CN105442619B - Cable duct bottom board slope controls smears pressure instrument and its application method with ditch in ditch - Google Patents

Cable duct bottom board slope controls smears pressure instrument and its application method with ditch in ditch Download PDF

Info

Publication number
CN105442619B
CN105442619B CN201511015295.0A CN201511015295A CN105442619B CN 105442619 B CN105442619 B CN 105442619B CN 201511015295 A CN201511015295 A CN 201511015295A CN 105442619 B CN105442619 B CN 105442619B
Authority
CN
China
Prior art keywords
ditch
slope
rod
slope control
cable duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511015295.0A
Other languages
Chinese (zh)
Other versions
CN105442619A (en
Inventor
姚炜
郑棋
孙建忠
占冬冬
朱崯斌
程雄
方俊齐
童成飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
State Grid Corp of China SGCC
Original Assignee
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Zhejiang Electric Power Co Ltd, Zhejiang Electric Power Transmission and Transforming Engineering Co, State Grid Corp of China SGCC filed Critical State Grid Zhejiang Electric Power Co Ltd
Priority to CN201511015295.0A priority Critical patent/CN105442619B/en
Publication of CN105442619A publication Critical patent/CN105442619A/en
Application granted granted Critical
Publication of CN105442619B publication Critical patent/CN105442619B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

电缆沟底板坡度控制和沟中沟抹压工具及其使用方法,涉及变电站电缆沟施工领域。目前,施工单位对沟中沟的施工没有统一的工艺标准,小沟的施工工具不统一,标高及坡度控制不精确。本发明包括支架杆、坡度控制杆、落地杆及操作手杆,支架杆为4根,两支架杆与一位于支架杆之间的落地杆连接形成一支架;两支架左右设置,坡度控制杆设于两支架之间形成坡度控制架;支架杆竖直放置,坡度控制杆斜向设于左右两支架杆的中下部,落地杆垂直设于支架杆的底部,操作手杆垂直设于支架杆的顶部,落地杆为圆形钢管。本技术方案通过不同的组合实现两种工具的装配,可以快速有效地进行电缆沟坡度和沟中沟的施工,提升了施工速度和质量。

The utility model relates to a tool for controlling the slope of the bottom plate of a cable trench, a tool for wiping and pressing the trench in the trench, and a method of use thereof, and relates to the field of construction of cable trenches in substations. At present, the construction unit does not have a unified process standard for the construction of the ditch in the middle of the ditch, the construction tools of the small ditch are not uniform, and the elevation and slope control is not accurate. The present invention comprises a support rod, a slope control rod, a landing rod and an operating hand rod. There are 4 support rods. A slope control frame is formed between the two supports; the support rods are placed vertically, the slope control rods are arranged obliquely at the middle and lower parts of the left and right support rods, the landing rods are vertically arranged at the bottom of the support rods, and the operating handle rods are vertically arranged at the bottom of the support rods. The top, drop bars are round steel tubes. The technical solution realizes the assembly of the two tools through different combinations, can quickly and effectively carry out the construction of the slope of the cable trench and the trench in the trench, and improves the construction speed and quality.

Description

电缆沟底板坡度控制和沟中沟抹压工具及其使用方法Cable trench floor slope control and trench-in-trough wiping tool and method of use thereof

技术领域technical field

本发明涉及变电站电缆沟施工领域,尤其是电缆沟底板坡度的控制及沟中沟抹压的施工技术。The invention relates to the field of substation cable trench construction, in particular to the control of the slope of the bottom plate of the cable trench and the construction technique for wiping and pressing the trench in the trench.

背景技术Background technique

目前,变电站设计多采用电缆沟中设置支沟进行排水。根据国家电网公司标准工艺要求,电缆沟中设置R30mm的沟中沟至集水井排水,最终汇集至就近的雨水检查井。目前,施工单位对沟中沟的施工没有统一的工艺标准,小沟的施工工具不统一,有些在沟底找坡时采用预埋PVC管;有采用人工分段用PVC管抹压成型。不美观,且标高及坡度控制不精确。At present, the design of substations mostly uses branch ditches in cable trenches for drainage. According to the standard technical requirements of the State Grid Corporation of China, a ditch of R30mm is set in the cable trench to drain water from the water collection well, and finally collect it to the nearest rainwater inspection well. At present, the construction unit does not have a unified process standard for the construction of the ditch in the ditch, and the construction tools of the small ditch are not uniform. Some use pre-embedded PVC pipes when finding slopes at the bottom of the ditch; Unsightly, and the level and slope control is imprecise.

发明内容Contents of the invention

本发明要解决的技术问题和提出的技术任务是对现有技术方案进行完善与改进,提供电缆沟底板坡度控制和沟中沟抹压工具及其使用方法,以提升电缆沟底板坡度和沟中沟抹压施工质量和速度为目的。为此,本发明采取以下技术方案。The technical problem to be solved and the technical task proposed by the present invention are to perfect and improve the existing technical solutions, to provide tools for controlling the slope of the cable trench bottom plate and for mopping the trench in the trench and its use method, so as to improve the slope of the cable trench bottom plate and The purpose of ditch wiping is construction quality and speed. For this reason, the present invention takes the following technical solutions.

电缆沟底板坡度控制和沟中沟抹压工具,包括支架杆、坡度控制杆、落地杆及操作手杆,所述的支架杆为4根,两支架杆与一位于支架杆之间的落地杆连接形成一支架;两支架左右设置,所述的坡度控制杆设于两支架之间形成坡度控制架;支架杆竖直放置,所述的坡度控制杆斜向设于左右两支架杆的中下部,所述的落地杆垂直设于支架杆的底部,所述的操作手杆垂直设于支架杆的顶部,所述的落地杆为圆形钢管。通过不同的组合实现两种工具的装配,可以快速有效地进行电缆沟坡度和沟中沟的施工,提升了施工速度和质量。The tool for controlling the slope of the bottom plate of the cable trench and wiping the ditch in the ditch includes a support rod, a slope control rod, a landing rod and an operating hand rod. There are 4 support rods, two support rods and a landing rod between the support rods Connect to form a bracket; two brackets are arranged on the left and right, and the slope control rod is arranged between the two brackets to form a slope control frame; the bracket rods are placed vertically, and the slope control rod is obliquely arranged on the middle and lower parts of the left and right two bracket rods , the landing rod is vertically arranged at the bottom of the support rod, the operating handle rod is vertically arranged at the top of the support rod, and the landing rod is a circular steel pipe. The assembly of the two tools through different combinations can quickly and effectively carry out the construction of the slope of the cable trench and the trench in the trench, which improves the construction speed and quality.

作为对上述技术方案的进一步完善和补充,本发明还包括以下附加技术特征。As a further improvement and supplement to the above technical solutions, the present invention also includes the following additional technical features.

所述的支架杆、落地杆之间通过焊接固定,坡度控制杆与支架杆之间、操作手杆与支架杆之间为可拆卸式连接或焊接固定。焊接方式成熟简单牢固,可拆卸式连接便于进行不同工具的组合。The support bar and the landing bar are fixed by welding, and the slope control bar and the support bar, and between the operating handle bar and the support bar are detachably connected or fixed by welding. The welding method is mature, simple and firm, and the detachable connection is convenient for the combination of different tools.

所述的支架杆、坡度控制杆、落地杆及操作手杆均采用镀锌圆形钢管或镀锌方形钢管。镀锌钢管光洁度高,粘性小,对坡度面的抹平效率高,面光效果好,移动方便。The support rods, slope control rods, landing rods and operating handle rods are all made of galvanized circular steel pipes or galvanized square steel pipes. Galvanized steel pipe has high smoothness, low viscosity, high smoothing efficiency on the slope surface, good surface gloss effect, and easy movement.

所述的坡度控制杆与支架杆之间、操作手杆与支架杆之间为可拆卸式连接,所述的支架杆的一侧的中下部设有位控制杆,位控制杆与支架垂直设置构成沟中沟抹压架。可拆卸式连接便于拆装,位控制杆便于控制沟与沟侧壁的距离。There is a detachable connection between the slope control rod and the support rod, and between the operating handle rod and the support rod. The middle and lower part of one side of the support rod is provided with a position control rod, and the position control rod is vertically arranged with the support It forms a ditch-in-ditch mopping frame. The detachable connection is convenient for disassembly and assembly, and the position control lever is convenient for controlling the distance between the ditch and the side wall of the ditch.

所述的落地杆的半径为R30mm。符合国家电网公司标准工艺要求,电缆沟中设置R30mm的沟中沟至集水井排水,最终汇集至就近的雨水检查井。The radius of the landing pole is R30mm. In line with the standard process requirements of the State Grid Corporation of China, a R30mm ditch in the ditch is set in the cable trench to drain water from the water collection well, and finally collect it into the nearest rainwater inspection well.

所述的坡度控制杆截面呈方形。方形截面的抹光效果好。The section of the slope control rod is square. Good troweling effect for square sections.

所述的操作手杆设有定位件以实现操作手杆方向调整固定。操作手杆实现换向便于操作手杆在两种不同使用状态下切换方向。The operating handle bar is provided with a positioning member to realize the adjustment and fixation of the operating handle bar. The operation handle lever realizes the reversing, which is convenient for the operation handle lever to switch directions under two different use states.

电缆沟底板坡度控制和沟中沟抹压工具的使用方法,包括电缆沟底板坡度控制步骤及沟中沟抹压步骤,The usage method of cable trench floor slope control and ditch-in-ditch wiping tools, including the steps of cable ditch floor slope control and ditch-in-ditch wiping steps,

电缆沟底板坡度控制步骤为:The slope control steps of the cable trench bottom plate are as follows:

11)将两支架通过坡度控制杆连接形成坡度控制架;11) Connect the two supports through the slope control rod to form a slope control frame;

12)在混凝土底板斜面施工完毕后,通过移动操作手杆从电缆沟的一端向另一端移动而实现混凝土底板坡度面的面层收光操作;12) After the construction of the inclined surface of the concrete floor is completed, the surface layer receiving operation of the slope surface of the concrete floor is realized by moving the operating handle from one end of the cable trench to the other end;

13)在面层收光完成后,拉出工具,并对拉出部位进行抹平操作;13) After the finishing of the surface layer, pull out the tool and smooth the pulled out part;

沟中沟抹压步骤为:The steps of wiping and pressing in the ditch are as follows:

21)拆除坡度控制架的坡度控制杆,保留一支架,并在支架的支架杆的中下部加装位控制杆形成沟中沟抹压架;操作手杆换向,使其与支架垂直;21) Remove the slope control rod of the slope control frame, retain a bracket, and install a position control rod at the middle and lower part of the bracket rod to form a ditch-in-ditch wiping frame; operate the hand lever to change direction so that it is perpendicular to the bracket;

22)在电缆沟侧壁上进行弹线,在电缆沟中沟施工时,施工人员握住操作手杆,将位控制杆对准弹线,通过按压操作手杆,使得落地杆深入混凝土一半,即形成电缆沟沟中沟。22) Carry out springing on the side wall of the cable trench. When constructing in the middle of the cable trench, the construction personnel hold the operating handle bar, align the control bar with the springing line, and press the operating handle bar so that the landing bar penetrates halfway into the concrete. That is to form the cable ditch in the ditch.

有益效果:方便定位、标高,可以进行不间断作业施工,人员操作简单,移动方面,施工效率高,可以重复循环使用。Beneficial effects: convenient positioning, high elevation, uninterrupted construction, easy operation by personnel, high construction efficiency in terms of movement, and can be used repeatedly.

附图说明Description of drawings

图1是本发明电缆沟底板坡面光面施工原理图。Fig. 1 is a construction principle diagram of the smooth surface of the slope surface of the cable trench bottom plate of the present invention.

图2是本发明沟中沟抹压工具示意图。Fig. 2 is a schematic diagram of a ditch-in-ditch wiping tool of the present invention.

图3是本发明沟中沟抹压工具抹压示意图。Fig. 3 is a schematic diagram of a wiping tool for wiping a ditch in a ditch of the present invention.

图中:1-支架杆;2-操作手杆;3-落地杆;4-坡度控制杆;5-电缆沟侧壁;6-电缆沟底板7-位控制杆。In the figure: 1-support rod; 2-operating handle rod; 3-floor rod; 4-slope control rod; 5-cable trench side wall; 6-cable trench bottom plate 7-position control rod.

具体实施方式Detailed ways

以下结合说明书附图对本发明的技术方案做进一步的详细说明。The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings.

实例一:如图1-3所示,电缆沟底板坡度控制和沟中沟抹压工具,包括支架杆1、坡度控制杆4、落地杆3及操作手杆2,支架杆1为4根,两支架杆1与一位于支架杆1之间的落地杆3连接形成一支架;两支架左右设置,坡度控制杆4设于两支架之间形成坡度控制架;支架杆1竖直放置,坡度控制杆4斜向设于左右两支架杆1的中下部,落地杆3垂直设于支架杆1的底部,操作手杆2垂直设于支架杆1的顶部,落地杆3为圆形钢管。Example 1: As shown in Figure 1-3, the tool for controlling the slope of the cable trench floor and wiping the trench in the ditch includes a support rod 1, a slope control rod 4, a floor rod 3 and an operating handle rod 2, and the support rod 1 is 4 pieces. Two support rods 1 are connected with a floor rod 3 positioned between the support rods 1 to form a support; the two supports are arranged left and right, and the slope control rod 4 is arranged between the two supports to form a slope control frame; the support rod 1 is placed vertically, and the slope is controlled Bar 4 is arranged obliquely at the middle and lower part of two support bars 1 on the left and right, floor bar 3 is vertically located at the bottom of support bar 1, and operating handle bar 2 is vertically located at the top of support bar 1, and floor bar 3 is a circular steel pipe.

为了便于进行不同使用方式的组合,支架杆1、落地杆3之间通过焊接固定,坡度控制杆4与支架杆1之间、操作手杆2与支架杆1之间为可拆卸式连接固定。支架杆1与落地杆3之间不需要拆卸可直接焊接固定,坡度控制杆4与支架杆1之间、操作手杆2与支架杆1之间的可拆卸式连接固定方式便于在不同使用方式下拆卸合组合。In order to facilitate the combination of different usage modes, the support bar 1 and the floor bar 3 are fixed by welding, and the slope control bar 4 and the support bar 1, and between the operating handle bar 2 and the support bar 1 are detachably connected and fixed. The bracket rod 1 and the floor rod 3 can be directly welded and fixed without disassembly, and the detachable connection and fixing methods between the slope control rod 4 and the bracket rod 1, and between the operating handle rod 2 and the bracket rod 1 are convenient for different use modes. Disassemble the combination below.

为了便于抹光操作,支架杆1、坡度控制杆4、落地杆3及操作手杆2均采用镀锌圆形钢管。镀锌钢管光洁度高,粘性小,对坡度面的抹平效率高,面光效果好,移动阻力小。In order to facilitate the troweling operation, the support rod 1, the slope control rod 4, the landing rod 3 and the operating handle rod 2 are all made of galvanized circular steel pipes. The galvanized steel pipe has high smoothness, low viscosity, high smoothing efficiency on the slope surface, good surface gloss effect, and small movement resistance.

为了实现沟中沟抹压的操作使用方式,所述的坡度控制杆4与支架杆1之间、操作手杆2与支架杆1之间为可拆卸式连接,支架杆1的一侧的中下部设有位控制杆7,位控制杆7与支架垂直设置构成沟中沟抹压架。便于切换使用方式,位控制杆7可以确定沟中沟的位置。In order to realize the operation and use mode of mopping in the ditch, the slope control rod 4 and the support rod 1, the operating handle rod 2 and the support rod 1 are detachably connected, and the middle of one side of the support rod 1 The lower part is provided with a position control rod 7, and the position control rod 7 is vertically arranged with the support to form a ditch wiping press frame in the ditch. It is convenient to switch the use mode, and the position control lever 7 can determine the position of the ditch in the ditch.

为了便于排水和符合国家电网公司标准工艺要求,落地杆3的半径为R30mm。In order to facilitate drainage and comply with the standard technical requirements of the State Grid Corporation, the radius of the landing pole 3 is R30mm.

为了实现操作手杆2的方向切换和定位,操作手杆2设有定位件以实现操作手杆2方向调整固定。In order to realize the direction switching and positioning of the operating handle bar 2 , the operating handle bar 2 is provided with a positioning member to realize the direction adjustment and fixation of the operating handle bar 2 .

电缆沟底板坡度控制和沟中沟抹压工具的使用方法,包括电缆沟底板坡度控制步骤及沟中沟抹压步骤,The usage method of cable trench floor slope control and ditch-in-ditch wiping tools, including the steps of cable ditch floor slope control and ditch-in-ditch wiping steps,

电缆沟底板坡度控制步骤为:The slope control steps of the cable trench bottom plate are as follows:

11)将两支架通过坡度控制杆4连接形成坡度控制架;11) Connect the two supports through the slope control rod 4 to form a slope control frame;

12)在混凝土底板6斜面施工完毕后,通过移动操作手杆2从电缆沟的一端向另一端移动而实现混凝土底板6坡度面的面层收光操作;12) After the construction of the inclined surface of the concrete base plate 6 is completed, the surface layer receiving operation of the slope surface of the concrete base plate 6 is realized by moving the operating handle 2 from one end of the cable trench to the other end;

13)在面层收光完成后,拉出工具,并对拉出部位进行抹平操作;13) After the finishing of the surface layer, pull out the tool and smooth the pulled out part;

沟中沟抹压步骤为:The steps of wiping and pressing in the ditch are as follows:

21)拆除坡度控制架的坡度控制杆4,保留一支架,并在支架的支架杆1的中下部加装位控制杆7形成沟中沟抹压架;操作手杆2换向,使其与支架垂直;21) Remove the slope control rod 4 of the slope control frame, retain a bracket, and install a position control rod 7 on the middle and lower part of the bracket rod 1 of the bracket to form a ditch-in-ditch wiping frame; stand vertical;

22)在电缆沟侧壁5上进行弹线,在电缆沟中沟施工时,施工人员握住操作手杆2,将位控制杆7对准弹线,通过按压操作手杆2,使得落地杆3深入混凝土一半,即形成电缆沟沟中沟。22) Carry out springing on the side wall 5 of the cable trench. During construction in the middle of the cable trench, the construction worker holds the operating handle 2, aligns the position control lever 7 with the springing line, and presses the operating handle 2 to make the landing pole 3. Go deep into the concrete halfway, that is, form the ditch in the cable ditch.

实例二:与以上实例一的不同之处在于坡度控制杆4与支架杆1之间、操作手杆2与支架杆1之间为采用镀锌方形钢管焊接固定。Example 2: The difference from the above example 1 is that between the slope control rod 4 and the support rod 1, and between the operating handle rod 2 and the support rod 1, galvanized square steel pipes are used for welding and fixing.

以上图1-3所示的电缆沟底板坡度控制和沟中沟抹压工具及其使用方法是本发明的具体实施例,已经体现出本发明实质性特点和进步,可根据实际的使用需要,在本发明的启示下,对其进行形状、结构等方面的等同修改,均在本方案的保护范围之列。The cable trench floor slope control shown in Figure 1-3 above and the tool for wiping and pressing the trench in the trench and its use method are specific embodiments of the present invention, which have already reflected the substantive features and progress of the present invention, and can be used according to actual needs. Under the enlightenment of the present invention, equivalent modifications to it in terms of shape, structure, etc., all fall within the scope of protection of this proposal.

Claims (8)

1. cable duct bottom board slope controls smears pressure instrument with ditch in ditch, it is characterised in that:Including cradling piece(1), slope control bar (4), ground rod(3)And operation hand lever(2), described cradling piece(1)For 4, two stands bar(1)It is located at cradling piece with one(1) Between ground rod(3)Connection forms a support;Two stands or so are set, described slope control bar(4)Located at two stands it Between formed slope control frame;Cradling piece(1)It is vertical to place, described slope control bar(4)It is oblique to be located at left and right two stands bar(1) Middle and lower part, described ground rod(3)It is vertical at cradling piece(1)Bottom, described operation hand lever(2)It is vertical at support Bar(1)Top, described ground rod(3)For round steel pipe;Pass through pressing operation hand lever(2)So that ground rod(3)It is deeply mixed Solidifying soil, that is, form ditch in cable duct ditch, ground rod(3)The depth for going deep into concrete is a half height of ground rod.
2. ditch smears pressure instrument in cable duct bottom board slope control according to claim 1 and ditch, it is characterised in that:Described Cradling piece(1), ground rod(3)Between by being welded and fixed, slope control bar(4)With cradling piece(1)Between, operation hand lever(2) With cradling piece(1)Between detachable connection or to be welded and fixed.
3. ditch smears pressure instrument in cable duct bottom board slope control according to claim 1 and ditch, it is characterised in that:Described Cradling piece(1), slope control bar(4)And operation hand lever(2)Use zinc-plated round steel pipe or zinc-plated rectangular steel tube, ground rod (3)Using zinc-plated round steel pipe.
4. ditch smears pressure instrument in the control of cable duct bottom board slope and ditch according to claim any one of 1-3, its feature exists In:Described slope control bar(4)With cradling piece(1)Between, operation hand lever(2)With cradling piece(1)Between be detachable company Connect, described cradling piece(1)The middle and lower part of side be provided with position control-rod(7), position control-rod(7)Set and form with support vertical Ditch smears pressure rack in ditch.
5. ditch smears pressure instrument in cable duct bottom board slope control according to claim 4 and ditch, it is characterised in that:Described Ground rod(3)Radius be 30mm.
6. ditch smears pressure instrument in cable duct bottom board slope control according to claim 1 and ditch, it is characterised in that:Described Slope control bar(4)Section is square.
7. ditch smears pressure instrument in cable duct bottom board slope control according to claim 4 and ditch, it is characterised in that:Described Operate hand lever(2)Provided with keeper to realize operation hand lever(2)Direction adjustment is fixed.
8. ditch smears the application method of pressure instrument in the control of cable duct bottom board slope and ditch described in claim 1, it is characterised in that Pressure step is smeared including cable duct bottom board slope rate-determining steps and Gou Zhonggou:
Cable duct bottom board slope rate-determining steps are:
11)Two stands are passed through into slope control bar(4)Connection forms slope control frame;
12)In concrete floor(6)After slope bearing layer, pass through moving operation hand lever(2)From one end of cable duct to another End is mobile and realizes concrete floor(6)The surface layer in gradient face receives light operation;
13)After the completion of surface layer receives light, instrument is pulled out, and floating operation is carried out to pulling out position;
In ditch ditch smear pressure step be:
21)Remove the slope control bar of slope control frame(4), retain a support, and in the cradling piece of support(1)Middle and lower part add Fill position control-rod(7)Form ditch in ditch and smear pressure rack;Operate hand lever(2)Commutation, makes itself and support vertical;
22)In cable duct side wall(5)Upper carry out snap the line, in the ditch spread man-hour in cable duct, workmen holds operation hand lever(2), By position control-rod(7)Snap the line is directed at, passes through pressing operation hand lever(2)So that ground rod(3)Go deep into concrete, that is, form cable Ditch in ditch ditch, ground rod(3)The depth for going deep into concrete is a half height of ground rod.
CN201511015295.0A 2015-12-31 2015-12-31 Cable duct bottom board slope controls smears pressure instrument and its application method with ditch in ditch Active CN105442619B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511015295.0A CN105442619B (en) 2015-12-31 2015-12-31 Cable duct bottom board slope controls smears pressure instrument and its application method with ditch in ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511015295.0A CN105442619B (en) 2015-12-31 2015-12-31 Cable duct bottom board slope controls smears pressure instrument and its application method with ditch in ditch

Publications (2)

Publication Number Publication Date
CN105442619A CN105442619A (en) 2016-03-30
CN105442619B true CN105442619B (en) 2018-03-09

Family

ID=55553214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511015295.0A Active CN105442619B (en) 2015-12-31 2015-12-31 Cable duct bottom board slope controls smears pressure instrument and its application method with ditch in ditch

Country Status (1)

Country Link
CN (1) CN105442619B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436753B (en) * 2016-09-23 2018-09-28 安徽送变电工程有限公司 A kind of cable duct bottom of trench operation unified platform
CN108755707A (en) * 2018-06-22 2018-11-06 五冶集团上海有限公司 A kind of cable duct sliding form apparatus

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100854718B1 (en) * 2006-09-09 2008-08-27 김동욱 Cable Trough Drainage Method and Cable Troughs Used in the Drainage Method
CN201388032Y (en) * 2009-04-07 2010-01-20 湖北省输变电工程公司 A kind of cable trench for easy drainage
CN202817674U (en) * 2012-09-20 2013-03-20 国家电网公司 Cable trench for keeping cable away from moisture
CN203755423U (en) * 2014-04-10 2014-08-06 福建省闽南建筑工程有限公司 Novel drainage ditch shaping device
CN205259196U (en) * 2015-12-31 2016-05-25 浙江省送变电工程公司 Pressure instrument is smeared to grade control of cable pit bottom plate and ditch median gutter

Also Published As

Publication number Publication date
CN105442619A (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN202194394U (en) Rapid hoisting, positioning and adjusting piece for prefabricated wall board
CN112064676A (en) Movable formwork structure and construction method thereof
CN105442619B (en) Cable duct bottom board slope controls smears pressure instrument and its application method with ditch in ditch
CN207177102U (en) Prefabricated conversion layer reserves sleeve joint bar accurate-location device
CN109057339A (en) A kind of one-time-concreting construction method of the anti-bank in toilet
CN204479572U (en) The change slope formula soil loss monitoring test unit that a kind of pulley blocks controls
CN205259196U (en) Pressure instrument is smeared to grade control of cable pit bottom plate and ditch median gutter
CN210659228U (en) A movable single-sided formwork system for subway construction
CN208034022U (en) A kind of nozzle for Large Diameter Pipeline steel pipe and nozzle docking facilities
CN218239433U (en) Water intaking ware is used in hydrology reconnaissance
CN105839914A (en) Adjustable steel beam supporting device and adjustable steel beam supporting system
CN203145475U (en) Foundation of floor concrete leveling device
CN204284655U (en) Direct-burried underground spigot and socket type concrete pressure pipeline pushing installation machine
CN203213143U (en) Construction structure of diversion trench for water pump installation base
CN203795431U (en) Drill exploration rod up-pulling device
CN213461027U (en) A simple cable trench support structure
CN217539856U (en) Pipeline connecting device for hydraulic engineering
CN204491953U (en) Floor slab structure between architecture pipe
CN213804761U (en) Concrete strickle device for civil engineering construction
CN210563413U (en) A indent device for cast-in-place horizontal floor
CN221255486U (en) A mesh sprayed concrete flatness control device
CN206353102U (en) A kind of Concrete and reinforced concrete drainage and sewer pipes external load test device
CN210025832U (en) A cable trench opening booster
CN206128118U (en) Operation integration platform at bottom of cable pit ditch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant