CN105545307A - 特大采场空间远近场井上下协同顶板控制方法 - Google Patents
特大采场空间远近场井上下协同顶板控制方法 Download PDFInfo
- Publication number
- CN105545307A CN105545307A CN201510912242.2A CN201510912242A CN105545307A CN 105545307 A CN105545307 A CN 105545307A CN 201510912242 A CN201510912242 A CN 201510912242A CN 105545307 A CN105545307 A CN 105545307A
- Authority
- CN
- China
- Prior art keywords
- tight roof
- pit
- far
- especially big
- control method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 106
- 238000002347 injection Methods 0.000 claims abstract description 18
- 239000007924 injection Substances 0.000 claims abstract description 18
- 230000035939 shock Effects 0.000 claims abstract description 15
- 238000010276 construction Methods 0.000 claims description 16
- 230000001186 cumulative effect Effects 0.000 claims description 15
- 238000004880 explosion Methods 0.000 claims description 13
- 238000011017 operating method Methods 0.000 claims description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 22
- 239000003245 coal Substances 0.000 abstract description 10
- 238000005422 blasting Methods 0.000 abstract description 6
- 230000003313 weakening effect Effects 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 9
- 239000011435 rock Substances 0.000 description 6
- 239000012530 fluid Substances 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000000523 sample Substances 0.000 description 4
- 238000007789 sealing Methods 0.000 description 4
- 238000005065 mining Methods 0.000 description 3
- 239000000843 powder Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000005855 radiation Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000037452 priming Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C37/00—Other methods or devices for dislodging with or without loading
- E21C37/06—Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
- E21C37/14—Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by compressed air; by gas blast; by gasifying liquids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C37/00—Other methods or devices for dislodging with or without loading
- E21C37/06—Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
- E21C37/12—Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by injecting into the borehole a liquid, either initially at high pressure or subsequently subjected to high pressure, e.g. by pulses, by explosive cartridges acting on the liquid
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Remote Sensing (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
本发明涉及煤矿坚硬顶板控制方法,具体为特大采场空间远近场井上下协同顶板控制方法,解决目前缺乏特大采场空间近场和远场坚硬顶板综合协同控制方法的问题,技术方案为:包括井上垂直孔水力压裂法、井上L型孔水力压裂法、井上高聚能重复脉冲强冲击波法、井下注水法、井下分层爆破法、井下水力压裂法;优点:1、井上、井下协同控制远场与近场坚硬顶板,使得特大采场空间的强矿压问题得到了有效的控制;2、充分发挥各种方法的优势,利用多种方法互相弥补劣势,使得坚硬顶板弱化效果得到显著的提高;3、井上、井下所开各孔洞,即可独立使用,也可共用,大大缩减了开孔所需的时间、人力、物力、财力。
Description
技术领域
本发明涉及煤矿坚硬顶板控制方法,具体为特大采场空间远近场井上下协同顶板控制方法。
背景技术
近年来,随着煤炭工业的快速发展,高效集约化的生产模式已逐渐成为煤矿开采的常态,特别是大采高综放开采先进采煤技术的应用,使得工作面走向长度、工作面斜长、煤层厚度大幅增加,顶板垮落带高度也大幅增加,垮裂比异于寻常,从而形成了特大采场空间,生产过程中出现异乎寻常的剧烈来压,这种条件下,剧烈矿压的显现已经远远超出了坚硬基本顶的作用引起的矿压显现范围。高位坚硬顶板岩层的破断失稳引发的采场应力场、覆岩空间结构演化更加复杂,大规模高强度的开采扰动不仅导致垮落带范围覆岩剧烈运动,而且会使上覆采空区空间平衡结构进一步失稳,从而形成采空区顶板岩层大面积异常矿压剧烈显现,甚至诱发冲击地压、煤与瓦斯突出等煤岩动力灾害。如何有效地降低矿压,不仅要立足于近场30-80m范围的坚硬基本顶的控制,更要着眼于远场100-350m高位坚硬基本顶的控制。因此,研究一种针对特大采场的能够有效控制近场坚硬顶板和远场坚硬顶板的协同顶板控制方法是十分有必要的。
专利文件CN201510108115.7公开了一种《弱化距煤层100~350m高位坚硬顶板的方法及装置》其中包括使用垂直孔水力压裂坚硬顶板控制方法,以下称为“垂直孔水力压裂坚硬顶板控制方法”。
专利文件CN201510037487.5公开了一种《降低特厚煤层工作面远场坚硬顶板冲击性来压强度的方法》其中包括使用L型孔水力压裂坚硬顶板的控制方法,以下称为“L型孔水力压裂坚硬顶板控制方法”。
专利文件CN201210013370.X公开了一种《利用脉冲致裂实现治理冲击地压的方法》其中包括使用高聚能重复脉冲强冲击波坚硬顶板控制方法,以下称为“高聚能重复脉冲强冲击波坚硬顶板控制方法”。
专利文件CN201210144077.7公开了一种《煤矿坚硬顶板分层爆破方法》,其中包括使用分层爆破控制坚硬顶板的方法,以下称为“分层爆破坚硬顶板控制方法”。
专利文件CN201310483719.0公开了一种《提高综放工作面初采期间顶煤回收率的方法》,其中包括使用水力压裂控制坚硬顶板的方法,以下称为“水力压裂弱化坚硬顶板控制方法”。
发明内容
本发明解决目前缺乏特大采场空间近场和远场坚硬顶板综合协同控制方法的问题,提供一种特大采场空间远近场井上下协同顶板控制方法。
本发明是通过以下技术方案实现的:特大采场空间远近场井上下协同顶板控制方法,包括特大采场空间远场井上垂直孔水力压裂坚硬顶板控制方法、特大采场空间远场井上L型孔水力压裂坚硬顶板控制方法、特大采场空间远场井上高聚能重复脉冲强冲击波坚硬顶板控制方法、特大采场空间近场井下注水坚硬顶板控制方法、特大采场空间近场井下分层爆破坚硬顶板控制方法、特大采场空间近场井下水力压裂弱化坚硬顶板控制方法;
首先,采用特大采场空间远场井上垂直孔水力压裂坚硬顶板控制方法对远场坚硬顶板进行控制;
其次,采用特大采场空间远场井上L型孔水力压裂坚硬顶板控制方法对各个目的层的坚硬顶板进行控制;
然后,采用特大采场空间远场井上高聚能重复脉冲强冲击波坚硬顶板控制方法对已经弱化的各目的层坚硬顶板进行深度控制;
至此,完成特大采场空间远场坚硬顶板井上施工控制,同时或然后,进行特大采场空间近场坚硬顶板井下施工控制,首先,采用特大采场空间近场井下注水坚硬顶板控制方法对近场坚硬顶板进行初步控制;
然后,采用特大采场空间近场井下分层爆破坚硬顶板控制方法分别对近场坚硬顶板进行分层弱化控制;
最后,采用特大采场空间近场井下水力压裂弱化坚硬顶板控制方法对近场坚硬顶板进行控制。
依次采用井上垂直孔水力压裂法、井上L型孔水力压裂法、井上高聚能重复脉冲强冲击波法对远场坚硬顶板进行控制,由于上述三种方法的施工次序的安排,不仅充分发挥了各个方法的优势,而且彼此之间功效得到了加强,具体体现在:1、垂直孔水力压裂法先对局部远场坚硬顶板进行重点弱化,但是其缺点在于辐射范围有限,一半只能覆盖半径几十米范围,对于特大采场空间远场坚硬顶板,若只采用垂直孔水力压裂法,需在广大的开采面上方打众多垂直孔,耗费大量人力物力财力;2、L型孔水力压力法主要针对同一目的层的远场坚硬顶板进行弱化,L型孔的水平孔可在较大长度范围内对目的层的坚硬顶板进行弱化,弥补了垂直孔水力压裂法的不足;3、高聚能重复脉冲强冲击波法的弱化效果主要体现在各个目的层的坚硬顶板经垂直孔、L型孔水力压裂法初步弱化之后,对其进行进一步弱化,使得各层、各部位坚硬顶板彻底弱化。
同时,仅采用井上各种控制方法只能对远场坚硬顶板进行弱化,而近场坚硬顶板须在井下进行控制,依次使用井下注水法、井下分层爆破法、井下水力压裂法对近场坚硬顶板进行控制,同样的,由于上述三种方法的施工次序的安排,不仅充分发挥了各个方法的优势,而且彼此之间功效得到了加强,具体体现在:1、先采用井下注水法对近场坚硬顶板进行湿润,初步弱化,以便于后续控制方法能够起到更加显著的效果,此方法为本领域公知的常规技术手段。但井下注水法对近场坚硬顶板的弱化效果受限于注水后的湿润半径,同井上垂直孔水力压裂法相似的,若要在大面积的开采面范围内对近场坚硬顶板进行弱化,必须在多处分布注水孔,且在注水孔内充入大量的动静压水,在弱化近场坚硬顶板的同时,也增加了顶板承受的压力,带来一定的安全隐患;2、井下分层爆破法主要针对的是同一目的层的坚硬顶板进行弱化控制,其可以在爆破后使得楔形槽预裂缝向外辐射扩散,在近场坚硬顶板受到初步注水弱化后,预裂缝的扩散范围与未经注水弱化时的范围相比得到了大幅度提高;3、近场坚硬顶板在经过湿润初步弱化、爆破进一步弱化之后,采用井下水力压裂法可使得各目的层,各空间区域内的坚硬顶板彻底弱化,其效果与单纯使用时相比,弱化效果提升明显。由于井上远场坚硬顶板控制与井下近场坚硬顶板控制互不干涉,因此井上、井下控制可同步进行或先后进行。
本发明方法具有以下优点:1、井上、井下协同控制远场与近场坚硬顶板,使得特大采场空间的强矿压问题得到了有效的控制;2、充分发挥各种方法的优势,利用多种方法互相弥补劣势,使得坚硬顶板弱化效果得到显著的提高;3、井上、井下所开各孔洞,即可独立使用,也可共用,大大缩减了开孔所需的时间、人力、物力、财力。
附图说明
图1为特大采场空间远场井上垂直孔水力压裂坚硬顶板控制方法和特大采场空间远场井上L型孔水力压裂坚硬顶板控制方法施工示意图。
图2为爆破孔和水力压裂孔结构示意图;
图中:1-L型水力压裂孔,2-垂直水力压裂孔,3-射孔割缝,4-地面,5-远场坚硬顶板,6-近场坚硬顶板,7-工作面,8-爆破孔,9-水力压裂孔,10-楔形槽预裂缝。
具体实施方式
特大采场空间远近场井上下协同顶板控制方法,包括特大采场空间远场井上垂直孔水力压裂坚硬顶板控制方法、特大采场空间远场井上L型孔水力压裂坚硬顶板控制方法、特大采场空间远场井上高聚能重复脉冲强冲击波坚硬顶板控制方法、特大采场空间近场井下注水坚硬顶板控制方法、特大采场空间近场井下分层爆破坚硬顶板控制方法、特大采场空间近场井下水力压裂弱化坚硬顶板控制方法;
首先,采用特大采场空间远场井上垂直孔水力压裂坚硬顶板控制方法对远场坚硬顶板进行控制,具体包括以下操作步骤:
a、在地面4向工作面7上覆远场坚硬顶板5钻一垂直水力压裂孔2,压裂孔端部距工作面100-350m;
b、通过高压水射孔与压裂装置从压裂管柱中向垂直水力压裂孔2和导向压裂孔中注入压裂液,经射孔枪对远场坚硬顶板5岩层进行射孔割缝;
c、对目的层进行射孔产生射孔割缝3后,从压裂管中继续注入压裂液,同时从压裂管柱与套管的环空中注入支撑剂,完成对垂直水力压裂孔2的水力压裂施工,施工完成后,通过花管与逆止阀进行反循环清洗,然后上提压裂管柱进行下一目的层施工;完成所有目的层施工后,将压裂管柱从套管内提出压裂孔口;
其次,采用特大采场空间远场井上L型孔水力压裂坚硬顶板控制方法对各个目的层的坚硬顶板进行控制,具体包括以下操作步骤:
d、在地面4向工作面7上覆远场坚硬顶板5钻一L型水力压裂孔1,水平孔距工作面7垂直距离100-350m;
e、通过高压水射孔与压裂装置从压裂管柱中向L型水力压裂孔1中注入压裂液,经射孔枪对高位坚硬顶板岩层进行射孔割缝;
f、对目的层进行分段射孔产生射孔割缝3后,从压裂管中继续注入压裂液,同时从压裂管柱与套管的环空中注入支撑剂,完成L型水力压裂孔对水平孔目的层多段水力压裂的施工,施工完成后,将压裂管柱从套管内提出压裂孔口;
然后,采用特大采场空间远场井上高聚能重复脉冲强冲击波坚硬顶板控制方法对已经弱化的各目的层坚硬顶板进行深度控制,具体包括以下操作步骤:
g、在地面4向工作面7上覆远场坚硬顶板5钻一垂直冲击孔,垂直冲击孔端部距工作面垂直距离100-350m;
h、向垂直冲击孔中注入清水,使垂直冲击孔饱和水;
i、将高聚能重复脉冲强冲击波探头深入垂直冲击孔中,并使其浸没在孔内的清水中,向高聚能重复脉冲强冲击波探头通电,高聚能重复脉冲强冲击波探头对高位坚硬顶板岩层目的层进行高压脉冲放电,从而形成裂缝并扩展,完成对垂直孔目的层高聚能重复脉冲冲击弱化的施工,施工完成后,将高聚能重复脉冲强冲击波探头从垂直孔内提出冲击孔口;
至此,完成特大采场空间远场坚硬顶板井上施工控制,同时或然后,进行特大采场空间近场坚硬顶板井下施工控制,首先,采用特大采场空间近场井下注水坚硬顶板控制方法对近场坚硬顶板进行初步控制,具体包括以下操作步骤:
j、在井下采场向工作面7上覆近场坚硬顶板6施工多个注水孔,并在各注水孔孔口进行水泥注浆封孔;
k、通过高压注水泵向注水孔注入动静压水,以经验湿润半径确定钻孔注水量;
l、重复上述步骤进行各注水孔注水,完成对近场坚硬顶板6初步软化的施工;
然后,采用特大采场空间近场井下分层爆破坚硬顶板控制方法分别对近场坚硬顶板进行分层弱化控制,具体包括以下操作步骤:
m、在井下采场向工作面7上覆近场坚硬顶板6施工多个爆破孔8,并沿各爆破孔8在各爆破段钻出楔形槽预裂缝10;
n、把起爆药、炮土和木楔依次放入爆破孔8的爆破段中,并将木楔卡紧,完成爆破孔8内第一爆破段的装药,然后重复上述步骤完成各爆破段的装药;
o、重复上述步骤,完成各爆破孔的装药,并用炮土对各爆破孔进行封孔,然后连接雷管到导爆索、封泥,最后连接爆破网络进行起爆;
最后,采用特大采场空间近场井下水力压裂弱化坚硬顶板控制方法对近场坚硬顶板进行控制,具体包括以下操作步骤:
p、在井下采场向工作面7上覆近场坚硬顶板6施工若干水力压裂孔9,并沿钻孔在各压裂段钻出楔形槽预裂缝10;
q、将带有水力压裂安装杆的封孔器推进至水力压裂段,并将封孔器加压对水力压裂段进行封孔;
r、通过压裂泵向水力压裂孔注入高压水,对水力压裂段实施压裂;
s、同一水力压裂孔有多段水力压裂段,重复上述步骤进行分段压裂,完成对水力压裂孔各水力压裂段的施工。
Claims (1)
1.一种特大采场空间远近场井上下协同顶板控制方法,包括特大采场空间远场井上垂直孔水力压裂坚硬顶板控制方法、特大采场空间远场井上L型孔水力压裂坚硬顶板控制方法、特大采场空间远场井上高聚能重复脉冲强冲击波坚硬顶板控制方法、特大采场空间近场井下注水坚硬顶板控制方法、特大采场空间近场井下分层爆破坚硬顶板控制方法、特大采场空间近场井下水力压裂弱化坚硬顶板控制方法;其特征在于是通过以下操作步骤实现的:
首先,采用特大采场空间远场井上垂直孔水力压裂坚硬顶板控制方法对远场坚硬顶板进行控制;
其次,采用特大采场空间远场井上L型孔水力压裂坚硬顶板控制方法对各个目的层的坚硬顶板进行控制;
然后,采用特大采场空间远场井上高聚能重复脉冲强冲击波坚硬顶板控制方法对已经弱化的各目的层坚硬顶板进行深度控制;
至此,完成特大采场空间远场坚硬顶板井上施工控制,同时或然后,进行特大采场空间近场坚硬顶板井下施工控制,首先,采用特大采场空间近场井下注水坚硬顶板控制方法对近场坚硬顶板进行初步控制;
然后,采用特大采场空间近场井下分层爆破坚硬顶板控制方法分别对近场坚硬顶板进行分层弱化控制;
最后,采用特大采场空间近场井下水力压裂弱化坚硬顶板控制方法对近场坚硬顶板进行控制。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510912242.2A CN105545307A (zh) | 2015-12-11 | 2015-12-11 | 特大采场空间远近场井上下协同顶板控制方法 |
US15/558,512 US20180080320A1 (en) | 2015-12-11 | 2016-06-20 | Method for over-pit and under-pit cooperative control of roofs of far and near fields of an extra-large stoping space |
PCT/CN2016/000321 WO2017096674A1 (zh) | 2015-12-11 | 2016-06-20 | 特大采场空间远近场井上下协同顶板控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510912242.2A CN105545307A (zh) | 2015-12-11 | 2015-12-11 | 特大采场空间远近场井上下协同顶板控制方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105545307A true CN105545307A (zh) | 2016-05-04 |
Family
ID=55824812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510912242.2A Pending CN105545307A (zh) | 2015-12-11 | 2015-12-11 | 特大采场空间远近场井上下协同顶板控制方法 |
Country Status (3)
Country | Link |
---|---|
US (1) | US20180080320A1 (zh) |
CN (1) | CN105545307A (zh) |
WO (1) | WO2017096674A1 (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106050234A (zh) * | 2016-05-26 | 2016-10-26 | 中国神华能源股份有限公司 | 在煤炭开采过程中对地下水进行保护的施工工艺 |
WO2017096674A1 (zh) * | 2015-12-11 | 2017-06-15 | 大同煤矿集团有限责任公司 | 特大采场空间远近场井上下协同顶板控制方法 |
CN109779634A (zh) * | 2019-01-24 | 2019-05-21 | 太原理工大学 | 煤矿地面垂直井压裂坚硬顶板位置确定方法 |
CN110080769A (zh) * | 2019-05-09 | 2019-08-02 | 大同煤矿集团有限责任公司 | 一种煤矿临空回采巷道坚硬顶板地面精准切顶卸压方法 |
CN110185448A (zh) * | 2019-05-19 | 2019-08-30 | 中铁十九局集团矿业投资有限公司 | 一种地面压裂和井下爆破控制深部矿体岩爆方法 |
CN112780340A (zh) * | 2021-01-05 | 2021-05-11 | 陕西彬长孟村矿业有限公司 | 一种煤矿井上下区域超前防治冲击地压的方法 |
CN113404535A (zh) * | 2021-07-07 | 2021-09-17 | 陕西彬长孟村矿业有限公司 | 一种煤矿井上下水力压裂防治冲击地压的方法 |
CN113847083A (zh) * | 2021-10-28 | 2021-12-28 | 重庆大学 | 一种高位巨厚坚硬顶板区冲击地压控制方法 |
CN115288681A (zh) * | 2022-08-03 | 2022-11-04 | 中煤科工开采研究院有限公司 | 一种煤矿顶板区域压裂源头防治冲击地压方法 |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109886550B (zh) * | 2019-01-23 | 2023-05-12 | 太原理工大学 | 煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法 |
CN110424965B (zh) * | 2019-07-19 | 2020-12-29 | 天地科技股份有限公司 | 一种煤矿冲击地压防治结构和方法 |
CN112709572A (zh) * | 2019-10-24 | 2021-04-27 | 西安闪光能源科技有限公司 | 基于可控冲击波增透的石门揭煤方法 |
CN112709575A (zh) * | 2019-10-24 | 2021-04-27 | 西安闪光能源科技有限公司 | 一种基于可控冲击波预裂的坚硬厚煤层放顶煤方法 |
CN112709571A (zh) * | 2019-10-24 | 2021-04-27 | 西安闪光能源科技有限公司 | 基于可控冲击波预裂卸压的煤矿巷道冲击地压防治方法 |
CN112709573B (zh) * | 2019-10-24 | 2023-08-11 | 西安闪光能源科技有限公司 | 基于可控冲击波预裂的坚硬采煤工作面冲击地压防治方法 |
CN112127864B (zh) * | 2020-09-23 | 2022-03-29 | 中煤科工集团重庆研究院有限公司 | 一种立井揭煤区域多煤层分段水力压裂方法 |
CN112483085B (zh) * | 2020-11-25 | 2023-06-13 | 晋能控股煤业集团有限公司 | 基于复合射孔在小煤柱或无煤柱切顶卸压的开采工艺 |
CN112855123B (zh) * | 2021-01-19 | 2023-04-11 | 兖州煤业股份有限公司 | 一种卸压钻孔深度的确定方法 |
CN112796712B (zh) * | 2021-03-26 | 2022-07-26 | 山西省煤炭地质勘查研究院 | 一种采空区与煤层压裂综合抽采方法 |
CN113216965A (zh) * | 2021-05-20 | 2021-08-06 | 山西鑫桥科技有限公司 | 一种防治冲击地压的方法 |
CN113266367B (zh) * | 2021-05-31 | 2024-05-14 | 太原理工大学 | 一种坚硬顶板巷道液压棒自动化切顶方法 |
CN113338925B (zh) * | 2021-06-30 | 2022-07-15 | 中国矿业大学 | 一种多煤层开采大巷遗留煤柱源头压裂防动载压架方法 |
CN113339071B (zh) * | 2021-07-06 | 2022-05-27 | 中国矿业大学 | 一种探测顶板预裂爆破损伤程度和范围的方法 |
CN113756809B (zh) * | 2021-09-29 | 2023-09-05 | 太原理工大学 | 一种地面压裂厚硬岩层的载荷迁移冲击矿压防治方法 |
CN114033375A (zh) * | 2021-11-26 | 2022-02-11 | 重庆大学 | 一种水力切槽与高压劈裂耦合的坚硬顶板造缝方法 |
CN114483036A (zh) * | 2022-01-05 | 2022-05-13 | 内蒙古银宏能源开发有限公司 | 一种水力软化切顶控制垮落步距的方法 |
CN119393138A (zh) * | 2024-12-17 | 2025-02-07 | 陕西小保当矿业有限公司 | 一种采空区附近油气井井上井下联合防护方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012058028A1 (en) * | 2010-10-27 | 2012-05-03 | Exxonmobil Upstream Research Company | Method and system for fracturing a formation |
CN102562067A (zh) * | 2012-01-17 | 2012-07-11 | 河南省煤层气开发利用有限公司 | 利用脉冲致裂实现治理冲击地压的方法 |
CN102661689A (zh) * | 2012-05-11 | 2012-09-12 | 大同煤矿集团有限责任公司 | 煤矿坚硬顶板分层爆破方法 |
CN103498680A (zh) * | 2013-10-16 | 2014-01-08 | 大同煤矿集团有限责任公司 | 提高综放工作面初采期间顶煤回收率的方法 |
CN104747232A (zh) * | 2015-01-26 | 2015-07-01 | 大同煤矿集团有限责任公司 | 降低特厚煤层工作面远场坚硬顶板冲击性来压强度的方法 |
CN104790951A (zh) * | 2015-03-12 | 2015-07-22 | 大同煤矿集团有限责任公司 | 弱化距煤层100~350m高位坚硬顶板的方法及装置 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4017121A (en) * | 1974-11-25 | 1977-04-12 | Allied Chemical Corporation | Longwall mining of trona with prefracturing to prevent slabbing |
US4265570A (en) * | 1979-06-01 | 1981-05-05 | Conoco, Inc. | Mine roof control |
US4244624A (en) * | 1979-08-08 | 1981-01-13 | Reclamite, Ltd. | Method for reclaiming highwalls at mining sites with partially mined ore veins |
US4814480A (en) * | 1986-04-21 | 1989-03-21 | Ethyl Corporation | Trifluoromethylation process |
AUPP209498A0 (en) * | 1998-03-02 | 1998-03-26 | Commonwealth Scientific And Industrial Research Organisation | Hydraulic fracturing of ore bodies |
CL2008003560A1 (es) * | 2008-11-28 | 2009-05-04 | Corporacion Nac Del Cobre De Chile | Metodo para la extraccion continua de mineral en faenas subterraneas, destinado a la produccion permanente de extraccion desde los puntos de explotacion, comprende construir galerias de explotacion, en que por el centro definido por un grupo de galerias atraviesa una calle para transportar mineral, y preacondicionamiento de roca. |
CN103953343B (zh) * | 2014-04-03 | 2016-03-30 | 太原理工大学 | 一种对煤层坚硬顶板控制放顶的方法 |
CN105545307A (zh) * | 2015-12-11 | 2016-05-04 | 大同煤矿集团有限责任公司 | 特大采场空间远近场井上下协同顶板控制方法 |
-
2015
- 2015-12-11 CN CN201510912242.2A patent/CN105545307A/zh active Pending
-
2016
- 2016-06-20 WO PCT/CN2016/000321 patent/WO2017096674A1/zh active Application Filing
- 2016-06-20 US US15/558,512 patent/US20180080320A1/en not_active Abandoned
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012058028A1 (en) * | 2010-10-27 | 2012-05-03 | Exxonmobil Upstream Research Company | Method and system for fracturing a formation |
CN102562067A (zh) * | 2012-01-17 | 2012-07-11 | 河南省煤层气开发利用有限公司 | 利用脉冲致裂实现治理冲击地压的方法 |
CN102661689A (zh) * | 2012-05-11 | 2012-09-12 | 大同煤矿集团有限责任公司 | 煤矿坚硬顶板分层爆破方法 |
CN103498680A (zh) * | 2013-10-16 | 2014-01-08 | 大同煤矿集团有限责任公司 | 提高综放工作面初采期间顶煤回收率的方法 |
CN104747232A (zh) * | 2015-01-26 | 2015-07-01 | 大同煤矿集团有限责任公司 | 降低特厚煤层工作面远场坚硬顶板冲击性来压强度的方法 |
CN104790951A (zh) * | 2015-03-12 | 2015-07-22 | 大同煤矿集团有限责任公司 | 弱化距煤层100~350m高位坚硬顶板的方法及装置 |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017096674A1 (zh) * | 2015-12-11 | 2017-06-15 | 大同煤矿集团有限责任公司 | 特大采场空间远近场井上下协同顶板控制方法 |
CN106050234A (zh) * | 2016-05-26 | 2016-10-26 | 中国神华能源股份有限公司 | 在煤炭开采过程中对地下水进行保护的施工工艺 |
CN109779634A (zh) * | 2019-01-24 | 2019-05-21 | 太原理工大学 | 煤矿地面垂直井压裂坚硬顶板位置确定方法 |
CN110080769A (zh) * | 2019-05-09 | 2019-08-02 | 大同煤矿集团有限责任公司 | 一种煤矿临空回采巷道坚硬顶板地面精准切顶卸压方法 |
CN110185448A (zh) * | 2019-05-19 | 2019-08-30 | 中铁十九局集团矿业投资有限公司 | 一种地面压裂和井下爆破控制深部矿体岩爆方法 |
CN112780340A (zh) * | 2021-01-05 | 2021-05-11 | 陕西彬长孟村矿业有限公司 | 一种煤矿井上下区域超前防治冲击地压的方法 |
CN112780340B (zh) * | 2021-01-05 | 2023-08-29 | 陕西彬长孟村矿业有限公司 | 一种煤矿井上下区域超前防治冲击地压的方法 |
CN113404535A (zh) * | 2021-07-07 | 2021-09-17 | 陕西彬长孟村矿业有限公司 | 一种煤矿井上下水力压裂防治冲击地压的方法 |
CN113847083A (zh) * | 2021-10-28 | 2021-12-28 | 重庆大学 | 一种高位巨厚坚硬顶板区冲击地压控制方法 |
CN113847083B (zh) * | 2021-10-28 | 2024-03-01 | 重庆大学 | 一种高位巨厚坚硬顶板区冲击地压控制方法 |
CN115288681A (zh) * | 2022-08-03 | 2022-11-04 | 中煤科工开采研究院有限公司 | 一种煤矿顶板区域压裂源头防治冲击地压方法 |
Also Published As
Publication number | Publication date |
---|---|
US20180080320A1 (en) | 2018-03-22 |
WO2017096674A1 (zh) | 2017-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105545307A (zh) | 特大采场空间远近场井上下协同顶板控制方法 | |
CN108894787B (zh) | 上覆采空区遗留矿柱应力集中的压裂解除方法 | |
Huang et al. | Cavability control by hydraulic fracturing for top coal caving in hard thick coal seams | |
CN104863629B (zh) | 一种利用复合钻孔抽覆岩下离层瓦斯及排水注浆的方法 | |
CN104790951B (zh) | 弱化距煤层100~350m高位坚硬顶板的方法及装置 | |
CN103306660B (zh) | 一种页岩气藏水力压裂增产的方法 | |
CN109736805A (zh) | 一种厚层坚硬顶板改性卸压源头治理冲击地压的方法 | |
CN106150503A (zh) | 一种水力压裂治理坚硬顶板的方法 | |
CN106869966B (zh) | 一种离层水补给源的封堵方法 | |
AU2021106168A4 (en) | High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face | |
CN109209472A (zh) | 一种冲孔、爆破、注水相互耦合的煤层卸压防突方法 | |
CN103498680B (zh) | 提高综放工作面初采期间顶煤回收率的方法 | |
US11976557B2 (en) | Coal bump control method for sectional hydraulic fracturing regions of near vertical ultra thick coal seam | |
CN107120137B (zh) | 一种煤巷掘进沿煤层底板深孔预裂爆破抽采方法 | |
CN112593936A (zh) | 一种深部矿井多灾害区域超前综合防治方法 | |
CN104879159A (zh) | 一种松软煤层回采工作面增透抽采瓦斯的装置及其方法 | |
CN107503747A (zh) | 一种静态爆破双效致裂弱化顶板方法 | |
CN101440704A (zh) | 可地浸矿层连续高能气体压裂增渗方法及专用高能气体发生器 | |
CN108756884A (zh) | 煤矿坚硬顶板全工作面地面提前消突方法 | |
CN108643960A (zh) | 一种地面区域条带煤矿瓦斯消突工艺 | |
CN104265297A (zh) | 一种多层易碎缓倾斜极薄矿脉的开采方法 | |
CN110985123A (zh) | 一种高压水力预裂解危冲击矿压顺槽巷道钻孔布置方法 | |
CN104453900A (zh) | 一种近水平矿体充填采矿方法 | |
CN103061732A (zh) | 煤层顶板中2-3米厚坚硬中砂岩层的水力致裂方法 | |
CN107339091A (zh) | 一种人工建造油页岩地下破碎体的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160504 |