CN105297740B - A kind of FRP plate belt foundation pit enclosure structure carries out the construction method of pattern foundation pit supporting structure - Google Patents
A kind of FRP plate belt foundation pit enclosure structure carries out the construction method of pattern foundation pit supporting structure Download PDFInfo
- Publication number
- CN105297740B CN105297740B CN201510638274.8A CN201510638274A CN105297740B CN 105297740 B CN105297740 B CN 105297740B CN 201510638274 A CN201510638274 A CN 201510638274A CN 105297740 B CN105297740 B CN 105297740B
- Authority
- CN
- China
- Prior art keywords
- pile tube
- pile
- foundation pit
- frp
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The invention discloses a kind of FRP plate belt foundation pit enclosure structure and construction method, pattern foundation pit supporting structure is realized installed in foundation ditch surrounding, including along pattern foundation pit supporting structure line setting, draw hole insertion using pile tube made by FRP reinforcements, described three one group of composition supporting pile bodies of pile tube, pile tube position at the top of pile tube and at excavation of foundation pit deep bottom, is respectively equipped with holding pile tube and supports the hoop of three root canal piles to lock, and being intertwined and connected between the front side pile tube of supporting pile body has FRP band cloth.The present invention adopts FRP pile tubes, by arranging hoop lock, stull and constraint are formed to support pile body, supporting construction is more stable, FRP band cloth plays preferably gear soil effect, so as to pattern foundation pit supporting structure type can be enriched, expand the pattern foundation pit supporting structure range of choice, shorten the construction period, realize energy-saving, pattern foundation pit supporting structure form also can expand to spatial model from conventional plane mode, effectively increase the rigidity of supporting construction, realize the safety and stability of base pit engineering.
Description
Technical field
The present invention relates to construction engineering technical field, especially one kind carry out base using FRP plate belt foundation pit enclosure structure
The construction method of hole supporting.
Background technology
In base pit engineering, the appropriate design of retaining design is the problem of core the most.It is main that current base pit engineering goes along with sb. to guard him pattern
Using steel sheet pile, reinforced concrete sheet pile, cast-in-situ bored pile barricade, diaphram wall, Deep-stirred Soil-cement Gravity Retaining Wall
Soil nail wall and composite soil nailing wall etc..These structural systems ensure that the good engineering support of pile foundation to a certain extent, however,
Its engineering material consumes big, and the engineering construction cycle is longer, and environmental pollution is serious so that under the overall situation of energy-saving and emission-reduction, various
Support technology is required for further improving.
The content of the invention
The technical problem to be solved in the present invention is:Overcome the deficiency in prior art, there is provided a kind of FRP plate belt foundation ditch encloses
Protection structure and construction method, with abundant supporting construction type, realize the material economy of base pit engineering, shorten construction period, reach
Energy-saving purpose.
The technical solution adopted for the present invention to solve the technical problems is:A kind of FRP plate belt foundation pit enclosure structure, installs
Pattern foundation pit supporting structure is realized in foundation ditch surrounding, including along pattern foundation pit supporting structure line setting, draw hole insertion and manage using made by FRP reinforcements
Stake, described three one group of composition supporting pile bodies of pile tube, the pile tube position at the top of pile tube and at excavation of foundation pit deep bottom,
It is respectively equipped with holding pile tube and supports the hoop of three root canal piles to lock, being intertwined and connected between the front side pile tube of supporting pile body there are FRP bands
Cloth.
Further, described hoop lock includes, around the stirrup for clamping pile tube, support three being connected between described stirrup
The triangle batten plate of root canal pile.
A kind of construction method that pattern foundation pit supporting structure is carried out using above-mentioned FRP plate belt foundation pit enclosure structure, with following steps:
A, along pattern foundation pit supporting structure line setting, mechanical equivalent of light excavation is into gathering sill;
After b, guide groove positioning, draw hole pitching pile and insert the pile tube that three FRP reinforcements make;
After c, pile tube implantation stratum, fixed using hoop lock at the top of three root canal piles, first stirrup is clamped per root canal pile, then
Three stirrup connections are supported into pile tube with triangle batten plate, the supporting pile body of three combinations is consequently formed;
D, repetition b, step c, supporting pile body is progressively deployed;
E, foundation ditch side are excavated, while FRP band cloth is wrapped between the front side pile tube of supporting pile body;
F, excavate in place after, the local cleaning soil body, repeat step c, with hoop at the pile tube position at cutting depth bottom
Lock is by the pile tube in excavation of foundation pit face support locking;
G, finally enclose to form FRP plate belt foundation pit supporting system.
The invention has the beneficial effects as follows:The present invention adopts FRP pile tubes, by arranging hoop lock, forms stull to support pile body
And constraint, supporting construction is more stable, while FRP band cloth plays preferably gear soil effect, so as to pattern foundation pit supporting structure type can be enriched,
Expand the pattern foundation pit supporting structure range of choice, shorten the construction period, realize energy-saving, promote Sustainable Construction Industry, while by base
Hole support form expands to spatial model from conventional plane mode, strengthens the globality of supporting construction, effectively increases and props up
The rigidity of protection structure, realizes the safety and stability of base pit engineering.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the mounting vertical plane structural representation of the present invention.
Fig. 2 is the mounting plane structural representation of the present invention.
Fig. 3 is the structural representation of hoop lock of the present invention.
5. triangle batten plate of the hoop of 1. pile tube 2. lock 3.FRP bands 4. stirrup of cloth, 6. foundation ditch in figure
Specific embodiment
Presently in connection with accompanying drawing and preferred embodiment, the present invention is further illustrated.These accompanying drawings are simplified signal
Figure, only illustrates the basic structure of the present invention in a schematic way, therefore which only shows the composition relevant with the present invention.
A kind of FRP plate belt foundation pit enclosure structure as shown in FIG. 1 to 3, realizes foundation ditch installed in 6 surrounding of foundation ditch
Shield, adopts pile tube 1 made by FRP reinforcements, described pile tube 1 three including hole insertion along 6 supporting line setting of foundation ditch, is drawn
One group of composition supporting pile body, 1 position of pile tube at the top of pile tube 1 and at 6 cutting depth bottom of foundation ditch is respectively equipped with holding pipe
Stake 1 simultaneously supports the hoop of three root canal piles 1 to lock 2, and described hoop lock 2 is included around the stirrup 4 for clamping pile tube 1, between described stirrup 4
It is connected with the triangle batten plate 5 for strutting three root canal piles 1.
Being intertwined and connected between the front side pile tube 1 of supporting pile body has FRP bands cloth 3, is consequently formed 6 surface layer of foundation ditch, plays gear
The effect of soil, soil layer active force is delivered on supporting pile body, realizes an effectively gear.
A kind of construction method that pattern foundation pit supporting structure is carried out using above-mentioned FRP plate belt foundation pit enclosure structure, with following steps:
A, along 6 supporting line setting of foundation ditch, mechanical equivalent of light excavation is into gathering sill;
After b, guide groove positioning, draw hole pitching pile and insert the pile tube 1 that three FRP reinforcements make;
After c, the implantation of pile tube 1 stratum, fixed using hoop lock 2 at the top of three root canal piles 1, stirrup 4 is clamped into every root canal pile first
1, three stirrups 4 are connected into support pile tube 1 with triangle batten plate 5 then, the supporting pile body of three combinations is consequently formed;
D, repetition b, step c, supporting pile body is progressively deployed;
E, 6 side of foundation ditch are excavated, while FRP bands cloth 3 is wrapped between the front side pile tube 1 of supporting pile body;
F, excavate in place after, the local cleaning soil body, repeat step c, with hoop at 1 position of pile tube at cutting depth bottom
2 are locked by the pile tube 1 in 6 excavation face support locking of foundation ditch;
G, finally enclose to form 6 support system of FRP plate belt foundation ditch.
The pile tube 1 that the present invention is made using FRP, by arranging hoop lock 2, forms stull and constraint, supporting to support pile body
Structure is more stable, while FRP band cloth plays preferably gear soil effect, sand gathers, and cohesive soil can be spaced 30cm arrangements, have
The advantages of low cost, convenient construction, so as to 6 Support types of foundation ditch can be enriched, expand the range of choice of 6 supporting of foundation ditch, shortening is applied
The work duration, realize energy-saving.6 support form of foundation ditch is expanded to into spatial model from conventional plane mode simultaneously, is strengthened
The globality of supporting construction, effectively increases the rigidity of supporting construction, realizes the safety and stability of 6 excavation project of foundation ditch.
Above-described embodiment technology design only to illustrate the invention and feature, its object is to allow person skilled in the art
Scholar will appreciate that present disclosure and be carried out, can not be limited the scope of the invention with this, all according to the present invention
Equivalence changes or modification that spirit is made, should all cover within the scope of the present invention.
Claims (2)
1. a kind of FRP plate belt foundation pit enclosure structure carries out the construction method of pattern foundation pit supporting structure, and described building enclosure is included along base
Cheat (6) supporting line setting, draw hole insertion using pile tube (1) made by FRP reinforcements, (1) three one group of described pile tube
Supporting pile body is constituted, pile tube (1) position at the top of pile tube (1) and at foundation ditch (6) cutting depth bottom is respectively equipped with holding
Three root canal piles (1) simultaneously support the hoop of three root canal piles (1) to lock (2), and being intertwined and connected between the front side pile tube of supporting pile body has FRP bands
Cloth (3);
Described construction method has following steps:
A, along foundation ditch (6) supporting line setting, mechanical equivalent of light excavation is into gathering sill;
After b, guide groove positioning, draw hole pitching pile and insert the pile tube (1) that three FRP reinforcements are fabricated to;
It is after c, pile tube (1) implantation stratum, fixed using hoop lock (2) at the top of three root canal piles (1), first stirrup (4) is clamped per root
Three stirrup (4) connections are then supported pile tube (1) with triangle batten plate (5), are consequently formed the supporting of three combinations by pile tube (1)
Pile body;
D, repetition b, step c, supporting pile body is progressively deployed;
E, foundation ditch (6) side are excavated, while FRP band cloth (3) is wrapped between the front side pile tube (1) of supporting pile body;
F, excavate in place after, the local cleaning soil body at pile tube (1) position at cutting depth bottom, repeat step c, with hoop lock
(2) by the pile tube (1) in foundation ditch (6) excavation face support locking;
G, finally enclose to form FRP plate belt foundation ditch (6) support system.
2. FRP plate belt foundation pit enclosure structure according to claim 1 carries out the construction method of pattern foundation pit supporting structure, its feature
It is:Described hoop lock (2) includes, around the stirrup (4) for clamping pile tube (1), support three being connected between described stirrup (4)
The triangle batten plate (5) of pile tube (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510638274.8A CN105297740B (en) | 2015-09-30 | 2015-09-30 | A kind of FRP plate belt foundation pit enclosure structure carries out the construction method of pattern foundation pit supporting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510638274.8A CN105297740B (en) | 2015-09-30 | 2015-09-30 | A kind of FRP plate belt foundation pit enclosure structure carries out the construction method of pattern foundation pit supporting structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105297740A CN105297740A (en) | 2016-02-03 |
CN105297740B true CN105297740B (en) | 2017-03-29 |
Family
ID=55195502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510638274.8A Expired - Fee Related CN105297740B (en) | 2015-09-30 | 2015-09-30 | A kind of FRP plate belt foundation pit enclosure structure carries out the construction method of pattern foundation pit supporting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105297740B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877302B (en) * | 2020-08-25 | 2021-09-10 | 广东劲拓建设工程有限公司 | Foundation construction method for in-situ solidification of surface soil and pile combined bearing |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101343870A (en) * | 2008-08-22 | 2009-01-14 | 北京航空航天大学 | Fiber-reinforced composite material rib concrete pile and its production and construction method |
CN102704465A (en) * | 2012-05-25 | 2012-10-03 | 中利建设集团有限公司 | FRP (fiber reinforce plastic) fiber cloth winding pile and manufacturing method thereof |
CN202689031U (en) * | 2012-05-23 | 2013-01-23 | 福建工程学院 | Deep foundation pit retaining and protecting retaining wall |
CN103074897A (en) * | 2013-01-18 | 2013-05-01 | 卫海 | Reinforced restraint earth compound supporting structure and construction method thereof |
CN103334423A (en) * | 2013-07-09 | 2013-10-02 | 中国人民解放军后勤工程学院 | Combined type steel pipe pile |
CN205012353U (en) * | 2015-09-30 | 2016-02-03 | 常州大学怀德学院 | FRP slab band formula foundation ditch envelope |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5180022B2 (en) * | 2008-10-03 | 2013-04-10 | 株式会社竹中土木 | Constraining method for mountain retaining wall head |
-
2015
- 2015-09-30 CN CN201510638274.8A patent/CN105297740B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101343870A (en) * | 2008-08-22 | 2009-01-14 | 北京航空航天大学 | Fiber-reinforced composite material rib concrete pile and its production and construction method |
CN202689031U (en) * | 2012-05-23 | 2013-01-23 | 福建工程学院 | Deep foundation pit retaining and protecting retaining wall |
CN102704465A (en) * | 2012-05-25 | 2012-10-03 | 中利建设集团有限公司 | FRP (fiber reinforce plastic) fiber cloth winding pile and manufacturing method thereof |
CN103074897A (en) * | 2013-01-18 | 2013-05-01 | 卫海 | Reinforced restraint earth compound supporting structure and construction method thereof |
CN103334423A (en) * | 2013-07-09 | 2013-10-02 | 中国人民解放军后勤工程学院 | Combined type steel pipe pile |
CN205012353U (en) * | 2015-09-30 | 2016-02-03 | 常州大学怀德学院 | FRP slab band formula foundation ditch envelope |
Non-Patent Citations (1)
Title |
---|
FRP土钉主要性能的试验研究;黄生文等;《土木工程学报》;20070831;第40卷(第8期);第74-78页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105297740A (en) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203654294U (en) | Foundation pit supporting structure used in reverse building method | |
CN104912098A (en) | Combined construction method for supporting beam plate and structural plate of deep foundation pit | |
CN110777802A (en) | Deep foundation pit high-low span supporting structure and construction method thereof | |
CN103469803A (en) | Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system | |
CN210439302U (en) | Foundation structure formed by basement and supporting piles | |
CN203583495U (en) | Double-row pile structure by utilization of existing adjoining building slope protection pile | |
CN104196032A (en) | Subway station supporting plate and inversed operation combined construction method | |
CN204825923U (en) | Relay formula underground structure | |
CN105297740B (en) | A kind of FRP plate belt foundation pit enclosure structure carries out the construction method of pattern foundation pit supporting structure | |
JP2012092601A (en) | Open shield machine start method of open shield method | |
CN205012353U (en) | FRP slab band formula foundation ditch envelope | |
CN209323533U (en) | It is a kind of it is upper just under soft system of deep foundation pit support | |
CN104047607A (en) | Construction method for lifting out shield tunneling machine under condition of envelop enclosure | |
KR101881577B1 (en) | Retaining Wall Using Pile With Center Hole And Construction Method Thereof | |
CN203531010U (en) | Supporting platform of heat pipe trench and for crossing reserved subway station | |
CN203049588U (en) | Pit-in-pit cylindrical mould | |
CN106284372A (en) | The method for supporting of roof plate template during a kind of electric power ditch is integrated poured | |
JP2011252290A (en) | Temporary steel column advance reverse placing construction method of underground skeleton | |
CN103215965A (en) | Laminate type high-rise platform pile tower crane foundation and construction method | |
CN204715364U (en) | A kind of foundation pit support device | |
CN204435389U (en) | A kind of assembled lattice unit for pattern foundation pit supporting structure | |
CN209227546U (en) | The deep basal pit composite supporting construction of double-row pile combination method of center island | |
CN103205983B (en) | Construction method of basement rear support system | |
CN209339172U (en) | A kind of novel peg board composite foundation | |
CN103572762B (en) | The bracket of the oblique inner support lower end of foundation pit supporting construction and fabrication tool and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 |