CN105350462A - Bridge overall transversely-moving beam replacing system and method - Google Patents

Bridge overall transversely-moving beam replacing system and method Download PDF

Info

Publication number
CN105350462A
CN105350462A CN201510831187.4A CN201510831187A CN105350462A CN 105350462 A CN105350462 A CN 105350462A CN 201510831187 A CN201510831187 A CN 201510831187A CN 105350462 A CN105350462 A CN 105350462A
Authority
CN
China
Prior art keywords
bridge
new
superstructure
traversing
new bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510831187.4A
Other languages
Chinese (zh)
Inventor
程慧林
梁志新
高占军
彭程
王治斌
郭亚娟
李闻
罗九林
罗红春
李力亨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Fifth Survey and Design Institute Group Co Ltd
Original Assignee
China Railway Fifth Survey and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Fifth Survey and Design Institute Group Co Ltd filed Critical China Railway Fifth Survey and Design Institute Group Co Ltd
Priority to CN201510831187.4A priority Critical patent/CN105350462A/en
Publication of CN105350462A publication Critical patent/CN105350462A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a bridge overall transversely-moving beam replacing system and method. A row of steel pipe piles and a row of first temporary bridge piers are inserted and hit into a transverse-bridge-direction axis of a pier of an existing bridge, and a transverse slideway of the existing bridge is installed; a row of steel pipe piles and a row of second temporary bridge piers are inserted and hit into a transverse-bridge-direction axis of a new pier, and a transverse slideway of the new bridge is installed; and an upper structure of the existing bridge and an upper structure of the new bridge are connected into a whole through connecting components, and a jack is arranged at the outer end of the transverse slideway of the new bridge. Under the line operation condition, the structure of the new bridge is completely constructed, and then the upper structure of the existing bridge and the upper structure of the new bridge are connected into a whole; in the operation line short closed time section, the upper structure of the existing bridge is moved out of the bridge position while the upper structure of the new bridge is transversely moved to the design bridge position; and the new bridge can be rapidly replaced under the condition that the traffic is broken off in a short period.

Description

A kind of integral bridge is traversing to be changed girder system system and changes beam method
Technical field
The present invention relates to a kind of Bridge Construction technology, particularly relate to the traversing girder system of changing of a kind of integral bridge and unite and change beam method.
Background technology
In technical field of civil engineering, especially in Bridge Construction technical field, under circuit operation condition, if exist curves is not suitable for continuing to be on active service, so need to suspend traffic, dismounting is carried out to bridge and rebuilds.If vehicle operating twocouese bridge is arranged separately, so can run by single width, two width bridges are alternately removed and are again built.The time of so general needs is long, and the time that suspends traffic is long, even generally can reach several years several months, very big to the pressure of traffic impact.
Also first can build near track plan one just line be open to traffic temporarily, then alignment type bridge carry out dismounting rebuild.Do like this and traffic pressure can be reduced, but shoofly to build the investment of removing with the later stage large, must not be the measure then taked.
Summary of the invention
The object of this invention is to provide a kind of can the integral bridge of short-term quick-replaceable new bridge traversing change girder system system and change beam method.
The object of the invention is to be achieved through the following technical solutions:
Integral bridge of the present invention is traversing changes girder system system, on exist curves bridge pier direction across bridge axis, inserted to play one arranges steel pipe pile and interim bridge pier one, and the traversing slideway of exist curves is installed on exist curves bridge pier, steel pipe pile and interim bridge pier one, exist curves superstructure is placed on the traversing slideway of described exist curves;
At the new bridge pier of lower structure of exist curves, and inserted to play one arranges steel pipe pile and interim bridge pier two on new bridge pier direction across bridge axis, and the traversing slideway of new bridge is installed on new bridge pier, steel pipe pile and interim bridge pier two, new bridge superstructure is placed on the traversing slideway of described new bridge;
Described exist curves superstructure and new bridge superstructure are connected into entirety by connecting elements, and jack is set in the outer end of the traversing slideway of new bridge.
Above-mentioned integral bridge of the present invention is traversing changes the method that girder system system realizes changing beam, comprises step:
On exist curves bridge pier direction across bridge axis, inserted to play one arranges steel pipe pile, in order to install the traversing slideway of exist curves;
On new bridge pier direction across bridge axis, many inserted to plays one arrange steel pipe pile, in order to install the traversing slideway of new bridge;
Exist curves superstructure and new bridge superstructure are connected into entirety, simultaneously traversing pushing tow;
Under circuit operation condition, New Bridge is constructed complete, then exist curves superstructure is connected together with new bridge superstructure, within the time period that operating line short-term is closed, by traversing for new bridge superstructure to design bridge location while, exist curves superstructure is shifted out beyond bridge location, realizes new bridge at short notice and be on active service.
As seen from the above technical solution provided by the invention, the integral bridge that the embodiment of the present invention provides is traversing to be changed girder system system and changes beam method, can in short-term---within being generally a few hours or within a couple of days---under the condition suspended traffic, quick-replaceable new bridge.
Accompanying drawing explanation
The traversing section structure schematic diagram changing girder system system of integral bridge that Fig. 1 provides for the embodiment of the present invention.
The traversing plane structure schematic diagram changing girder system system of integral bridge that Fig. 2 provides for the embodiment of the present invention.
In figure:
1, exist curves superstructure, 2, new bridge superstructure, 3, exist curves sliding crossbeam, 4, new bridge sliding crossbeam, 5, existing bridge pier, 6, newly bridge pier, 7, temporarily bridge pier one, 8, interim bridge pier two, 9, connecting elements, 10, back seat, 11, connecting pin, 12, jack, 13, pumping plant control centre.
Detailed description of the invention
To be described in further detail the embodiment of the present invention below.
Integral bridge of the present invention is traversing changes girder system system, its preferably detailed description of the invention be:
On exist curves bridge pier direction across bridge axis, inserted to play one arranges steel pipe pile and interim bridge pier one, and the traversing slideway of exist curves is installed on exist curves bridge pier, steel pipe pile and interim bridge pier one, exist curves superstructure is placed on the traversing slideway of described exist curves;
At the new bridge pier of lower structure of exist curves, and inserted to play one arranges steel pipe pile and interim bridge pier two on new bridge pier direction across bridge axis, and the traversing slideway of new bridge is installed on new bridge pier, steel pipe pile and interim bridge pier two, new bridge superstructure is placed on the traversing slideway of described new bridge;
Described exist curves superstructure and new bridge superstructure are connected into entirety by connecting elements, and jack is set in the outer end of the traversing slideway of new bridge.
There is back seat the outer end of the traversing slideway of described new bridge, and the outside of described new bridge superstructure is provided with connecting pin, and the cylinder bottom of described jack is against on described back seat, and cylinder bar is connected on described connecting pin.
Above-mentioned integral bridge of the present invention is traversing changes the method that girder system system realizes changing beam, its preferably detailed description of the invention be:
Comprise step:
On exist curves bridge pier direction across bridge axis, inserted to play one arranges steel pipe pile, in order to install the traversing slideway of exist curves;
On new bridge pier direction across bridge axis, many inserted to plays one arrange steel pipe pile, in order to install the traversing slideway of new bridge;
Exist curves superstructure and new bridge superstructure are connected into entirety, simultaneously traversing pushing tow;
Under circuit operation condition, New Bridge is constructed complete, then exist curves superstructure is connected together with new bridge superstructure, within the time period that operating line short-term is closed, by traversing for new bridge superstructure to design bridge location while, exist curves superstructure is shifted out beyond bridge location, realizes new bridge at short notice and be on active service.
Integral bridge of the present invention is traversing to be changed girder system system and changes beam method, can in short-term---within being generally a few hours or within a couple of days---under the condition suspended traffic, quick-replaceable new bridge.
Know-why of the present invention is:
Beyond the safe distance that the upstream or downstream that need the exist curves changed are certain, and on the axis parallel with line midline, under the not affected condition of guarantee exist curves normal operation, assembled good new bridge superstructure in advance.Exist curves superstructure and new bridge superstructure are connected into entirety, and install pushing tow jack in the side, rear in new bridge superstructure horizontal sliding direction, a jack installed by every pier.All jack are connected to pumping plant control centre, and pumping plant control centre can ensure all jack synchronization jobs.Then short-term closed-loop, is separated the superstructure of exist curves with circuit, and by new bridge superstructure pushing tow to design bridge location place, exist curves superstructure just leaves place on line simultaneously.New bridge can begin one's duty.Then can remove original bridge and construction equipment after circuit operation, complete exchanging bridge.
Specific embodiment:
As shown in Figure 1 and Figure 2, comprising: exist curves superstructure 1, new bridge superstructure 2, exist curves sliding crossbeam 3, new bridge sliding crossbeam 4, existing bridge pier 5, new bridge pier 6, interim bridge pier 1, interim bridge pier 28, connecting elements 9, back seat 10, connecting pin 11, jack 12, pumping plant control centre 13.
Under circuit normal operation uninterrupted traffic condition, at exist curves both sides inserted to play steel pipe pile, i.e. described new bridge pier, interim bridge pier one, interim bridge pier two.Existing bridge pier and interim bridge pier one arrange described exist curves sliding crossbeam, new bridge pier and described interim bridge pier two arranges described new bridge sliding crossbeam, material is thus formed the sliding rail of exist curves and new bridge.
Described exist curves superstructure and described new bridge superstructure are fixed by described connecting elements, connects into entirety.
Described back seat is set at the rear of the sideslip direction of described new bridge sliding crossbeam, described connecting pin is set in the side, rear of the sideslip direction of described new bridge superstructure, described jack is connected on described back seat and described connecting pin.
Described jack on each described new bridge sliding crossbeam is connected to described pumping plant control centre, and described pumping plant control centre controls described jack synchronization job by computer and servo-fluid pressure valve, ensures to be advanced by pushing tow object is synchronously traversing.
Operating line temporary blockage, suspend traffic a few hours or a couple of days, described exist curves superstructure and existing line are disconnected, while described new bridge superstructure traversing pushing tow to bridge location, described exist curves superstructure leaves existing bridge location simultaneously, by described new bridge superstructure in connection, circuit can open operation.
Remove described connecting elements, remove described exist curves superstructure, remove described interim bridge pier one, described interim bridge pier two, remove the construction equipments such as described back seat, described connecting pin, so just complete exist curves in the short period of time and more change jobs.
Beneficial effect of the present invention may be summarized to be:
(1) within the maintenance time of circuit operation, exist curves can be changed, affects circuit normal operation hardly.
(2) do not need to build sidewalk to be open to traffic temporarily, significantly saved construction costs.
(3) construction equipment is simple.
The above; be only the present invention's preferably detailed description of the invention, but protection scope of the present invention is not limited thereto, is anyly familiar with those skilled in the art in the technical scope that the present invention discloses; the change that can expect easily or replacement, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claims.

Claims (3)

1. the traversing girder system of changing of integral bridge is united, it is characterized in that, on exist curves bridge pier direction across bridge axis, inserted to play one arranges steel pipe pile and interim bridge pier one, and the traversing slideway of exist curves is installed on exist curves bridge pier, steel pipe pile and interim bridge pier one, exist curves superstructure is placed on the traversing slideway of described exist curves;
At the new bridge pier of lower structure of exist curves, and inserted to play one arranges steel pipe pile and interim bridge pier two on new bridge pier direction across bridge axis, and the traversing slideway of new bridge is installed on new bridge pier, steel pipe pile and interim bridge pier two, new bridge superstructure is placed on the traversing slideway of described new bridge;
Described exist curves superstructure and new bridge superstructure are connected into entirety by connecting elements, and jack is set in the outer end of the traversing slideway of new bridge.
2. integral bridge according to claim 1 is traversing changes girder system system, it is characterized in that, there is back seat the outer end of the traversing slideway of described new bridge, and the outside of described new bridge superstructure is provided with connecting pin, the cylinder bottom of described jack is against on described back seat, and cylinder bar is connected on described connecting pin.
3. the integral bridge described in claim 1 or 2 is traversing changes the method that girder system system realizes changing beam, it is characterized in that, comprises step:
On exist curves bridge pier direction across bridge axis, inserted to play one arranges steel pipe pile, in order to install the traversing slideway of exist curves;
On new bridge pier direction across bridge axis, many inserted to plays one arrange steel pipe pile, in order to install the traversing slideway of new bridge;
Exist curves superstructure and new bridge superstructure are connected into entirety, simultaneously traversing pushing tow;
Under circuit operation condition, New Bridge is constructed complete, then exist curves superstructure is connected together with new bridge superstructure, within the time period that operating line short-term is closed, by traversing for new bridge superstructure to design bridge location while, exist curves superstructure is shifted out beyond bridge location, realizes new bridge at short notice and be on active service.
CN201510831187.4A 2015-11-25 2015-11-25 Bridge overall transversely-moving beam replacing system and method Pending CN105350462A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510831187.4A CN105350462A (en) 2015-11-25 2015-11-25 Bridge overall transversely-moving beam replacing system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510831187.4A CN105350462A (en) 2015-11-25 2015-11-25 Bridge overall transversely-moving beam replacing system and method

Publications (1)

Publication Number Publication Date
CN105350462A true CN105350462A (en) 2016-02-24

Family

ID=55326515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510831187.4A Pending CN105350462A (en) 2015-11-25 2015-11-25 Bridge overall transversely-moving beam replacing system and method

Country Status (1)

Country Link
CN (1) CN105350462A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611994A (en) * 2018-05-22 2018-10-02 郑州德威机械设备有限公司 A kind of equipment and construction method for exchanging bridge
CN111926721A (en) * 2020-07-20 2020-11-13 中铁二十四局集团浙江工程有限公司 Construction method for replacing turnout beam
CN113026540A (en) * 2021-04-16 2021-06-25 中铁第四勘察设计院集团有限公司 On-bridge track connecting system and method for integral translation of newly-built bridge pier box girder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100730234B1 (en) * 2006-03-07 2007-06-19 오창열 Emergency superstructure of bridge superstructure by transverse propulsion
JP4348108B2 (en) * 2003-04-30 2009-10-21 三菱重工鉄構エンジニアリング株式会社 Bridge replacement method and bridge
CN103410103A (en) * 2013-07-24 2013-11-27 中铁大桥局股份有限公司 Quick-beam change construction method for existing railway line of railroad
CN104947604A (en) * 2015-05-14 2015-09-30 中国铁路总公司 Rapid beam-replacing construction method for high speed railway 900 t concrete box beam
CN205152818U (en) * 2015-11-25 2016-04-13 中铁第五勘察设计院集团有限公司 Girder system is traded all to whole sideslip of bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4348108B2 (en) * 2003-04-30 2009-10-21 三菱重工鉄構エンジニアリング株式会社 Bridge replacement method and bridge
KR100730234B1 (en) * 2006-03-07 2007-06-19 오창열 Emergency superstructure of bridge superstructure by transverse propulsion
CN103410103A (en) * 2013-07-24 2013-11-27 中铁大桥局股份有限公司 Quick-beam change construction method for existing railway line of railroad
CN104947604A (en) * 2015-05-14 2015-09-30 中国铁路总公司 Rapid beam-replacing construction method for high speed railway 900 t concrete box beam
CN205152818U (en) * 2015-11-25 2016-04-13 中铁第五勘察设计院集团有限公司 Girder system is traded all to whole sideslip of bridge

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
涂满明: "洪山庙大桥钢梁顶推施工技术", 《铁道建筑》 *
王然君: "液压横移顶推法在铁路电气化区段换梁施工中的应用", 《中国建筑金属结构》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611994A (en) * 2018-05-22 2018-10-02 郑州德威机械设备有限公司 A kind of equipment and construction method for exchanging bridge
CN111926721A (en) * 2020-07-20 2020-11-13 中铁二十四局集团浙江工程有限公司 Construction method for replacing turnout beam
CN111926721B (en) * 2020-07-20 2022-01-18 中铁二十四局集团浙江工程有限公司 Construction method for replacing turnout beam
CN113026540A (en) * 2021-04-16 2021-06-25 中铁第四勘察设计院集团有限公司 On-bridge track connecting system and method for integral translation of newly-built bridge pier box girder

Similar Documents

Publication Publication Date Title
CN109468960A (en) Rapid replacement method and replacement system of expressway flyover
CN103643640B (en) Jacking-first and line-reinforcement-second jacking construction method for frame bridge
CN102322026A (en) Reinforcing method of masonry arch bridge
CN103437254B (en) Framed underpass bridge railway trouble district track strengthening device
CN105350462A (en) Bridge overall transversely-moving beam replacing system and method
CN108457207B (en) Method for dismantling multi-span bridge body of operation line by utilizing longitudinal connection of bridge girder erection machine
CN104099872B (en) A kind of undercrossing tunnel large span box culvert is vertical to be chosen and horizontal lifts jacking construction method
CN205152818U (en) Girder system is traded all to whole sideslip of bridge
CN102660925A (en) Moveable formwork for variable-width curved bridge
CN204266132U (en) Adopt the railway Frame Pier crossbeam of D type beam
CN103437304B (en) A kind of method increasing pier section replacing pot bearing
CN104947604A (en) Rapid beam-replacing construction method for high speed railway 900 t concrete box beam
CN104314009A (en) Large segment lifting mechanism and use method thereof
CN201411630Y (en) Bridge hydraulic pressure automatic adjusting mechanism for asymmetrical sedimentation ground
CN209260577U (en) The replacement system of highway line bridge
KR100865752B1 (en) Railway bridge replacement method
CN104612031A (en) Reinforced concrete continuous rigid frame arch bridge and construction method
CN208501505U (en) Kiloton bridge superstructure fast replacement system
CN115710866B (en) A method for repairing bridge abutment defects on a highway bridge crossing an existing railway
CN105714691A (en) Staggered arrangement and transverse movement construction method for hanging baskets of curved short-tower cable-stayed bridge
CN109468937A (en) Bridge and its method for dismounting with falsework
JP4424744B2 (en) Bridge replacement method
CN203440720U (en) Line reinforcing device of railway turnout area in frame bridge jacking
CN114182654A (en) Railway box girder transverse moving and falling device and dismantling construction method
CN112900290A (en) Bridge beam replacing method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160224