CN105507213B - A kind of lossless method for increasing sluice concrete flap gate - Google Patents

A kind of lossless method for increasing sluice concrete flap gate Download PDF

Info

Publication number
CN105507213B
CN105507213B CN201510999913.3A CN201510999913A CN105507213B CN 105507213 B CN105507213 B CN 105507213B CN 201510999913 A CN201510999913 A CN 201510999913A CN 105507213 B CN105507213 B CN 105507213B
Authority
CN
China
Prior art keywords
steel plate
gate
concrete
parts
support arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510999913.3A
Other languages
Chinese (zh)
Other versions
CN105507213A (en
Inventor
郑铎
于乾贤
周继元
冯立民
杨金良
李佳超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zheng Duo
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510999913.3A priority Critical patent/CN105507213B/en
Publication of CN105507213A publication Critical patent/CN105507213A/en
Application granted granted Critical
Publication of CN105507213B publication Critical patent/CN105507213B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/22Stop log dams; Emergency gates
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08GMACROMOLECULAR COMPOUNDS OBTAINED OTHERWISE THAN BY REACTIONS ONLY INVOLVING UNSATURATED CARBON-TO-CARBON BONDS
    • C08G18/00Polymeric products of isocyanates or isothiocyanates
    • C08G18/06Polymeric products of isocyanates or isothiocyanates with compounds having active hydrogen
    • C08G18/08Processes
    • C08G18/10Prepolymer processes involving reaction of isocyanates or isothiocyanates with compounds having active hydrogen in a first reaction step
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08GMACROMOLECULAR COMPOUNDS OBTAINED OTHERWISE THAN BY REACTIONS ONLY INVOLVING UNSATURATED CARBON-TO-CARBON BONDS
    • C08G18/00Polymeric products of isocyanates or isothiocyanates
    • C08G18/06Polymeric products of isocyanates or isothiocyanates with compounds having active hydrogen
    • C08G18/28Polymeric products of isocyanates or isothiocyanates with compounds having active hydrogen characterised by the compounds used containing active hydrogen
    • C08G18/40High-molecular-weight compounds
    • C08G18/48Polyethers
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08KUse of inorganic or non-macromolecular organic substances as compounding ingredients
    • C08K5/00Use of organic ingredients
    • C08K5/16Nitrogen-containing compounds
    • C08K5/17Amines; Quaternary ammonium compounds
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J11/00Features of adhesives not provided for in group C09J9/00, e.g. additives
    • C09J11/02Non-macromolecular additives
    • C09J11/04Non-macromolecular additives inorganic
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J11/00Features of adhesives not provided for in group C09J9/00, e.g. additives
    • C09J11/02Non-macromolecular additives
    • C09J11/06Non-macromolecular additives organic
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J163/00Adhesives based on epoxy resins; Adhesives based on derivatives of epoxy resins
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J175/00Adhesives based on polyureas or polyurethanes; Adhesives based on derivatives of such polymers
    • C09J175/04Polyurethanes
    • C09J175/08Polyurethanes from polyethers
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/70Grouts, e.g. injection mixtures for cables for prestressed concrete
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L2205/00Polymer mixtures characterised by other features
    • C08L2205/03Polymer mixtures characterised by other features containing three or more polymers in a blend

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Health & Medical Sciences (AREA)
  • Polymers & Plastics (AREA)
  • Medicinal Chemistry (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • General Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Epoxy Resins (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The present invention relates to a kind of lossless method for increasing sluice concrete flap gate, belong to the lossless method increased of existed concrete bridge water gate.Remove carbonized part, broken segment and dirt at the top of gate, it is ready for that steel plate box is installed, utilize the support arm of former concrete gate, steel plate set and support arm are socketed, carry out bonding closing with rapid hardening high tenacity binding material or polyurethane asphalt material in socket part, steel plate set is integrally formed with support arm, bonded in steel plate box and concrete gate joint with high tenacity cement based grouting material or polyurethane asphalt material, counterweight is adjusted, concrete balancing weight is filled.Advantage is gate can not to be influenceed normally to run, and the profit point of construction time is not influenceed, the formation of former gate structure is not injured, realization quickly directly increases gate.

Description

A kind of lossless method for increasing sluice concrete flap gate
Technical field
The invention belongs to the lossless method increased of existed concrete bridge water gate.
Background technology
Concrete gate is cheap, and processing is easy with maintenance, and many regulating dam type plants without storage are all happy at present Using the structure of this kind of concrete gate is:Stoplog type groove profile concrete gate door board is connected by consolidating steel plate strip from bottom to top Being connected on the inside of gate, gate has support arm to connect each door-plate, and the height of the support arm is higher than the height of door-plate.Because engineering operation will Ask, igfet gate can not meet head requirement, output of hydraulic turbine is affected, it is therefore desirable to increase.With metal structure gate phase Than, concrete gate can not be welded directly, other directly modes of increasing are required for cutting concrete gate door, The problems such as welded reinforcement, second stage concrete, both existed and the formation of former gate structure had been damaged, and also influenceed the operation of sluice.
The content of the invention
The present invention provides a kind of lossless method for increasing sluice concrete flap gate, is increased with solving current concrete gate What is existed when high damages to the formation of former gate structure, influences the operation problem of sluice.
The present invention is adopted the technical scheme that, is comprised the following steps:
(One)Carbonized part, broken segment and dirt at the top of gate are removed with wire brush, fresh concrete face is seen as far as possible, It is ready for carrying out installation steel plate box;The gate is concrete gate, and structure is:Stoplog type groove profile concrete gate door board is certainly There is support arm to connect each door-plate on the inside of gate, gate by consolidating steel plate strip and connecting on down, the height of the support arm is higher than door The height of plate;The structure of the steel plate box is:The bottom surface of steel plate box is identical with gate top shape, the steel plate for being socketed support arm Set is fixedly connected with steel plate box side, has concrete grouting hole at the top of steel plate box;
(Two)Using the support arm of former concrete gate, steel plate set and support arm are socketed, rapid hardening high tenacity is used in socket part Binding material or polyurethane asphalt material carry out bonding closing, steel plate set is integrally formed with support arm, and protection steel plate set is internal Not corrosion;Make steel plate box with being connected at the top of former gate by steel plate strip using original consolidation steel plate strip riveted joint bolt, in steel plate box and Concrete gate joint is bonded with high tenacity cement based grouting material or polyurethane asphalt material, the pressure for undertaking steel plate box Former gate is delivered in phase;
The quick binding material of rapid hardening high tenacity is made up of the raw material of following bulking value part:
300 ~ 320 parts of 634# epoxy resin,
100 ~ 110 parts of dibutylester,
20 ~ 22 parts of ethylenediamine,
0 ~ 16 part of styrene,
18 ~ 22 parts of acetone;
It is more preferable with polyurethane asphalt material result moist or in the case of having water;
The polyurethane asphalt material is obtained by the raw material and step of following masses part:
Material:Polyether-type polyisocyanates(NCO)It is prepared by base polyurethane prepolymer for use as:
200 ~ 1000 parts of PPG PPE,
200 ~ 1500 parts of toluene diisocyanate vinegar TDI,
100 ~ 1500 parts of dibutyl phthalate,
Ultra-violet absorber A, 1 ~ 8 part of septichen phenyl ester,
Ultra-violet absorber B, 1 ~ 8 part of 2,4-DihydroxyBenzophenone,
Antioxidant, 2,6- 1 ~ 8 part of three-level butyl -4- methylphenols,
PPG PPE, ultra-violet absorber A, ultra-violet absorber B, antioxidant are mixed by a certain percentage, heated To 130 ~ 150 DEG C, vacuum dehydration 2 ~ 3 hours is cooled to 43 DEG C ~ 45 DEG C, a certain proportion of first is added under nitrogen protection The isocyanate TDI high-speed stirreds of benzene two are warming up to 78 DEG C ~ 82 DEG C after 0. 5 hours, continue to react 3 hours, with di-n-butylamine method point Analyse NCO content and reach and stop reaction after theoretical value, be cooled to 45 DEG C, add dibutyl phthalate and mix 0. 5 hours, produce To material;
Second material:15~35 parts of silica flour, 15~40 parts of flyash, 25~50 parts of asphalt emulsion, 8 ~ 10 parts of thin oil;
According to material, second material with 1:2~1:4 mixing, it is flexible to increase and increase with second material, during construction, preheated before stirring with water 40 ~ 80 DEG C, material can obtain more preferable bond effect with second material;
Material in the compounding caulking material also includes 250 ~ 500 parts of precipitated calcium carbonate;
The preparation method of asphalt emulsion is as follows in second material in the compounding caulking material:
1000 parts of 100# pitches,
Emulsifying agent, double, 8 ~ 100 parts of tributyl phenol APEO (C4H9)-- O (EO) nH,
1 ~ 20 part of compatilizer XRJ-10,
1 ~ 20 part of compatilizer ST-2,
100# pitches are heated to 120 ~ 130 DEG C, emulsifying agent, two kinds of compatilizers are added, into the min of high-speed stirred 5 ~ 8 Obtain asphalt emulsion;
The high tenacity cement based grouting material match ratio:
100 parts of 631# epoxy resin,
0 ~ 20 part of dimethylbenzene,
30 ~ 40 parts of dibutyl ester,
7 ~ 9 parts of ethylenediamine;
Cement or superfine cement, specific surface area are 90 ~ 110 parts of 600m2/kg~800m2/kg;
0.2 ~ 1.6 part of high-efficiency water-reducing agent of poly-carboxylic acid;
16 ~ 20 parts of acetone;
(Three)Counterweight is adjusted, equilibrant force is checked again, the increased hoisting capacity of opening and closing device is reduced to greatest extent so that without Change the headstock gear method of operation, concrete mode is in the groove of former groove profile concrete gate door board, to fill concrete balancing weight;
Also include:(Four)Anti-corrosion and internal anti-corrosion outside steel plate box, wherein outside is conventional method, to ensure steel plate box not Deformation and internal anti-corrosion, can inject conventional concrete or cement mortar in steel plate box.
The present invention it is lossless increase sluice concrete flap gate structure be:Stoplog type groove profile concrete gate door board is under And on connect gate by consolidating steel plate strip, there is on the inside of gate support arm to connect each door-plate, the height of the support arm is higher than door-plate Highly;The bottom surface of steel plate box is identical with gate top shape, and the steel plate set for being socketed support arm is fixedly connected with steel plate box side, Steel plate covers Nian Jie with after support arm socket, and the bottom surface of steel plate box is Nian Jie with the top of gate, and steel plate box two ends pass through steel plate strip and gate Concrete balancing weight is filled in connection, the groove of groove profile concrete gate door board.
There is concrete grouting hole at the top of steel plate box of the present invention.
It is an advantage of the invention that:It can be constructed when installing steel plate box in the case of band water, it is not necessary to ancillary works, can be with Aboard ship construct.This method does not influence engineering operation not only, can also improve efficiency of construction, should when covering slip casting for steel plate This is avoided humidity, if be not avoided that humidity, can be with filling polyurethane asphalt material, and the steel plate set after slip casting will not be produced with support arm Raw relative displacement, therefore friction destruction will not be produced, effectively improve its service life.
Grouting can be constructed with water between gate and steel plate box, and using certain closing measure, high-ductility is injected with grouting pump Property cement based grouting material, can not so influence engineering operation;If falling gate, directly it is in the milk, process very simple, but It is that engineering operation is affected.
Using the technology of the present invention, gate can not be influenceed normally to run, the profit point of construction time not influenceed, not to original Gate structure formation injury, realization quickly directly increases gate.
Weighted areas can be constructed directly after gate, and the former gate groove part of filling, total amount is determined according to EQUILIBRIUM CALCULATION FOR PROCESS, this Part band water construction is more laborsaving, can be with by sea defeated.
Brief description of the drawings
Fig. 1 is the structural representation after steel plate box of the present invention is connected with former gate;
Fig. 2 is Fig. 1 top view;
Fig. 3 is Fig. 1 left view;In figure:
Stoplog type groove profile concrete gate door board 1, consolidates steel plate strip 2, gate 3, support arm 4, steel plate box 5, steel plate set 6, steel Lath 7, concrete balancing weight 8, concrete grouting hole 9.
Embodiment
Embodiment 1
Comprise the following steps:
(One)Carbonized part, broken segment and dirt at the top of gate are removed with wire brush, fresh concrete face is seen as far as possible, It is ready for carrying out installation steel plate box;The gate is concrete gate, and structure is:Stoplog type groove profile concrete gate door board is certainly There is support arm to connect each door-plate on the inside of gate, gate by consolidating steel plate strip and connecting on down, the height of the support arm is higher than door The height of plate;The structure of the steel plate box is:The bottom surface of steel plate box is identical with gate top shape, the steel plate for being socketed support arm Set is fixedly connected with steel plate box side, has concrete grouting hole at the top of steel plate box;
