CN105421210A - Rapid assembling type steel box-precast concrete plank bridge structure and construction method thereof - Google Patents
Rapid assembling type steel box-precast concrete plank bridge structure and construction method thereof Download PDFInfo
- Publication number
- CN105421210A CN105421210A CN201510959393.3A CN201510959393A CN105421210A CN 105421210 A CN105421210 A CN 105421210A CN 201510959393 A CN201510959393 A CN 201510959393A CN 105421210 A CN105421210 A CN 105421210A
- Authority
- CN
- China
- Prior art keywords
- precast concrete
- steel
- girder
- steel box
- construction
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 97
- 239000010959 steel Substances 0.000 title claims abstract description 97
- 239000011178 precast concrete Substances 0.000 title claims abstract description 61
- 238000010276 construction Methods 0.000 title claims abstract description 43
- 239000004567 concrete Substances 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 4
- 230000000875 corresponding Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract 1
- 239000002131 composite material Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000010923 batch production Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000007873 sieving Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
The invention relates to a rapid assembling type steel box-precast concrete plank bridge structure and a construction method thereof. The structure comprises a plurality of steel box beams, a precast concrete deck panel and a shear transfer device, wherein the steel box beams are arranged at equal intervals, and every two adjacent steel box beams are connected through a truss type horizontal connector and a solid-web horizontal connector; an upper flange is arranged on the upper portion of each steel box beam, and horizontal connectors are welded between the upper flanges; the precast concrete deck panel is arranged on top of the steel box beams, and the shear transfer device is vertically welded to the upper flanges and inserted into the precast concrete deck panel. According to the structure, the industrial precast degree is high, construction quality is reliable, site assembly is quick, and interference with under-bridge traffic in the construction period is reduced due to the fact that the support-free construction technique is adopted.
Description
[technical field]
The present invention relates to a kind of bridge and construction method thereof, be specifically related to a kind of steel case-precast concrete plank bridge construction and construction method thereof of quick-assembling, belong to technical field of bridge engineering.
[background technology]
Steel-concrete composite beam bridge can give full play to Steel concrete material advantage separately, and deck-molding is less, and therefore such bridge is widely used.
After traditional composite beam bridge has normally set up girder steel, set up rack template system, entirely cast-in-place or part cast-in-situ concrete panel.Mainly there is some deficiency following in this kind of structural form: 1. cast-in-place amount is large, speed of application is comparatively slow, construction quality is difficult to ensure; 2. concrete early-age shrinkage easily causes bridge deck to ftracture; 3. working load is comparatively large, need set up support and template.
Therefore, for solving the problems of the technologies described above, necessary steel case-precast concrete plank bridge construction and the construction method thereof providing a kind of quick-assembling of innovation, to overcome described defect of the prior art.
[summary of the invention]
For solving the problem, the object of the present invention is to provide that a kind of speed of application is fast, quality easily controls, the steel of the quick-assembling of good endurance case-precast concrete plank bridge construction.
Another object of the present invention is to the construction method of steel case-precast concrete plank bridge construction that a kind of quick-assembling is provided.
For realizing above-mentioned first object, the technical scheme that the present invention takes is: a kind of steel case-precast concrete plank bridge construction of quick-assembling, and it comprises some steel box-girder, precast concrete bridge deck and Shear transfer device; Wherein, described some steel box-girder are equally arranged, and are connected with steel flanged beam lateral ties by truss-like lateral ties between adjacent steel box-girder; The top of each steel box-girder is provided with top flange, is welded with horizontal connection between top flange; Described precast concrete bridge deck are placed in the top of steel box-girder; Described Shear transfer device is vertically welded on described top flange, and it inserts described precast concrete bridge deck.
Steel case-precast concrete plank the bridge construction of quick-assembling of the present invention is set to further: described steel box-girder adopts open steel box beam, horizontal spacing 3.6m; Described steel box-girder inside is provided with the support of K word.
Steel case-precast concrete plank the bridge construction of quick-assembling of the present invention is set to further: described steel flanged beam lateral ties are positioned at the two ends of steel box-girder; Described truss-like lateral ties are between steel flanged beam lateral ties; The spacing of adjacent two steel flanged beam lateral ties is 6m; Described truss-like lateral ties and steel flanged beam lateral ties adopt high-strength bolt to be connected with steel box-girder.
Steel case-precast concrete plank the bridge construction of quick-assembling of the present invention is set to further: described precast concrete bridge deck are preset with some shear connector slotted eyes, and the position of shear connector slotted eye is corresponding with the position of Shear transfer device; High strength micro expansion mortar is built in described shear connector slotted eye.
Steel case-precast concrete plank the bridge construction of quick-assembling of the present invention is set to further: described precast concrete bridge deck precast block, reserved longitudinal prestressing duct in each precast concrete bridge deck.
Steel case-precast concrete plank the bridge construction of quick-assembling of the present invention is also set to: described Shear transfer device is specially collection bunch formula peg shear connector, and every bunch has 9 pegs.
For realizing above-mentioned second object, the technical scheme that the present invention takes is: a kind of construction method of steel case-precast concrete plank bridge construction of quick-assembling, and it comprises following processing step:
1), at produce in factory steel box-girder (comprising the welding of the support of K word, horizontal connection, Shear transfer device); Be prefabricated in the factory and maintenance precast concrete bridge deck;
2), steel box-girder and precast concrete bridge deck are transported to job site;
3), erection steel box-girder, rear installation truss-like lateral ties in place and steel flanged beam lateral ties;
4), precast concrete bridge deck are laid;
5) seam between precast concrete bridge deck, is built;
6), after seam, water material and reach design strength post-stress bundle;
7), build shear key slotted eye, make girder steel and concrete slab connect into entirety.
Compared with prior art, the present invention has following beneficial effect:
1, have employed full precast concrete bridge deck and collection bunch formula peg shear connector in the present invention, speed of application is accelerated greatly, and construction quality is easily controlled, the endurance quality of structure accesses guarantee;
2, pass through rational tectonic sieving in the present invention, the prefabricated degree of structure structure batch production is high, makes the site operation amount of structure greatly less, reliable construction quality, and on-site consolidation is fast, and adopts erection without scaffolding technology, decreases the interference of construction period to traffic under bridge.
3, in the present invention, structural system is simple, achieve the quick prefabricated assembled of bridge construction, and this bridge construction was easy to safeguard in the later stage, for full Prefabricated composite beam bridge and bridge rapid construction provide feasible scheme, also provided technical guarantee for bridge industrialization and sustainable development.
[accompanying drawing explanation]
Fig. 1 is the three-dimensional exploded view of the steel case-precast concrete plank bridge construction of quick-assembling of the present invention.
Fig. 2 is the transverse cross of the steel case-precast concrete plank bridge construction of quick-assembling of the present invention.
Fig. 3 is the connection plan view in Fig. 1 between steel box-girder.
[detailed description of the invention]
Refer to shown in Figure of description 1 to accompanying drawing 3, the present invention is a kind of steel case-precast concrete plank bridge construction of quick-assembling, and it is made up of a few parts such as some steel box-girder 1, precast concrete bridge deck 8 and Shear transfer devices 7.
Wherein, described some steel box-girder 1 are equally arranged, and are connected with steel flanged beam lateral ties 6 by truss-like lateral ties 5 between adjacent steel box-girder 1.Described steel flanged beam lateral ties 6 are positioned at the two ends of steel box-girder 1; Described truss-like lateral ties 5 are between steel flanged beam lateral ties 6; The spacing of adjacent two steel flanged beam lateral ties 6 is 6m; Described truss-like lateral ties 5 and steel flanged beam lateral ties 6 adopt high-strength bolt to be connected with steel box-girder 1.
Further, the top of each steel box-girder 1 is provided with top flange 2, is welded with horizontal connection 4 between top flange 2.Described steel box-girder 1 adopts open steel box beam, horizontal spacing 3.6m; Described steel box-girder 1 inside is provided with K word support 3, thus increases open steel box beam 1 torsional rigidity.
Described precast concrete bridge deck 8 are placed in the top of steel box-girder 1, it are preset with some shear connector slotted eyes 9, and the position of shear connector slotted eye 9 is corresponding with the position of Shear transfer device 7.Precast concrete bridge deck 8 are laid on after on steel box-girder 1, in shear connector slotted eye 9, build high-strength mortar, and steel box-girder and precast concrete bridge deck are connected into entirety.
Described precast concrete bridge deck 8 precast block, is spliced into entirety at the scene.For preventing laterally being sewn on bridge operation phase cracking, reserved longitudinal prestressing duct 11 in each precast concrete bridge deck 8, so that tensioned prestressing bar, makes to produce the prestressing force being about 2.0MPa in concrete slab.
Steel box-girder 1 and precast concrete bridge deck 8 are connected into overall jointly stressed component by described Shear transfer device 7, and it is vertically welded on described top flange 2, and it inserts described precast concrete bridge deck 8.Described Shear transfer device 7 is specially collection bunch formula peg shear connector 7, and every bunch has 9 pegs.
The construction method of the steel case-precast concrete plank bridge construction of quick-assembling of the present invention, comprises following processing step:
1) welding of K word support 3, horizontal connection 4, Shear transfer device 7, is comprised at produce in factory steel box-girder 1(); Be prefabricated in the factory and maintenance precast concrete bridge deck 8;
2), steel box-girder 1 and precast concrete bridge deck 8 are transported to job site;
3), erection steel box-girder 1, rear installation truss-like lateral ties 5 in place and steel flanged beam lateral ties 6;
4), precast concrete bridge deck 8 are laid;
5) seam between precast concrete bridge deck 8, is built;
6), after seam, water material and reach design strength post-stress bundle;
7), build shear key slotted eye 9, make steel box-girder 1 and concrete slab 8 connect into entirety.
Above detailed description of the invention is only the preferred embodiment of this creation, and not in order to limit this creation, any amendment made within all spirit in this creation and principle, equivalent replacement, improvement etc., within the protection domain that all should be included in this creation.
Claims (7)
1. steel case-precast concrete plank bridge construction of quick-assembling, is characterized in that: comprise some steel box-girder, precast concrete bridge deck and Shear transfer device; Wherein, described some steel box-girder are equally arranged, and are connected with steel flanged beam lateral ties by truss-like lateral ties between adjacent steel box-girder; The top of each steel box-girder is provided with top flange, is welded with horizontal connection between top flange; Described precast concrete bridge deck are placed in the top of steel box-girder; Described Shear transfer device is vertically welded on described top flange, and it inserts described precast concrete bridge deck.
2. the steel case-precast concrete plank bridge construction of quick-assembling as claimed in claim 1, is characterized in that: described steel box-girder adopts open steel box beam, horizontal spacing 3.6m; Described steel box-girder inside is provided with the support of K word.
3., as the steel case-precast concrete plank bridge construction of quick-assembling as claimed in claim 2, it is characterized in that: described steel flanged beam lateral ties are positioned at the two ends of steel box-girder; Described truss-like lateral ties are between steel flanged beam lateral ties; The spacing of adjacent two steel flanged beam lateral ties is 6m; Described truss-like lateral ties and steel flanged beam lateral ties adopt high-strength bolt to be connected with steel box-girder.
4. the steel case-precast concrete plank bridge construction of quick-assembling as claimed in claim 1, it is characterized in that: described precast concrete bridge deck are preset with some shear connector slotted eyes, the position of shear connector slotted eye is corresponding with the position of Shear transfer device; High strength micro expansion mortar is built in described shear connector slotted eye.
5. the steel case-precast concrete plank bridge construction of quick-assembling as claimed in claim 4, is characterized in that: described precast concrete bridge deck precast block, reserved longitudinal prestressing duct in each precast concrete bridge deck.
6. the steel case-precast concrete plank bridge construction of quick-assembling as claimed in claim 1, is characterized in that: described Shear transfer device is specially collection bunch formula peg shear connector, and every bunch has 9 pegs.
7. a construction method for the steel case-precast concrete plank bridge construction of the quick-assembling as described in claim 1 to 6 any one, is characterized in that: comprise following processing step:
1), at produce in factory steel box-girder (comprising the welding of the support of K word, horizontal connection, Shear transfer device); Be prefabricated in the factory and maintenance precast concrete bridge deck;
2), steel box-girder and precast concrete bridge deck are transported to job site;
3), erection steel box-girder, rear installation truss-like lateral ties in place and steel flanged beam lateral ties;
4), precast concrete bridge deck are laid;
5) seam between precast concrete bridge deck, is built;
6), after seam, water material and reach design strength post-stress bundle;
7), build shear key slotted eye, make girder steel and concrete slab connect into entirety.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510959393.3A CN105421210A (en) | 2015-12-21 | 2015-12-21 | Rapid assembling type steel box-precast concrete plank bridge structure and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510959393.3A CN105421210A (en) | 2015-12-21 | 2015-12-21 | Rapid assembling type steel box-precast concrete plank bridge structure and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105421210A true CN105421210A (en) | 2016-03-23 |
Family
ID=55499725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510959393.3A CN105421210A (en) | 2015-12-21 | 2015-12-21 | Rapid assembling type steel box-precast concrete plank bridge structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421210A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087741A (en) * | 2016-08-12 | 2016-11-09 | 长安大学 | A kind of seam bolt connects precast concrete floorings and method for prefabricating |
CN106149540A (en) * | 2016-07-19 | 2016-11-23 | 长安大学 | Assembling steel plate composite beam bridge and construction method thereof based on steel reinforced concrete combined bridge deck |
CN106835951A (en) * | 2017-03-28 | 2017-06-13 | 宁波金蛟龙重工钢构有限公司 | A kind of replaceable prefabricated assembled combined beam structure and manufacturing process |
CN107245934A (en) * | 2017-07-31 | 2017-10-13 | 哈尔滨工业大学 | A kind of assembled steel profiled sheet concrete combined board small box girder |
CN109577164A (en) * | 2017-07-19 | 2019-04-05 | 孟美丽 | The installation equipment of bridge and bridge |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08302619A (en) * | 1995-04-30 | 1996-11-19 | Nippon Steel Corp | Joint structure for composite members |
CN101424073A (en) * | 2008-12-04 | 2009-05-06 | 中铁大桥局股份有限公司 | Bridge deck and steel girder second combination method for whole arch precasted steel-concrete composite continuous box girder |
WO2011108781A1 (en) * | 2010-03-05 | 2011-09-09 | 주식회사 삼현피에프 | Manufacturing method of composite steel box girder and construction method of box girder bridge using same |
KR20120029625A (en) * | 2010-09-17 | 2012-03-27 | 변형균 | Construction method of steel composite girder bridge applying precast deck |
CN202298482U (en) * | 2011-06-17 | 2012-07-04 | 广东工业大学 | Newly-added steel truss-reinforced concrete box girder bridge structure |
CN203546589U (en) * | 2013-10-24 | 2014-04-16 | 同济大学 | Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge |
CN205295909U (en) * | 2015-12-21 | 2016-06-08 | 华汇工程设计集团股份有限公司 | Combination steel box girder structure of assembling fast |
-
2015
- 2015-12-21 CN CN201510959393.3A patent/CN105421210A/en not_active Application Discontinuation
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08302619A (en) * | 1995-04-30 | 1996-11-19 | Nippon Steel Corp | Joint structure for composite members |
CN101424073A (en) * | 2008-12-04 | 2009-05-06 | 中铁大桥局股份有限公司 | Bridge deck and steel girder second combination method for whole arch precasted steel-concrete composite continuous box girder |
WO2011108781A1 (en) * | 2010-03-05 | 2011-09-09 | 주식회사 삼현피에프 | Manufacturing method of composite steel box girder and construction method of box girder bridge using same |
KR20120029625A (en) * | 2010-09-17 | 2012-03-27 | 변형균 | Construction method of steel composite girder bridge applying precast deck |
CN202298482U (en) * | 2011-06-17 | 2012-07-04 | 广东工业大学 | Newly-added steel truss-reinforced concrete box girder bridge structure |
CN203546589U (en) * | 2013-10-24 | 2014-04-16 | 同济大学 | Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge |
CN205295909U (en) * | 2015-12-21 | 2016-06-08 | 华汇工程设计集团股份有限公司 | Combination steel box girder structure of assembling fast |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106149540A (en) * | 2016-07-19 | 2016-11-23 | 长安大学 | Assembling steel plate composite beam bridge and construction method thereof based on steel reinforced concrete combined bridge deck |
CN106087741A (en) * | 2016-08-12 | 2016-11-09 | 长安大学 | A kind of seam bolt connects precast concrete floorings and method for prefabricating |
CN106835951A (en) * | 2017-03-28 | 2017-06-13 | 宁波金蛟龙重工钢构有限公司 | A kind of replaceable prefabricated assembled combined beam structure and manufacturing process |
CN109577164A (en) * | 2017-07-19 | 2019-04-05 | 孟美丽 | The installation equipment of bridge and bridge |
CN107245934A (en) * | 2017-07-31 | 2017-10-13 | 哈尔滨工业大学 | A kind of assembled steel profiled sheet concrete combined board small box girder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979175B (en) | Industrialized multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system | |
Ioan et al. | Experimental validation of re-centring capability of eccentrically braced frames with removable links | |
CN104712089B (en) | Open the compound shear attachment structure of net | |
CN203049832U (en) | Assembling type shear wall structure | |
CN103104053B (en) | A kind of assembly concrete shear wall and construction method | |
CN103243652B (en) | A kind of large-span non-floor type cast-in-place beam falsework and construction method thereof | |
CN100507150C (en) | Corrugated steel web box girder with steel-concrete combined board lower wing edges | |
CN102979162B (en) | Multi-story high-rise assembled steel structure frame - prestressed centrally-braced system | |
CN105804241A (en) | Single-layer prefabricated assembly type reinforced concrete beam-column joint | |
CN105649360A (en) | Integral assembling type building system and installing method | |
CN104988844B (en) | Two times tensioning prestressing force assembled Wavelike steel webplate combination beam | |
CN103114648A (en) | Multi-high-layer assembly type steel structure frame-center supporting system | |
JP5830195B2 (en) | How to assemble a truss, suspend a formwork, and manufacture a ferrocement slab on site | |
JP2013518199A (en) | Construction Method of Steel Composite Girder Bridge {ConstructionMethod SteelCompositeGirderBridge} | |
CN103741792A (en) | Whole assembly frame system and construction method thereof | |
CN103104039B (en) | Assembled framework beam-column joint adopting cover plate connection and construction method thereof | |
CN103276833B (en) | A kind of industrialization assembling shaped pile frame-steel plate shear force wall steel structure system | |
CN104060761B (en) | U-shaped steel concrete combination beam and construction method thereof | |
CN104929281A (en) | Steel bar truss stiffened steel concrete composite shear wall | |
CN101798794B (en) | Composite box girder bridge erected in advance by using corrugated steel web steel girders and construction method thereof | |
CN203334425U (en) | Steel structure unit and steel structure system | |
CN103114681B (en) | High-altitude long-span reinforced concrete beam treat pouring structure | |
CN103074941A (en) | Assembly type recycled concrete node with steel bar truss girders at end parts and manufacturing method thereof | |
CN103276806B (en) | A kind of industrialization assembling hetermorphiscal column steel work prestressing force eccentrical braces | |
CN102979163B (en) | Multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160323 |
|
RJ01 | Rejection of invention patent application after publication |