学 Automatic power grid scheduling system of intelligent unattended substations
CN202634082U (en) * 2012-06-27 2012-12-26 国家电网公司 On-line monitoring and early warning system for direct-current equipment of substations
CN103779960A (en) * 2013-10-30 2014-05-07 国家电网公司 Intelligent switching station integrated monitoring system
CN103747212A (en) * 2014-01-04 2014-04-23 国网四川省电力公司信息通信公司 Realization method of transformer substation video monitoring system integrating motive power environment monitoring data
CN104052151A (en) * 2014-05-14 2014-09-17 国家电网公司 Intelligent auxiliary comprehensive monitoring and D5000 comprehensive linkage platform of transformer substation
CN105376534A (en) * 2015-11-17 2016-03-02 国网山东曲阜市供电公司 Integrated electric power information communication monitoring platform based on wireless transmission technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宁雪峰: "变电站综合监控系统在东莞供电局集控中心的应用探索", 《中国优秀硕士学位论文全文数据库(电子期刊)》 *
郑炎: "数字化变电站若干技术研究", 《中国优秀硕士学位论文全文数据库(电子期刊)》 *

Similar Documents

Publication Publication Date Title
Cheng et al. Energy internet access equipment integrating cyber-physical systems: Concepts, key technologies, system development, and application prospects
CN103279638B (en) Large power grid overall situation on-line integrated quantitative evaluation method based on response
Li et al. Enabling datacenter servers to scale out economically and sustainably
Jia et al. Architecture design for new AC-DC hybrid micro-grid
CN107968429B (en) Energy management device and system of light storage and charging system
CN103441520A (en) Micro-grid distribution type new energy storage system
CN110429624B (en) Energy storage capacity configuration method applied to data center energy storage system
Xu et al. Control devices development of multi‐microgrids based on hierarchical structure
CN110021950B (en) Flexible direct distribution network compact control protection host
Liu et al. RE-UPS: an adaptive distributed energy storage system for dynamically managing solar energy in green datacenters
CN101752904B (en) Power supply system distributed controlling and managing subsystem computer
CN114421586A (en) Data center power supply system, power supply control method and device and data center
CN117060503A (en) Method and system for regulating and controlling platform area, electronic equipment and storage medium
CN102830755B (en) Integrated soft intelligent equipment server for intelligent substation
CN202798010U (en) Micro-grid distributed power supply layering coordination control system
Guo et al. Low‐voltage DC building distribution and utilization system and its implementation in China southern grid
Xu et al. Power Management of AC/DC Hybrid Distribution Network With Multi-Port PET Considering Reliability of Power Supply System
CN105576835A (en) Intelligent energy saving control system
CN204424898U (en) Novel microgrid system control device
CN109768568A (en) Distributed generation resource based on big data analysis accesses distribution network planning remodeling method
CN105576836A (en) Variable-frequency energy saving control system
CN106384306A (en) Intelligent management system for data center power supplying
CN104345654A (en) Different-power rectifier mixed insertion system and energy saving realization method and device thereof
CN103280815A (en) User side low-voltage reactive power compensation device
CN111864895A (en) Intelligent alternating current-direct current integrated power supply system for transformer substation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511

RJ01 Rejection of invention patent application after publication