CN105369827B - Integral type anti-settling valve inspection shaft - Google Patents
Integral type anti-settling valve inspection shaft Download PDFInfo
- Publication number
- CN105369827B CN105369827B CN201510711017.2A CN201510711017A CN105369827B CN 105369827 B CN105369827 B CN 105369827B CN 201510711017 A CN201510711017 A CN 201510711017A CN 105369827 B CN105369827 B CN 105369827B
- Authority
- CN
- China
- Prior art keywords
- integral type
- valve inspection
- inspection shaft
- type anti
- tubular structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
- Compositions Of Macromolecular Compounds (AREA)
Abstract
The invention discloses a kind of integral type anti-settling valve inspection shaft, and for the straight tube structure of bottom lock, the straight tube outer wall is provided with integrally formed reinforcement;The straight tube is made up of following parts by weight material:Vinyon 100, acrylonitrile butadiene styrene plastic 2~3, the methoxy benzophenone 0.08~0.12,1 of 2 hydroxyl 4,1,3 3 (the 2-methyl-2-phenylpropane base of 2 methyl, 4 hydroxyl 5) butane 0.2~0.5, titanate coupling agent 0.3~0.55, nanometer grade calcium carbonate 15~20, releasing agent 0.5~1.0, black powder 0.2~0.5, Ratproof agent 0.5~1.5.The present invention is processed using rotational molding technique, pressureless compacting, material is in itself without the damage of internal stress, high mechanical strength, ne-leakage, freedom from repairs, service life length, security is good, and well body space is big, it is easy for construction, short construction period, construction cost is saved, be the quality product of supporting feedwater and fire engineering.
Description
Technical field
The present invention relates to hydraulic engineering equipment technical field, especially a kind of integral type anti-settling valve inspection shaft.
Background technology
Premier of the State Council Li Keqiang points out in the government work report in this year, 57 projects that great hydraulic engineering has gone into operation
Accelerating The Construction is wanted, go into operation this year 27 projects again, is building great investment of water project scale more than 800,000,000,000 yuan.Hydraulic engineering is built
If it is already one of major fields of financial investment.Statistics shows, in recent years, domestic investment of water project speed one
Straight to keep fair speed to increase, the great hydraulic engineering center investment in last year China reaches nearly more than 400 hundred million yuan, and this year will then reach
To more than 700 hundred million yuan.There is water conservancy enterprises personage to think that following investment on water conservancy will keep higher speedup.
In hydraulic engineering, the aqueduct of installation, valve etc. need to carry out buried protection, and the valve of hydraulic engineering at present
Inspection shaft generally use is brick or concreting is, it is necessary to substantial amounts of cost of labor, cost is high, efficiency is low for door, and in Complex Soil
Easy burn into leak, sedimentation, cause water pollution or the situation of geological disaster under earth environment.And injection-moulded plastic well is due to technique
Feature, well body is smaller, is all to be molded into widget to assemble (structure design as disclosed in CN103132542A), is asking
Topic is when needing repairing and inconvenience and seepage in underground also occurs.
The content of the invention
The present invention in view of the shortcomings of the prior art, proposes a kind of integral type anti-settling valve inspection shaft, bore is big, corrosion resistant
Erosion, long lifespan, ne-leakage, anti-settling.
In order to realize foregoing invention purpose, the present invention provides following technical scheme:A kind of integral type anti-settling valve inspection
Well, it is the tubular structure of top closing in bottom straight tube, and bottom lock, the tubular structure outer wall are provided with integrally formed reinforcement
Muscle;The tubular structure is made up of following parts by weight material:
The reinforcement is hollow-core construction.
Further, the reinforcement includes shaft orientation reinforcing rib and radial reinforced rib.
Further, the tubular structure side wall lower ends are provided with Pipe installing hole.
Further, the Pipe installing hole is provided with four, is arranged for tubing type.
Further, the tubular structure inwall, which is provided with well, checks that climbing is ridden with work.
Further, the tubular structure top open part piles up platform provided with bearing ring.
Further, the tubular structure upper outside is provided with lifting lug used for hoisting.
Further, the vinyon is that particle diameter is two kinds of powdered plastic particles of 15~30 mesh and 30~50 purposes.
Compared with prior art, the present invention has advantages below:Original brick or coagulation is instead of using the plastics borehole wall
Tu Jing, efficiency of construction is substantially increased in work progress, reduce construction cost;Valve inspection well of the present invention is according to water conservancy work
Journey construction demand, rationally designs valve inspection well construction, meets actual use, construction requirement.Well body uses rotational molding technique, realizes
Standardized production, integral pressureless compacting, unstressed centrostigma in product, internal stress damage is eliminated, solves injection moulding valve inspection
Well is looked into because process characteristic can not produce the problem of large-caliber product.The reinforcement on well body surface solves simple plastic material knot
The problem of structure low intensity so that well body is firm in structure, is more suitable for industrial circle.
Valve inspection well raw material of the present invention is mainly based on LLDPE or HDPE material or related compound material, corrosion resistant
Lose, be green, being adapted to a variety of geological conditions to use, antiseismic and anti-ground end settling property is strong, can absorb and buffer well
Vibrations and pressure, it is particularly suitable in the Northwest and the use of geologic structure non-densified regions.Service life grow, solve brick well and
Concrete well easily by acid and alkali corrosion the problem of, for ease of maintenaince, maintenance.
Inspection shaft well body of the present invention carries out selective designed openings according to the external diameter size of connecting pipe, and is designed with
O-ring seal, connection is simple, easy for construction, can really realize zero seepage.
Brief description of the drawings
Fig. 1 is the cross section structure diagram of the present invention.
Embodiment
A kind of large-caliber water supply as shown in Figure 1, fire engineering are to utilize rotational molding technique once with buried valve inspection well
Shaping, and well body wall thickness is consistent, and it is integrally formed equally distributed provided with rotational moulding that the outer circumference surface of well body 1 of the inspection shaft prolongs axial plane
Longitudinal semicircle shape reinforcement and "+" font reinforcement 2 and concentric semicircles type reinforcement 3, reinforcement are hollow, can be effectively improved
Well body intensity, save raw material, reduce cost.
As shown in figure 1, large-caliber water supply, FSE are additionally provided with tubing type with buried valve inspection well well body 1
Pipe installing mouth 4, can be according to straight-through selection, threeway, four-way be actually needed, and the bore for installing tubing can be from 75~Ф of Ф 450
Between choose at random;Well body is provided with structural type O-ring seal with pipeline junction, realizes zero seepage.It is provided with well and checks that climbing is used
Work foot-operated 5, enter beneficial to personnel and Pipe installing and maintenance are carried out in well.
Piled up as shown in figure 1, large-caliber water supply, fire engineering are additionally provided with well head bearing ring with buried valve inspection well top
Platform 6, it is easy to install concrete bearing ring additional, improves the weight capacity of product;Top is additionally provided with two symmetrical hangers 7 of lifting, just
In fast hoisting.
Well body 1 of the present invention can select existing LLDPE or HDPE plastic material, and optional plastics kind and the trade mark are also very
It is more.The reinforcement that other well body surface is set, material cost is also reduced while reinforcement structure intensity.
The present invention forms the plastic formula of product:
The PE plastic materials of the manufacture valve inspection well are handled through milling, and particle diameter is 15~30 mesh and 30~50 purposes two
Kind powdered plastic.
With reference to specific embodiment, the present invention will be described in detail, and the description of this part is only exemplary and explained
Property, there should not be any restriction effect to protection scope of the present invention.
Embodiment 1
The present invention forms the plastic formula of product:
The PE plastic materials of the manufacture valve inspection well are handled through milling, and particle diameter is the two kinds of powdery modelings of 15 mesh and 50 purposes
Material.
Embodiment 2
The present invention forms the plastic formula of product:
The PE plastic materials of the manufacture valve inspection well are handled through milling, and particle diameter is the two kinds of powdery modelings of 30 mesh and 35 purposes
Material.
Embodiment 3
The present invention forms the plastic formula of product:
The PE plastic materials of the manufacture valve inspection well are handled through milling, and particle diameter is the two kinds of powdery modelings of 25 mesh and 40 purposes
Material.
The manufacture method of well body 1 of the present invention, has the following steps:
1st, mold design:In the inner chamber of well body mould, the groove of design axially and longitudinally, mould oral area is designed with well
The structure mould that mouth matches, well body mould lower section are also devised with the straight tube mould to be matched with branch tube shape;
2nd, weight is adjusted:The raw material weight M of production valve inspection well is calculated according to well body surface area S:
1. M=ρ × s × e
2. S=(π r1 2+2πr1h+πr2 2)*k
Wherein:ρ-raw material density, about 0.93g/cm3;E-thickness of shaft wall;r1- well body radius;r2- well head half
Footpath;H-well body total height;K-correction factor, general k take 1.1-1.5;
3rd, batch mixing:After raw material is mixed according to formula rate, stirring at normal temperature 15min is carried out;
4th, feed:The raw material of the manufacture valve inspection well of weight obtained by being calculated as step 3 is added in die cavity, closes lid
Son.
5th, rotation molding:Complete mould will be assembled to be fixed on mould bases, at 220 DEG C~250 DEG C while rotating, wave
30~50min of heating uniform to mould in environment;
6th, cool down:Continue to rotate, wave mould, air-cooled to about 40 DEG C;
7th, it is stripped:Upper mould is removed, the product for taking out in-mold molding obtains finished product.
8th, deburring:Carry out deburring processing at the mold-closing seam to product, is put in storage after the assay was approved.
The installation method of heavy caliber hydraulic engineering valve inspection well of the present invention:
1st, pit is excavated:Excavate pit and relax≤300mm than product actual size;Cutting depth is with product top working hole
5cm meters are higher by than ground;
2nd, based process:Compacting, smooth sand or original soil basis are made, adds and does the thick concrete pedestals of 5cm;
3rd, assemble:External pipe is put into cushion rubber and loads well body position of opening, installation valve completes assembling in it;
4th, backfill:Successively backfilled, backfilled while tamp, suitably pour water using medium coarse sand or the original soil to ravel, backfilled
Compactness cannot be less than 90%.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (8)
- A kind of 1. integral type anti-settling valve inspection shaft, it is characterised in that:For the tubular structure of top closing in bottom straight tube, and bottom Portion closes, and the tubular structure outer wall is provided with integrally formed reinforcement;The tubular structure is made up of following parts by weight material:Vinyon 100Acrylonitrile-butadiene-styrene (ABS) plastics 2~3ESCALOL 567 0.08~0.121,1,3- tri- (2- methyl -4- hydroxyl -5- 2-methyl-2-phenylpropanes base) butane 0.2~0.5Titanate coupling agent 0.3~0.55Nanometer grade calcium carbonate 15~20Releasing agent 0.5~1.0Black powder 0.2~0.5Ratproof agent 0.5~1.5;The reinforcement is hollow-core construction.
- 2. the integral type anti-settling valve inspection shaft as described in claim 1, it is characterised in that:The reinforcement includes axially adding Strengthening tendons and radial reinforced rib.
- 3. the integral type anti-settling valve inspection shaft as described in claim 1 or 2, it is characterised in that:Under the tubular structure side wall End is provided with Pipe installing hole.
- 4. the integral type anti-settling valve inspection shaft as described in claim 3, it is characterised in that:The Pipe installing hole is provided with four It is individual, arranged for tubing type.
- 5. the integral type anti-settling valve inspection shaft as described in claim 3, it is characterised in that:The tubular structure inwall is provided with Check that climbing is ridden with work in well.
- 6. the integral type anti-settling valve inspection shaft as described in claim 1, it is characterised in that:The tubular structure open top Platform is piled up provided with bearing ring in place.
- 7. the integral type anti-settling valve inspection shaft as described in claim 1, it is characterised in that:The tubular structure upper outside Provided with lifting lug used for hoisting.
- 8. the integral type anti-settling valve inspection shaft as described in claim 1, it is characterised in that:The vinyon is particle diameter For two kinds of powdered plastic particles of 15~30 mesh and 30~50 purposes.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510711017.2A CN105369827B (en) | 2015-10-28 | 2015-10-28 | Integral type anti-settling valve inspection shaft |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510711017.2A CN105369827B (en) | 2015-10-28 | 2015-10-28 | Integral type anti-settling valve inspection shaft |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105369827A CN105369827A (en) | 2016-03-02 |
| CN105369827B true CN105369827B (en) | 2018-01-02 |
Family
ID=55372412
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510711017.2A Active CN105369827B (en) | 2015-10-28 | 2015-10-28 | Integral type anti-settling valve inspection shaft |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105369827B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106893244A (en) * | 2017-03-17 | 2017-06-27 | 四会市恒星智能科技有限公司 | A kind of composite plastic inspection shaft and preparation method thereof |
| CN108149775A (en) * | 2017-12-26 | 2018-06-12 | 舒朋士泵业常州有限公司 | A kind of prefabricated Boosting pumping station of PE and its mounting process |
| CN112375281A (en) * | 2020-11-24 | 2021-02-19 | 三杰节能新材料股份有限公司 | Rotational molding formula and manufacturing process of heat-preservation outer protective pipe elbow |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102993538B (en) * | 2011-09-09 | 2016-08-03 | 滁州格美特科技有限公司 | A kind of modified plastics and manufacture method and purposes |
| CN202500153U (en) * | 2012-01-11 | 2012-10-24 | 杭州雄魁塑胶科技有限公司 | Integral ribbed plastic inspection well |
| BR112016006528B1 (en) * | 2013-09-27 | 2021-07-27 | Basf Se | EXTRUDED ARTICLE COMPRISING A POLYOLEFIN COMPOSITION |
| CN104594382B (en) * | 2014-12-09 | 2016-06-29 | 浙江邦德光电集团有限公司 | A kind of buried communication well |
-
2015
- 2015-10-28 CN CN201510711017.2A patent/CN105369827B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN105369827A (en) | 2016-03-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113445498A (en) | Construction process of karst hole pile foundation in complex geology | |
| CN201330407Y (en) | Reinforced plastic inspection chamber | |
| CN101343871A (en) | Composite pile with high durability protective layer and method of making and constructing same | |
| CN202850177U (en) | Reinforced steel skeleton plastic inspection well | |
| CN201495558U (en) | Plastic inspection chamber | |
| CN112112654A (en) | Isolation plate structure in upper soft lower hard stratum and construction method thereof | |
| CN110130385B (en) | A composite caisson foundation suitable for the reinforcement treatment of soft soil foundation and its construction method | |
| CN103628509A (en) | Double-casing structure formed by inner casing and outer casing for pile foundation bearing capacity test and made of different materials, and construction method thereof | |
| CN102409674A (en) | Micropile for wall protection with cloth bag and its construction method | |
| CN105369827A (en) | Integrated sedimentation-prevention valve inspection well | |
| CN201495560U (en) | Plastic inspection chamber | |
| CN216238650U (en) | Prefabricated whole PC well room of assembled | |
| CN212896462U (en) | Grid reinforced composite structure underground well | |
| CN221721758U (en) | Energy-saving bored pile soil taking device | |
| CN219450816U (en) | Cluster type underground hydrogen storage well | |
| CN205077517U (en) | Integral type antisettle valve door inspection shaft | |
| CN201933496U (en) | Novel pile tip for soft clay foundation treatment | |
| CN115217103B (en) | Construction method of miniature precast pile | |
| CN205224019U (en) | Stake of reinforcing bar fiber cement soil | |
| CN203741945U (en) | Flange rib horizontal type plastic water cellar | |
| CN2743440Y (en) | Environment-friendly assembled inspection well | |
| CN201495559U (en) | Plastic inspection chamber | |
| CN107012868A (en) | A kind of prefabricated screw pile construction method | |
| CN103899115B (en) | A kind of vertical plastic water cellar and assemble method thereof | |
| CN222457353U (en) | A rotary bored pile for foundation pit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |