CN105484793A - Rapid plugging device for air-raid shelter roof - Google Patents

Rapid plugging device for air-raid shelter roof Download PDF

Info

Publication number
CN105484793A
CN105484793A CN201510961236.6A CN201510961236A CN105484793A CN 105484793 A CN105484793 A CN 105484793A CN 201510961236 A CN201510961236 A CN 201510961236A CN 105484793 A CN105484793 A CN 105484793A
Authority
CN
China
Prior art keywords
door
door frame
sealing device
blocked
right frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510961236.6A
Other languages
Chinese (zh)
Inventor
曹继勇
陈湘生
郭东军
朱益海
朱星平
刘正根
杨红禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PLA University of Science and Technology
Original Assignee
PLA University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PLA University of Science and Technology filed Critical PLA University of Science and Technology
Priority to CN201510961236.6A priority Critical patent/CN105484793A/en
Publication of CN105484793A publication Critical patent/CN105484793A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • E21F17/12Dam doors
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B3/00Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
    • E06B3/32Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing
    • E06B3/34Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing with only one kind of movement
    • E06B3/36Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing with only one kind of movement with a single vertical axis of rotation at one side of the opening, or swinging through the opening
    • E06B3/362Double winged doors or windows
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B5/00Doors, windows, or like closures for special purposes; Border constructions therefor
    • E06B5/10Doors, windows, or like closures for special purposes; Border constructions therefor for protection against air-raid or other war-like action; for other protective purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Special Wing (AREA)

Abstract

本发明公开一种人防工程顶板快速封堵装置,其包括通过门轴与门框(2)左、右边框(21、22)分别铰接的左、右门扇(11、12),两门扇(11、12)宽度之和大于门框左、右边框(21、22)之间的水平距离,所述门框(2)的左、右边框(21、22)可分别固定于待封堵部位相对的两侧壁上。本发明的人防工程顶板快速封堵装置,便于保存、操作简便、平战转换快、防护效果好。

The invention discloses a quick sealing device for the roof of a civil air defense project, which comprises left and right door leaves (11, 12) respectively hinged through door shafts and left and right frames (21, 22) of a door frame (2), and two door leaves (11, 12). 12) The sum of the widths is greater than the horizontal distance between the left and right frames (21, 22) of the door frame, and the left and right frames (21, 22) of the door frame (2) can be respectively fixed on opposite sides of the part to be blocked on the wall. The rapid sealing device for the roof of the civil air defense project of the present invention is convenient for storage, easy to operate, fast in peacetime and wartime conversion, and good in protection effect.

Description

人防工程顶板快速封堵装置Quick sealing device for roof of civil air defense project

技术领域 technical field

本发明属于人防工程构件技术领域,特别是一种便于保存、操作简便、平战转换快、防护效果好的人防工程顶板快速封堵装置。 The invention belongs to the technical field of civil air defense engineering components, in particular to a quick sealing device for the roof of civil air defense engineering which is convenient for storage, easy to operate, fast in peacetime and wartime conversion, and has good protection effect.

背景技术 Background technique

大型人防工程,如城市地铁等,需在临战前采取封堵措施实现平战转换。 Large-scale civil air defense projects, such as urban subways, need to take blocking measures before a war to achieve a transition from peacetime to wartime.

对于人防工程顶板的水平封堵,目前多采用工字型钢封堵、预制混凝土梁式封堵或预制盖板封堵几种方式。 For the horizontal sealing of the roof of civil air defense projects, several methods such as I-shaped steel sealing, prefabricated concrete beam sealing or prefabricated cover plate sealing are mostly used at present.

上述人防工程顶板水平封堵方式存在的问题是: The problems existing in the above-mentioned civil air defense engineering roof horizontal sealing method are:

1、封堵材料在平时需专门保存,不但需要专门空间,且容易丢失和损坏; 1. The plugging material needs to be specially stored in normal times, which not only requires a special space, but is also easy to be lost and damaged;

2、封堵操作复杂,对操作人员技术要求高,防护效果难以保证; 2. The plugging operation is complicated, and the technical requirements for the operators are high, so the protection effect is difficult to guarantee;

3、平战转换时间长。 3. The conversion time between peacetime and wartime is long.

发明内容 Contents of the invention

本发明的目的在于提供一种人防工程顶板快速封堵装置,便于保存、操作简便、平战转换快、防护效果好。 The object of the present invention is to provide a quick sealing device for the roof of civil air defense engineering, which is convenient for storage, easy to operate, fast in peacetime and wartime, and has good protection effect.

实现本发明目的的技术解决方案为:一种人防工程顶板快速封堵装置,其包括通过门轴与门框左、右边框分别铰接的左、右门扇,两门扇宽度之和大于门框左、右边框之间的水平距离,所述门框的左、右边框可分别固定于待封堵部位相对的两侧壁上。 The technical solution to realize the object of the present invention is: a quick sealing device for the roof of civil air defense engineering, which includes left and right door leaves respectively hinged to the left and right frames of the door frame through the door shaft, and the sum of the width of the two door leaves is greater than the left and right frames of the door frame The horizontal distance between them, the left and right frames of the door frame can be respectively fixed on the opposite side walls of the part to be blocked.

本发明与现有技术相比,其显著优点为: Compared with the prior art, the present invention has the remarkable advantages of:

1、便于保存:平时安装到位,不会造成构件丢失和临战准备材料; 1. Easy to save: usually installed in place, will not cause loss of components and preparation materials for battle;

2、操作简便:战时仅需人力简单关闭门扇,操作简便,从而大大节省平战转换时间; 2. Easy operation: only manpower is needed to close the door leaf in wartime, which is easy to operate, thus greatly saving the transition time between peacetime and wartime;

3、防护效果好:双门扇关闭时,呈人字型互为支撑,受力合理,增强了防护效果。 3. Good protective effect: when the double doors are closed, they support each other in a herringbone shape, and the force is reasonable, which enhances the protective effect.

下面结合附图和具体实施方式对本发明作进一步的详细描述。 The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

附图说明 Description of drawings

图1为本发明人防工程顶板快速封堵装置的结构示意图(战时封堵状态)。 Fig. 1 is a schematic structural view (blocking state in wartime) of the present invention's civil air defense project roof quick sealing device.

图2为本发明人防工程顶板快速封堵装置的结构示意图(平时存放状态)。 Fig. 2 is a structural schematic diagram (normal storage state) of the rapid sealing device for the roof of the civil air defense project of the present invention.

图3为本发明多块拼接示意图。 Fig. 3 is a schematic diagram of multi-block splicing according to the present invention.

图中,11、12门扇,2门框,21、22、23、24(24图中未标出)边框,3支撑梁41、42固定装置。 Among the figure, 11,12 door leaves, 2 doorframes, 21,22,23,24 (not marked among 24 figures) frames, 3 support beams 41,42 fixtures.

具体实施方式 detailed description

如图1所示,本发明人防工程顶板快速封堵装置,其包括通过门轴与门框2左、右边框21、22分别铰接的左、右门扇11、12,两门扇11、12宽度之和大于门框左、右边框21、22之间的水平距离,所述门框2的左、右边框21、22可分别固定于待封堵部位相对的两侧壁上。 As shown in Figure 1, the rapid sealing device for the roof of the civil air defense project of the present invention comprises the left and right door leaves 11,12 respectively hinged with the left and right frames 21,22 of the door frame and the door frame 2, and the sum of the widths of the two door leaves 11,12 Greater than the horizontal distance between the left and right frames 21, 22 of the door frame, the left and right frames 21, 22 of the door frame 2 can be respectively fixed on the opposite side walls of the part to be blocked.

由于两门扇11、12宽度之和大于门框左、右边框21、22之间的水平距离,当左、右门扇11、12相向闭合时,封堵面向上突起,从竖剖面看两门扇呈人字形,相互支撑,并将荷载向两侧传递,改变了原有人防门纯弯设计方式,使结构受力更加合理,提高了防护效果。两门扇11、12关闭后,可在人防门上方做防水处理并覆土,从而解决人防工程中防冲击波荷载、防毒、防早期核辐射问题。 Since the sum of the widths of the two door leaves 11, 12 is greater than the horizontal distance between the left and right frames 21, 22 of the door frame, when the left and right door leaves 11, 12 are closed towards each other, the blocking surface protrudes upwards, and the two door leaves look like a person from a vertical section. The glyphs support each other and transmit the load to both sides, which changes the original design method of pure bending of civil air defense doors, makes the structural force more reasonable and improves the protection effect. After the two door leaves 11 and 12 were closed, waterproof treatment and soil covering could be done above the civil air defense door, thereby solving the problems of anti-shock wave load, anti-virus, and early nuclear radiation prevention in the civil air defense project.

所述门框的前、后边框23、24在竖直面上均呈人字型,当左、右门扇11、12闭合时,其前、后两端分别与门框的前、后边框23、24贴合。 The front and rear frames 23,24 of the door frame are in the shape of a herringbone on the vertical plane. fit.

门框采用与门扇关闭后配套的人字型钢门框,竖井短边方向为人字形,在长边方向保证与门扇的连接,以保证人防门在关闭时,双扇人防门与钢门框四边重合,同时保证门扇推力由钢门框传至顶板梁牛腿。 The door frame adopts the herringbone-shaped steel door frame matched with the door leaf after it is closed. The door leaf thrust is transmitted from the steel door frame to the roof beam corbel.

所述门扇11、12与门框左、右边框21、22接触的边缘为圆弧状,所述门框2左、右边框21、22均设有接纳门扇11、12圆弧状边缘的圆弧状槽。 The edges of the door leaves 11, 12 in contact with the left and right frames 21, 22 of the door frame are arc-shaped, and the left and right frames 21, 22 of the door frame 2 are all provided with arc-shaped edges for receiving the arc-shaped edges of the door leaves 11, 12. groove.

还包括可使门扇11、12开启时竖直贴放在待封堵部位的侧壁上的固定装置41、42,所述固定装置41、42固设于左、右边框21、22所在的待封堵部位侧壁上。 It also includes fixing devices 41, 42 that can be vertically pasted on the side walls of the parts to be blocked when the door leaves 11, 12 are opened. On the side wall of the blockage site.

平时,门扇11、12开启,竖直贴放在待封堵部位侧壁上,用固定装置41、42将门扇11、12固定,不需另外的储存空间存放作为封堵材料的门扇,节省空间,且不易丢失和损坏。战时,靠人力关闭门扇11、12,门扇11、12关闭时,不在同一平面内,呈人字型互为支撑。门框2左、右边框21、22设有的圆弧状槽可使门扇11、12在开启和关闭之间自由转动,同时利于推力的传递。 Normally, the door leaves 11 and 12 are opened and placed vertically on the side wall of the part to be blocked, and the door leaves 11 and 12 are fixed by the fixing devices 41 and 42, and no additional storage space is required to store the door leaves as sealing materials, saving space , and not easy to lose and damage. During wartime, close door leaf 11,12 by manpower, when door leaf 11,12 closes, not in same plane, be the mutual support of herringbone. The arc-shaped grooves provided on the left and right frames 21, 22 of the door frame 2 can make the door leaves 11, 12 rotate freely between opening and closing, and at the same time facilitate the transmission of thrust.

还包括一根与门框2左、右边框21、22平行的支撑梁,其两端可拆式固定在待封堵部位的另外两侧壁3上,其上沿与左、右门扇11、12闭合时门缝处的下沿接触。 Also comprise a support beam parallel to the left and right frames 21, 22 of the door frame 2, its two ends are detachably fixed on the other side walls 3 of the position to be blocked, and its upper edge is connected with the left and right door leaves 11, 12 The lower edge of the door seam contacts when closed.

为使每扇人防门关闭时定位,在天窗中部人字型钢门框最顶部,设置可拆式支撑梁3,可拆式支撑梁3平时不安装,战时安装在两端预留的安装槽内,以便于左右人防门对接。可拆式支撑梁3只在安装时起到定位支撑作用,战时不考虑对门扇的支撑作用,战时荷载作用下,荷载由人字型双扇人防门形成的单向板(杆)结构支撑体系承担。 In order to position each civil air defense door when it is closed, a detachable support beam 3 is installed at the top of the herringbone steel door frame in the middle of the skylight. The detachable support beam 3 is not installed at ordinary times, and is installed in the installation slots reserved at both ends during wartime , so as to facilitate the docking of the left and right air defense doors. The detachable support beam 3 only serves as a positioning support during installation, and does not consider the support for the door leaf during wartime. Under the action of wartime loads, the load is a one-way plate (rod) structure formed by herringbone double-leaf air defense doors support system.

本封堵装置在宽度方向上与待封堵部位的宽度相同,在长度上可按整倍数自由拼接,如图3所示。 The plugging device is the same as the width of the part to be plugged in the width direction, and can be spliced freely in integer multiples in length, as shown in FIG. 3 .

Claims (6)

1.一种人防工程顶板快速封堵装置,其特征在于:包括通过门轴与门框(2)左、右边框(21、22)分别铰接的左、右门扇(11、12),两门扇(11、12)宽度之和大于门框左、右边框(21、22)之间的水平距离,所述门框(2)的左、右边框(21、22)可分别固定于待封堵部位相对的两侧壁上。1. a quick sealing device for the roof of civil air defense engineering, is characterized in that: comprise the left and right door leaves (11,12) hinged respectively by door shaft and door frame (2) left and right frame (21,22), two door leaves ( 11, 12) The sum of the widths is greater than the horizontal distance between the left and right frames (21, 22) of the door frame, and the left and right frames (21, 22) of the door frame (2) can be respectively fixed on the opposite sides of the parts to be blocked. on both side walls. 2.根据权利要求1所述的快速封堵装置,其特征在于:所述门框的前、后边框(23、24)在竖直面上均呈人字型,当左、右门扇(11、12)闭合时,其前、后两端分别与门框的前、后边框(23、24)贴合。2. The quick blocking device according to claim 1, characterized in that: the front and rear frames (23, 24) of the door frame are herringbone-shaped on the vertical plane, when the left and right door leaves (11, 24) 12) When it is closed, its front and rear ends are respectively attached to the front and rear frames (23, 24) of the door frame. 3.根据权利要求1或2所述的快速封堵装置,其特征在于:所述门扇(11、12)与门框左、右边框(21、22)接触的边缘为圆弧状,所述门框(2)左、右边框(21、22)均设有接纳门扇(11、12)圆弧状边缘的圆弧状槽。3. The rapid sealing device according to claim 1 or 2, characterized in that: the edges of the door leaf (11, 12) in contact with the left and right frame (21, 22) of the door frame are arc-shaped, and the door frame (2) The left and right frames (21, 22) are all provided with arc-shaped slots for receiving the arc-shaped edges of the door leaves (11, 12). 4.根据权利要求1或2所述的快速封堵装置,其特征在于:还包括可使门扇(11、12)开启时竖直贴放在待封堵部位的侧壁上的固定装置(41、42),所述固定装置(4)固设于左、右边框(21、22)所在的待封堵部位侧壁上。4. The quick sealing device according to claim 1 or 2, characterized in that it also includes a fixing device (41) that can make the door leaf (11, 12) be vertically attached to the side wall of the site to be blocked when it is opened. , 42), the fixing device (4) is fixed on the side wall of the position to be blocked where the left and right frames (21, 22) are located. 5.根据权利要求3所述的快速封堵装置,其特征在于:还包括可使门扇(11、12)开启时竖直贴放在待封堵部位的侧壁上的固定装置(41、42),所述固定装置(41、42)固设于左、右边框(21、22)所在的待封堵部位侧壁上。5. The quick sealing device according to claim 3, characterized in that it also includes a fixing device (41, 42) that can make the door leaf (11, 12) be vertically attached to the side wall of the site to be blocked when the door leaf (11, 12) is opened. ), the fixing devices (41, 42) are fixed on the side walls of the parts to be blocked where the left and right frames (21, 22) are located. 6.根据权利要求2所述的快速封堵装置,其特征在于:还包括一与门框(2)左、右边框(21、22)平行的支撑梁,其两端可拆式固定在待封堵部位的另外两侧壁3上,其上沿与左、右门扇(11、12)闭合时门缝处的下沿接触。6. The quick sealing device according to claim 2, characterized in that: it also includes a support beam parallel to the left and right frames (21, 22) of the door frame (2), the two ends of which are detachably fixed on the On the other side walls 3 of the blocking position, its upper edge contacts with the lower edge of the door gap when the left and right door leaves (11, 12) are closed.
CN201510961236.6A 2015-12-18 2015-12-18 Rapid plugging device for air-raid shelter roof Pending CN105484793A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510961236.6A CN105484793A (en) 2015-12-18 2015-12-18 Rapid plugging device for air-raid shelter roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510961236.6A CN105484793A (en) 2015-12-18 2015-12-18 Rapid plugging device for air-raid shelter roof

Publications (1)

Publication Number Publication Date
CN105484793A true CN105484793A (en) 2016-04-13

Family

ID=55672038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510961236.6A Pending CN105484793A (en) 2015-12-18 2015-12-18 Rapid plugging device for air-raid shelter roof

Country Status (1)

Country Link
CN (1) CN105484793A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025084A (en) * 2018-08-03 2018-12-18 南京恒威防护设备有限公司 It can be used for the roof light and its installation and methods for using them of civil air defense constructions and installations
CN114991857A (en) * 2022-06-08 2022-09-02 中铁第六勘察设计院集团有限公司 A civil air defense blocking method for setting a circular light guide in a subway station

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2040145U (en) * 1988-07-05 1989-06-28 吕炳生 Waterproof gate
CN2881041Y (en) * 2006-01-09 2007-03-21 天津新港船厂 Open type V-shaped moisture-proof door
CN101532395A (en) * 2009-03-15 2009-09-16 樊铁山 Method for automatically closing coal mine explosion-proof cover (door) after opening by explosion shock wave
CN201443410U (en) * 2009-07-07 2010-04-28 兖州煤业股份有限公司 Rapid reset vertical ventilating shaft explosion-proof door
CN102206984A (en) * 2011-05-26 2011-10-05 中国人民解放军总参谋部工程兵第四设计研究院 Light high-strength automatically controlled protective door
CN202055865U (en) * 2011-05-30 2011-11-30 湖南科技大学 Safety air bag automatic plugging device of mine anti-explosion well cover
CN202300523U (en) * 2011-11-04 2012-07-04 山西创奇实业有限公司 Plum-petal explosion-proof door for coal mine shaft
CN202325099U (en) * 2011-11-18 2012-07-11 苏州市江诚人防设备有限公司 Three-dimensional reinforced protective door
CN202417228U (en) * 2011-11-16 2012-09-05 苏州市江诚人防设备有限公司 Side stress reinforced protective door
CN105089690A (en) * 2014-05-06 2015-11-25 山东科技大学 Novel coal mine vertical air shaft explosion-proof door
CN205370647U (en) * 2015-12-18 2016-07-06 中国人民解放军理工大学 Quick plugging device of civil air defense engineering roof

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2040145U (en) * 1988-07-05 1989-06-28 吕炳生 Waterproof gate
CN2881041Y (en) * 2006-01-09 2007-03-21 天津新港船厂 Open type V-shaped moisture-proof door
CN101532395A (en) * 2009-03-15 2009-09-16 樊铁山 Method for automatically closing coal mine explosion-proof cover (door) after opening by explosion shock wave
CN201443410U (en) * 2009-07-07 2010-04-28 兖州煤业股份有限公司 Rapid reset vertical ventilating shaft explosion-proof door
CN102206984A (en) * 2011-05-26 2011-10-05 中国人民解放军总参谋部工程兵第四设计研究院 Light high-strength automatically controlled protective door
CN202055865U (en) * 2011-05-30 2011-11-30 湖南科技大学 Safety air bag automatic plugging device of mine anti-explosion well cover
CN202300523U (en) * 2011-11-04 2012-07-04 山西创奇实业有限公司 Plum-petal explosion-proof door for coal mine shaft
CN202417228U (en) * 2011-11-16 2012-09-05 苏州市江诚人防设备有限公司 Side stress reinforced protective door
CN202325099U (en) * 2011-11-18 2012-07-11 苏州市江诚人防设备有限公司 Three-dimensional reinforced protective door
CN105089690A (en) * 2014-05-06 2015-11-25 山东科技大学 Novel coal mine vertical air shaft explosion-proof door
CN205370647U (en) * 2015-12-18 2016-07-06 中国人民解放军理工大学 Quick plugging device of civil air defense engineering roof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025084A (en) * 2018-08-03 2018-12-18 南京恒威防护设备有限公司 It can be used for the roof light and its installation and methods for using them of civil air defense constructions and installations
CN114991857A (en) * 2022-06-08 2022-09-02 中铁第六勘察设计院集团有限公司 A civil air defense blocking method for setting a circular light guide in a subway station

Similar Documents

Publication Publication Date Title
CN203856373U (en) Typhoon-resisting window
CN201901945U (en) a folding house
CN105484793A (en) Rapid plugging device for air-raid shelter roof
CN105064286B (en) A pumping station water blocking trash rack ram and its manufacturing, construction and use methods
CN205370647U (en) Quick plugging device of civil air defense engineering roof
CN207672516U (en) A kind of flood-control wall increases collapsible flood plate washer
CN207700844U (en) Construction enclosing unit and construction guard fender
CN103215926A (en) Vertical hoisting platform anti-flooding door applied to underground building waterproofing field
CN204846624U (en) Foldable packing container
CN207212409U (en) The manual vertical rotary type protective airtight partition door of rail rapid transit engineering
CN106761922A (en) A kind of avoid-dismantle cable tunnel fireproof partition device
CN118686529B (en) Protective door for civil air defense engineering
CN202055719U (en) Double-leaf air-tight and whether-tight fireproof door with detachable plate
CN105064866A (en) Indoor special cover plate door opened vertically up
CN102206986B (en) Double-leaf airtight and weather-tight fireproof door with detachable plate
CN205530120U (en) Folding flood prevention curtain floodgate
CN110259513B (en) Reinforced concrete single-leaf protective safety airtight door and using method thereof
CN111962718A (en) Modular assembly type non-bearing wall and construction method thereof
CN102561910A (en) Nuclear power radiation-proof door
CN206903487U (en) The doorframe structure of compounded horizontal sliding formula double-leaf sealed door
CN102243019B (en) Kiln seal door
CN212454469U (en) Waterproof device for coal mine excavation roadway
CN108487847A (en) The pull-type gate of telescopic column
CN107559043A (en) The manual vertical rotary type protective airtight partition door of rail rapid transit engineering
CN206071427U (en) A kind of flood control isolating door suitable for transformer station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160413