- Publication number
- CN105526464B CN105526464B CN201410505807.0A CN201410505807A CN105526464B CN 105526464 B CN105526464 B CN 105526464B CN 201410505807 A CN201410505807 A CN 201410505807A CN 105526464 B CN105526464 B CN 105526464B
- Authority
- CN
- China
- Prior art keywords
- capsule
- ring
- sealing
- sealed
- fracture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
本发明提供一种胶囊式油管断口封堵器及利用该封堵器的输油管道断口快速封堵方法,用于油气管道拆除过程中断口的快速、可靠封堵,并提高封堵器的适用性和可循环利用性。胶囊式油管断口封堵器包括环封胶囊、胶囊拉杆、胶囊固定座板、胶囊活动压板、固定支架和胶囊气管。输油管道断口快速封堵方法是通过环封胶囊充气实现管道密封,通过固定支架上的锁紧螺钉实现胶囊式油管断口封堵器在管道端口位置的固定,提高封堵强度。该方法具有封堵可靠、操作简便迅速、适应性强等特点。
This invention provides a capsule-type tubing break plug and a method for rapid sealing of oil pipeline breaks using this plug, for rapid and reliable sealing of breaks during oil and gas pipeline dismantling, and improves the applicability and recyclability of the plug. The capsule-type tubing break plug includes a ring-sealing capsule, a capsule pull rod, a capsule fixing plate, a capsule movable pressure plate, a fixing bracket, and a capsule air tube. The rapid sealing method for oil pipeline breaks achieves pipeline sealing by inflating the ring-sealing capsule, and the capsule-type tubing break plug is fixed at the pipeline end position by locking screws on the fixing bracket, improving the sealing strength. This method features reliable sealing, simple and rapid operation, and strong adaptability.
Description
技术领域technical field
本发明涉及一种胶囊式油管断口封堵器及输油管道断口快速封堵方法,属于石油管道工程技术领域。The invention relates to a capsule type oil pipe fracture plugging device and an oil pipeline fracture rapid plugging method, belonging to the technical field of petroleum pipeline engineering.
技术背景technical background
对破损及超期服役石油管道的拆除是石油安全开发的重要工作之一,据不完全统计每年须拆除的石油管道达到数十公里。为便于拆除施工,目前采用的工艺为管道分段切割拆除,每段的长度在10m~20m左右。由于在分段拆除过程中,管道内积存残留的油水混合液体易流出并对环境造成二次污染,须在拆除过程中对油管断口位置进行封堵,要求封堵可靠、工艺过程简便迅速、适应性强、可循环利用等特点。目前常用的封堵方法有断面法兰封堵和管内密封圈封堵两种方式。其中,断面法兰封堵方法采用在管道端口位置安装法兰及密封垫,通过密封垫在法兰和管道端口面上的挤压实现封堵,具有封堵强度高的优点,但是操作工艺复杂,封堵效率较低,对管道断口的平整度要求较高,现场实施较为困难。管内密封圈方式通过堵杆上的多道密封圈实现与管道内壁密封,具有操作简便的优点,但封堵强度低,同时在管道出现变形或内壁油膜较厚时易滑落,封堵的可靠性较差。The demolition of damaged and overdue oil pipelines is one of the most important tasks in the safe development of oil. According to incomplete statistics, tens of kilometers of oil pipelines need to be demolished every year. In order to facilitate the demolition construction, the currently adopted process is to cut and dismantle the pipeline in sections, and the length of each section is about 10m to 20m. Since the residual oil-water mixed liquid in the pipeline is easy to flow out and cause secondary pollution to the environment during the segmental demolition process, the fracture position of the oil pipe must be blocked during the demolition process, requiring reliable plugging, simple and rapid process, and adaptability Strong, recyclable and so on. At present, the commonly used sealing methods include cross-section flange sealing and pipe inner sealing ring sealing. Among them, the cross-section flange sealing method adopts the installation of flanges and gaskets at the pipe port, and the sealing is realized by the extrusion of the gasket on the flange and the pipe port surface. It has the advantage of high sealing strength, but the operation process is complicated. , the plugging efficiency is low, and the flatness of the pipeline fracture is high, so it is difficult to implement on site. The sealing ring in the pipe is sealed with the inner wall of the pipe through multiple sealing rings on the plugging rod, which has the advantage of easy operation, but the sealing strength is low, and it is easy to slip when the pipe is deformed or the oil film on the inner wall is thick. poor.
发明内容Contents of the invention
本发明的目的是为解决上述问题,提供一种胶囊式油管断口封堵器及利用该封堵器的输油管道断口快速封堵方法,用于油气管道拆除过程中断口的快速、可靠封堵,并提高封堵器的适用性和可循环利用性。The object of the present invention is to solve the above problems, to provide a capsule type oil pipe fracture plugging device and a quick sealing method for oil pipeline fractures using the plugging device, which are used for fast and reliable plugging of fractures in the process of removing oil and gas pipelines, And improve the applicability and recyclability of the occluder.
本发明涉及的胶囊式油管断口封堵器包括环封胶囊、胶囊拉杆、胶囊固定座板、胶囊活动压板、固定支架和胶囊气管;其中,胶囊拉杆穿过环封胶囊(1)的芯孔后一端与固定支架连接,胶囊固定座板和胶囊活动压板分置在环封胶囊的两侧,胶囊固定座板与胶囊拉杆固连,胶囊活动压板与胶囊拉杆通过螺纹连接,胶囊气管与环封胶囊连通。The capsule-type oil pipe fracture plugging device involved in the present invention comprises a ring-sealed capsule, a capsule pull rod, a capsule fixed seat plate, a capsule movable pressure plate, a fixed bracket and a capsule trachea; wherein, the capsule pull rod passes through the core hole of the ring-sealed capsule (1) One end is connected with the fixed bracket, the capsule fixed seat plate and the capsule movable pressure plate are placed separately on both sides of the ring-sealed capsule, the capsule fixed seat plate is fixedly connected with the capsule pull rod, the capsule movable pressure plate is connected with the capsule pull rod through threads, the capsule trachea is connected with the ring-sealed capsule connected.
上述的胶囊式油管断口封堵器还包括:固定支架外周边设有环形套,环形套上径向分布有若干个锁紧螺钉。The above-mentioned capsule oil pipe fracture plugging device also includes: an annular sleeve is arranged on the outer periphery of the fixing bracket, and a plurality of locking screws are radially distributed on the annular sleeve.
环封胶囊的胶囊气管上连接阀门和快速接头。The capsule trachea of the ring-sealed capsule is connected with a valve and a quick connector.
利用前述胶囊式油管断口封堵器的输油管道断口快速封堵方法,其方法步骤为:Utilize the method for quickly sealing off the oil pipeline fracture of the aforementioned capsule type oil pipe fracture plugging device, the method steps are:
(1)打开胶囊活动压板,装入环封胶囊后,安装胶囊活动压板,并调节至压紧环封胶囊;(1) Open the movable pressing plate of the capsule, after loading the ring-sealed capsule, install the movable pressing plate of the capsule, and adjust to compress the ring-sealed capsule;
(2)将胶囊式油管断口封堵器的环封胶囊塞入管道内,快速接头连接气源,并对环封胶囊充气,待环封胶囊与管道内壁密封后,关闭阀门;(2) Insert the ring-sealing capsule of the capsule-type oil pipe fracture plugging device into the pipeline, connect the air source with the quick connector, and inflate the ring-sealing capsule, and close the valve after the ring-sealing capsule is sealed with the inner wall of the pipeline;
(3)拧紧锁紧螺钉,并使锁紧螺钉顶端与管道外壁卡紧,实现固定支架的固定。(3) Tighten the locking screw, and clamp the top of the locking screw with the outer wall of the pipe to realize the fixing of the fixing bracket.
