CN105525784B - 临时拉线工具 - Google Patents
临时拉线工具 Download PDFInfo
- Publication number
- CN105525784B CN105525784B CN201610074174.1A CN201610074174A CN105525784B CN 105525784 B CN105525784 B CN 105525784B CN 201610074174 A CN201610074174 A CN 201610074174A CN 105525784 B CN105525784 B CN 105525784B
- Authority
- CN
- China
- Prior art keywords
- pivoting
- female
- male
- walls
- pivoting part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/20—Side-supporting means therefor, e.g. using guy ropes or struts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明公开了一种临时拉线工具,包括:一公一母两个枢转部及销子,每个枢转部包括两个横截面为半圆的壁面;在壁面的开口端两侧固定有圆管,每一侧的圆管交错的部分位于公枢转部上,部分位于母枢转部上,位于两壁面之间的圆管将两壁面固定在一起,位于两壁面外侧中一侧的圆管用于枢接公枢转部和母枢转部本体,该圆管上设有固定的销子;在枢转部的端部设有挂环。本发明大大缩短施工时间,减少劳动力需求、提高了工作效率,同时提高临时拉线受力均匀度,且不影响原有拉线受力,大大延长导线寿命,减少因拉线钢丝崩出造成人员伤害。
Description
技术领域:
本发明涉及电力施工中的拉线工具,特别涉及一种临时拉线工具。
背景技术:
在农网一二期线路或新架线路中有大量的拉线没有加装拉线绝缘子,拉线上把与带电导线很近,若拉线带电,直接威胁人员生命,二是砼杆荷载超重需要打拉线,防止砼杆被大风刮倒;三是部分砼杆倾斜需要打拉线,防止砼杆倒塌。;更换临时拉线一直沿用旧的更换拉线的方法,一般至少有四个人协助才能更换临时拉线或新辐射,造成时间长,需要打临时拉线和劳动效率低下,拉线过紧或过松现象十分突出,易造成杆倒线断甚至整个线路倒塌现象,为此对更换临时拉线进行研制,希望能够制作一个临时拉线工具,解决更换拉线浪费时间问题。
发明内容:
鉴于此,有必要设计一种安全、可靠、高效的临时拉线工具。
一种临时拉线工具,包括:一公一母两个枢转部及销子,每个枢转部包括两个半弧形的壁面,该壁面的横截面为半圆,两壁面平行排列且其开口面共面;在壁面的开口端两侧固定有圆管,每一侧的圆管交错的部分位于公枢转部上,部分位于母枢转部上,位于两壁面之间的圆管将两壁面固定在一起,位于两壁面外侧中一侧的圆管用于枢接公枢转部和母枢转部本体,该圆管上设有固定的销子;当公枢转部和母枢转部枢转到完全扣合位置时,公枢转部和母枢转部对应的壁面形成完整圆筒,且公枢转部和母枢转部对应位置的圆管共轴,活动销子此时插入两个非枢转圆管用于暂时固定公枢转部和母枢转部的扣合状态;在枢转部的端部设有挂环。
使用时,首先将公、母枢转部打开,把拉线棒置于半圆壁面上,合上公、母枢转部,并用销子穿过非枢转圆管进行锁定;
其次,将紧线器一端挂在本发明的挂环上;然后将紧线器另一端挂在原拉线上,拉紧紧线器,使紧线器受力;
再次,把打好的新拉线一端使用拉线抱箍挂到砼杆杆顶上,另一端挂到原拉线棒上;
再次,使用UT线夹,使新拉线受力达到原拉线受力;
最后,松开临时拉线工具上的紧线器,拆除临时拉线工具和紧线器,一条新拉线更换完毕。
优选的,母枢转部其枢转圆管位于壁面中部,非枢转圆管位于壁面两端部。
本发明大大缩短施工时间,减少劳动力需求、提高了工作效率,同时提高临时拉线受力均匀度,且不影响原有拉线受力,大大延长导线寿命,减少因拉线钢丝崩出造成人员伤害。
附图说明:
附图1是本发明实施例中的临时拉线工具打开时的立体结构示意图。
附图2是本发明实施例中的临时拉线工具扣合时的立体结构示意图。
附图3是本发明实施例中的枢转部的立体结构示意图。
图中:枢转部1、销子2、壁面11、圆管12、圆管12`、销子2`、挂环13。
具体实施方式:
如图1~3所示,一种临时拉线工具,包括:一公一母两个枢转部1及销子2,公、母枢转部1的相对关系类似于合页,每个枢转部1包括两个半弧形的壁面11,该壁面11的横截面为半圆,两壁面11平行排列且其开口面共面;在壁面11的开口端两侧固定有圆管12,每一侧的圆管12交错的部分位于公枢转部1上,部分位于母枢转部1上,位于两壁面11之间的圆管12将两壁面11固定在一起,位于两壁面11外侧中一侧的圆管12`用于枢接公枢转部1和母枢转部1本体,该圆管12`上设有固定的销子2,销子2为圆柱状,用于插入圆管12`内作为枢转轴;当公枢转部1和母枢转部1枢转到完全扣合位置时(如图2所示),公枢转部1和母枢转部1对应的壁面11形成完整圆筒,且公枢转部1和母枢转部1对应位置的圆管12共轴,活动销子2`此时插入两个非枢转圆管12用于暂时固定公枢转部1和母枢转部1的扣合状态;在枢转部1的端部设有挂环13。
使用时,首先将公、母枢转部1打开,把拉线棒置于半圆壁面上,合上公、母枢转部1,并用销子2`穿过非枢转圆管12进行锁定;
其次,将紧线器一端挂在本发明的挂环13上;然后将紧线器另一端挂在原拉线上,拉紧紧线器,使紧线器受力;
再次,把打好的新拉线一端使用拉线抱箍挂到砼杆杆顶上,另一端挂到原拉线棒上;
再次,使用UT线夹,使新拉线受力达到原拉线受力;
最后,松开临时拉线工具上的紧线器,拆除临时拉线工具和紧线器,一条新拉线更换完毕。
在本实施方式中,母枢转部1其枢转圆管12`位于壁面11中部,非枢转圆管12位于壁面11两端部。
Claims (2)
1.一种临时拉线工具,其特征在于,包括:一公一母两个枢转部及销子,每个枢转部包括两个半弧形的壁面,该壁面的横截面为半圆,两壁面平行排列且其开口面共面;在壁面的开口端两侧固定有圆管,每一侧的圆管交错的部分位于公枢转部上,部分位于母枢转部上,位于两壁面之间的圆管将两壁面固定在一起,位于两壁面外侧中一侧的圆管用于枢接公枢转部和母枢转部本体,该圆管上设有固定的销子;当公枢转部和母枢转部枢转到完全扣合位置时,公枢转部和母枢转部对应的壁面形成完整圆筒,且公枢转部和母枢转部对应位置的圆管共轴,活动销子此时插入两个非枢转圆管用于暂时固定公枢转部和母枢转部的扣合状态;在枢转部的端部设有挂环。
2.如权利要求1所述的临时拉线工具,其特征在于:母枢转部其枢转圆管位于壁面中部,非枢转圆管位于壁面两端部。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610074174.1A CN105525784B (zh) | 2016-02-02 | 2016-02-02 | 临时拉线工具 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610074174.1A CN105525784B (zh) | 2016-02-02 | 2016-02-02 | 临时拉线工具 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105525784A CN105525784A (zh) | 2016-04-27 |
| CN105525784B true CN105525784B (zh) | 2017-08-29 |
Family
ID=55768278
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610074174.1A Expired - Fee Related CN105525784B (zh) | 2016-02-02 | 2016-02-02 | 临时拉线工具 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105525784B (zh) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06236714A (ja) * | 1993-02-10 | 1994-08-23 | Sumitomo Wiring Syst Ltd | ワイヤーハーネス用布線治具 |
| CN203347322U (zh) * | 2013-06-17 | 2013-12-18 | 湖南省电力公司邵阳电业局 | 电杆拉线卡具 |
| CN204103342U (zh) * | 2014-08-21 | 2015-01-14 | 国家电网公司 | 电力拉线安装专用装置 |
| CN205558444U (zh) * | 2016-02-02 | 2016-09-07 | 国网宁夏电力公司石嘴山供电公司 | 临时拉线工具 |
-
2016
- 2016-02-02 CN CN201610074174.1A patent/CN105525784B/zh not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06236714A (ja) * | 1993-02-10 | 1994-08-23 | Sumitomo Wiring Syst Ltd | ワイヤーハーネス用布線治具 |
| CN203347322U (zh) * | 2013-06-17 | 2013-12-18 | 湖南省电力公司邵阳电业局 | 电杆拉线卡具 |
| CN204103342U (zh) * | 2014-08-21 | 2015-01-14 | 国家电网公司 | 电力拉线安装专用装置 |
| CN205558444U (zh) * | 2016-02-02 | 2016-09-07 | 国网宁夏电力公司石嘴山供电公司 | 临时拉线工具 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105525784A (zh) | 2016-04-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101250943B (zh) | 用于改造扣件式钢管脚手架的连接装置 | |
| CN207612011U (zh) | 电缆穿沟装置 | |
| CN105215232A (zh) | 一种钢绞线折弯塑形器及其使用方法 | |
| JP2011171256A (ja) | 碍子連固定装置及び固定方法 | |
| CN205558444U (zh) | 临时拉线工具 | |
| CN203129563U (zh) | 一种万向可调式脚手架连墙件 | |
| CN105525784B (zh) | 临时拉线工具 | |
| KR100793617B1 (ko) | 전선 인출용 풀링아이 | |
| CN107546658A (zh) | 电缆穿沟装置 | |
| CN104734105B (zh) | 电缆管口护套装置 | |
| CN205777821U (zh) | 新型拉线下拔 | |
| CN205452584U (zh) | 一种多角度双管式接地线操作棒 | |
| CN101749367A (zh) | 拉线回头压接套管 | |
| CN103777299B (zh) | 一种电力管道的光缆敷设辅助装置及其制作和施工方法 | |
| CN105429060B (zh) | 一种用于穿引电缆的变力臂杠杆 | |
| CN108915089B (zh) | 伸缩三角锥拼接的微建筑 | |
| CN206023043U (zh) | 绝缘绳索安装工具 | |
| CN106410699B (zh) | 一种适用于架设类线路的断线接线装置 | |
| CN204424855U (zh) | 电缆管口护套装置 | |
| CN216959149U (zh) | 水源井潜水泵电缆抱箍 | |
| CN209817456U (zh) | 一种高空管桁架的可拆卸支撑装置 | |
| CN110355718B (zh) | 一种高压电缆t形插拔接头拆卸装置 | |
| CN106684754B (zh) | 一种10kV线路裸线带电加装绝缘层装置 | |
| CN204819369U (zh) | 电力拉线套管安装装置 | |
| CN204441820U (zh) | 一种电缆简易安全隔离装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170829 Termination date: 20210202 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |