CN105465484A - Steel structure pipeline support mounting method and support structure thereof - Google Patents

Steel structure pipeline support mounting method and support structure thereof Download PDF

Info

Publication number
CN105465484A
CN105465484A CN201510405295.5A CN201510405295A CN105465484A CN 105465484 A CN105465484 A CN 105465484A CN 201510405295 A CN201510405295 A CN 201510405295A CN 105465484 A CN105465484 A CN 105465484A
Authority
CN
China
Prior art keywords
column
plate
pipe support
root
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510405295.5A
Other languages
Chinese (zh)
Inventor
黄璜
王晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201510405295.5A priority Critical patent/CN105465484A/en
Publication of CN105465484A publication Critical patent/CN105465484A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a steel structure pipeline support mounting method and a support structure thereof. According to the invention, by changing the construction sequence, the pipe support mounting process is simplified; specifically, in making of a pipe support, a column soleplate is not welded to the bottom of a pipe support upright temporarily; in construction, the column soleplate is first independently fixed on an anchor bolt of a reinforced concrete base, and the column soleplate is leveled by using a base plate below the column soleplate and an adjusting nut on the anchor bolt; and then the pipe support upright is settled on the column soleplate, so as to complete groove welding of the upright and the column soleplate and welding of a stiffening plate between the upright and the column soleplate. According to the invention, the hoisting is relatively convenient compared with common construction methods, broaching is not needed for a steel column bottom plate, anchor bolt hole aligning and leveling are easy, and construction is simple. Therefore, the method provides convenience and saves time for construction of a large quantity of pipeline supports in factories.

Description

A kind of steelwork pipe support installing method and supporting structure thereof
Technical field
the present invention relates to a kind of steelwork pipe support installing method and supporting structure thereof, belong to the mounting technique field of support of pipelines.
Background technique
the working procedure of the routine of steelwork pipe support is: at produce in factory pipe support, is transported to on-the-spot integral hoisting, lifts and locates with the steel column of column root-plate and concrete foundation short column, installs crab-bolt, and adjusts level by nut; Crab-bolt backing plate and column root-plate point weld after installing and correcting by pipe support.
existing installation method, because column bolt is easily shifted in concreting process, during pipe support integral hoisting steel column, the Bolt to position of steel column base plate and absolute altitude levelling all more difficult, normal needs are reaming and increase temporary support in hoisting process, and pipe support is installed wastes time and energy.
Summary of the invention
the object of the invention is to, a kind of steelwork pipe support installing method and supporting structure thereof are provided, to facilitate the installation of steelwork pipe support, improve installation efficiency, thus overcome the deficiencies in the prior art.
technological scheme of the present invention is achieved in that
the installation method of a kind of steelwork pipe support of the present invention is, the method is by changing sequence of construction, realizes simplifying pipe support installation process; Specifically when making pipe support, column root-plate wouldn't be welded on the bottom of pipe support column; During construction, first independent column root-plate to be fixed in the crab-bolt of reinforced concrete plinth, and by the backing plate below column root-plate and the adjusting nut in crab-bolt column root-plate is levelling; And then pipe support column is seated on column root-plate, scene completes welding of column and column root-plate and the welding of stiffened plate between column with column root-plate.
according to of the present invention a kind of steelwork pipe supporting structure that said method is formed be, this structure comprises reinforced concrete plinth, reinforced concrete plinth is provided with one group of crab-bolt, crab-bolt is connected with adjusting nut through the fixed hole on column root-plate, one group of backing plate is provided with bottom column root-plate, column root-plate end face welds with pipe support column, is welded with one group of stiffened plate between column root-plate and pipe support column.
in aforementioned structure, be provided with crab-bolt backing plate between described adjusting nut and column root-plate, adjusting nut is connected with the spot welding of crab-bolt backing plate.
in aforementioned structure, on described adjusting nut, be provided with locking nut.
owing to have employed technique scheme, compared with prior art, the comparatively conventional method of construction of method of the present invention lifting is convenient in the present invention, and steel column base plate is without reaming, and foot bolt is to hole with to be levellingly all easy in this wise, and construction is simple.The method allows bolt to there is deviation, and deviation can be adjusted by the location of column root-plate and post, does not affect use, and this installation method provides convenient to the construction of measuring large support of pipelines in factory and saves time.
Accompanying drawing explanation
fig. 1 is structural representation of the present invention.
mark in accompanying drawing: 1-reinforced concrete plinth, 2-crab-bolt, 3-column root-plate, 4-adjusting nut, 5-backing plate, 6-pipe support column, 7-stiffened plate, 8-crab-bolt backing plate, 9-locking nut.
Embodiment
below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
the installation method of a kind of steelwork pipe support of the present invention is, the method is by changing sequence of construction, to realize the object simplifying pipe support installation process; Specifically when making pipe support, column root-plate wouldn't be welded on the bottom of pipe support column; During construction, first independent column root-plate to be fixed in the crab-bolt of reinforced concrete plinth, and by the backing plate below column root-plate and the adjusting nut in crab-bolt column root-plate is levelling; And then pipe support column is seated on column root-plate, scene completes welding of column and column root-plate and the welding of stiffened plate between column with column root-plate.
according to of the present invention a kind of steelwork pipe supporting structure that said method is formed, comprise reinforced concrete plinth 1, reinforced concrete plinth 1 is provided with one group of crab-bolt 2, crab-bolt 2 is connected with adjusting nut 4 through the fixed hole on column root-plate 3, one group of backing plate 5 is provided with bottom column root-plate 3, column root-plate 3 end face welds with pipe support column 6, is welded with one group of stiffened plate 7 between column root-plate 3 and pipe support column 6.Be provided with crab-bolt backing plate 8 between adjusting nut 4 and column root-plate 3, adjusting nut 4 is connected with crab-bolt backing plate 8 spot welding.Locking nut 9 is provided with on adjusting nut 4.
Embodiment
for process for making alumina more support of pipelines used, process for making alumina support of pipelines used adopts rigidity suspension column usually, and requirement of strength is not high compared with the suspension column of building, therefore can adopt installation method of the present invention.The method column root-plate 3 and pipe support column 6 is separated when pipe support makes.That is temporarily column root-plate 3 and pipe support column 6 are not welded together at making pipe support column 6.During installation, first install separately column root-plate 3, then pipe support column 6 is installed.
concrete implementation step is as follows:
1, the fixed hole on column root-plate 3 is located through crab-bolt 2, and bottom column root-plate 3, pad some backing plates 5, and then overlap a crab-bolt backing plate 8 in each crab-bolt 2, and screw in adjusting nut 4.By horizontal absolute altitude and the levelness of backing plate 5 and adjusting nut 4 adjustment column sole 3.
2, after the horizontal absolute altitude adjusting column root-plate 3 and levelness, by spot-welded together to adjusting nut 4 and crab-bolt backing plate 8, and screw in a locking nut 9 again at adjusting nut 4, loosen to prevent adjusting nut 4.
3, then by crane gear, pipe support column 6 is in place on column root-plate 3, in placely first pipe support column 6 and column root-plate 3 groove welding to be welded together afterwards.
4, then between pipe support column 6 with column root-plate 3, stiffened plate 7 is welded, to improve suspension column rigidity.
5, finally adopt C20 concrete bag post angle, whole linkage structure is closed.

Claims (4)

1. a steelwork pipe support installing method, is characterized in that: the method is by changing sequence of construction, realizes simplifying pipe support installation process; Specifically when making pipe support, column root-plate wouldn't be welded on the bottom of pipe support column; During construction, first independent column root-plate to be fixed in the crab-bolt of reinforced concrete plinth, and by the backing plate below column root-plate and the adjusting nut in crab-bolt column root-plate is levelling; And then pipe support column is seated on column root-plate, scene completes welding of column and column root-plate and the welding of stiffened plate between column with column root-plate.
2. one kind according to claim 1 method form steelwork pipe supporting structure, it is characterized in that: comprise reinforced concrete plinth (1), reinforced concrete plinth (1) is provided with one group of crab-bolt (2), crab-bolt (2) is connected with adjusting nut (4) through the fixed hole on column root-plate (3), column root-plate (3) bottom is provided with one group of backing plate (5), column root-plate (3) end face welds with pipe support column (6), is welded with one group of stiffened plate (7) between column root-plate (3) and pipe support column (6).
3. steelwork pipe supporting structure according to claim 2, it is characterized in that: be provided with crab-bolt backing plate (8) between described adjusting nut (4) and column root-plate (3), adjusting nut (4) is connected with crab-bolt backing plate (8) spot welding.
4. steelwork pipe supporting structure according to claim 2, is characterized in that: be provided with locking nut (9) on described adjusting nut (4).
CN201510405295.5A 2015-07-13 2015-07-13 Steel structure pipeline support mounting method and support structure thereof Pending CN105465484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510405295.5A CN105465484A (en) 2015-07-13 2015-07-13 Steel structure pipeline support mounting method and support structure thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510405295.5A CN105465484A (en) 2015-07-13 2015-07-13 Steel structure pipeline support mounting method and support structure thereof

Publications (1)

Publication Number Publication Date
CN105465484A true CN105465484A (en) 2016-04-06

Family

ID=55603494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510405295.5A Pending CN105465484A (en) 2015-07-13 2015-07-13 Steel structure pipeline support mounting method and support structure thereof

Country Status (1)

Country Link
CN (1) CN105465484A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939946A (en) * 2017-04-27 2017-07-11 苏州天地彩钢制造有限公司 A kind of supporting structure for steel construction
CN117005556A (en) * 2023-07-28 2023-11-07 珠海十字门中央商务区建设控股有限公司 A construction method and structure for mechanical reinforcement of steel column foot anchor bolts
CN119641100A (en) * 2024-12-26 2025-03-18 上海二十冶建设有限公司 Method for mounting cold-rolled technical steel structural column

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006183266A (en) * 2004-12-27 2006-07-13 Takenaka Komuten Co Ltd Building construction of seismically isolated structure by laminated-rubber bearing
JP2008057323A (en) * 2007-11-17 2008-03-13 Okabe Co Ltd Exposed steel frame plinth structure
CN101787736A (en) * 2010-03-09 2010-07-28 中铁建设集团有限公司 Steel structure hoisting slide support seat with large span and construction process thereof
CN102071745A (en) * 2010-12-10 2011-05-25 上海电力设计院有限公司 Stylobate joint of framework column
CN102200019A (en) * 2011-04-14 2011-09-28 中铁第一勘察设计院集团有限公司 Tunnel boring machine middle-plate stepping reinforcing support mechanism and construction method thereof
CN203462583U (en) * 2013-08-20 2014-03-05 浙江精工钢结构集团有限公司 Super high-rise exposed column foot
CN104278752A (en) * 2014-10-21 2015-01-14 安徽铁创新材料科技有限公司 Solid joint column base structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006183266A (en) * 2004-12-27 2006-07-13 Takenaka Komuten Co Ltd Building construction of seismically isolated structure by laminated-rubber bearing
JP2008057323A (en) * 2007-11-17 2008-03-13 Okabe Co Ltd Exposed steel frame plinth structure
CN101787736A (en) * 2010-03-09 2010-07-28 中铁建设集团有限公司 Steel structure hoisting slide support seat with large span and construction process thereof
CN102071745A (en) * 2010-12-10 2011-05-25 上海电力设计院有限公司 Stylobate joint of framework column
CN102200019A (en) * 2011-04-14 2011-09-28 中铁第一勘察设计院集团有限公司 Tunnel boring machine middle-plate stepping reinforcing support mechanism and construction method thereof
CN203462583U (en) * 2013-08-20 2014-03-05 浙江精工钢结构集团有限公司 Super high-rise exposed column foot
CN104278752A (en) * 2014-10-21 2015-01-14 安徽铁创新材料科技有限公司 Solid joint column base structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939946A (en) * 2017-04-27 2017-07-11 苏州天地彩钢制造有限公司 A kind of supporting structure for steel construction
CN117005556A (en) * 2023-07-28 2023-11-07 珠海十字门中央商务区建设控股有限公司 A construction method and structure for mechanical reinforcement of steel column foot anchor bolts
CN117005556B (en) * 2023-07-28 2025-10-17 珠海十字门中央商务区建设控股有限公司 Construction method and structure for mechanical reinforcement of steel column foot anchor bolt
CN119641100A (en) * 2024-12-26 2025-03-18 上海二十冶建设有限公司 Method for mounting cold-rolled technical steel structural column
CN119641100B (en) * 2024-12-26 2026-04-07 上海二十冶建设有限公司 Method for mounting cold-rolled technical steel structural column

Similar Documents

Publication Publication Date Title
CN102095052B (en) Installing method of foundation bolt anchoring system and method for installing industrial equipment
CN104234385B (en) A post-installation construction method of large-scale steel plate embedded parts on the floor
CN202194244U (en) Positioning support for embedding of ultra-high steel-work pedestals
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
KR101621944B1 (en) setting device based towers enclosing
CN104141318B (en) A kind of Large-diameter Steel tubing string suspension column construction method of installation
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN207392771U (en) A kind of guide type steel column locator
CN105465484A (en) Steel structure pipeline support mounting method and support structure thereof
CN101985824B (en) For the embedded part installation device of bridge pad
CN203546728U (en) Improved installation fixing device of top-down steel pipe column
CN206000165U (en) A kind of aluminum alloy mould plate form bracing fast assembly and disassembly mechanism
CN202627494U (en) Device for locating and supporting prefabricated concrete structure laminated slab
CN206174487U (en) Pre -cast screw fixing device
CN109179222B (en) Construction method for controlling inclination and levelness of embedded joint of tower crane
CN104452810B (en) The erecting device of pipe trench interior conduit buttress and mounting method thereof
CN202884252U (en) High-low horizontal adjusting seat
CN119663898A (en) Assembling method for assembled station components
CN114687567A (en) Ultrahigh heavy embedded part hanging construction tool and method
CN208650798U (en) A kind of derrick support column and derrick
CN209817462U (en) Overhanging type supporting and positioning device for field installation of prefabricated air conditioner plate
CN203594264U (en) Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification
CN110943411A (en) Distribution box mounting bracket and mounting method
CN204785059U (en) Steel construction pipeline bracket structure
CN205476528U (en) Precast pile device of taking one's place fast

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160406

RJ01 Rejection of invention patent application after publication