发明的有益效果:Beneficial effects of the invention:
本发明的胶囊式油管断口封堵器具有结构设计合理,封堵效果好,可重复利用;配合该装置的方法能够实现海上油气管道拆除过程中断口的快速、可靠封堵,具有封堵可靠、操作简便迅速、适应性强、可循环利用等优点。The capsule type oil pipe fracture plugging device of the present invention has reasonable structural design, good plugging effect, and can be reused; the method combined with the device can realize fast and reliable plugging of the fracture in the offshore oil and gas pipeline dismantling process, and has the advantages of reliable plugging, It has the advantages of simple and fast operation, strong adaptability, and recyclable utilization.
附图说明Description of drawings
图1为一种胶囊式油管断口封堵器结构示意图。Fig. 1 is a schematic structural diagram of a capsule type oil pipe fracture plugging device.
图中:1-环封胶囊,2-胶囊拉杆,3-胶囊固定座板,4-胶囊活动压板,5-固定支架,6-锁紧螺钉,7-胶囊气管,8-阀门,9-快速接头。In the figure: 1-ring-sealed capsule, 2-capsule pull rod, 3-capsule fixed seat plate, 4-capsule movable pressure plate, 5-fixed bracket, 6-lock screw, 7-capsule trachea, 8-valve, 9-quick connector.
具体实施方式detailed description
如附图1所示,本发明涉及的一种胶囊式油管断口封堵器主要由环封胶囊1、胶囊拉杆2、胶囊固定座板3、胶囊活动压板4、固定支架5、锁紧螺钉6、胶囊气管7、阀门8、快速接头9等组成。其中,固定支架5、胶囊固定座板3、胶囊拉杆2固定连接,胶囊活动压板4通过螺纹安装在胶囊拉杆2的末端,环封胶囊1通过芯孔套在胶囊拉杆2上,并安装于胶囊固定座板3和胶囊活动压板4之间,根据封堵需求,调节胶囊固定座板3和胶囊活动压板4之间的空间。固定支架5的环形套尺寸大于管道外径,其上设若干个螺纹通孔,用于安装锁紧螺钉6,实现固定支架5与管道之间的连接固定,增加封堵强度。是环封胶囊1一端设胶囊气管7,并依次安装阀门8和快速接头9,用于环封胶囊的快速充气、放气以及保压。As shown in Figure 1, a capsule type oil pipe fracture plugging device related to the present invention is mainly composed of a ring-sealed capsule 1, a capsule pull rod 2, a capsule fixed seat plate 3, a capsule movable pressure plate 4, a fixed bracket 5, and a locking screw 6 , capsule trachea 7, valve 8, quick connector 9 and other components. Among them, the fixed bracket 5, the capsule fixed seat plate 3, and the capsule pull rod 2 are fixedly connected, the capsule movable pressure plate 4 is installed on the end of the capsule pull rod 2 through threads, and the ring-sealed capsule 1 is sleeved on the capsule pull rod 2 through the core hole, and installed on the capsule. Between the fixed seat plate 3 and the capsule movable press plate 4, the space between the capsule fixed seat plate 3 and the capsule movable press plate 4 is adjusted according to the blocking requirement. The size of the annular sleeve of the fixed bracket 5 is larger than the outer diameter of the pipeline, and several threaded through holes are arranged on it for installing the locking screws 6, so as to realize the connection between the fixed bracket 5 and the pipeline and increase the sealing strength. One end of the ring-sealed capsule 1 is provided with a capsule trachea 7, and a valve 8 and a quick connector 9 are installed in sequence for rapid inflation, deflation and pressure maintenance of the ring-sealed capsule.
通过采用上述胶囊式油管断口封堵器进行输油管道断口快速封堵方法的具体实施步骤为:The specific implementation steps of the rapid sealing method for the fracture of the oil pipeline by using the above-mentioned capsule type oil pipe fracture plugging device are as follows:
(1)打开胶囊活动压板4,装入环封胶囊1后,安装胶囊活动压板4,并调节至适当位置;(1) Open the movable pressing plate 4 of the capsule, and after loading the ring-sealed capsule 1, install the movable pressing plate 4 of the capsule and adjust it to an appropriate position;
(2)将胶囊式油管断口封堵器的环封胶囊1塞入管道内,快速接头9连接气源,并对环封胶囊1充气,待环封胶囊1与管道内壁密封后,关闭阀门8,防止气体泄漏。(2) Insert the ring-sealing capsule 1 of the capsule oil pipe fracture plugging device into the pipeline, connect the quick joint 9 to the air source, and inflate the ring-sealing capsule 1, and close the valve 8 after the ring-sealing capsule 1 is sealed with the inner wall of the pipeline , to prevent gas leakage.
(3)拧紧锁紧螺钉6,并使锁紧螺钉6顶端与管道外壁卡紧,实现固定支架5的固定,保证胶囊式油管断口封堵器的封堵强度。(3) Tighten the locking screw 6, and clamp the top of the locking screw 6 with the outer wall of the pipeline to fix the fixing bracket 5 and ensure the sealing strength of the capsule oil pipe fracture occluder.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410505807.0A CN105526464B (en) | 2014-09-28 | 2014-09-28 | A kind of capsule-type oil pipe fracture plugging device and oil pipeline fracture rapid plugging method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410505807.0A CN105526464B (en) | 2014-09-28 | 2014-09-28 | A kind of capsule-type oil pipe fracture plugging device and oil pipeline fracture rapid plugging method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105526464A CN105526464A (en) | 2016-04-27 |
| CN105526464B true CN105526464B (en) | 2017-05-31 |
Family
ID=55768868
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410505807.0A Active CN105526464B (en) | 2014-09-28 | 2014-09-28 | A kind of capsule-type oil pipe fracture plugging device and oil pipeline fracture rapid plugging method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105526464B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113327747B (en) * | 2021-08-02 | 2021-11-09 | 常州东方三环电气有限公司 | Compact transformer and transformer substation with same |
| CN116025798B (en) * | 2021-10-27 | 2025-03-18 | 中国石油化工股份有限公司 | Pipeline pressure testing and plugging device |
| CN114526396A (en) * | 2022-04-24 | 2022-05-24 | 中国石油大学胜利学院 | Petroleum pipeline fracture plugging device |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB636870A (en) * | 1948-05-26 | 1950-05-10 | Abbot Birks & Co Ltd | Improvements in or relating to gas pipe obturators |
| GB2109326A (en) * | 1981-10-28 | 1983-06-02 | Misuzu Machineries & Eng | A ballast exhaust pipe closing appliance for a ship |
| CN2203740Y (en) * | 1994-08-27 | 1995-07-19 | 上海市煤气公司第一管线公司 | Guide press resisting choke ball |
| CN203718274U (en) * | 2014-01-27 | 2014-07-16 | 衡水美德橡塑有限责任公司 | Multi-pipe-diameter general type gas filling pipe plug |
| CN204201368U (en) * | 2014-09-28 | 2015-03-11 | 中国石油化工集团公司 | A kind of capsule-type oil pipe fracture plugging device |
-
2014
- 2014-09-28 CN CN201410505807.0A patent/CN105526464B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB636870A (en) * | 1948-05-26 | 1950-05-10 | Abbot Birks & Co Ltd | Improvements in or relating to gas pipe obturators |
| GB2109326A (en) * | 1981-10-28 | 1983-06-02 | Misuzu Machineries & Eng | A ballast exhaust pipe closing appliance for a ship |
| CN2203740Y (en) * | 1994-08-27 | 1995-07-19 | 上海市煤气公司第一管线公司 | Guide press resisting choke ball |
| CN203718274U (en) * | 2014-01-27 | 2014-07-16 | 衡水美德橡塑有限责任公司 | Multi-pipe-diameter general type gas filling pipe plug |
| CN204201368U (en) * | 2014-09-28 | 2015-03-11 | 中国石油化工集团公司 | A kind of capsule-type oil pipe fracture plugging device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105526464A (en) | 2016-04-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205402082U (en) | Natural gas line plugging device | |
| CN103485742B (en) | A kind of can the mechanical sealing plug of simple and quick only slurry/water and installation method thereof | |
| CN204201368U (en) | A kind of capsule-type oil pipe fracture plugging device | |
| CN105526464A (en) | Capsule type oil pipeline fracture plugging device and method of rapidly plugging oil pipeline fracture | |
| CN205155448U (en) | Pipeline shutoff isolating device | |
| CN204554225U (en) | The outer pod apertures of a kind of first-aid clamp tears valve self-closing device open | |
| EP2716955A3 (en) | Plugging machine for interventions of installation, repair, maintenance on pressure fluids supply piping | |
| CN103216209B (en) | Packer in tubing and casing sealing propertytest pipe | |
| CN205424261U (en) | From inflation formula seal for pipe joints device | |
| CN217583666U (en) | Sewage pipes plugging device | |
| CN103644423B (en) | A kind of online hanger device of pipeline | |
| CN203585618U (en) | Pneumatic tire fast connection joint | |
| CN205639939U (en) | Fractured well mouth high -speed joint union | |
| CN203757286U (en) | Hough type pipeline connecting and repairing device | |
| CN202673229U (en) | High-pressure filling hole sealing device | |
| CN204604217U (en) | A kind of stopping transportation pressure changes the device of high compression diameter ball valve | |
| CN104213848B (en) | An arc-shaped sealing device for opening holes in pressurized pipelines or drill pipes and its application method | |
| CN104901258A (en) | Hole plugging device for cable conduit | |
| CN202452029U (en) | Safety pipeline plug device | |
| CN104019324A (en) | Quick repairing device for underwater double-layer oil pipeline | |
| CN108302279A (en) | Emergent pipeline quick blocking equipment and its construction method temporarily | |
| CN205606078U (en) | Fast -assembling seal for pipe joints device | |
| CN204252915U (en) | An oil pipe self-sealing device | |
| CN205026296U (en) | Pipeline plugging device | |
| CN205532438U (en) | An oil pipe self-sealing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address |
Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No. Patentee after: SINOPEC Group Country or region after: China Patentee after: SINOPEC SHENGLI PETROLEUM ENGINEERING CO., LTD. DRILLING TECHNOLOGY Research Institute Address before: 100728 Beijing, Chaoyangmen, North Street, No. 22, No. Patentee before: CHINA PETROLEUM & CHEMICAL Corp. Country or region before: China Patentee before: SINOPEC SHENGLI PETROLEUM ENGINEERING CO., LTD. DRILLING TECHNOLOGY Research Institute |
|
| CP03 | Change of name, title or address | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250625 Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No. Patentee after: SINOPEC Group Country or region after: China Patentee after: Sinopec Petroleum Engineering Technology Service Co.,Ltd. Patentee after: SINOPEC SHENGLI PETROLEUM ENGINEERING Co.,Ltd. Patentee after: SINOPEC SHENGLI PETROLEUM ENGINEERING CO., LTD. DRILLING TECHNOLOGY Research Institute Address before: 100728 Beijing, Chaoyangmen, North Street, No. 22, No. Patentee before: SINOPEC Group Country or region before: China Patentee before: SINOPEC SHENGLI PETROLEUM ENGINEERING CO., LTD. DRILLING TECHNOLOGY Research Institute |
|
| TR01 | Transfer of patent right |