CN105303922B - Electric energy quality monitoring simulation training system and its Training Methodology - Google Patents

Electric energy quality monitoring simulation training system and its Training Methodology Download PDF

Info

Publication number
CN105303922B
CN105303922B CN201510863660.7A CN201510863660A CN105303922B CN 105303922 B CN105303922 B CN 105303922B CN 201510863660 A CN201510863660 A CN 201510863660A CN 105303922 B CN105303922 B CN 105303922B
Authority
CN
China
Prior art keywords
monitoring
data monitoring
node
monitoring node
cloud server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510863660.7A
Other languages
Chinese (zh)
Other versions
CN105303922A (en
Inventor
许中平
胡金贵
黄凯
李栋华
李欣
梁昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING NETSTONE ACCENTURE INFORMATION TECHNOLOGY CO., LTD.
Original Assignee
Beijing Netstone Accenture Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Netstone Accenture Information Technology Co Ltd filed Critical Beijing Netstone Accenture Information Technology Co Ltd
Priority to CN201510863660.7A priority Critical patent/CN105303922B/en
Priority to CN201710925004.4A priority patent/CN107545815A/en
Priority to CN201710925000.6A priority patent/CN107610543A/en
Priority to CN201710813345.2A priority patent/CN107633748A/en
Priority to CN201710813756.1A priority patent/CN107358832A/en
Publication of CN105303922A publication Critical patent/CN105303922A/en
Application granted granted Critical
Publication of CN105303922B publication Critical patent/CN105303922B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/0815Network architectures or network communication protocols for network security for authentication of entities providing single-sign-on or federations
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/083Network architectures or network communication protocols for network security for authentication of entities using passwords
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]

Abstract

The invention discloses a kind of electric energy quality monitoring simulation training system and its Training Methodology, this training system includes system server, wireless network and mobile phone.This Training Methodology includes trainer by configuring the monitoring range of monitoring modular configuration electric energy quality monitoring net and the steps such as each data monitoring node being configured in the monitoring range of electric energy quality monitoring net, the beneficial effects of the invention are as follows reduce training low cost, not only safety again carried out actual combat, can be by training to the voltage dip in power system, temporarily liter and short interruptions, the important power quality problem such as voltage waveform distortion is detected this ability and is improved in real time caused by harmonic wave.

Description

Electric energy quality monitoring simulation training system and its Training Methodology
Technical field
The invention belongs to lation training course for power system field, in particular to a kind of electric energy quality monitoring simulation training system and Its Training Methodology.
Background technology
During 12, motherland's economy keeps high speed development, and the supply load of power network also increasingly increases, and electric company is Ensure resident and commercial power demand, it is necessary to the quality of power supply is improved, monitoring turns into the focus of various regions Utilities Electric Co., seriously Accident happens occasionally caused by power quality problem, causes the loss of manpower, material resources and financial resources, therefore carry out essence to the quality of power supply Really, quick and actual time safety monitoring is very important.Although many trainings on electric energy quality monitoring have been held in various regions Class to be instructed, but is nothing more than two kinds, one kind is pure theory training, and this Competitive effects are not high, and another is on-the-spot guidance, but It is this dangerous high, is easily limited by environmental condition, and cost is high, additionally due to measured terminal is a lot, and most of points Cloth is in the severe area of weather conditions, and position distribution is also more complicated, so the data monitoring inserting knot positioned at each terminal The data monitoring node for very cumbersome and intrinsic each terminal of getting up usually by the environment of surrounding influenceed and damage or Fine motion position, " traffic jam " occurs in transmission signal, it is also very mixed and disorderly unordered during transmission, greatly reduce efficiency and inspection The stable accuracy of survey, often can only be by consulting and adjusting in monitoring center for Monitoring Data and historical situation staff Take, the place in the wild or beyond monitoring center just can not consult and transfer, and by the hardware condition of mobile phone is limited, use Browser in mobile phone directly invokes that local Verification System is substantially impossible, have to develop special secure browser plug-in unit OK.
The content of the invention
The invention aims to overcome above-mentioned deficiency to provide a kind of electric energy quality monitoring simulation training system and its training Method for training.
To achieve the above object, the technical solution adopted by the present invention is:
A kind of electric energy quality monitoring simulation training system, including system server 1, wireless network 2 and mobile phone 3, the system System server 1 is connected by wireless network 2 with mobile phone 3.
The system server 1 includes:Configure monitoring modular 1a, configuration factor module 1b, generation scene module 1c, marking Module 1d and authentication module 1e, the configuration monitoring modular 1a, configuration factor module 1b are respectively with generating scene module 1c phases Even, the generation scene module 1c is connected with scoring modules 1d, and the scoring modules 1d is connected with authentication module 1e, the certification Module 1e is built-in with digital certificate.
The mobile phone 3 includes browser 3a, monitoring workflow management APP3b and configuration monitoring sets APP.
A kind of electric energy quality monitoring emulation training method comprises the concrete steps that:
Step 1:Trainer configures the monitoring range of electric energy quality monitoring net and in electric energy by configuring monitoring modular The each data monitoring node of configuration in the monitoring range of quality-monitoring net, electric energy quality monitoring net is configured by configuration factor module Monitoring range in whether occur thunder and lightning, capacitor switching and electric arc interference load etc. influence the quality of power supply factor;
Step 2:Virtual Monitoring net scene is generated by generating scene module, then the bar in the range of monitoring net selected by loading Tower, branch, equipment, operating personnel and surrounding environment.
Step 3:Virtual Monitoring net scene is presented to by trainee by mobile phone;Trainee is by mobile phone according to monitoring flow Emulation monitoring resultses are carried out, and each problem to being found in monitoring is handled;
Step 4:Scoring modules judge whether processing of the trainee to each problem in monitoring be correct;If to each The processing of individual problem is incorrect, will record current mistake, and prompts trainee to reenter step 3 and handle;Judge each field Whether all monitoring tasks are fully completed in scape;If all monitoring tasks are not completed in each scene, reenter Step 3 is circulated;If all monitoring tasks complete in each scene, scoring modules will provide trainee into Achievement, and be encrypted, trainee is simultaneously inquired about by cellphone deciphering, and whole training process terminates.
Each data monitoring node is configured in the step 1 and specifically includes following steps:
011, data monitoring nodal test network environment, determine the frequency point information of each data monitoring node;
012, set data monitoring node to gather the signal of multiple frequencies simultaneously, and only send letter in a frequency Number;
013, master data monitoring node constantly to from data monitoring node transmission time information, receives from data monitoring node And after deadline synchronization, temporal information is handed down to remaining one of data monitoring node, by that analogy, complete complete The time synchronized of net;
014, adjacent data monitoring node is searched for, and the frequency point information of adjacent data monitoring node is recorded, and frequency is believed Breath is handed down to adjacent data monitoring node;
015, if data monitoring node T1 in certain business time-slot, will send data to adjacent data monitoring node T2, that Data monitoring node T1 is output state in the business time-slot, can not now arrange other purposes node again, can only be at one Frequency is handed down to adjacent data monitoring node T2;Assuming that data monitoring node T1 in certain business time-slot, will receive adjacent data prison Survey node T2 data, then data monitoring node T1 is input state in the business time-slot, can receive different frequencies Data, so this time slot can also receive the data that other different frequent points are sent.
The step 013 is specially:Master data monitoring node sends signal using omnidirectional antenna, receives multiple frequencies and sends Signal, until cover all frequencies;If the signal of master data monitoring node is not received from data monitoring node, often The secondary signal for receiving multiple frequencies and sending, until all frequencies are covered, if receiving master data monitoring section from data monitoring node The signal of point, then enter thick synchronous regime from data monitoring node, and temporal information is handed down into remaining one of data supervises Node is surveyed, has received (n+1)th data monitoring node of nth data monitoring node temporal information, for nth data monitoring section Point n jumps the node of scope, by that analogy, will will be sequentially formed with nth data monitoring node building topology network hierarchical structure N+1, which is jumped, n+2 is jumped, n+3 is jumped ... waits node, ultimately forms the networking of multi-levels data monitoring node and complete each hierarchical data The time synchronized of monitoring node.
In the step 4 trainee and by cellphone deciphering inquiry specifically include following steps:
041, trainee logs in Cloud Server using the browser in mobile phone by HTTP, by digital certificate Call request be sent to Cloud Server;
042, authentication module logs in Cloud Server, and Cloud Server sends inquiry request password, authentication module to authentication module Input inquiry request password receives call request, then completes the processing of the calling of digital certificate, afterwards feeds back result To Cloud Server;
043, trainee logs in Cloud Server using the browser in mobile phone by HTTP, Cloud Server to Mobile phone feeds back the inquiry request password, and mobile phone inputs the inquiry request password query processing result, and according to result Go out the achievement of trainee in selection inquiry scoring modules;
044, after completing inquiry, the inquiry request password is temporarily stored in Cloud Server, and call request is received when next time When, authentication module first logs in whether Cloud Server retrieval preserves inquiry request password described in identical, if not having, returns to step Rapid 042, if so, then return to step 043, if the inquiry request password kept in Cloud Server does not all have once within January It is called, even if authentication module logs in Cloud Server retrieval and preserves inquiry request password described in identical, cloud service after January Device is also refused to send the inquiry request password to authentication module.
The present invention reduce training low cost, not only safety again carried out under battle conditions, can by training in power system Voltage dip, temporarily rise and short interruptions, the important power quality problem of voltage waveform distortion etc. caused by harmonic wave carry out real When detect this ability and be improved.And when using in reality, the job network structure of data monitoring node of the invention can To carry out being dynamically adapted to optimum state at any time, solve because weather conditions badly cause the bad shape of wireless communications environment Condition, multiple signals are received while summit sends signal all the way, effectively avoid " traffic jam ", considerably increase network appearance Measure, the browser in mobile phone can log in Cloud Server by HTTP, then pass through several bouts and call certification System does not have to develop special secure browser plug-in unit.
Brief description of the drawings
Fig. 1 is a kind of electric energy quality monitoring simulation training system schematic diagram of the present invention.
Embodiment
Below in conjunction with the accompanying drawings and embodiment further illustrates the present invention.
Embodiment:A kind of electric energy quality monitoring simulation training system, including system server 1, wireless network 2 and mobile phone 3, The system server 1 is connected by wireless network 2 with mobile phone 3.
The system server 1 includes:Configure monitoring modular 1a, configuration factor module 1b, generation scene module 1c, marking Module 1d and authentication module 1e, the configuration monitoring modular 1a, configuration factor module 1b are respectively with generating scene module 1c phases Even, the generation scene module 1c is connected with scoring modules 1d, and the scoring modules 1d is connected with authentication module 1e, the certification Module 1e is built-in with digital certificate.
The mobile phone 3 includes browser 3a, monitoring workflow management APP3b and configuration monitoring sets APP.
A kind of electric energy quality monitoring emulation training method comprises the concrete steps that:
Step 1:Trainer configures the monitoring range of electric energy quality monitoring net and in electric energy by configuring monitoring modular The each data monitoring node of configuration in the monitoring range of quality-monitoring net, electric energy quality monitoring net is configured by configuration factor module Monitoring range in whether occur thunder and lightning, capacitor switching and electric arc interference load etc. influence the quality of power supply factor;
Step 2:Virtual Monitoring net scene is generated by generating scene module, then the bar in the range of monitoring net selected by loading Tower, branch, equipment, operating personnel and surrounding environment.
Step 3:Virtual Monitoring net scene is presented to by trainee by mobile phone;Trainee is by mobile phone according to monitoring flow Emulation monitoring resultses are carried out, and each problem to being found in monitoring is handled;
Step 4:Scoring modules judge whether processing of the trainee to each problem in monitoring be correct;If to each The processing of individual problem is incorrect, will record current mistake, and prompts trainee to reenter step 3 and handle;Judge each field Whether all monitoring tasks are fully completed in scape;If all monitoring tasks are not completed in each scene, reenter Step 3 is circulated;If all monitoring tasks complete in each scene, scoring modules will provide trainee into Achievement, and be encrypted, trainee is simultaneously inquired about by cellphone deciphering, and whole training process terminates.
Each data monitoring node is configured in the step 1 and specifically includes following steps:
011, data monitoring nodal test network environment, determine the frequency point information of each data monitoring node;
012, set data monitoring node to gather the signal of multiple frequencies simultaneously, and only send letter in a frequency Number;
013, master data monitoring node constantly to from data monitoring node transmission time information, receives from data monitoring node And after deadline synchronization, temporal information is handed down to remaining one of data monitoring node, by that analogy, complete complete The time synchronized of net;
014, adjacent data monitoring node is searched for, and the frequency point information of adjacent data monitoring node is recorded, and frequency is believed Breath is handed down to adjacent data monitoring node;
015, if data monitoring node T1 in certain business time-slot, will send data to adjacent data monitoring node T2, that Data monitoring node T1 is output state in the business time-slot, can not now arrange other purposes node again, can only be at one Frequency is handed down to adjacent data monitoring node T2;Assuming that data monitoring node T1 in certain business time-slot, will receive adjacent data prison Survey node T2 data, then data monitoring node T1 is input state in the business time-slot, can receive different frequencies Data, so this time slot can also receive the data that other different frequent points are sent.
The step 013 is specially:Master data monitoring node sends signal using omnidirectional antenna, receives multiple frequencies and sends Signal, until cover all frequencies;If the signal of master data monitoring node is not received from data monitoring node, often The secondary signal for receiving multiple frequencies and sending, until all frequencies are covered, if receiving master data monitoring section from data monitoring node The signal of point, then enter thick synchronous regime from data monitoring node, and temporal information is handed down into remaining one of data supervises Node is surveyed, has received (n+1)th data monitoring node of nth data monitoring node temporal information, for nth data monitoring section Point n jumps the node of scope, by that analogy, will will be sequentially formed with nth data monitoring node building topology network hierarchical structure N+1, which is jumped, n+2 is jumped, n+3 is jumped ... waits node, ultimately forms the networking of multi-levels data monitoring node and complete each hierarchical data The time synchronized of monitoring node.
In the step 4 trainee and by cellphone deciphering inquiry specifically include following steps:
041, trainee logs in Cloud Server using the browser in mobile phone by HTTP, by digital certificate Call request be sent to Cloud Server;
042, authentication module logs in Cloud Server, and Cloud Server sends inquiry request password, authentication module to authentication module Input inquiry request password receives call request, then completes the processing of the calling of digital certificate, afterwards feeds back result To Cloud Server;
043, trainee logs in Cloud Server using the browser in mobile phone by HTTP, Cloud Server to Mobile phone feeds back the inquiry request password, and mobile phone inputs the inquiry request password query processing result, and according to result Go out the achievement of trainee in selection inquiry scoring modules;
044, after completing inquiry, the inquiry request password is temporarily stored in Cloud Server, and call request is received when next time When, authentication module first logs in whether Cloud Server retrieval preserves inquiry request password described in identical, if not having, returns to step Rapid 042, if so, then return to step 043, if the inquiry request password kept in Cloud Server does not all have once within January It is called, even if authentication module logs in Cloud Server retrieval and preserves inquiry request password described in identical, cloud service after January Device is also refused to send the inquiry request password to authentication module.
The present invention reduce training low cost, not only safety again carried out under battle conditions, can by training in power system Voltage dip, temporarily rise and short interruptions, the important power quality problem of voltage waveform distortion etc. caused by harmonic wave carry out real When detect this ability and be improved.And when using in reality, the job network structure of data monitoring node of the invention can To carry out being dynamically adapted to optimum state at any time, solve because weather conditions badly cause the bad shape of wireless communications environment Condition, multiple signals are received while summit sends signal all the way, effectively avoid " traffic jam ", considerably increase network appearance Measure, the browser in mobile phone can log in Cloud Server by HTTP, then pass through several bouts and call certification System does not have to develop special secure browser plug-in unit.

Claims (3)

1. a kind of electric energy quality monitoring simulation training system, including system server (1), wireless network (2) and mobile phone (3), institute System server (1) is stated to be connected with mobile phone (3) by wireless network (2);The system server (1) includes:Configuration monitoring mould Block (1a), configuration factor module (1b), generation scene module (1c), scoring modules (1d) and authentication module (1e), it is described to match somebody with somebody Put monitoring modular (1a), configuration factor module (1b) respectively with generation scene module (1c) to be connected, the generation scene module (1c) is connected with scoring modules (1d), and the scoring modules (1d) are connected with authentication module (1e), in the authentication module (1e) It is equipped with digital certificate;The mobile phone (3) includes browser (3a), monitoring workflow management APP (3b) and configuration monitoring and set APP;It is characterized in that:Its emulation training method comprises the following steps:
Step 1:Trainer configures the monitoring range of electric energy quality monitoring net and in the quality of power supply by configuring monitoring modular The each data monitoring node of configuration in the monitoring range of monitoring net, the prison of electric energy quality monitoring net is configured by configuration factor module Whether thunder and lightning, capacitor switching and electric arc interference load are occurred in the range of survey;
Step 2:Generate Virtual Monitoring net scene by generating scene module, then the shaft tower selected by loading in the range of monitoring net, Branch, equipment, operating personnel and surrounding environment;
Step 3:Virtual Monitoring net scene is presented to by trainee by mobile phone;Trainee is carried out by mobile phone according to monitoring flow Monitoring resultses are emulated, and each problem to being found in monitoring is handled;
Step 4:Scoring modules judge whether processing of the trainee to each problem in monitoring be correct;If each is asked The processing of topic is incorrect, will record current mistake, and prompts trainee to reenter step 3 and handle;Judge in each scene Whether all monitoring tasks are fully completed;If all monitoring tasks are not completed in each scene, step 3 is reentered Circulated;If all monitoring tasks complete in each scene, scoring modules will provide the achievement of trainee, go forward side by side Row encryption, trainee are simultaneously inquired about by cellphone deciphering, and whole training process terminates.
2. electric energy quality monitoring simulation training system according to claim 1, it is characterised in that configured in the step 1 Each data monitoring node specifically includes following steps:
011, data monitoring nodal test network environment, determine the frequency point information of each data monitoring node;
012, set data monitoring node to gather the signal of multiple frequencies simultaneously, and only send signal in a frequency;
013, master data monitoring node constantly to from data monitoring node transmission time information, receives and complete from data monitoring node Into after time synchronized, temporal information is handed down to remaining one of data monitoring node, by that analogy, completes the whole network Time synchronized;
014, adjacent data monitoring node is searched for, and the frequency point information of adjacent data monitoring node is recorded, and by under frequency point information Issue adjacent data monitoring node;
015, if data monitoring node T1 in certain business time-slot, will send data to adjacent data monitoring node T2, then number In the business time-slot it is output state according to monitoring node T1, can not now arranges other purposes node again, can only be in a frequency It is handed down to adjacent data monitoring node T2;Assuming that data monitoring node T1 in certain business time-slot, will receive adjacent data monitoring section Point T2 data, then data monitoring node T1 is input state in the business time-slot, can receive the data of different frequencies, So this time slot can also receive the data that other different frequent points are sent.
3. electric energy quality monitoring simulation training system according to claim 1, it is characterised in that undergone training in the step 4 Person simultaneously specifically includes following steps by cellphone deciphering inquiry:
041, trainee logs in Cloud Server using the browser in mobile phone by HTTP, by the tune of digital certificate Cloud Server is sent to request;
042, authentication module logs in Cloud Server, and Cloud Server sends inquiry request password, authentication module input to authentication module Inquiry request password receives call request, then completes the processing of the calling of digital certificate, result is fed back into cloud afterwards Server;
043, trainee logs in Cloud Server using the browser in mobile phone by HTTP, and Cloud Server is to mobile phone The inquiry request password is fed back, mobile phone inputs the inquiry request password query processing result, and is selected according to result Go out the achievement of trainee in inquiry scoring modules;
044, after completing inquiry, the inquiry request password is temporarily stored in Cloud Server, when receiving call request next time, is recognized Card module first logs in whether Cloud Server retrieval preserves inquiry request password described in identical, if not having, return to step 042, if so, then return to step 043, if the inquiry request password kept in Cloud Server within January once all not by Call, though after January authentication module log in Cloud Server retrieval preserve inquiry request password described in identical, Cloud Server Also refuse to send the inquiry request password to authentication module.
CN201510863660.7A 2015-11-30 2015-11-30 Electric energy quality monitoring simulation training system and its Training Methodology Expired - Fee Related CN105303922B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201510863660.7A CN105303922B (en) 2015-11-30 2015-11-30 Electric energy quality monitoring simulation training system and its Training Methodology
CN201710925004.4A CN107545815A (en) 2015-11-30 2015-11-30 A kind of emulation training method of electric energy quality monitoring simulation training system
CN201710925000.6A CN107610543A (en) 2015-11-30 2015-11-30 A kind of electric energy quality monitoring simulation training system
CN201710813345.2A CN107633748A (en) 2015-11-30 2015-11-30 The emulation training method of electric energy quality monitoring simulation training system
CN201710813756.1A CN107358832A (en) 2015-11-30 2015-11-30 Electric energy quality monitoring simulation training system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510863660.7A CN105303922B (en) 2015-11-30 2015-11-30 Electric energy quality monitoring simulation training system and its Training Methodology

Related Child Applications (4)

Application Number Title Priority Date Filing Date
CN201710813756.1A Division CN107358832A (en) 2015-11-30 2015-11-30 Electric energy quality monitoring simulation training system
CN201710925004.4A Division CN107545815A (en) 2015-11-30 2015-11-30 A kind of emulation training method of electric energy quality monitoring simulation training system
CN201710925000.6A Division CN107610543A (en) 2015-11-30 2015-11-30 A kind of electric energy quality monitoring simulation training system
CN201710813345.2A Division CN107633748A (en) 2015-11-30 2015-11-30 The emulation training method of electric energy quality monitoring simulation training system

Publications (2)

Publication Number Publication Date
CN105303922A CN105303922A (en) 2016-02-03
CN105303922B true CN105303922B (en) 2017-12-01

Family

ID=55201112

Family Applications (5)

Application Number Title Priority Date Filing Date
CN201710813756.1A Pending CN107358832A (en) 2015-11-30 2015-11-30 Electric energy quality monitoring simulation training system
CN201710925004.4A Withdrawn CN107545815A (en) 2015-11-30 2015-11-30 A kind of emulation training method of electric energy quality monitoring simulation training system
CN201710925000.6A Withdrawn CN107610543A (en) 2015-11-30 2015-11-30 A kind of electric energy quality monitoring simulation training system
CN201510863660.7A Expired - Fee Related CN105303922B (en) 2015-11-30 2015-11-30 Electric energy quality monitoring simulation training system and its Training Methodology
CN201710813345.2A Withdrawn CN107633748A (en) 2015-11-30 2015-11-30 The emulation training method of electric energy quality monitoring simulation training system

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201710813756.1A Pending CN107358832A (en) 2015-11-30 2015-11-30 Electric energy quality monitoring simulation training system
CN201710925004.4A Withdrawn CN107545815A (en) 2015-11-30 2015-11-30 A kind of emulation training method of electric energy quality monitoring simulation training system
CN201710925000.6A Withdrawn CN107610543A (en) 2015-11-30 2015-11-30 A kind of electric energy quality monitoring simulation training system

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710813345.2A Withdrawn CN107633748A (en) 2015-11-30 2015-11-30 The emulation training method of electric energy quality monitoring simulation training system

Country Status (1)

Country Link
CN (5) CN107358832A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952518A (en) * 2017-05-11 2017-07-14 武汉大学 A kind of therrmodynamic system real-time simulation tutoring system based on smart mobile phone
CN110749767B (en) * 2019-10-31 2020-07-10 四川大学 Voltage sag monitoring device configuration method considering network topology dynamic reconstruction
CN112904156A (en) * 2021-01-19 2021-06-04 重庆邮电大学 Fault arc detection method based on frequency domain classification

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6771957B2 (en) * 2001-11-30 2004-08-03 Interdigital Technology Corporation Cognition models for wireless communication systems and method and apparatus for optimal utilization of a radio channel based on cognition model data
JP2005157028A (en) * 2003-11-27 2005-06-16 Toshiba Corp Simulator for plant operation training and program therefor
CN101303706A (en) * 2008-07-01 2008-11-12 中国电子科技集团公司第三十研究所 Method and system for sharing data between modeling tool and simulation tool
CN201255753Y (en) * 2008-09-05 2009-06-10 湖南大学 Electricity energy quality monitoring and analysis system based on network
CN102053202B (en) * 2009-11-10 2013-06-05 北京博电新力电气股份有限公司 Smart grid-oriented power quality monitoring system and method
CN201897857U (en) * 2010-08-27 2011-07-13 徐培龙 Locating early-warning monitoring system for forest fire prevention
CN102324184B (en) * 2011-05-27 2014-06-04 迈锐数据(北京)有限公司 Vehicle detecting system
CN102522015B (en) * 2011-11-28 2013-11-13 上海欣方智能系统有限公司 Remote training system based on mobile Internets and working method thereof
CN102637151A (en) * 2011-12-19 2012-08-15 上海华御信息技术有限公司 Cloud architecture based virtual safety U-disk system
CN103035139B (en) * 2012-11-28 2015-01-21 湖州电力局 Simulating training system and training method thereof for distribution network cable line inspection tour
CN103581202B (en) * 2013-11-19 2016-06-01 上海众人网络安全技术有限公司 The trade company of identity-based authentication platform makes board cross-certification method
CN103916939A (en) * 2014-03-10 2014-07-09 重庆邮电大学 Wireless chain-type transmission system
CN104299464B (en) * 2014-10-30 2016-08-17 国家电网公司 Electric power safety technical ability simulation training system
CN204740299U (en) * 2014-12-19 2015-11-04 国网电力科学研究院 Electric energy quality intelligent monitoring system based on cloud calculates
CN105071531B (en) * 2015-07-17 2017-07-25 云南电网有限责任公司电力科学研究院 A kind of Internet of Things electricity quality intelligent monitoring governing system
CN105070052B (en) * 2015-07-17 2017-11-03 袁丽 Wireless communication system and method for intelligent traffic monitoring

Also Published As

Publication number Publication date
CN107633748A (en) 2018-01-26
CN107610543A (en) 2018-01-19
CN107358832A (en) 2017-11-17
CN105303922A (en) 2016-02-03
CN107545815A (en) 2018-01-05

Similar Documents

Publication Publication Date Title
CN105301416B (en) Equipment for monitoring power quality and its monitoring method
Chen et al. Implementing a real-time cyber-physical system test bed in RTDS and OPNET
Monteiro et al. Optical radio convergence infrastructure for communications and power delivering (ORCIP)
CN105303922B (en) Electric energy quality monitoring simulation training system and its Training Methodology
Zhao et al. A service migration strategy based on multiple attribute decision in mobile edge computing
CN107819645A (en) A kind of Internet of Things method of testing based on software emulation
CN107888613B (en) Management system based on cloud platform
CN107094091B (en) A kind of intelligent substation station level network configuration method of calibration and system
CN106230993A (en) The security protection compliance data acquisition method of electric power monitoring system and system
CN105873057A (en) Pseudo base station protection method and system
Yohanandhan et al. A holistic review on Cyber-Physical Power System (CPPS) testbeds for secure and sustainable electric power grid–Part–II: Classification, overview and assessment of CPPS testbeds
Darwish et al. Vulnerability Assessment and Experimentation of Smart Grid DNP3.
CN105516277B (en) Monitoring method for power grid electrical equipment temperature monitoring device
CN105657857B (en) Wireless network connecting method and device
CN106936658A (en) The method of testing and test platform of test case, simulation test equipment
CN110429713B (en) Centralized meter reading equipment fault diagnosis system based on terminal
CN105488279B (en) Power grid electrical equipment temperature measures simulation training system and its Training Methodology
CN104125605B (en) A kind of implementation method and device for asking to set up WIFI connections
CN109547064A (en) Platform area identifying system
Lin et al. Joint wireless-optical infrastructure deployment and layout planning for cloud-radio access networks
CN106789165A (en) The network configuration system and method for a kind of batch cloud terminal device
CN205883229U (en) Radio station data transmission trainer
Liu et al. The real-time co-simulation platform with hardware-in-loop for cyber-attack in smart grid
Chen et al. Design and practice of virtual simulation experiment for broadband wireless communication
CN105281985B (en) The querying method of electric energy quality monitoring net state inquiry system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Chen Guodong

Inventor after: Chen Jinqi

Inventor after: Dong Run

Inventor before: Zeng Zhengyang

TA01 Transfer of patent application right

Effective date of registration: 20170825

Address after: 18 No. 311800 Zhejiang province Zhuji City Fengqiao town Busen Avenue

Applicant after: Chen Guodong

Address before: 315113 Zhejiang city of Ningbo province Yinzhou District east Wu Town Road No. 58

Applicant before: Zeng Zhengyang

TA01 Transfer of patent application right
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xu Zhongping

Inventor after: Hu Jingui

Inventor after: Huang Kai

Inventor after: Li Donghua

Inventor after: Li Xin

Inventor after: Liang Kun

Inventor before: Chen Guodong

Inventor before: Chen Jinqi

Inventor before: Dong Run

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171108

Address after: 100089 B209 room, 1 floor, building 8, No. 29 northeast West Road, Zhongguancun Software Park, Beijing, Haidian District

Applicant after: BEIJING NETSTONE ACCENTURE INFORMATION TECHNOLOGY CO., LTD.

Address before: 18 No. 311800 Zhejiang province Zhuji City Fengqiao town Busen Avenue

Applicant before: Chen Guodong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171201

Termination date: 20181130

CF01 Termination of patent right due to non-payment of annual fee