CN105544382A - Construction method of dumbbell-shaped bearing platform - Google Patents
Construction method of dumbbell-shaped bearing platform Download PDFInfo
- Publication number
- CN105544382A CN105544382A CN201510916182.1A CN201510916182A CN105544382A CN 105544382 A CN105544382 A CN 105544382A CN 201510916182 A CN201510916182 A CN 201510916182A CN 105544382 A CN105544382 A CN 105544382A
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- cushion cap
- circular
- district
- bearing platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Revetment (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510916182.1A CN105544382B (en) | 2015-12-10 | 2015-12-10 | Construction method of dumbbell-shaped bearing platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510916182.1A CN105544382B (en) | 2015-12-10 | 2015-12-10 | Construction method of dumbbell-shaped bearing platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105544382A true CN105544382A (en) | 2016-05-04 |
CN105544382B CN105544382B (en) | 2017-03-22 |
Family
ID=55823914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510916182.1A Active CN105544382B (en) | 2015-12-10 | 2015-12-10 | Construction method of dumbbell-shaped bearing platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105544382B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108999206A (en) * | 2018-07-02 | 2018-12-14 | 中铁大桥勘测设计院集团有限公司 | A kind of construction method of bridge bearing platform |
CN109137945A (en) * | 2018-10-26 | 2019-01-04 | 四川公路桥梁建设集团有限公司 | Cofferdam suitable for waist-shaped pier bearing platform and construction method thereof |
CN109137960A (en) * | 2018-09-04 | 2019-01-04 | 中铁大桥局集团有限公司 | A kind of construction method of the dumbbell shape cushion cap suitable for land |
CN110485443A (en) * | 2019-06-03 | 2019-11-22 | 四川公路桥梁建设集团有限公司 | 8-shaped Double-Wall Steel Boxed Cofferdam and construction manipulation process |
CN111088809A (en) * | 2019-12-26 | 2020-05-01 | 中交武汉港湾工程设计研究院有限公司 | Water-stopping cofferdam structure for construction of undersea beam in sea and construction method |
CN114164763A (en) * | 2021-11-10 | 2022-03-11 | 中交第四航务工程局有限公司 | Construction method of bridge pier column system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2474571Y (en) * | 2001-04-24 | 2002-01-30 | 路桥集团第一公路工程局 | Suspending steel jacket box used for tie beam construction of two column bridge pier under water |
KR20100113739A (en) * | 2009-04-14 | 2010-10-22 | 삼성물산 주식회사 | Template and costruction method for cofferdam using the same |
CN203034468U (en) * | 2012-12-27 | 2013-07-03 | 中铁港航局集团有限公司 | Novel cofferdam for deep water foundation construction |
JP2013224578A (en) * | 2013-06-04 | 2013-10-31 | Penta Ocean Construction Co Ltd | Reinforcing method of underwater structure and temporary coffering structure |
CN203701113U (en) * | 2013-12-31 | 2014-07-09 | 广州市市政集团有限公司 | Combined dual-wall steel cofferdam |
-
2015
- 2015-12-10 CN CN201510916182.1A patent/CN105544382B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2474571Y (en) * | 2001-04-24 | 2002-01-30 | 路桥集团第一公路工程局 | Suspending steel jacket box used for tie beam construction of two column bridge pier under water |
KR20100113739A (en) * | 2009-04-14 | 2010-10-22 | 삼성물산 주식회사 | Template and costruction method for cofferdam using the same |
CN203034468U (en) * | 2012-12-27 | 2013-07-03 | 中铁港航局集团有限公司 | Novel cofferdam for deep water foundation construction |
JP2013224578A (en) * | 2013-06-04 | 2013-10-31 | Penta Ocean Construction Co Ltd | Reinforcing method of underwater structure and temporary coffering structure |
CN203701113U (en) * | 2013-12-31 | 2014-07-09 | 广州市市政集团有限公司 | Combined dual-wall steel cofferdam |
Non-Patent Citations (1)
Title |
---|
叶庆旱: "南京长江第四大桥北塔基础施工技术", 《施工技术》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108999206A (en) * | 2018-07-02 | 2018-12-14 | 中铁大桥勘测设计院集团有限公司 | A kind of construction method of bridge bearing platform |
CN109137960A (en) * | 2018-09-04 | 2019-01-04 | 中铁大桥局集团有限公司 | A kind of construction method of the dumbbell shape cushion cap suitable for land |
CN109137945A (en) * | 2018-10-26 | 2019-01-04 | 四川公路桥梁建设集团有限公司 | Cofferdam suitable for waist-shaped pier bearing platform and construction method thereof |
CN110485443A (en) * | 2019-06-03 | 2019-11-22 | 四川公路桥梁建设集团有限公司 | 8-shaped Double-Wall Steel Boxed Cofferdam and construction manipulation process |
CN111088809A (en) * | 2019-12-26 | 2020-05-01 | 中交武汉港湾工程设计研究院有限公司 | Water-stopping cofferdam structure for construction of undersea beam in sea and construction method |
CN114164763A (en) * | 2021-11-10 | 2022-03-11 | 中交第四航务工程局有限公司 | Construction method of bridge pier column system |
Also Published As
Publication number | Publication date |
---|---|
CN105544382B (en) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544382A (en) | Construction method of dumbbell-shaped bearing platform | |
CN105780935B (en) | Prefabricated assembled steel tube confinement energy consumption connecting node and construction method | |
CN105908861B (en) | A kind of arrangement of reinforcement method of 3D printing reinforced masonry shear wall | |
CN108193782A (en) | Prefabricated modular frame node and assembling method thereof | |
CN106149873A (en) | Prefabricated assembled concrete frame construction and preparation method thereof | |
CN105735113A (en) | Pier pile transition connection structure for concrete-filled steel tube bridge and construction method of pier pile transition connection structure | |
CN207846687U (en) | Prefabricated assembled modularization frame node | |
CN108412128A (en) | A kind of connection structure of steel core concrete column | |
CN104947712A (en) | Construction method of constructing beam-column joint using ring beam | |
CN202644376U (en) | Dumbbell type steel tube concrete structure of non-filling abdominal cavity stiffening batten plate | |
CN107190763B (en) | Similar-large-diameter pile formed by bundling a plurality of small piles and construction method thereof | |
CN204530791U (en) | There is the frame type bridge foundation of shock insulation function | |
CN106638686B (en) | Pipe gallery with corrugated steel shear wall and its construction method | |
CN106869032B (en) | Bridge bearing platform beam tying construction method | |
CN103741812A (en) | Connection joint of steel reinforced concrete superposed beams and middle column | |
CN106284304A (en) | A kind of pre-manufactured steel casing diaphram wall and construction method thereof | |
CN105544581A (en) | Construction method of dumbbell type bearing platform | |
CN201347558Y (en) | Ring-shaped bracing structure system of deep and large foundation pit | |
CN104652446A (en) | Temporary steel lattice column core filling device and method thereof | |
CN203320703U (en) | Connecting node of reinforced concrete column and newly added steel beam | |
CN102733297B (en) | A kind of concrete filled steel tube continuous girder bridge exempts from welding support node and construction method thereof | |
CN205242441U (en) | Oval contrary shaft of doing of suspension type | |
CN205188999U (en) | Vertical supporting system of reverse construction method | |
CN206693470U (en) | A kind of cast-in-place secondary beam T-shaped floor | |
CN214656281U (en) | Prefabricated bent cap pier stud connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhao Xiaojing Inventor after: Pan Dongfa Inventor after: Zhang Chunxin Inventor after: Chen Zhiren Inventor after: Mao Weiqi Inventor after: Tu Manming Inventor after: Wu Fangming Inventor after: Ma Tao Inventor after: Zhang Ruizhi Inventor before: Zhao Xiaojing Inventor before: Pan Dongfa Inventor before: Chen Zhiren Inventor before: Mao Weiqi Inventor before: Tu Manming Inventor before: Wu Fangming Inventor before: Ma Tao Inventor before: Zhang Ruizhi |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |