CN105402847A - System data backup method and central air conditioning unit adopting same - Google Patents
System data backup method and central air conditioning unit adopting same Download PDFInfo
- Publication number
- CN105402847A CN105402847A CN201510677143.0A CN201510677143A CN105402847A CN 105402847 A CN105402847 A CN 105402847A CN 201510677143 A CN201510677143 A CN 201510677143A CN 105402847 A CN105402847 A CN 105402847A
- Authority
- CN
- China
- Prior art keywords
- mainboard
- parameters
- display board
- intelligent service
- backup method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000004378 air conditioning Methods 0.000 title claims abstract description 25
- 230000013011 mating Effects 0.000 claims description 4
- 238000004321 preservation Methods 0.000 claims description 2
- 238000012423 maintenance Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 2
- 238000012986 modification Methods 0.000 abstract description 2
- 230000004048 modification Effects 0.000 abstract description 2
- 230000000153 supplemental effect Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000010977 unit operation Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/56—Remote control
- F24F11/58—Remote control using Internet communication
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Fuzzy Systems (AREA)
- Mathematical Physics (AREA)
- Signal Processing (AREA)
- Air Conditioning Control Device (AREA)
Abstract
The invention discloses a backup method of system data and an air conditioning unit adopting the backup method, wherein a central air conditioning unit comprises a display panel, a mainboard and an intelligent service center, and the backup method comprises the following steps: s1, storing the latest setting parameters by the display panel and the main board; s2, the intelligent service center saves the latest setting parameters and modification records; s3, detecting whether to replace the display board or the main board; and S4, selecting an updated setting parameter from the display panel, the main board or the intelligent service center according to the prompt based on the replaced display panel or main board. By adopting the backup method, the manpower and material resources for secondary debugging can be saved, the stable operation of the unit is ensured, and the later maintenance dispute can be avoided.
Description
Technical field
The present invention relates to data backup field, be specifically related to a kind of backup method of system data; The invention still further relates to a kind of Central air-conditioning unit, be specifically related to a kind of Central air-conditioning unit adopting this backup method.
Background technology
Central air-conditioning unit of the prior art needs the unit operation parameters on old master's plate or old display board to be directly set to when changing on new mainboard or new display board at mainboard or display board, but need to input one by one manually, and if the words of display board blank screen, the parameters run before being at all unable to find out unit, unit can only be allowed to run with an initialized default value, be unfavorable for the operation of unit like this, because unit in running according to it self environmental condition, operating conditions etc. are to some parameter adjustment, parameters after adjustment is only the normal service data of unit, so the words that unit runs with default setting parameter after renewing display board are unstable, need again it could be allowed normally to run through debugging repeatedly.The data that particularly running time etc. of unit is relevant with maintenance, after replacing mainboard or display board, the running time of unit is zero-based, and there is certain maintenance cycle in the general central air-conditioning cycle, can cause exceeded maintenance cycle the service time of unit reality like this, but the compressor operating time on display board is also less than the situation in maintenance cycle.
Summary of the invention
A kind of backup method of system data is provided in the embodiment of the present invention and adopts the Central air-conditioning unit of this backup method, to solve the problem that automatically cannot use original parameters in prior art when changing display board or mainboard.
For achieving the above object, the invention provides a kind of backup method of system data, for the backup of the system data of Central air-conditioning unit, wherein, Central air-conditioning unit comprises display board, mainboard and Intelligent Service center, and the backup method of system data comprises the following steps:
S1, display board and mainboard all preserve nearest parameters;
S2, nearest parameters and amendment record are preserved in Intelligent Service center;
S3, detects whether change display board or mainboard;
S4, based on the display board changed or mainboard, selects one to upgrade parameters in the heart according to prompting from display board, mainboard or Intelligent Service.
As preferably, from display board, mainboard or Intelligent Service, select the concrete steps upgrading parameters as follows in the heart:
S11, if select to upgrade from mainboard, then enters step S12, if not then entering step S21;
S12, reads the value of the parameters of the value renewal display board of parameters, then enters step S13 from mainboard;
S13, display board runs with the parameters after renewal.
As preferably, from display board, mainboard or Intelligent Service, selecting one in the heart, to upgrade parameters further comprising the steps of:
S21, if select to upgrade from display board, then enters step S22, if not then entering step S31;
S22, the value being issued parameters by display board to upgrade the value of the parameters on mainboard, then enters step S23 to mainboard;
S23, mainboard runs with the parameters after renewal.
As preferably, from display board, mainboard or Intelligent Service, selecting one in the heart, to upgrade parameters further comprising the steps of:
S31, if select to upgrade from Intelligent Service center, then enters step S32, if not then entering step S41;
S32, opens the control appliance function interface at Intelligent Service center, enters step S33;
S33, the amendment record of the parameters of inquiry unit, enters step S34;
S34, selects the value of the parameters of certain version, enters step S35;
S35, issues control command to the GPRS module at Intelligent Service center to revise the value of the parameters of mainboard or display board, enters step S36;
S36, mainboard or display board run with the value of the parameters after renewal.
As preferably, from display board, mainboard or Intelligent Service, selecting one in the heart, to upgrade parameters further comprising the steps of:
S41, the parameter of mainboard and display board does not upgrade, and runs with the parameters given tacit consent to.
As preferably, in step s3, detect successively and whether change display board and mainboard, if all do not changed, then make display board and mainboard mating operation.
As preferably, all parameters of Central air-conditioning unit can be monitored in Intelligent Service center, and can remotely modifying unit parameters and preserve the Operation Log of user's amendment.
The present invention also provides a kind of Central air-conditioning unit, and it adopts the backup method of the system data in above-mentioned any one technical scheme.
The backup method of the system data that the present invention relates to, can realize Central air-conditioning unit mainboard or display board break down need change mainboard or display board time, by the data syn-chronization on old master's plate or old display board on new mainboard or new display board, thus make new and old main board or the seamless replacement of new and old display board, make unit still can with the parameters operating unit of old master's plate or old display board after changing mainboard or display board, mating operation can be carried out smoothly between mainboard and display board, no longer need the data manually inputting original old master's plate or old display board, save the man power and material of secondary debugging, also avoid can't see the data of old display board because of display board blank screen and repeatedly need debugging the situation that unit could allow unit normally run according to original supplemental characteristic, ensure that the stable operation of unit.In addition, the repair and maintenance dispute in the later stage of causing because the unit operation time after mainboard or display board replacing recalculates can also be avoided.
Accompanying drawing explanation
Fig. 1 is the flow chart of the backup method of the system data for Central air-conditioning unit that the present invention relates to.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail, but not as a limitation of the invention.
As shown in Figure 1, Fig. 1 shows a kind of flow chart of backup method of the system data for Central air-conditioning unit, and wherein, this Central air-conditioning unit comprises display board, mainboard and Intelligent Service center, and wherein, Intelligent Service center comprises GPRS module.All parameters of Central air-conditioning unit can be monitored in Intelligent Service center, and can the parameters of remotely modifying unit, and for the parameters revised by Intelligent Service center, Intelligent Service center saves the Operation Log of user's amendment.
The implementation step of the backup method of said system data is as follows:
S1, when Central air-conditioning unit runs, display board and mainboard all preserve nearest unit parameters, preferably preserve the unit parameters of nearest twice;
S2, nearest unit parameters and change record are preserved in Intelligent Service center when monitoring unit, preferably preserve the unit parameters of nearest twice;
S3, detects whether change display board or mainboard, preferably can detect successively here and whether change display board (S301) and mainboard (S302), if do not changed, then enter step S303, display board and mainboard mating operation;
S4, based on the display board changed or mainboard, selects one to upgrade parameters in the heart according to prompting from display board, mainboard or Intelligent Service;
The above-mentioned concrete steps of a renewal parameters of selecting in the heart from display board, mainboard or Intelligent Service are as follows:
S11, if select to upgrade from mainboard, then enters step S12, if not then entering step S21;
S12, reads the value of the parameters of the value renewal display board of parameters, then enters step S13 from mainboard;
S13, display board runs with the parameters after renewal.
S21, if select to upgrade from display board, then enters step S22, if not then entering step S31;
S22, the value being issued parameters by display board to upgrade the value of the parameters on mainboard, then enters step S23 to mainboard;
S23, mainboard runs with the parameters after renewal.
S31, if select to upgrade from Intelligent Service center, then enters step S32, if not then entering step S41;
S32, opens the control appliance function interface at Intelligent Service center, enters step S33;
S33, the parameters change record of inquiry unit, namely the Intelligent Service center Operation Log that can list user and the parameters revised, enter step S34;
S34, selects the value of the parameters of certain version, and namely user can select to be handed down to mainboard or display board with the parameters of certain version, enters step S35;
S35, issues control command to GPRS module to revise the value of the parameters of mainboard or display board, enters step S36;
S36, mainboard or display board run with the value of the parameters after renewal.
S41, the parameter of mainboard and display board does not upgrade, and runs with the parameters given tacit consent to.
In practical operation, be described in detail in particular embodiments.When detect change the display board of Central air-conditioning unit time, display board is pointed out the unit parameters upgrading display board from mainboard or Intelligent Service in the heart, after operating personnel select according to prompting will from corresponding parameters more new data to display board.If what select is mainboard, so the parameters that oneself is saved in can be issued display board by mainboard automatically; If what select is Intelligent Service center, then notify that related personnel is at the enterprising line operate in Intelligent Service central control equipment interface, the data upgraded on display board are sent under selecting the parameter of respective version, allow new display board work on the supplemental characteristic of old display board, make the operation of unit unaffected.
When the mainboard changing Central air-conditioning unit being detected, display board is pointed out the unit parameters upgrading mainboard from display board or Intelligent Service in the heart, to corresponding unit parameters be updated on mainboard after operating personnel select according to prompting, wherein, if select to upgrade unit parameters from display board, then the unit parameters of preservation can be written in mainboard by display board automatically; If select to upgrade unit parameters in the heart from Intelligent Service, then notify the control appliance interface enterprising line operate of related personnel at Intelligent Service center, the unit parameters of respective version is selected to send to mainboard to upgrade the unit parameters on mainboard, thus allow the new mainboard after upgrading work on according to the parameters of the old master's plate before renewal, make the operation of unit unaffected.
When automatically completing after supplemental characteristic upgrades, mainboard or display board all carry out stable operation with the parameters of old master's plate or old display board and do not need to debug again, and remain the true running time of unit, provide the most direct foundation for calculating the repair and maintenance time.
Embodiments of the invention are only the descriptions carried out the preferred embodiment of the present invention; not design of the present invention and scope are limited; under the prerequisite not departing from design philosophy of the present invention; the various modification that in this area, engineers and technicians make technical scheme of the present invention and improvement; protection scope of the present invention all should be fallen into; the technology contents of request protection of the present invention, all records in detail in the claims.
Claims (8)
1. a backup method for system data, for the backup of the system data of Central air-conditioning unit, wherein, described Central air-conditioning unit comprises display board, mainboard and Intelligent Service center, it is characterized in that, the backup method of described system data comprises the following steps:
S1, described display board and described mainboard all preserve nearest parameters;
S2, nearest described parameters and amendment record are preserved in described Intelligent Service center;
S3, detects whether change described display board or described mainboard;
S4, based on the described display board changed or described mainboard, selects one to upgrade described parameters in the heart according to prompting from described display board, mainboard or Intelligent Service.
2. the backup method of system data according to claim 1, is characterized in that, the described concrete steps of a renewal parameters of selecting in the heart from display board, mainboard or Intelligent Service are as follows:
S11, if select to upgrade from described mainboard, then enters step S12, if not then entering step S21;
S12, the value reading described parameters from described mainboard upgrades the value of the described parameters of described display board, then enters step S13;
S13, described display board runs with the described parameters after renewal.
3. the backup method of system data according to claim 2, is characterized in that, described select in the heart from display board, mainboard or Intelligent Service one upgrade parameters further comprising the steps of:
S21, if select to upgrade from described display board, then enters step S22, if not then entering step S31;
S22, by described display board issue described parameters value give described mainboard to upgrade the value of the described parameters on described mainboard, then enter step S23;
S23, described mainboard runs with the described parameters after renewal.
4. the backup method of system data according to claim 3, is characterized in that, described select in the heart from display board, mainboard or Intelligent Service one upgrade parameters further comprising the steps of:
S31, if select to upgrade from described Intelligent Service center, then enters step S32, if not then entering step S41;
S32, opens the control appliance function interface at described Intelligent Service center, enters step S33;
S33, the described amendment record of the described parameters of inquiry unit, enters step S34;
S34, selects the value of the described parameters of certain version, enters step S35;
S35, issues control command to the GPRS module at described Intelligent Service center to revise the value of the described parameters of described mainboard or described display board, enters step S36;
S36, described mainboard or described display board run with the value of the described parameters after renewal.
5. the backup method of system data according to claim 4, is characterized in that, described select in the heart from display board, mainboard or Intelligent Service one upgrade parameters further comprising the steps of:
S41, the parameter of described mainboard and described display board does not upgrade, and runs with the described parameters given tacit consent to.
6. the backup method of system data according to claim 5, is characterized in that, in described step S3, detects successively and whether changes described display board and described mainboard, if all do not changed, then makes described display board and described mainboard mating operation.
7. the backup method of the system data according to any one of claim 1-6, it is characterized in that, all parameters of described Central air-conditioning unit can be monitored in described Intelligent Service center, and can the described parameters of remotely modifying unit and the Operation Log of preservation user amendment.
8. a Central air-conditioning unit, it adopts the backup method of the system data described in above-mentioned any one claim.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510677143.0A CN105402847A (en) | 2015-10-15 | 2015-10-15 | System data backup method and central air conditioning unit adopting same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510677143.0A CN105402847A (en) | 2015-10-15 | 2015-10-15 | System data backup method and central air conditioning unit adopting same |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105402847A true CN105402847A (en) | 2016-03-16 |
Family
ID=55468497
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510677143.0A Pending CN105402847A (en) | 2015-10-15 | 2015-10-15 | System data backup method and central air conditioning unit adopting same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105402847A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106209453A (en) * | 2016-07-11 | 2016-12-07 | 珠海格力电器股份有限公司 | Device and method for updating equipment engineering information and server |
CN106482299A (en) * | 2016-11-01 | 2017-03-08 | 珠海格力电器股份有限公司 | Unit system data backup device and method and air conditioning unit with device |
CN106650954A (en) * | 2016-09-18 | 2017-05-10 | 珠海格力电器股份有限公司 | Air conditioner and processing method, device and system of operation data of air conditioner |
CN107192095A (en) * | 2017-06-02 | 2017-09-22 | 中山大洋电机股份有限公司 | Heat, divulge information or air-conditioning system maintaining method |
CN107957886A (en) * | 2017-11-06 | 2018-04-24 | 珠海格力电器股份有限公司 | Data synchronization method and device for air conditioning unit control equipment |
CN108278745A (en) * | 2018-01-22 | 2018-07-13 | 珠海格力电器股份有限公司 | Air conditioner and multi-party backup method and device for unit parameters of air conditioner |
CN108512927A (en) * | 2018-04-08 | 2018-09-07 | 珠海格力电器股份有限公司 | Information updating method and device for commercial water heater system |
WO2024021601A1 (en) * | 2022-07-28 | 2024-02-01 | 佛山市顺德区美的电子科技有限公司 | Operation control method and apparatus for air conditioner, and computer readable storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6073235A (en) * | 1983-09-30 | 1985-04-25 | Mitsubishi Electric Corp | Decentralization type control device for air-conditioning and refrigerating device |
CN101158854A (en) * | 2007-11-07 | 2008-04-09 | 阿尔西制冷工程技术(北京)有限公司 | Machinery room air conditioner controller |
CN101236422A (en) * | 2007-02-02 | 2008-08-06 | Lg电子株式会社 | Integrated management system and method using setting information back-up for controlling multi-type air conditioners |
CN102589095A (en) * | 2012-03-18 | 2012-07-18 | 江苏劳特斯机电设备工程有限公司 | Remote control monitoring system for central air conditioner |
CN102914964A (en) * | 2012-09-07 | 2013-02-06 | 三一重工股份有限公司 | Engineering machinery, and controller, host and data backup system thereof |
CN103047736A (en) * | 2013-01-04 | 2013-04-17 | 广东美的制冷设备有限公司 | System and method for automatically matching outdoor control parameters and air-conditioner |
CN104613607A (en) * | 2015-02-12 | 2015-05-13 | 珠海格力电器股份有限公司 | Data interaction method and device and air conditioner control system |
US20150159899A1 (en) * | 2013-12-11 | 2015-06-11 | Honeywell International Inc. | Building automation system setup using a remote control device |
CN104898463A (en) * | 2014-03-05 | 2015-09-09 | 珠海格力电器股份有限公司 | Multi-component program processing method and system for air conditioning system |
-
2015
- 2015-10-15 CN CN201510677143.0A patent/CN105402847A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6073235A (en) * | 1983-09-30 | 1985-04-25 | Mitsubishi Electric Corp | Decentralization type control device for air-conditioning and refrigerating device |
CN101236422A (en) * | 2007-02-02 | 2008-08-06 | Lg电子株式会社 | Integrated management system and method using setting information back-up for controlling multi-type air conditioners |
CN101158854A (en) * | 2007-11-07 | 2008-04-09 | 阿尔西制冷工程技术(北京)有限公司 | Machinery room air conditioner controller |
CN102589095A (en) * | 2012-03-18 | 2012-07-18 | 江苏劳特斯机电设备工程有限公司 | Remote control monitoring system for central air conditioner |
CN102914964A (en) * | 2012-09-07 | 2013-02-06 | 三一重工股份有限公司 | Engineering machinery, and controller, host and data backup system thereof |
CN103047736A (en) * | 2013-01-04 | 2013-04-17 | 广东美的制冷设备有限公司 | System and method for automatically matching outdoor control parameters and air-conditioner |
US20150159899A1 (en) * | 2013-12-11 | 2015-06-11 | Honeywell International Inc. | Building automation system setup using a remote control device |
CN104898463A (en) * | 2014-03-05 | 2015-09-09 | 珠海格力电器股份有限公司 | Multi-component program processing method and system for air conditioning system |
CN104613607A (en) * | 2015-02-12 | 2015-05-13 | 珠海格力电器股份有限公司 | Data interaction method and device and air conditioner control system |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106209453A (en) * | 2016-07-11 | 2016-12-07 | 珠海格力电器股份有限公司 | Device and method for updating equipment engineering information and server |
CN106209453B (en) * | 2016-07-11 | 2019-04-09 | 珠海格力电器股份有限公司 | Device and method for updating equipment engineering information and server |
CN106650954A (en) * | 2016-09-18 | 2017-05-10 | 珠海格力电器股份有限公司 | Air conditioner and processing method, device and system of operation data of air conditioner |
CN106482299A (en) * | 2016-11-01 | 2017-03-08 | 珠海格力电器股份有限公司 | Unit system data backup device and method and air conditioning unit with device |
CN106482299B (en) * | 2016-11-01 | 2019-01-25 | 珠海格力电器股份有限公司 | Unit system data backup device and method and air conditioning unit with device |
CN107192095A (en) * | 2017-06-02 | 2017-09-22 | 中山大洋电机股份有限公司 | Heat, divulge information or air-conditioning system maintaining method |
CN107192095B (en) * | 2017-06-02 | 2019-11-26 | 中山大洋电机股份有限公司 | The maintaining method of heating, ventilation or air-conditioning system |
CN107957886A (en) * | 2017-11-06 | 2018-04-24 | 珠海格力电器股份有限公司 | Data synchronization method and device for air conditioning unit control equipment |
CN108278745A (en) * | 2018-01-22 | 2018-07-13 | 珠海格力电器股份有限公司 | Air conditioner and multi-party backup method and device for unit parameters of air conditioner |
CN108512927A (en) * | 2018-04-08 | 2018-09-07 | 珠海格力电器股份有限公司 | Information updating method and device for commercial water heater system |
WO2024021601A1 (en) * | 2022-07-28 | 2024-02-01 | 佛山市顺德区美的电子科技有限公司 | Operation control method and apparatus for air conditioner, and computer readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105402847A (en) | System data backup method and central air conditioning unit adopting same | |
CN103377094B (en) | Method for monitoring abnormality and device | |
CN105318497A (en) | Updating method and device for operating parameters of air conditioning unit | |
CN204330370U (en) | The trouble-shooter of air conditioner | |
CN101114933A (en) | Method, system and terminal for maintaining capability management object, managing capability | |
US20120319944A1 (en) | Control system equipped with programmable display, programmable display, and drawing data generation means | |
CN105573864A (en) | Terminal system recovery method and system | |
CN106383692A (en) | Single-chip microcomputer embedded equipment OTA upgrade method | |
WO2016082649A1 (en) | Method and device for automatically processing static test data of rail transit vehicle | |
CN104125455A (en) | Projector fault monitoring method, terminal and system | |
CN110749031B (en) | Air conditioner detection method, device and system, storage medium and processor | |
CN104180482A (en) | Control method and system for operating parameters of air conditioner controller | |
CN109582341A (en) | A kind of host system and its programing change method of On-board System of Cab Signal equipment | |
CN111581096A (en) | Automatic testing method for android system terminal equipment | |
CN103414602A (en) | Testing device and testing system for testing Dongle device | |
CN105262890A (en) | Information update control system and method for applications on portable electronic device | |
JP2006244269A (en) | Facility managing device, program update system, facility management program updating method, starting program and facility management program | |
CN103914288A (en) | Control state judging method | |
JP2007248070A (en) | Vehicle running test device | |
CN107544872A (en) | A kind of method and apparatus of system upgrade | |
CN104200164A (en) | Loader virus searching and killing method, device and terminal | |
US20220318000A1 (en) | Communication apparatus and program | |
CN102914964B (en) | Engineering machinery, and controller, host and data backup system thereof | |
KR101622591B1 (en) | Method for managing driving record of multi-air conditioner | |
CN112510823A (en) | Power supply remote control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160316 |
|
RJ01 | Rejection of invention patent application after publication |