(Two)Using the support arm of former concrete gate, steel plate set and support arm are socketed, rapid hardening high tenacity is used in socket part Binding material or polyurethane asphalt material carry out bonding closing, steel plate set is integrally formed with support arm, and protection steel plate set is internal Not corrosion;Make steel plate box with being connected at the top of former gate by steel plate strip using original consolidation steel plate strip riveted joint bolt, in steel plate box and Concrete gate joint is bonded with high tenacity cement based grouting material or polyurethane asphalt material, the pressure for undertaking steel plate box Former gate is delivered in phase;
The quick binding material of rapid hardening high tenacity is made up of the raw material of following bulking value part:
300 parts of 634# epoxy resin,
100 parts of dibutylester,
20 parts of ethylenediamine,
18 parts of acetone;
Material mix is in more than 30 DEG C of temperature, and condensing faster, moist or in the case of having water can use polyurethane asphalt material Effect is more preferable;
The polyurethane asphalt material is obtained by the raw material and step of following masses part:
Material:Polyether-type polyisocyanates(NCO)It is prepared by base polyurethane prepolymer for use as:
200 parts of PPG PPE,
200 parts of toluene diisocyanate vinegar TDI,
100 parts of dibutyl phthalate,
Ultra-violet absorber A, 1 part of septichen phenyl ester,
Ultra-violet absorber B, 1 part of 2,4-DihydroxyBenzophenone,
Antioxidant, 2,6- 1 part of three-level butyl -4- methylphenols,
PPG PPE, ultra-violet absorber A, ultra-violet absorber B, antioxidant are mixed by a certain percentage, heated To 130 DEG C, vacuum dehydration 2 hours is cooled to 43 DEG C DEG C, and a certain proportion of toluene diisocyanate vinegar is added under nitrogen protection TDI high-speed stirreds are warming up to 78 DEG C ~ 82 DEG C after 0. 5 hours, continue to react 3 hours, are reached with di-n-butylamine method analysis NCO content Stop reaction after theoretical value, be cooled to 45 DEG C, add dibutyl phthalate and mix 0. 5 hours, that is, obtain material;
Second material:15 parts of silica flour, 15 parts of flyash, 25 parts of asphalt emulsion, 8 parts of thin oil;
According to material, second material with 1:2 mixing, it is flexible to increase and increase with second material, during construction, 40 are preheated with water before stirring DEG C, material can obtain more preferable bond effect with second material;
Material in the compounding caulking material also includes 250 parts of precipitated calcium carbonate;
The preparation method of asphalt emulsion is as follows in second material in the compounding caulking material:
1000 parts of 100# pitches,
Emulsifying agent, double, 8 parts of tributyl phenol APEO (C4H9)-- O (EO) nH,
1 part of compatilizer XRJ-10,
1 part of compatilizer ST-2,
100# pitches are heated to 120 DEG C, emulsifying agent, two kinds of compatilizers is added, is dripped into the min of high-speed stirred 5 Blue or green emulsion;
The high tenacity cement based grouting material match ratio:
100 parts of 631# epoxy resin,
30 parts of dibutyl ester,
7 parts of ethylenediamine;
Cement or superfine cement, specific surface area are 90 parts of 600m2/kg~800m2/kg;
0.2 part of high-efficiency water-reducing agent of poly-carboxylic acid;
16 parts of acetone;
(Three)Counterweight is adjusted, equilibrant force is checked again, the increased hoisting capacity of opening and closing device is reduced to greatest extent so that without Change the headstock gear method of operation, concrete mode is in the groove of former groove profile concrete gate door board, to fill concrete balancing weight;
Also include:(Four)Anti-corrosion and internal anti-corrosion outside steel plate box, wherein outside is conventional method, to ensure steel plate box not Deformation and internal anti-corrosion, can inject conventional concrete or cement mortar in steel plate box.
The present invention it is lossless increase sluice concrete flap gate structure be:Stoplog type groove profile concrete gate door board 1 is certainly There is support arm 4 to connect each door-plate by consolidating steel plate strip 2 and connecting on the inside of gate 3, gate on down, the height of the support arm is higher than door The height of plate;The bottom surface of steel plate box 5 is identical with gate top shape, and the steel plate set 6 and steel plate box side for being socketed support arm are solid Fixed connection, steel plate set is Nian Jie with after support arm socket, and the bottom surface of steel plate box is Nian Jie with the top of gate, and steel plate box two ends pass through steel plate strip 7 are connected with gate, and concrete balancing weight 8 is filled in the groove of groove profile concrete gate door board;
There is concrete grouting hole 9 at the top of steel plate box of the present invention.
Embodiment 2
Comprise the following steps:
(One)Carbonized part, broken segment and dirt at the top of gate are removed with wire brush, fresh concrete face is seen as far as possible, It is ready for carrying out installation steel plate box;The gate is concrete gate, and structure is:Stoplog type groove profile concrete gate door board is certainly There is support arm to connect each door-plate on the inside of gate, gate by consolidating steel plate strip and connecting on down, the height of the support arm is higher than door The height of plate;The structure of the steel plate box is:The bottom surface of steel plate box is identical with gate top shape, the steel plate for being socketed support arm Set is fixedly connected with steel plate box side, has concrete grouting hole at the top of steel plate box;
(Two)Using the support arm of former concrete gate, steel plate set and support arm are socketed, rapid hardening high tenacity is used in socket part Binding material or polyurethane asphalt material carry out bonding closing, steel plate set is integrally formed with support arm, and protection steel plate set is internal Not corrosion;Make steel plate box with being connected at the top of former gate by steel plate strip using original consolidation steel plate strip riveted joint bolt, in steel plate box and Concrete gate joint is bonded with high tenacity cement based grouting material or polyurethane asphalt material, the pressure for undertaking steel plate box Former gate is delivered in phase;
The quick binding material of rapid hardening high tenacity is made up of the raw material of following bulking value part:
310 parts of 634# epoxy resin,
105 parts of dibutylester,
21 parts of ethylenediamine,
8 parts of styrene,
20 parts of acetone;
Material mix is in more than 30 DEG C of temperature, and condensing faster, moist or in the case of having water can use polyurethane asphalt material Effect is more preferable;
The polyurethane asphalt material is obtained by the raw material and step of following masses part:
Material:Polyether-type polyisocyanates(NCO)It is prepared by base polyurethane prepolymer for use as:
600 parts of PPG PPE,
850 parts of toluene diisocyanate vinegar TDI,
800 parts of dibutyl phthalate,
Ultra-violet absorber A, 4.5 parts of septichen phenyl ester,
Ultra-violet absorber B, 4.5 parts of 2,4-DihydroxyBenzophenone,
Antioxidant, 2,6- 4.5 parts of three-level butyl -4- methylphenols,
PPG PPE, ultra-violet absorber A, ultra-violet absorber B, antioxidant are mixed by a certain percentage, heated To 140 DEG C, vacuum dehydration 2.5 hours is cooled to 44 DEG C, and a certain proportion of toluene diisocyanate vinegar is added under nitrogen protection TDI high-speed stirreds are warming up to 80 DEG C after 0. 5 hours, continue to react 3 hours, and theoretical value is reached with di-n-butylamine method analysis NCO content Stop reaction afterwards, be cooled to 45 DEG C, add dibutyl phthalate and mix 0. 5 hours, that is, obtain material;
Second material:25 parts of silica flour, 27.5 parts of flyash, 37.5 parts of asphalt emulsion, 9 parts of thin oil;
According to material, second material with 1:3 mixing, it is flexible to increase and increase with second material, during construction, 60 are preheated with water before stirring DEG C, material can obtain more preferable bond effect with second material;
Material in the compounding caulking material also includes 375 parts of precipitated calcium carbonate;
The preparation method of asphalt emulsion is as follows in second material in the compounding caulking material:
1000 parts of 100# pitches,
Emulsifying agent, double, 54 parts of tributyl phenol APEO (C4H9)-- O (EO) nH,
10.5 parts of compatilizer XRJ-10,
10.5 parts of compatilizer ST-2,
100# pitches are heated to 125 DEG C, emulsifying agent, two kinds of compatilizers is added, is obtained into the min of high-speed stirred 6.5 Asphalt emulsion;
The high tenacity cement based grouting material match ratio:
100 parts of 631# epoxy resin,
10 parts of dimethylbenzene,
35 parts of dibutyl ester,
8 parts of ethylenediamine;
Cement or superfine cement, specific surface area are 100 parts of 600m2/kg~800m2/kg;
0.9 part of high-efficiency water-reducing agent of poly-carboxylic acid;
18 parts of acetone;
(Three)Counterweight is adjusted, equilibrant force is checked again, the increased hoisting capacity of opening and closing device is reduced to greatest extent so that without Change the headstock gear method of operation, concrete mode is in the groove of former groove profile concrete gate door board, to fill concrete balancing weight;
Also include:(Four)Anti-corrosion and internal anti-corrosion outside steel plate box, wherein outside is conventional method, to ensure steel plate box not Deformation and internal anti-corrosion, can inject conventional concrete or cement mortar in steel plate box.
Embodiment 3
Comprise the following steps:
(One)Carbonized part, broken segment and dirt at the top of gate are removed with wire brush, fresh concrete face is seen as far as possible, It is ready for carrying out installation steel plate box;The gate is concrete gate, and structure is:Stoplog type groove profile concrete gate door board is certainly There is support arm to connect each door-plate on the inside of gate, gate by consolidating steel plate strip and connecting on down, the height of the support arm is higher than door The height of plate;The structure of the steel plate box is:The bottom surface of steel plate box is identical with gate top shape, the steel plate for being socketed support arm Set is fixedly connected with steel plate box side, has concrete grouting hole at the top of steel plate box;
(Two)Using the support arm of former concrete gate, steel plate set and support arm are socketed, rapid hardening high tenacity is used in socket part Binding material or polyurethane asphalt material carry out bonding closing, steel plate set is integrally formed with support arm, and protection steel plate set is internal Not corrosion;Make steel plate box with being connected at the top of former gate by steel plate strip using original consolidation steel plate strip riveted joint bolt, in steel plate box and Concrete gate joint is bonded with high tenacity cement based grouting material or polyurethane asphalt material, the pressure for undertaking steel plate box Former gate is delivered in phase;
The quick binding material of rapid hardening high tenacity is made up of the raw material of following bulking value part:
320 parts of 634# epoxy resin,
110 parts of dibutylester,
22 parts of ethylenediamine,
16 parts of styrene,
22 parts of acetone;
Material mix is in more than 30 DEG C of temperature, and condensing faster, moist or in the case of having water can use polyurethane asphalt material Effect is more preferable;
The polyurethane asphalt material is obtained by the raw material and step of following masses part:
Material:Polyether-type polyisocyanates(NCO)It is prepared by base polyurethane prepolymer for use as:
1000 parts of PPG PPE,
1500 parts of toluene diisocyanate vinegar TDI,
1500 parts of dibutyl phthalate,
Ultra-violet absorber A, 8 parts of septichen phenyl ester,
Ultra-violet absorber B, 8 parts of 2,4-DihydroxyBenzophenone,
Antioxidant, 2,6- 8 parts of three-level butyl -4- methylphenols,
PPG PPE, ultra-violet absorber A, ultra-violet absorber B, antioxidant are mixed by a certain percentage, heated To 150 DEG C, vacuum dehydration 3 hours is cooled to 45 DEG C, and a certain proportion of toluene diisocyanate vinegar TDI is added under nitrogen protection High-speed stirred is warming up to 82 DEG C after 0. 5 hours, continue to react 3 hours, is reached with di-n-butylamine method analysis NCO content after theoretical value Stop reaction, be cooled to 45 DEG C, add dibutyl phthalate and mix 0. 5 hours, that is, obtain material;
Second material:35 parts of silica flour, 40 parts of flyash, 50 parts of asphalt emulsion, 8 ~ 10 parts of thin oil;
According to material, second material with 1:4 mixing, it is flexible to increase and increase with second material, during construction, 80 are preheated with water before stirring DEG C, material can obtain more preferable bond effect with second material;
Material in the compounding caulking material also includes 500 parts of precipitated calcium carbonate;
The preparation method of asphalt emulsion is as follows in second material in the compounding caulking material:
1000 parts of 100# pitches,
Emulsifying agent, double, 100 parts of tributyl phenol APEO (C4H9)-- O (EO) nH,
20 parts of compatilizer XRJ-10,
20 parts of compatilizer ST-2,
100# pitches are heated to 130 DEG C, emulsifying agent, two kinds of compatilizers is added, is dripped into the min of high-speed stirred 8 Blue or green emulsion;
The high tenacity cement based grouting material match ratio:
100 parts of 631# epoxy resin,
20 parts of dimethylbenzene,
40 parts of dibutyl ester,
9 parts of ethylenediamine;
Cement or superfine cement, specific surface area are 110 parts of 600m2/kg~800m2/kg;
1.6 parts of high-efficiency water-reducing agent of poly-carboxylic acid;
20 parts of acetone;
(Three)Counterweight is adjusted, equilibrant force is checked again, the increased hoisting capacity of opening and closing device is reduced to greatest extent so that without Change the headstock gear method of operation, concrete mode is in the groove of former groove profile concrete gate door board, to fill concrete balancing weight;
Also include:(Four)Anti-corrosion and internal anti-corrosion outside steel plate box, wherein outside is conventional method, to ensure steel plate box not Deformation and internal anti-corrosion, can inject conventional concrete or cement mortar in steel plate box.

Claims (11)

1. a kind of lossless method for increasing sluice concrete flap gate, it is characterised in that comprise the following steps:
(One)Carbonized part, broken segment and dirt at the top of gate are removed with wire brush, fresh concrete face is seen as far as possible, then It is ready for that steel plate box is installed;The gate is concrete gate, and structure is:Stoplog type groove profile concrete gate door board from lower and On there is support arm to connect each door-plate on the inside of gate, gate by consolidating steel plate strip and connecting into, the height of the support arm is higher than door-plate Highly;The structure of the steel plate box is:The bottom surface of steel plate box is identical with gate top shape, for be socketed support arm steel plate cover with Steel plate box side is fixedly connected, and has concrete grouting hole at the top of steel plate box;
(Two)Using the support arm of former concrete gate, steel plate set and support arm are socketed, bonded in socket part with rapid hardening high tenacity Material or polyurethane asphalt material carry out bonding closing, steel plate set is integrally formed with support arm, and protection steel plate set is internal stainless Erosion;Make steel plate box with being connected at the top of former gate by steel plate strip using original consolidation steel plate strip riveted joint bolt, in steel plate box and coagulation Native gate joint is bonded with high tenacity cement based grouting material or polyurethane asphalt material, coordinates the pressure that steel plate box undertakes Ground is delivered to former gate;
(Three)Counterweight is adjusted, equilibrant force is checked again, the increased hoisting capacity of opening and closing device is reduced to greatest extent so that without changing The headstock gear method of operation, concrete mode is in the groove of former groove profile concrete gate door board, to fill concrete balancing weight.
2. a kind of lossless method for increasing sluice concrete flap gate according to claim 1, it is characterised in that:Step (Two)In, moist or in the case of having water, using polyurethane asphalt material.
3. a kind of lossless method for increasing sluice concrete flap gate according to claim 1, it is characterised in that:Also wrap Include:(Four)Anti-corrosion and internal anti-corrosion outside steel plate box, wherein outside is conventional method, prevent to ensure that steel plate box is indeformable with inside Corruption, injects conventional concrete or cement mortar in steel plate box.
4. a kind of lossless method for increasing sluice concrete flap gate according to claim 1, it is characterised in that:It is described The quick binding material of rapid hardening high tenacity is made from the following raw materials in parts by weight:
300 ~ 320 parts of 634# epoxy resin,
100 ~ 110 parts of dibutylester,
20 ~ 22 parts of ethylenediamine,
0 ~ 16 part of styrene,
18 ~ 22 parts of acetone.
5. a kind of lossless method for increasing sluice concrete flap gate according to claim 1, it is characterised in that:It is described Polyurethane asphalt material is obtained by the raw material and step of following masses part:
Material:Polyether-type polyisocyanates base polyurethane prepolymer for use as, it is obtained by the raw material and step of following masses part:
200 ~ 1000 parts of PPG PPE,
200 ~ 1500 parts of toluene diisocyanate vinegar TDI,
100 ~ 1500 parts of dibutyl phthalate,
Ultra-violet absorber A, 1 ~ 8 part of septichen phenyl ester,
Ultra-violet absorber B, 1 ~ 8 part of 2,4-DihydroxyBenzophenone,
Antioxidant, 2,6- 1 ~ 8 part of three-level butyl -4- methylphenols,
PPG PPE, ultra-violet absorber A, ultra-violet absorber B, antioxidant are mixed by a certain percentage, are heated up to 130 ~ 150 DEG C, vacuum dehydration 2 ~ 3 hours is cooled to 43 DEG C ~ 45 DEG C, a certain proportion of toluene is added under nitrogen protection Two isocyanate TDI high-speed stirreds are warming up to 78 DEG C ~ 82 DEG C after 0. 5 hours, continue to react 3 hours, analyzed with di-n-butylamine method NCO content, which reaches, stops reaction after theoretical value, be cooled to 45 DEG C, adds dibutyl phthalate and mixes 0. 5 hours, that is, obtains Material;
Second material:15~35 parts of silica flour, 15~40 parts of flyash, 25~50 parts of asphalt emulsion, 8 ~ 10 parts of thin oil;
According to material, second material with 1:2~1:4 mixing, flexible increase with second material and increase, during construction, before stirring with water preheating 40 ~ 80 DEG C, material obtains more preferable bond effect with second material.
6. a kind of lossless method for increasing sluice concrete flap gate according to claim 5, it is characterised in that:It is described Material also have 250 ~ 500 parts of precipitated calcium carbonate.
7. a kind of lossless method for increasing sluice concrete flap gate according to claim 5, it is characterised in that:It is described Second material in asphalt emulsion preparation method it is as follows:
1000 parts of 100# pitches,
Emulsifying agent, double, 8 ~ 100 parts of tributyl phenol APEO,
1 ~ 20 part of compatilizer XRJ-10,
1 ~ 20 part of compatilizer ST-2,
100# pitches are heated to 120 ~ 130 DEG C, emulsifying agent, two kinds of compatilizers is added, is obtained into the min of high-speed stirred 5 ~ 8 Asphalt emulsion.
8. a kind of lossless method for increasing sluice concrete flap gate according to claim 1, it is characterised in that:It is described High tenacity cement based grouting material match ratio:
100 parts of 631# epoxy resin,
0 ~ 20 part of dimethylbenzene,
30 ~ 40 parts of dibutyl ester,
7 ~ 9 parts of ethylenediamine;
Cement, specific surface area is 90 ~ 110 parts of 600m2/kg~800m2/kg;
0.2 ~ 1.6 part of high-efficiency water-reducing agent of poly-carboxylic acid;
16 ~ 20 parts of acetone.
9. a kind of lossless method for increasing sluice concrete flap gate according to claim 8, it is characterised in that:It is described Cement uses superfine cement.
What 10. a kind of lossless method for increasing sluice concrete flap gate as described in claim 1 was obtained lossless increases water Lock concrete flap gate, it is characterised in that:Stoplog type groove profile concrete gate door board is connected by consolidating steel plate strip from bottom to top Connecing on the inside of gate, gate has support arm to connect each door-plate, and the height of the support arm is higher than the height of door-plate;The bottom surface of steel plate box and lock Header shape is identical, and the steel plate set for being socketed support arm is fixedly connected with steel plate box side, and steel plate set is viscous after being socketed with support arm Connect, the bottom surface of steel plate box is Nian Jie with the top of gate, and steel plate box two ends are connected by steel plate strip with gate, groove profile concrete gate door Concrete balancing weight is filled in the groove of plate.
Lossless increase sluice concrete flap gate 11. according to claim 10, it is characterised in that:The steel plate box top There is concrete grouting hole in portion.
CN201510999913.3A 2015-12-28 2015-12-28 A kind of lossless method for increasing sluice concrete flap gate Active CN105507213B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510999913.3A CN105507213B (en) 2015-12-28 2015-12-28 A kind of lossless method for increasing sluice concrete flap gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510999913.3A CN105507213B (en) 2015-12-28 2015-12-28 A kind of lossless method for increasing sluice concrete flap gate

Publications (2)

Publication Number Publication Date
CN105507213A CN105507213A (en) 2016-04-20
CN105507213B true CN105507213B (en) 2017-08-22

Family

ID=55715490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510999913.3A Active CN105507213B (en) 2015-12-28 2015-12-28 A kind of lossless method for increasing sluice concrete flap gate

Country Status (1)

Country Link
CN (1) CN105507213B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000234323A (en) * 1999-02-15 2000-08-29 Kumagai Gumi Co Ltd Cut-off method for tap, etc., of dam
CN101899823A (en) * 2010-03-10 2010-12-01 陈雪良 Hydraulic automatically-controlled shutter gate with steel structure
CN202482832U (en) * 2012-03-27 2012-10-10 葛洲坝集团试验检测有限公司 Cavity concrete stoplog
CN103334411A (en) * 2013-06-25 2013-10-02 衢州市河圣水力自控翻板门有限公司 The steel work flap gate
CN104153327A (en) * 2014-08-23 2014-11-19 安徽水利开发股份有限公司 Reinforced concrete stop log gate sealing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000234323A (en) * 1999-02-15 2000-08-29 Kumagai Gumi Co Ltd Cut-off method for tap, etc., of dam
CN101899823A (en) * 2010-03-10 2010-12-01 陈雪良 Hydraulic automatically-controlled shutter gate with steel structure
CN202482832U (en) * 2012-03-27 2012-10-10 葛洲坝集团试验检测有限公司 Cavity concrete stoplog
CN103334411A (en) * 2013-06-25 2013-10-02 衢州市河圣水力自控翻板门有限公司 The steel work flap gate
CN104153327A (en) * 2014-08-23 2014-11-19 安徽水利开发股份有限公司 Reinforced concrete stop log gate sealing method

Also Published As

Publication number Publication date
CN105507213A (en) 2016-04-20

Similar Documents

Publication Publication Date Title
Brühwiler et al. Rehabilitation and strengthening of concrete structures using ultra-high performance fibre reinforced concrete
CN104448207B (en) A kind of injecting paste material that can be used for regulation plate-type ballastless track to rise soil and preparation method thereof and application method
CN110424457B (en) Crack control method for cast-in-situ concrete structure of lining of strong-constraint superposed wall of underground station
CN102392413A (en) Pavement structure of combined steel bridge deck and pavement method thereof
CN105088965A (en) Steel bridge deck pavement structure and method
CN105239502B (en) Uniform force transmission device used for bridge support and installation method of uniform force transmission device
CN105507213B (en) A kind of lossless method for increasing sluice concrete flap gate
CN104846737B (en) A kind of bridge on highway expansion joint, Frozen Area flexibility freeze thawing resistance processing method
CN104846782B (en) A kind of band water flexibility joint seal method at concrete for hydraulic structure expansion joint
CN206646348U (en) A kind of prefabricated mixed mud splice plate of high intensity
CN113119296A (en) Preparation method and system of partially prestressed concrete pile foundation for power transmission line tower
CA2522185A1 (en) Sandwich plate-like construction
Zarghamee et al. Coating delamination by radial tension in prestressed concrete pipe. I: Experiments
CN114349402B (en) Super-strong high-toughness polyester concrete for structure restoration, preparation method and application
CN114315229A (en) Resin concrete and preparation method thereof, steel bridge deck pavement structure and construction method thereof
CN108203285A (en) A kind of epoxide resin grouting material and preparation method thereof
CN111101708A (en) Precise control construction process for prestress of wild goose-shaped plate
WO2004044267A2 (en) Corrosion protection for metals in cementitious material and method of applying and making the same
CN113666683B (en) Oil-seepage-proof concrete and special construction device thereof
CN107722228A (en) A kind of superpower caking property polyurethane waterproof material manufacture method and waterproof material
KR20020059960A (en) Precasted Concrete using a Fiber Reinforced Concrete and method for construction
CN114276070B (en) Super-strong high-toughness polyester concrete for structural repair, preparation method and application
Mansur et al. Composite Behavior of Ferrocement-Deck-Rei nforced Concrete Slabs
KR102171659B1 (en) Equipment Foundation Structure
Zamrawi et al. Experimental work of effect of openings on the post-tensioned flat slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zheng Duo

Inventor after: Yu Qianxian

Inventor after: Zhou Jiyuan

Inventor after: Feng Limin

Inventor after: Yang Jinliang

Inventor after: Li Jiachao

Inventor before: Zheng Duo

Inventor before: Yu Qianxian

Inventor before: Zhou Jiyuan

Inventor before: Yang Jinliang

Inventor before: Li Jiachao

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170714

Address after: 130022 Jilin City, Changchun province people's street, No. 8220

Applicant after: Zheng Duo

Address before: 130022 Jilin City, Changchun province people's street, No. 8220

Applicant before: Jilin Yinhe Water Resources And Hydropower New Technology Co., Ltd.

GR01 Patent grant