CN105298105A - Scaffold outward projecting net dismounting method - Google Patents

Scaffold outward projecting net dismounting method Download PDF

Info

Publication number
CN105298105A
CN105298105A CN201510607117.0A CN201510607117A CN105298105A CN 105298105 A CN105298105 A CN 105298105A CN 201510607117 A CN201510607117 A CN 201510607117A CN 105298105 A CN105298105 A CN 105298105A
Authority
CN
China
Prior art keywords
net
scaffold
suspension hook
hook
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510607117.0A
Other languages
Chinese (zh)
Other versions
CN105298105B (en
Inventor
麻蒙
车海宝
朱殿奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201510607117.0A priority Critical patent/CN105298105B/en
Publication of CN105298105A publication Critical patent/CN105298105A/en
Application granted granted Critical
Publication of CN105298105B publication Critical patent/CN105298105B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a scaffold outward projecting net dismounting method. The scaffold outward projecting net dismounting method comprises the following steps: providing a tower crane and a lifting hook; lifting the lifting hook to the position of a transverse rod connected to the outer side of the outward projecting net by using the tower crane; providing a pull rod which comprises an operating end and a hooking end with a hook; operating the hook until the hook is hooked to the lifting hook by using the operating end; hooking the lifting hook to the transverse rod; unfastening a fastener through which an inclined strut on the lower side of the outward projecting net is connected with a scaffold and the outward projecting net connected with the scaffold; and hoisting the outward projecting net to the ground through the tower crane connected with the lifting hook. The problem that accidents can be caused when operators require to walk from the inner side of the scaffold to the outer side of the outward projecting net so as to dismount the outward projecting net is solved.

Description

Net method for dismounting is chosen outside scaffold
Technical field
The present invention relates to the realm of building construction, be specifically related to choose net method for dismounting outside a kind of scaffold.
Background technology
Choose net outside scaffold when removing, because operating personnel needs outwards to choose the walking operation of net direction inside scaffold, usually because of safety belt can not high hang be of use or safety belt the measure such as to hang nowhere not in place and cause security incident.
Summary of the invention
For overcoming the defect existing for prior art, now providing outside a kind of scaffold and choosing net method for dismounting, with solve operating personnel outwards need choose inside scaffold the walking of net outside with carry out choose net dismounting operation time and cause the problems such as security incident.
For solving the problem, choosing net method for dismounting outside a kind of scaffold, comprising the following steps: tower crane and suspension hook are provided, by described tower crane, described suspension hook is winched to the outer cross bar place choosing net outside of connection; There is provided pull bar, described pull bar comprises operating side and is provided with the hooking end of hook, utilizes described operating side to operate described hook to link up with in described suspension hook, is hooked in by described suspension hook on described cross bar; Untie fastener that the described outer diagonal brace choosing side off the net is connected with scaffold and be connected with described scaffold describedly choose net outward; Outside described, net handling is chosen to ground by the described tower crane be connected with described suspension hook.
The further improvement of choosing net method for dismounting outside scaffold of the present invention is, described suspension hook is connected to described tower crane by connection cord, after described suspension hook being hooked on described cross bar by the hook on described hooking end, further comprising the steps of: described tower crane slowly rises suspension hook, until described connection cord stretching stressed after, remove described pull bar.
The further improvement of choosing net method for dismounting outside scaffold of the present invention is, until described connection cord stretching stressed after, further comprising the steps of: to determine whether described cross bar is set up continuously; Determine described cross bar be set up continuously when, described cross bar is cut off according to target distance.
The further improvement of choosing net method for dismounting outside scaffold of the present invention is, described target distance is less than or equal to 4m.
The further improvement of choosing net method for dismounting outside scaffold of the present invention is, at least two described suspension hooks be provided and correspond to the pull bar of described suspension hook quantity, by the hook on described hooking end described suspension hook being hooked on described cross bar and specifically comprising: at least two described suspension hooks are synchronously hooked on described cross bar by least two described pull bars.
Beneficial effect of the present invention is, according to choose outside scaffold of the present invention net method for dismounting carry out that dismounting is outer chooses net time, operating personnel stands on scaffold outrigger, and do not need operating personnel inside scaffold, outwards choose the walking operation of net outside, thus avoid high fall accident, solve operating personnel outwards need choose inside scaffold the walking of net outside with carry out choose net dismounting operation time and cause the problems such as security incident.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet choosing net method for dismounting outside scaffold of the present invention.
Fig. 2 chooses tower crane in net method for dismounting to sling the view of suspension hook outside scaffold of the present invention.
Fig. 3 is for choosing the Tiebar structure schematic diagram provided in net method for dismounting outside scaffold of the present invention.
Fig. 4 chooses outside scaffold of the present invention in net method for dismounting to use pull bar that described suspension hook is hooked in the view on described cross bar.
Fig. 5 chooses tower crane in net method for dismounting slowly to rise suspension hook until the stretching stressed view of described connection cord outside scaffold of the present invention.
Fig. 6 chooses the view that in net method for dismounting, cross bar cuts off according to target distance outside scaffold of the present invention.
Fig. 7 chooses the fastener that the diagonal brace of choosing side off the net in net method for dismounting over solution is connected with scaffold and the outer view of choosing net be connected with scaffold outside scaffold of the present invention.
Fig. 8 chooses tower crane in net method for dismounting will to choose outward the view of net handling to ground outside scaffold of the present invention.
Detailed description of the invention
Below by way of specific instantiation, embodiments of the present invention are described, those skilled in the art the content disclosed by this manual can understand other advantages of the present invention and effect easily.The present invention can also be implemented or be applied by detailed description of the invention different in addition, and the every details in this manual also can based on different viewpoints and application, carries out various modification or change not deviating under spirit of the present invention.
It should be noted that, structure, ratio, size etc. that this manual institute accompanying drawings illustrates, content all only in order to coordinate manual to disclose, understand for person skilled in the art scholar and read, and be not used to limit the enforceable qualifications of the present invention, therefore the not technical essential meaning of tool, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting under effect that the present invention can produce and the object that can reach, still all should drop on disclosed technology contents and obtain in the scope that can contain.Simultaneously, quote in this manual as " on ", D score, "left", "right", " centre " and " one " etc. term, also only for ease of understanding of describing, and be not used to limit the enforceable scope of the present invention, the change of its relativeness or adjustment, under changing technology contents without essence, when being also considered as the enforceable category of the present invention.
Please refer to Fig. 1 and composition graphs 2 to Fig. 8, Fig. 1 are the schematic flow sheet choosing net method for dismounting outside scaffold of the present invention, the invention provides outside a kind of scaffold and choose net method for dismounting, comprise the following steps:
S1, provides tower crane 2 and suspension hook 1, by tower crane 2, suspension hook 1 is winched to outer cross bar 4 place chosen outside net 3 of connection.
S2, provides pull bar 5, and pull bar 5 comprises operating side 50 and is provided with the hooking end 51 of hook 52, utilizes operating side 50 to operate hook 52 to link up with in suspension hook 1, is hooked on cross bar 4 by suspension hook 1.
S3, choose over solution fastener that the diagonal brace 6 on the downside of net 3 is connected with scaffold 7 and be connected with scaffold 7 choose net 3 outward.
S4, will choose outward net 3 handling to ground by the tower crane 2 be connected with suspension hook 1.
Concrete, in step sl, as shown in Figure 2, Fig. 2 chooses tower crane in net method for dismounting to sling the view of suspension hook outside scaffold of the present invention, suspension hook 1 quantity provided is at least two, and this city embodiment is described in detail for two suspension hooks 1.The shape of suspension hook 1 can be serpentine suspension hook as shown in Figure 2, and described serpentine suspension hook can be bent by Φ 20 round steel to form.Two suspension hooks 1 are connected on the hanger 20 of tower crane 2 by connection cord 10, and two suspension hooks 1 hang on the below of hanger 20.Connection cord 10 can be wire rope.As shown in Figure 2, after two suspension hooks 1 hang on the below of hanger 20, tower crane 2 is commanded slowly to be risen by two suspension hooks 1 by ground signal work 80, until two suspension hooks 1 winch to connect outer cross bar 4 place chosen outside net 3.
After two suspension hooks 1 winch to outer cross bar 4 place chosen outside net 3 of connection, implementation step S2, the pull bar 5 provided in step s 2 as shown in Figure 3, Fig. 3 is for choosing the Tiebar structure schematic diagram provided in net method for dismounting outside scaffold of the present invention, pull bar 5 comprises operating side 50 and the hooking end 51 relative to operating side 50, hooking end 51 both sides are provided with hook 52, and pull bar 5 can be steel pipe, and two hooks 52 are welded in the both sides of the hooking end 51 of described steel pipe respectively.Next please refer to Fig. 4, Fig. 4 chooses outside scaffold of the present invention in net method for dismounting to use pull bar that described suspension hook is hooked in the view on described cross bar.As shown in Figure 4, the scaffolder 81 stood on scaffold 7 holds the operating side 50 of pull bar 5, and the hooking end 51 of operation operating side 50 is near suspension hook 1, and make the hook 52 on hooking end 51 hook suspension hook 1, then operate operating side 50, toward Zola's pull bar 5, finally make suspension hook 1 be hooked on cross bar 4.Now, as shown in Figure 4, connection cord 10 is in bending state.Wherein, the quantity of pull bar 5 corresponds to the quantity of suspension hook 1, and the quantity of pull bar 5 is also two, and preferably, in step s 2, two suspension hooks 1 are synchronously hooked on cross bar 4 by two pull bars 2.
Next please refer to Fig. 5, Fig. 5 chooses tower crane in net method for dismounting slowly to rise suspension hook until the stretching stressed view of described connection cord outside scaffold of the present invention.Suspension hook 1 is hooked in after on cross bar 4 by pull bar 5, and before implementation step S3, further comprising the steps of: tower crane 2 slowly rises suspension hook 1, until connection cord 10 stretching stressed after, remove pull bar 5.After step S2 completes, as shown in Figure 4, connection cord 10 is in bending state, if now remove pull bar 5, suspension hook 1 easily comes off from cross bar 4, comes off from cross bar 4 to prevent suspension hook 1, hanger 20 under tower crane 2 slowly rises, hanger 20 pulls connection cord 10 toward rising, because suspension hook 1 is hooked on cross bar 4, after hanger 20 rises to certain altitude, as shown in Figure 5, connection cord 10 is in stretching stress, now removes pull bar 5, and suspension hook 1 just not easily comes off from cross bar 4.
Next please refer to Fig. 6, Fig. 6 chooses the view that in net method for dismounting, cross bar cuts off according to target distance outside scaffold of the present invention.After connection cord 10 is in stretching stress, and before implementation step S3, namely choose over solution fastener that the diagonal brace 6 on the downside of net 3 is connected with scaffold 7 and be connected with scaffold 7 outer choose net 3 before, choosing net method for dismounting outside scaffold of the present invention can also comprise the following steps: determine whether cross bar 4 is set up continuously; When determining cross bar 4 for setting up continuously, as shown in Figure 6, cross bar 4 is cut off according to target distance.Described target distance can be less than or equal to 4m, namely determine whether the length of cross bar 4 is greater than described target distance, when the length of cross bar 4 is greater than 4m, as shown in Figure 6, use electric welding machine 9 cross bar 4 to be cut into the length of every section of target distance, such as just cross bar 4 is cut into the length of every section of 4m.It should be noted that, a plurality of suspension hook 1 need be positioned on one section of cross bar 4 to be lifted.
Next, please refer to Fig. 7, Fig. 7 chooses the fastener that the diagonal brace of choosing side off the net in net method for dismounting over solution is connected with scaffold and the outer view of choosing net be connected with scaffold outside scaffold of the present invention.After step S2 completes, as shown in Figure 7, scaffolder 81 and scaffolder's 82 need stand on scaffold 7 outrigger, scaffolder 81 is responsible for removing be connected with scaffold 7 outer and chooses net 3, scaffolder 82 is responsible for removing the outer fastener chosen the diagonal brace 6 on the downside of net 3 and be connected with scaffold 7, choose over solution respectively fastener that the diagonal brace 6 on the downside of net 3 is connected with scaffold 7 and be connected with scaffold 7 outer choose net 3 after, diagonal brace 6 with choose net 3 outward and hang on below cross bar 4.
Finally, please refer to Fig. 8, Fig. 8 chooses tower crane in net method for dismounting will to choose outward the view of net handling to ground outside scaffold of the present invention.After step S3 completes, choose over solution respectively fastener that the diagonal brace 6 on the downside of net 3 is connected with scaffold 7 and be connected with scaffold 7 outer choose net 3 after, namely as shown in Figure 7, commanded by ground signal work 80, tower crane 2 will choose net 3 handling to ground outside this joint, then repeat above-mentioned several step, remainingly outer choose net 3 until remove.Wholely outer choose in net 3 demolishing process, operating personnel stands on scaffold 7 outrigger, and does not need operating personnel outwards to choose inside scaffold 7 to walk outside net 3 operation, thus avoids high fall accident.
Beneficial effect of the present invention is:
According to choose outside scaffold of the present invention net method for dismounting carry out that dismounting is outer chooses net time, operating personnel stands on scaffold outrigger, and do not need operating personnel inside scaffold, outwards choose the walking operation of net outside, thus avoid high fall accident, solve operating personnel outwards need choose inside scaffold the walking of net outside with carry out choose net dismounting operation time and cause the problems such as security incident.
Below embodiment is to invention has been detailed description by reference to the accompanying drawings, and those skilled in the art can make many variations example to the present invention according to the above description.Thus, some details in embodiment should not form limitation of the invention, the present invention by the scope that defines using appended claims as protection domain.

Claims (5)

1. choose a net method for dismounting outside scaffold, it is characterized in that, comprise the following steps:
Tower crane and suspension hook are provided, by described tower crane, described suspension hook are winched to the outer cross bar place choosing net outside of connection;
There is provided pull bar, described pull bar comprises operating side and is provided with the hooking end of hook, utilizes described operating side to operate described hook to link up with in described suspension hook, is hooked in by described suspension hook on described cross bar;
Untie fastener that the described outer diagonal brace choosing side off the net is connected with scaffold and be connected with described scaffold describedly choose net outward;
Outside described, net handling is chosen to ground by the described tower crane be connected with described suspension hook.
2. choose net method for dismounting outside scaffold according to claim 1, it is characterized in that, described suspension hook is connected to described tower crane by connection cord, after described suspension hook being hooked on described cross bar by the hook on described hooking end, further comprising the steps of: described tower crane slowly rises suspension hook, until described connection cord stretching stressed after, remove described pull bar.
3. choose net method for dismounting outside scaffold according to claim 2, it is characterized in that, until described connection cord stretching stressed after, further comprising the steps of: to determine whether described cross bar is set up continuously; Determine described cross bar be set up continuously when, described cross bar is cut off according to target distance.
4. choose net method for dismounting outside scaffold according to claim 3, it is characterized in that, described target distance is less than or equal to 4m.
5. choose net method for dismounting outside scaffold according to claim 1, it is characterized in that, at least two described suspension hooks be provided and correspond to the pull bar of described suspension hook quantity, by the hook on described hooking end described suspension hook being hooked on described cross bar and specifically comprising: at least two described suspension hooks are synchronously hooked on described cross bar by least two described pull bars.
CN201510607117.0A 2015-09-22 2015-09-22 Net method for dismounting is chosen outside scaffold Active CN105298105B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510607117.0A CN105298105B (en) 2015-09-22 2015-09-22 Net method for dismounting is chosen outside scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510607117.0A CN105298105B (en) 2015-09-22 2015-09-22 Net method for dismounting is chosen outside scaffold

Publications (2)

Publication Number Publication Date
CN105298105A true CN105298105A (en) 2016-02-03
CN105298105B CN105298105B (en) 2017-07-21

Family

ID=55195855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510607117.0A Active CN105298105B (en) 2015-09-22 2015-09-22 Net method for dismounting is chosen outside scaffold

Country Status (1)

Country Link
CN (1) CN105298105B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10184037A (en) * 1996-12-25 1998-07-14 Ishii Iron Works Co Ltd Construction method of water-containing type gas holder
JP2010101163A (en) * 2009-12-04 2010-05-06 Yuji Sakurai Working platform disassembling method
CN102444203A (en) * 2011-09-15 2012-05-09 浙江城建建设集团有限公司 High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN102650170A (en) * 2012-05-03 2012-08-29 中国十七冶集团有限公司 Vibration-free cutting method for equipment concrete foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10184037A (en) * 1996-12-25 1998-07-14 Ishii Iron Works Co Ltd Construction method of water-containing type gas holder
JP2010101163A (en) * 2009-12-04 2010-05-06 Yuji Sakurai Working platform disassembling method
CN102444203A (en) * 2011-09-15 2012-05-09 浙江城建建设集团有限公司 High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN102650170A (en) * 2012-05-03 2012-08-29 中国十七冶集团有限公司 Vibration-free cutting method for equipment concrete foundation

Also Published As

Publication number Publication date
CN105298105B (en) 2017-07-21

Similar Documents

Publication Publication Date Title
CN105443871B (en) A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN103883129B (en) A kind of steel structural roof beam installation method
CN105275253A (en) Equal-diameter rod erecting device and application method thereof
CN203639011U (en) Safety climbing channel for sized tower crane for building engineering
CN102168483B (en) Flexible construction platform of suspension cable
CN204454235U (en) A kind of novel many suspension centres equalizing bar device
CN201703776U (en) Inverted lifting device of storage tank
CN103395688A (en) Method for hoisting self-release vertical upright rod and special lifting tool
CN105298105A (en) Scaffold outward projecting net dismounting method
CN202530736U (en) Steel wire rope operating platform for building
CN203781631U (en) Sling system for integral slinging of thin-wall equipment
CN203699679U (en) Lifting appliance for lifting wire coil
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN202689529U (en) Deformation-joint steel flying die template
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN206667594U (en) A kind of hanging apparatus of steel core concrete column
CN207296454U (en) Edge protection system
CN207582981U (en) Building bar lifts auxiliary tool
CN106915686B (en) A kind of device for auxiliary hanging lifting scaffold steel pipe
CN210064888U (en) Roof panel lifting device
CN205990172U (en) A kind of multi-functional lifting balance beam structure
CN204643648U (en) Pylon and hanging basket thereof
KR200477538Y1 (en) Safety rope holder
CN211310552U (en) Protection device for hoisting large part
CN215974552U (en) Panel hoisting frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant