- CN105299132B CN105299132B CN201510666406.8A CN201510666406A CN105299132B CN 105299132 B CN105299132 B CN 105299132B CN 201510666406 A CN201510666406 A CN 201510666406A CN 105299132 B CN105299132 B CN 105299132B
- Authority
- CN
- China
- Prior art keywords
- glue groove
- vibration isolation
- active vibration
- isolation arrangement
- micro
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of micro-vibration active vibration isolation arrangement installation connecting element and its installation method disclosed by the invention, wherein, micro-vibration active vibration isolation arrangement installation connecting element successively include: from top to bottom on fill glue groove, active vibration isolation arrangement and under fill glue groove, on fill glue groove and under fill in glue groove to be respectively welded filled with structure glue and by the first leveling bolt and be fixed to upper embedded board and lower embedded board, the upper plate and lower plate of active vibration isolation arrangement are respectively welded by the second leveling bolt is fixed to the upper junction plate that the lower connecting plate for filling glue groove fills glue groove under.The present invention is by being arranged upper built-in fitting and lower built-in fitting, and the step of being encapsulated using installation, leveling, fixation and encapsulating from bottom to top, is constructed, installation connection can be carried out to the active vibration isolation arrangement of various models in micro-vibration active control system, efficiently solved the problems, such as various as caused by delicate nature in various active vibration isolation arrangement installation processes.
Description
Technical field
The present invention relates to a kind of micro-vibration active vibration isolation arrangement installation connecting element and its installation methods.
Background technique
At present in micro-vibration active control system, active control device installation is directly connected to micro-vibration active control system
In system, the installation of active control device connection is non-dismountable, such as encounter problems after building up can only overall pulling down reconstruct, this
Sample causes inconvenient and waste to engineering, and in the controller installing engineering of various large-scale vibrating control systems, this problem is especially
Seriously, in addition, various active vibration isolation arrangements are such as not easy to adjust during the installation process due to the various problems that delicate nature will also result in
Flat, height difference problem, restricted problem and efficiency etc..
Summary of the invention
To solve the above-mentioned problems, the present invention provides a kind of micro-vibration active vibration isolation arrangement installation connecting element, from up to
Under successively include: on fill glue groove, active vibration isolation arrangement and under fill glue groove, above fill glue groove and under fill in glue groove filled with structure glue and logical
It crosses the first leveling bolt and is respectively welded and be fixed to embedded board and lower embedded board, the upper plate and lower plate of active vibration isolation arrangement are logical
Cross the second leveling bolt be respectively welded be fixed to the lower connecting plate for filling glue groove and under fill the upper junction plate of glue groove.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, distributing installation is in micro-vibration active control system
In passive vibration isolation device between.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein upper embedded board and lower embedded board difference
Pre-buried supreme concrete structure and lower concrete structure.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein the first leveling bolt fills glue groove upper
The quantity filled in glue groove under or is at least 3.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein the first leveling bolt angular distribution exists
On fill glue groove or under fill in glue groove.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein the second leveling bolt is in active vibration isolation
The upper plate of device or the quantity on lower plate are at least 4.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein the second leveling bolt distributed rectangular exists
On the upper plate or lower plate of active vibration isolation arrangement.
The present invention also provides a kind of installation methods of micro-vibration active vibration isolation arrangement installation connecting element, upper pre- by being arranged
Embedded part and lower built-in fitting, and the step of being encapsulated using installation, leveling, fixation and encapsulating from bottom to top.
According to a kind of above-mentioned installation method of micro-vibration active vibration isolation arrangement installation connecting element, comprising the following steps:
Step 1: filling glue groove under installation, the first leveling bolt is first soldered to lower embedded board, then will process down and fills
The connecting plate of glue groove adjusts connecting plate position by the first leveling bolt, and upper junction plate height is adjusted to design height, then
The nut of first leveling bolt on upper junction plate is leveled and positioned;
Step 2: filling glue groove under fixed, and glue groove is filled under and carries out encapsulating, after structure glue solidification has intensity, under detection
The upper junction plate flatness and absolute altitude of glue groove are filled, is welded the leveling nut of the first leveling bolt and bolt weld all around after qualified;
Step 3: installation positioning active vibration isolation arrangement pacifies the lower plate of active vibration isolation arrangement by the second leveling bolt
It is mounted in down on the upper junction plate for filling glue groove, the second leveling bolt is leveled and fixed;
Step 4: glue groove is filled in installation positioning, the first leveling bolt is first connected to upper embedded board, is filled under glue groove by
Connecting plate is connect with active vibration isolation arrangement, is leveled and fixed by the second leveling bolt, determines that the first leveling bolt fills glue upper
The lower connecting plate of slot positions, and the first leveling bolt is fixed with the lower connecting plate spot welding for above filling glue groove;
Step 5: filling glue groove on fixed, takes out active vibration isolation arrangement, filled by the first leveling bolt of glue groove with it is upper pre-buried
Plate is fully welded fixation;
Step 6: active vibration isolation arrangement is reinstalled to be located in down and fills glue groove by installation positioning active vibration isolation arrangement again
It above fills between glue groove, passive vibration isolation device and active vibration isolation arrangement is inflated jointly, rise pedestal repeatedly, by adjusting above filling
The adjusting nut of first leveling bolt of glue groove ensures that all active vibration isolation arrangements are carried by design value;
Step 7: filling glue groove on fixed, after adjustment, fill glue groove by and filled with structure glue, solidifies and has to structure glue
The lower connecting plate flatness and absolute altitude of glue groove are filled after having intensity, in detection, enclose the leveling nut of the first leveling bolt after qualified
Weldering is welded.
According to a kind of above-mentioned installation method of micro-vibration active vibration isolation arrangement installation connecting element, after completing the step 7,
Whole micro-vibration active control system is tested for the property.
Beneficial effect
A kind of micro-vibration active vibration isolation arrangement installation connecting element and its installation method disclosed by the invention, it is upper pre- by being arranged
Embedded part and lower built-in fitting, and the step of being encapsulated using installation, leveling, fixation and encapsulating from bottom to top is constructed, it can be right
The active vibration isolation arrangement of various models carries out installation connection in micro-vibration active control system, efficiently solve various actives every
The various problems as caused by delicate nature in vibrating device installation process, be such as not easy to level, height difference problem, restricted problem and
Efficiency etc..Especially suitable for the controller installing engineering of other various large-scale vibrating control systems, have quickly, stablize,
Accurately, easy-operating feature, and flush type construction can be carried out according to actual needs, realize recycling, embedded part replacement, two
The functions such as secondary reparation.
Detailed description of the invention
Fig. 1 is a kind of structure chart of micro-vibration active vibration isolation arrangement installation connecting element disclosed by the invention;
Fig. 2 is a kind of side view of micro-vibration active vibration isolation arrangement installation connecting element disclosed by the invention;
Fig. 3 is a kind of scheme of installation of micro-vibration active vibration isolation arrangement installation connecting element disclosed by the invention.
Specific embodiment
Present invention is further described in detail in the following with reference to the drawings and specific embodiments, but not as to limit of the invention
It is fixed.
Fig. 1 is a kind of structure chart of micro-vibration active vibration isolation arrangement installation connecting element disclosed by the invention, and Fig. 2 is the present invention
A kind of side view of disclosed micro-vibration active vibration isolation arrangement installation connecting element, as depicted in figs. 1 and 2, the present invention provides one
Kind of micro-vibration active vibration isolation arrangement installation connecting element, successively include: from top to bottom on fill glue groove 01, active vibration isolation arrangement 02 and under
Glue groove 03 is filled, Fig. 3 is a kind of scheme of installation of micro-vibration active vibration isolation arrangement installation connecting element disclosed by the invention, such as Fig. 3
It is shown, above fill glue groove 01 and under fill in glue groove 03 be respectively welded filled with structure glue and by the first leveling bolt 04 be fixed to it is upper pre-
Buried plate 05 and lower embedded board 06, the upper plate 07 and lower plate 08 of active vibration isolation arrangement 02 are welded respectively by the second leveling bolt 09
It connects and is fixed to the upper junction plate 11 that the lower connecting plate 10 for filling glue groove 01 fills glue groove 03 under.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, distributing installation is in micro-vibration active control system
Between passive vibration isolation device in system.
As shown in figure 3, according to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein upper 05 He of embedded board
Lower embedded board 06 distinguishes pre-buried supreme concrete structure 12 and lower concrete structure 13.
As shown in Figure 1, according to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein the first leveling bolt
04 it is upper fill glue groove 01 or under fill the quantity in glue groove 03 and be at least 3.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein 04 angular distribution of the first leveling bolt
It is upper fill glue groove 01 or under fill in glue groove 03.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein the second leveling bolt 09 active every
The upper plate 07 of vibrating device 02 or the quantity on lower plate 08 are at least 4.
According to a kind of above-mentioned micro-vibration active vibration isolation arrangement installation connecting element, wherein 09 distributed rectangular of the second leveling bolt
On the upper plate 07 or lower plate 08 of active vibration isolation arrangement 02.
As shown in figure 3, leading to the present invention also provides a kind of installation method of micro-vibration active vibration isolation arrangement installation connecting element
Cross the upper built-in fitting 05 of setting and lower built-in fitting 06, and the step of encapsulating using installation, leveling, fixation and encapsulating from bottom to top.
According to a kind of above-mentioned installation method of micro-vibration active vibration isolation arrangement installation connecting element, comprising the following steps:
Step 1: filling glue groove 03 under installation, the first leveling bolt 04 is first soldered to lower embedded board 06, then will be processed
Under fill the connecting plate of glue groove 03 connecting plate position adjusted by the first leveling bolt 04, under fill glue groove 03 upper junction plate 11 it is high
Degree is adjusted to design height, and the nut that the first leveling bolt 04 on the upper junction plate 11 of glue groove 03 is then filled under levels
And positioning;
Step 2: filling glue groove 03 under fixed, and glue groove 03 is filled under and carries out encapsulating, after structure glue solidification has intensity, inspection
11 flatness of upper junction plate and absolute altitude of glue groove 03 are filled under survey, enclose the leveling nut of the first leveling bolt 04 and bolt after qualified
Weldering is welded;
Step 3: the lower plate 08 of active vibration isolation arrangement 02 is passed through the second leveling by installation positioning active vibration isolation arrangement 02
Bolt 09 is mounted on down on the upper junction plate 11 for filling glue groove 03, and the second leveling bolt 09 is leveled and fixed;
Step 4: glue groove 01 is filled in installation positioning, the first leveling bolt 04 is first connected to upper embedded board 05, glue is filled by
The lower connecting plate 10 of slot 01 is connect with active vibration isolation arrangement 02, is leveled and fixed by the second leveling bolt 09, determines the first tune
The lower connecting plate 10 that flat bolt 04 fills glue groove 01 upper positions, by the first leveling bolt 04 and the lower connecting plate 10 that above fills glue groove 01
Spot welding is fixed;
Step 5: filling glue groove 01 on fixed, take out active vibration isolation arrangement 02, the first leveling bolt 04 of glue groove 01 is filled by
Fixation is fully welded with upper embedded board 05;
Step 6: active vibration isolation arrangement 02 is reinstalled to be located in down and be filled by installation positioning active vibration isolation arrangement 02 again
Glue groove 03 and on fill between glue groove 01, passive vibration isolation device (not shown) and active vibration isolation arrangement 02 are inflated jointly, instead
Pedestal is risen again, ensures all active vibration isolation arrangements by adjusting the adjusting nut of the first leveling bolt 04 for above filling glue groove 01
02 is carried by design value;
Step 7: filling glue groove 01 on fixed, after adjustment, glue groove 01 filled by and is filled with structure glue, is gelled to structure
Fill 10 flatness of lower connecting plate and absolute altitude of glue groove 01 in detection after admittedly there is intensity, it is qualified after by the first leveling bolt 04
Leveling nut weld all around is welded.
According to a kind of above-mentioned installation method of micro-vibration active vibration isolation arrangement installation connecting element, after completing the step 7,
Whole micro-vibration active control system is tested for the property.
The above is only the preferable embodiment of the present invention, not does in any form to technical solution of the present invention
Limitation.Any simple modification, form variation and modification are made to above embodiments according to the technical essence of the invention, fallen
Enter protection scope of the present invention.
Claims (9)
1. a kind of micro-vibration active vibration isolation arrangement installation connecting element, it is characterised in that: the micro-vibration active vibration isolation arrangement installation
Connector successively include: from top to bottom on fill glue groove, active vibration isolation arrangement and under fill glue groove, it is described on fill glue groove and under fill glue groove
Interior be respectively welded filled with structure glue and by the first leveling bolt is fixed to upper embedded board and lower embedded board, the active vibration isolation dress
The upper plate and lower plate set be respectively welded by the second leveling bolt be fixed to the lower connecting plate for filling glue groove and under fill glue groove
Upper junction plate.
2. a kind of micro-vibration active vibration isolation arrangement installation connecting element according to claim 1, it is characterised in that: micro- vibration
Dynamic active vibration isolation arrangement installation connecting element distributing installation is between the passive vibration isolation device in micro-vibration active control system.
3. a kind of micro-vibration active vibration isolation arrangement installation connecting element according to claim 1, it is characterised in that: described pre-
Buried plate and the lower embedded board distinguish pre-buried supreme concrete structure and lower concrete structure.
4. a kind of micro-vibration active vibration isolation arrangement installation connecting element according to claim 1, it is characterised in that: described first
Leveling bolt it is upper fill glue groove or under fill the quantity in glue groove and be at least 3.
5. a kind of micro-vibration active vibration isolation arrangement installation connecting element according to claim 4, it is characterised in that: described first
Leveling bolt angular distribution it is upper fill glue groove or under fill in glue groove.
6. a kind of micro-vibration active vibration isolation arrangement installation connecting element according to claim 1, it is characterised in that: described second
Quantity of the leveling bolt on the upper plate or lower plate of active vibration isolation arrangement is at least 4.
7. a kind of micro-vibration active vibration isolation arrangement installation connecting element according to claim 6, it is characterised in that: described second
Leveling bolt distributed rectangular is on the upper plate or lower plate of active vibration isolation arrangement.
8. a kind of installation method of micro-vibration active vibration isolation arrangement installation connecting element, it is characterised in that: the method passes through setting
Upper built-in fitting and lower built-in fitting, and the step of being encapsulated using installation, leveling, fixation and encapsulating from bottom to top;
Wherein: the step of installation, leveling, fixed and encapsulating encapsulate includes:
Step 1: filling glue groove under installation, the first leveling bolt is first soldered to lower embedded board, then will process down and fills glue groove
Upper junction plate upper junction plate position is adjusted by the first leveling bolt, upper junction plate height adjusts to design height, then
The leveling nut of first leveling bolt on upper junction plate is leveled and positioned;
Step 2: filling glue groove under fixed, and glue groove is filled under and carries out encapsulating, after structure glue solidification has intensity, fills glue under detection
The leveling nut of first leveling bolt and bolt weld all around are welded by the upper junction plate flatness and absolute altitude of slot after qualified;
Step 3: the lower plate of active vibration isolation arrangement is mounted on by installation positioning active vibration isolation arrangement by the second leveling bolt
Under fill on the upper junction plate of glue groove, the second leveling bolt is leveled and is fixed;
Step 4: glue groove is filled in installation positioning, the first leveling bolt is first connected to upper embedded board, the lower connection of glue groove is filled by
Plate connect, levels with active vibration isolation arrangement by the second leveling bolt and fixation, determines first leveling bolt in upper glue groove of filling
The position of lower connecting plate fixes the first leveling bolt with the lower connecting plate spot welding for above filling glue groove;
Step 5: filling glue groove on fixed, takes out active vibration isolation arrangement, and the first leveling bolt and upper embedded board that glue groove is filled by expire
Solid welding is fixed;
Step 6: active vibration isolation arrangement is reinstalled to be located in down and fills glue groove and upper by installation positioning active vibration isolation arrangement again
It fills between glue groove, passive vibration isolation device and active vibration isolation arrangement is inflated jointly, rise pedestal repeatedly, by adjusting glue groove is above filled
The leveling nut of the first leveling bolt ensure that all active vibration isolation arrangements are carried by design value;
Step 7: filling glue groove on fixed, after adjustment, fill glue groove by and filled with structure glue, has to structure glue solidification strong
The lower connecting plate flatness and absolute altitude of glue groove are filled after degree, in detection, weld the leveling nut weld all around of the first leveling bolt after qualified
Extremely.
9. a kind of installation method of micro-vibration active vibration isolation arrangement installation connecting element according to claim 8, feature exist
In: after completing the step 7, whole micro-vibration active control system is tested for the property.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510666406.8A CN105299132B (en) | 2015-10-15 | 2015-10-15 | A kind of micro-vibration active vibration isolation arrangement installation connecting element and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510666406.8A CN105299132B (en) | 2015-10-15 | 2015-10-15 | A kind of micro-vibration active vibration isolation arrangement installation connecting element and its installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105299132A CN105299132A (en) | 2016-02-03 |
CN105299132B true CN105299132B (en) | 2019-05-17 |
Family
ID=55196754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510666406.8A Active CN105299132B (en) | 2015-10-15 | 2015-10-15 | A kind of micro-vibration active vibration isolation arrangement installation connecting element and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105299132B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677557B (en) * | 2017-03-10 | 2019-03-12 | 中国机械工业集团有限公司 | A kind of support protection structure and construction technology rising top replacement large-scale air spring |
CN109827033B (en) * | 2018-12-28 | 2021-12-17 | 中国机械工业集团有限公司 | Towering type suspension micro-vibration equipment construction structure and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3507123A (en) * | 1967-09-06 | 1970-04-21 | Seibu Gomu Kagaku Kk | Fender for dock wall |
CN202323689U (en) * | 2011-11-24 | 2012-07-11 | 江苏扬州合力橡胶制品有限公司 | Vibration isolation rubber support seat |
CN203731022U (en) * | 2014-02-28 | 2014-07-23 | 南车玉柴四川发动机股份有限公司 | Installation and debugging system for high-power diesel generating set |
CN104376972A (en) * | 2014-11-24 | 2015-02-25 | 中国电力工程顾问集团西南电力设计院 | 500kV transformer shock insulation structure and installation method |
CN205089892U (en) * | 2015-10-15 | 2016-03-16 | 中国电子工程设计院 | Little vibration initiative isolation mounting erection joint spare |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101497009B1 (en) * | 2007-10-23 | 2015-02-27 | 각코 호진 도쿄 덴키 다이가쿠 | Seismic isolation system and seismic isolation structure |
-
2015
- 2015-10-15 CN CN201510666406.8A patent/CN105299132B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3507123A (en) * | 1967-09-06 | 1970-04-21 | Seibu Gomu Kagaku Kk | Fender for dock wall |
CN202323689U (en) * | 2011-11-24 | 2012-07-11 | 江苏扬州合力橡胶制品有限公司 | Vibration isolation rubber support seat |
CN203731022U (en) * | 2014-02-28 | 2014-07-23 | 南车玉柴四川发动机股份有限公司 | Installation and debugging system for high-power diesel generating set |
CN104376972A (en) * | 2014-11-24 | 2015-02-25 | 中国电力工程顾问集团西南电力设计院 | 500kV transformer shock insulation structure and installation method |
CN205089892U (en) * | 2015-10-15 | 2016-03-16 | 中国电子工程设计院 | Little vibration initiative isolation mounting erection joint spare |
Also Published As
Publication number | Publication date |
---|---|
CN105299132A (en) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105299132B (en) | A kind of micro-vibration active vibration isolation arrangement installation connecting element and its installation method | |
CN203477777U (en) | Vibration isolation mechanism for leveling platform | |
CN104267756B (en) | Horizontal overlength precision equipment micro-vibration control system | |
CN102900110B (en) | For equipment being installed on method and the device of engineering machinery | |
CN106402261A (en) | Penetration type micro-vibration air spring vibration isolation system | |
CN104899372A (en) | Construction method for highly accelerated stress screening test section by combining simulation and reliability analysis | |
CN205089892U (en) | Little vibration initiative isolation mounting erection joint spare | |
CN101644373A (en) | Method for mounting bedding liner plate of motor foundation plate | |
CN102650135B (en) | Method for leveling embedded parts at bottom of vertical column in sintered ring cooling machine | |
CN204487130U (en) | The adjusting device of centering is installed for equipment | |
CN103624537B (en) | The leveling method installed for equipment and leveller | |
CN104965061A (en) | Assembled type multifunctional model experiment trough | |
CN106812861A (en) | For the lossless vibration absorber and its construction technology of existing steel structure support precision equipment | |
CN106320186B (en) | A kind of skewback embedded anchor bar positioning system and construction method | |
CN104480976A (en) | Visual long-distance wireless monitoring system of pile foundation static loading test | |
JP2017020312A (en) | Steel column leg | |
CN108593420A (en) | It is a kind of can three-dimensional load physical test model casing and its application method | |
CN105485477B (en) | A kind of anti-seismic structure applied to LED sealing machine | |
CN110356558A (en) | Adjustable connecting device for the fixed external pod of helicopter | |
CN207372555U (en) | A kind of device for positioning and supporting for the tailgate that is welded | |
CN207744300U (en) | A kind of dual leveling micromodule pedestal | |
CN206267008U (en) | A kind of precast beam pedestal for prefabricated highway precast beam | |
CN209125205U (en) | Framework connecting flange leveling device | |
CN203891056U (en) | Foundation embedded bolt positioning device of tower crane | |
CN207279164U (en) | A kind of equipment supporter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100840 No. 27, Haidian District, Beijing, Wanshou Road Patentee after: CHINA ELECTRONICS ENGINEERING DESIGN INSTITUTE Co.,Ltd. Address before: 100840 No. 27, Haidian District, Beijing, Wanshou Road Patentee before: CHINA ELECTRONICS ENGINEERING DESIGN INSTITUTE |
|
CP01 | Change in the name or title of a patent holder |