CN105293701B - Carbon source reserve type IBR bioreactor - Google Patents
Carbon source reserve type IBR bioreactor Download PDFInfo
- Publication number
- CN105293701B CN105293701B CN201510746390.1A CN201510746390A CN105293701B CN 105293701 B CN105293701 B CN 105293701B CN 201510746390 A CN201510746390 A CN 201510746390A CN 105293701 B CN105293701 B CN 105293701B
- Authority
- CN
- China
- Prior art keywords
- biological reaction
- carbon source
- sewage
- zone
- sludge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W10/00—Technologies for wastewater treatment
- Y02W10/10—Biological treatment of water, waste water, or sewage
Landscapes
- Biological Treatment Of Waste Water (AREA)
- Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
Abstract
Description
技术领域technical field
本发明涉及污水处理设备领域,具体是一种碳源储备式IBR生物反应器。The invention relates to the field of sewage treatment equipment, in particular to a carbon source storage type IBR bioreactor.
背景技术Background technique
小城镇污水由于C/N比值较低,通常采用常规的脱氮除磷工艺,即好氧-缺氧-厌氧的过程:第一阶段为好氧段,即硝化反应阶段,异养微生物进行氨化作用产生的氨,被硝化细菌、亚硝化细菌氧化成亚硝酸,再氧化成硝酸的过程,硝化营养类型为化能自养需氧型,少数为兼性自养型,也就是说,可以是自养或是异样养,自养为主,但此过程因污水中含大量氧气,异养微生物通过消耗大量的碳源来进行增殖,所以此过程大量碳源被消耗;第二阶段为缺氧段-厌氧段,即反硝化阶段,反硝化细菌在缺氧条件下,还原硝酸盐,释放出分子态氮(N2)或一氧化二氮(N2O)的过程,大部分反硝化细菌是异养菌,在缺少氧气的条件下,利用硝酸中的氧,使葡萄糖氧化成二氧化碳和水并释放能量,因此反硝化需要消耗大量的碳源;综合分析,硝化阶段消耗大量碳源,到反硝化阶段,碳源严重不足,则反硝化效果不理想,最终可导致出水N不达标,若C/N比值过低,或污水处理厂出水提标改造,N的去除采用常规的硝化反硝化是无法满足排放要求的,因此需要对现有工艺进行改进。Due to the low C/N ratio of sewage in small towns, the conventional process of nitrogen and phosphorus removal is usually adopted, that is, the process of aerobic-anoxic-anaerobic: the first stage is the aerobic stage, that is, the nitrification reaction stage, and heterotrophic microorganisms carry out Ammonia produced by ammonification is oxidized to nitrous acid by nitrifying bacteria and nitrosifying bacteria, and then oxidized to nitric acid. The type of nitrification nutrition is chemoautotrophic and aerobic, and a few are facultative autotrophic, that is to say, It can be autotrophic or heterotrophic, mainly autotrophic, but in this process, because the sewage contains a lot of oxygen, heterotrophic microorganisms proliferate by consuming a large amount of carbon sources, so a large amount of carbon sources are consumed in this process; the second stage is Anoxic stage-anaerobic stage, that is, the denitrification stage, the process in which denitrifying bacteria reduce nitrate and release molecular nitrogen (N 2 ) or nitrous oxide (N 2 O) under anoxic conditions. Denitrifying bacteria are heterotrophic bacteria. In the absence of oxygen, they use the oxygen in nitric acid to oxidize glucose into carbon dioxide and water and release energy. Therefore, denitrification needs to consume a large amount of carbon sources; comprehensive analysis shows that the nitrification stage consumes a large amount of carbon In the denitrification stage, if the carbon source is seriously insufficient, the denitrification effect will be unsatisfactory, and eventually the effluent N will not meet the standard. If the C/N ratio is too low, or the effluent of the sewage treatment plant is upgraded, the removal of N is carried out by conventional methods. Nitrification and denitrification cannot meet the discharge requirements, so the existing process needs to be improved.
发明内容Contents of the invention
为克服污水处理过程中硝化反硝化技术中碳源不足的问题,本提供了一种新装置——碳源储备式的IBR生物反应器,该生物反应器主体特点为连续流一体化间歇生物反应,实现短程硝化反硝化,同时设置有特定的碳源储备单元,在硝化阶段,碳源被储备,在反硝化阶段,碳源被迅速释放,以供反硝化所需。In order to overcome the problem of insufficient carbon source in nitrification and denitrification technology in the process of sewage treatment, this paper provides a new device - carbon source storage type IBR bioreactor, the main feature of this bioreactor is continuous flow integrated intermittent biological reaction , realize short-range nitrification and denitrification, and set up a specific carbon source storage unit. In the nitrification stage, the carbon source is stored, and in the denitrification stage, the carbon source is quickly released for denitrification.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种碳源储备式IBR生物反应器,包括反应器外壁,所述反应器外壁围成污水处理装置的主体,所述反应器外壁围成的主体中设置有内隔墙,将主体分隔为净水分离区和生物反应区,净水分离区为水、泥、气三相分离区,净水分离区布置在生物反应区的四周或两侧或其中一侧;所述生物反应区内通过可调挡板围有碳源储备区,碳源储备区与生物反应区通过可调挡板的开启或封闭实现连通或隔离;所述碳源储备区上部设置有污水进水管,污水进水管出口伸入碳源储备区中的导流筒上部,导流筒竖向设置,碳源储备区底部正对导流筒下方的位置设置导流墩;所述生物反应区中的内隔墙或反应器外壁上还安装有多个潜水泵,潜水泵通过连接管与激波传质射流曝气器连接,生物反应区中设置有多个搅拌器,生物反应区的底部还设置有用以排除污泥的污泥排管;所述净水分离区中设置有滑泥斜板、导气挡板、斜管沉淀器、排水管和溢流堰槽,所述滑泥斜板与内隔墙相连的位置开设有长条型下泥槽,导气挡板与内隔墙相连的位置安装有排气管,所述斜管沉淀器设置在滑泥斜板和导气挡板的上方,反应器外壁上开设有排水管,排水管与溢流堰槽连接。A carbon source storage type IBR bioreactor, comprising an outer wall of the reactor, the outer wall of the reactor encloses the main body of the sewage treatment device, an inner partition wall is arranged in the main body surrounded by the outer wall of the reactor, and the main body is divided into clean The water separation zone and the biological reaction zone, the clean water separation zone is a three-phase separation zone of water, mud and gas, and the clean water separation zone is arranged around or on both sides or one side of the biological reaction zone; The adjustable baffle is surrounded by a carbon source storage area, and the carbon source storage area and the biological reaction area are connected or isolated by opening or closing the adjustable baffle; the upper part of the carbon source storage area is provided with a sewage inlet pipe, and the outlet of the sewage inlet pipe extends Into the upper part of the diversion cylinder in the carbon source storage area, the diversion cylinder is vertically arranged, and the bottom of the carbon source reserve area is directly opposite to the position below the diversion cylinder to set up a diversion pier; the inner partition wall or reactor in the biological reaction area There are also multiple submersible pumps installed on the outer wall. The submersible pumps are connected to the shock wave mass transfer jet aerator through connecting pipes. There are multiple agitators in the biological reaction area. Sludge discharge pipe; the water separation area is provided with a sloping mud sloping plate, an air guide baffle, an inclined pipe settler, a drainpipe and an overflow weir groove, and the position where the sloping mud sloping plate is connected to the inner partition wall There is a long mud trough, and an exhaust pipe is installed at the position where the air guide baffle is connected to the inner partition wall. A drainage pipe is provided, and the drainage pipe is connected with the overflow weir groove.
作为本发明进一步的方案:所述碳源储备区内污水通过可调挡板溢流进入生物反应区。As a further solution of the present invention: the sewage in the carbon source storage area overflows into the biological reaction area through the adjustable baffle.
作为本发明再进一步的方案:所述污水进水管的数量与碳源储备区的数量相同,每个污水进水管对应1个碳源储备区。As a further solution of the present invention: the number of the sewage inlet pipes is the same as the number of carbon source storage areas, and each sewage inlet pipe corresponds to one carbon source storage area.
作为本发明再进一步的方案:所述的碳源储备式IBR生物反应器的工作流程,包括以下步骤:As a further solution of the present invention: the working process of the carbon source storage type IBR bioreactor comprises the following steps:
(1)生物反应区内部组成与工作过程:需处理的污水从污水进水管连续进入碳源储备区内,使主体内的整个污水液面在可调挡板闭合阶段保持稳定,并溢流进入生物反应区,生物反应区内污水液面保持稳定,且通过水压使净水分离区的处理后净水液面溢过溢流堰槽由排水管排出达到连续出水的目的;(1) The internal composition and working process of the biological reaction area: the sewage to be treated continuously enters the carbon source storage area from the sewage inlet pipe, so that the entire sewage liquid level in the main body remains stable during the closing stage of the adjustable baffle, and overflows into the In the biological reaction area, the liquid level of the sewage in the biological reaction area is kept stable, and the liquid level of the purified water in the water purification separation area overflows the overflow weir groove and is discharged by the drain pipe to achieve the purpose of continuous water discharge through the hydraulic pressure;
(2)碳源储备区与生物反应区联合作用,包括三个工作流程阶段,三个工作流程阶段交替连续运行:(2) The combined effect of the carbon source storage area and the biological reaction area includes three work flow stages, and the three work flow stages run alternately and continuously:
a)好氧反应阶段:可调挡板完全闭合,碳源储备区与生物反应区完全隔开,污水通过可调挡板溢流进入生物反应区,生物反应区内安装在内隔墙上的潜水泵将污水通过连接管高速吸入至激波传质射流曝气器并从上到下快速喷射,由于负压作用,含有氧气的空气通过激波传质射流曝气器进气管吸入,并与激波传质射流曝气器内的流体激波紊流切割与融合,达到切细污泥及生物絮体并加速氧化的目的;含有氧气的流体从激波传质射流器下端高速喷出,冲开并带动池体底部的污泥和生物絮体在生物反应区内翻滚,使氧气、生物体、污水均匀混合、反应,混合体又被潜水泵不断吸入;连续重复以上过程,通过生物及化学反应达到COD降解、氨氮硝化、好氧吸磷的效果;a) Aerobic reaction stage: the adjustable baffle is completely closed, the carbon source storage area is completely separated from the biological reaction area, the sewage overflows into the biological reaction area through the adjustable baffle, and the internal partition wall installed in the biological reaction area The submersible pump sucks the sewage into the shock wave mass transfer jet aerator at high speed through the connecting pipe and sprays it quickly from top to bottom. The shock wave turbulence cutting and fusion of the fluid in the shock mass transfer jet aerator achieves the purpose of cutting sludge and biological flocs and accelerating oxidation; the fluid containing oxygen is ejected from the lower end of the shock wave mass transfer jet at high speed, Wash away and drive the sludge and biological flocs at the bottom of the pool to roll in the biological reaction area, so that oxygen, organisms, and sewage are evenly mixed and reacted, and the mixture is continuously sucked by the submersible pump; the above process is repeated continuously, through the biological and The chemical reaction achieves the effects of COD degradation, ammonia nitrogen nitrification, and aerobic phosphorus absorption;
b)缺氧反应阶段:按照工艺要求通过控制系统设定各阶段反应时间及条件,当好氧反应阶段停止,缺氧反应阶段开始,在此阶段潜水泵和激波传质射流曝气器都停止工作,安装在生物反应区内的搅拌器搅动生物反应区内的污水均匀翻滚,且搅拌器启动时,可调挡板完全打开,碳源储备区的污水迅速进入生物反应区,达到COD降解和氨氮反硝化的目的;b) Anoxic reaction stage: according to the process requirements, the reaction time and conditions of each stage are set through the control system. When the aerobic reaction stage stops, the anoxic reaction stage begins. At this stage, the submersible pump and the shock mass transfer jet aerator are both Stop working, the agitator installed in the bioreaction area stirs the sewage in the bioreaction area to roll evenly, and when the agitator starts, the adjustable baffle is fully opened, and the sewage in the carbon source storage area quickly enters the bioreaction area to achieve COD degradation and ammonia nitrogen denitrification purposes;
c)厌氧反应阶段:缺氧反应阶段按设定的时间停止后,进入厌氧反应阶段,此阶段除污水进水管维持进水状态,潜水泵、激波传质射流曝气器和搅拌器停止工作,且可调挡板闭合,生物反应区内的污水通过重力沉淀,污泥沉入池底,多余的污泥通过污泥排管排出,厌氧反应阶段仍然有COD降解和除磷效果;c) Anaerobic reaction stage: After the anoxic reaction stage is stopped according to the set time, it enters the anaerobic reaction stage. In this stage, the sewage inlet pipe maintains the water inlet state, and the submersible pump, shock wave mass transfer jet aerator and agitator Stop working, and the adjustable baffle is closed, the sewage in the biological reaction zone is settled by gravity, the sludge sinks to the bottom of the pool, and the excess sludge is discharged through the sludge discharge pipe, and the anaerobic reaction stage still has the effect of COD degradation and phosphorus removal ;
(3)净水分离区内部组成与工作过程为:生物反应区中经过生物反应的混合液通过内隔墙上的排气管和长条型下泥槽流入净水分离区,在自然沉淀作用下,比重轻的气泡上升,沿着导气挡板上升并通过排气管溶入生物反应区内;混合液中的污泥因比重大,向下沉淀沿着滑泥斜板下滑并通过长条型下泥槽流入生物反应区的底部;经过气泥分离的干净的水在水压作用下通过滑泥斜板和导气挡板的狭口向上流,并经过斜管沉淀器进一步水、泥过滤分离,经过层层处理并达标的净水升至处理后净水液面后溢入溢流堰槽并通过排水管排出。(3) The internal composition and working process of the water purification separation area are as follows: the biologically reacted mixed liquid in the biological reaction area flows into the water purification separation area through the exhaust pipe on the inner partition wall and the long strip mud tank, and in the process of natural precipitation The air bubbles with light specific gravity rise up, rise along the air guide baffle and dissolve into the biological reaction area through the exhaust pipe; the sludge in the mixed solution is heavy in proportion, settles downwards, slides down the sliding mud ramp and passes through the long The strip-shaped lower mud tank flows into the bottom of the biological reaction zone; the clean water separated from the air-sludge flows upward through the narrow opening of the sliding mud swash plate and the air guide baffle under the action of hydraulic pressure, and passes through the inclined tube settler for further water, The mud is filtered and separated, and the clean water that has been treated layer by layer and reaches the standard rises to the treated clean water liquid level and then overflows into the overflow weir groove and is discharged through the drain pipe.
作为本发明再进一步的方案:所述步骤2中,好氧反应阶段、缺氧反应阶段、厌氧反应阶段在生物反应区交替连续运行。As a further solution of the present invention: in the
作为本发明再进一步的方案:所述步骤3中,净水分离区的工作过程与生物反应区的三个过程同时进行以实现连续出水的目的。As a further solution of the present invention: in the
与现有技术相比,本发明的有益效果是:本发明结构紧凑,将污水处理的好氧反应过程、缺氧反应过程、沉淀过程、净水分离出水过程集中在一个池体单元结构内完成,同时,在好氧反应阶段设置碳源储备区以储备碳源,碳源储备区有利于为反硝化阶段提供碳源,利于总氮的去除,出水总氮降低,等到缺氧反应过程,释放碳源,供反硝化过程消耗,从而确保在低C/N比或污水厂提标改造时,N这项指标能达标,并实现进出水连续不间断运行,提高了工作效率,占地少、投资省、运行费用低、处理效果好;在生物反应区进水点附近设置碳源储备区,通过可调挡板实现自如调整碳源储存及释放的功能,可调挡板的开启与搅拌器的开启联动起来,可严格区分碳源释放节点,实现碳源的可控释放,通过可调挡板隔离碳源储备区及生化反应区,灵活调整两者之间的关系,不需额外建处理单元,投资成本少;生物反应区进水点可根据实际需要设计多个,且每一个进水点对应一个碳源储备区,进水通过导流筒向下并经导流墩反弹后上升,防止短流;本发明能进一步优化硝化和反硝化过程,污染物去除率高,运行稳定,出水水质好,具有占地面积少、投资少、运行成本低、运行维护方便的特点。Compared with the prior art, the beneficial effects of the present invention are: the present invention has a compact structure, and the aerobic reaction process, anoxic reaction process, sedimentation process, and water purification and separation process of sewage treatment are concentrated in one pool body unit structure to complete At the same time, a carbon source reserve area is set up in the aerobic reaction stage to store carbon source. The carbon source reserve area is conducive to providing carbon source for the denitrification stage, which is beneficial to the removal of total nitrogen, and the total nitrogen in the effluent is reduced. After the anoxic reaction process, the release The carbon source is consumed by the denitrification process, so as to ensure that the N index can meet the standard when the C/N ratio is low or the sewage plant is upgraded, and the continuous and uninterrupted operation of the inflow and outflow is realized, which improves the work efficiency and occupies less land. Low investment, low operating cost, and good treatment effect; set up a carbon source reserve area near the water inlet point of the biological reaction area, and realize the function of freely adjusting carbon source storage and release through an adjustable baffle, and the opening of the adjustable baffle and the agitator The opening and linkage of the carbon source can strictly distinguish the carbon source release node, realize the controllable release of the carbon source, isolate the carbon source storage area and the biochemical reaction area through the adjustable baffle, and flexibly adjust the relationship between the two without additional construction. Unit, low investment cost; multiple water inlet points in the bioreaction area can be designed according to actual needs, and each water inlet point corresponds to a carbon source reserve area. Prevent short flow; the invention can further optimize the process of nitrification and denitrification, with high pollutant removal rate, stable operation, good effluent quality, small footprint, low investment, low operating cost, and convenient operation and maintenance.
附图说明Description of drawings
图1为本发明的剖面结构示意图。Fig. 1 is a schematic cross-sectional structure diagram of the present invention.
图2为本发明的平面布置示意图。Fig. 2 is a schematic plan view of the present invention.
其中,1-反应器外壁;2-内隔墙;3-滑泥斜板;4-导气挡板;5-斜管沉淀器;6-排水管;7-溢流堰槽;8-潜水泵;9-连接管;10-激波传质射流曝气器;11-污水进水管;12-搅拌器;13-污泥排管;14-导流筒;15-导流墩;16-可调挡板;17-净水分离区;18-生物反应区;19-碳源储备区;20-污水液面;21-排气管:22-长条型下泥槽;23-处理后净水液面。Among them, 1-outer wall of reactor; 2-inner partition wall; 3-slide slope; 4-air guide baffle; 5-incline tube settler; 6-drainage pipe; Pump; 9-Connecting pipe; 10-Shock wave mass transfer jet aerator; 11-Sewage inlet pipe; 12-Agitator; 13-Sludge discharge pipe; Adjustable baffle; 17-clean water separation area; 18-biological reaction area; 19-carbon source storage area; 20-sewage liquid level; Clean water surface.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
请参阅图1-2,一种碳源储备式IBR生物反应器,包括反应器外壁1,所述反应器外壁1围成污水处理装置的主体,主体用于容纳污水及处理过的净化水,所需的其它设备同样安装在主体内;在反应器外壁1中设置有内隔墙2,将主体分隔为净水分离区17和生物反应区18,净水分离区17为水、泥、气三相分离区,净水分离区17布置在生物反应区18的四周或两侧或其中一侧;所述生物反应区18内通过可调挡板16围有碳源储备区19,碳源储备区19的数量及尺寸根据实际情况进行调整设置,所述可调挡板16的高度低于内隔板2的高度;所述碳源储备区19中设置有污水进水管11,需要处理的污水通过污水进水管11进入碳源储备区19中的导流筒14,自流通过导流墩15导流上升,通过可调挡板16溢流进入生物反应区18,图1中示出了污水液面20,在生物反应区18中的内隔墙2或反应器外壁1上还设置有潜水泵8,潜水泵8的数量可以根据需要设置;所述潜水泵8通过连接管9与激波传质射流曝气器10连接,在生物反应区18中还设置有搅拌器12,其数量同样可以根据需要设置,搅拌器12搅动生物反应区18内的污水均匀翻滚,在生物反应区18的底部还设置有污泥排管13用以排除污泥;在净水分离区17中设置有滑泥斜板3、导气挡板4、斜管沉淀器5、排水管6和溢流堰槽7,所述滑泥斜板3与内隔墙2相连的位置开设有长条型下泥槽22,所述导气挡板4与内隔墙2相连的位置安装有排气管21,斜管沉淀器5设置在滑泥斜板3和导气挡板4的上方,在反应器外壁1上开设有排水管6,排水管6与溢流堰槽7连接;曝气阶段,可调挡板16完全封闭,则碳源储备区19与生物反应区18完全隔开,进水通过溢流进入生物反应区18;搅拌阶段,搅拌器12启动,可调挡板16打开,碳源储备区19污水与生物反应区18污水混合。Please refer to Figure 1-2, a carbon source storage type IBR bioreactor, including the outer wall of the
本发明的工作原理是:The working principle of the present invention is:
(1)生物反应区18内部组成与工作过程:需处理的污水从污水进水管11源源不断连续进入碳源储备区19内,使装置内的整个污水液面20在可调挡板16闭合阶段保持稳定,并溢流进入生物反应区18,生物反应区18内污水液面20保持稳定,且通过水压使净水分离区17的处理后净水液面23刚好溢过溢流堰槽7从而达到连续出水的目的;(1) The internal composition and working process of the biological reaction zone 18: the sewage to be treated continuously enters the carbon
(2)碳源储备区19与生物反应区18联合作用,其有三个工作流程阶段交替连续运行:(2) The carbon
a)好氧反应阶段:可调挡板16完全闭合,则碳源储备区19与生物反应区18完全隔开,污水通过可调挡板16溢流进入生物反应区18,生物反应区18内安装在内隔墙2上的潜水泵8将污水通过连接管9高速吸入至激波传质射流曝气器10并从上到下快速喷射,由于负压作用,含有氧气的空气通过激波传质射流曝气器10进气管吸入,并与激波传质射流曝气器10内的流体激波紊流切割与融合,从而达到切细污泥及生物絮体并加速氧化的目的:含有氧气的流体从激波传质射流器10下端高速喷出,冲开并带动池体底部的污泥和生物絮体在生物反应区18内不断翻滚,使氧气、生物体、污水均匀混合、反应,混合体又被潜水泵8不断吸入连续重复以上过程,这个过程通过生物及化学反应可达到COD降解、氨氮硝化、好氧吸磷等效果;a) Aerobic reaction stage: when the
b)缺氧反应阶段:根据工艺要求事先通过控制系统设定各阶段反应时间及条件,一定时间后好氧反应阶段停止,缺氧反应阶段开始,在此阶段潜水泵8和激波传质射流曝气器10都停止工作,安装在生物反应区18内的搅拌器12搅动生物反应区18内的污水均匀翻滚,且搅拌器12启动时,可调挡板16完全打开,则碳源储备区19的污水迅速进入生物反应区18,此阶段主要达到COD降解和氨氮反硝化的目的;b) Anoxic reaction stage: According to the process requirements, the reaction time and conditions of each stage are set in advance through the control system. After a certain period of time, the aerobic reaction stage stops and the anoxic reaction stage starts. At this stage, the
c)厌氧反应阶段:缺氧反应阶段按设定的时间停止后,进入此阶段,此阶段除污水进水管11仍在进水外,其它设备如潜水泵8、激波传质射流曝气器10、搅拌器12等都停止工作,且可调挡板16闭合,生物反应区18内的污水通过重力沉淀,污泥沉入池底,此阶段仍然有COD降解和除磷效果,根据实际情况,多余的污泥通过污泥排管13排出;c) Anaerobic reaction stage: after the anoxic reaction stage stops according to the set time, enter this stage. In this stage, except that the
好氧反应阶段、缺氧反应阶段、厌氧反应阶段在反应区交替连续运行;The aerobic reaction stage, anoxic reaction stage, and anaerobic reaction stage operate alternately and continuously in the reaction zone;
(3)净水分离区17(水、泥、气三相分离区)内部组成与工作过程为:生物反应区18中经过生物反应的混合液通过内隔墙2上的排气管21和长条型下泥槽22流入净水分离区17,在自然沉淀作用下,比重轻的气泡上升,沿着导气挡板4上升并通过排气管21溶入生物反应区18内;混合液中的污泥因比重大,向下沉淀沿着滑泥斜板3下滑并通过长条型下泥槽22流入生物反应区18的底部;经过气泥分离的较干净的水在水压作用下通过滑泥斜板3和导气挡板4的狭口向上流,并经过斜管沉淀器5进一步水、泥过滤分离,这时经过层层处理并达标的净水升至处理后净水液面23后溢入溢流堰槽7并通过排水管6排出。(3) The internal composition and working process of the clean water separation zone 17 (water, mud and gas three-phase separation zone) are as follows: the mixed liquid through the biological reaction in the
净水分离区17的工作过程与生物反应区18的三个过程同时进行,从而实现连续出水的目的。The working process of the clean
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Accordingly, the embodiments should be regarded in all points of view as exemplary and not restrictive, the scope of the invention being defined by the appended claims rather than the foregoing description, and it is therefore intended that the scope of the invention be defined by the appended claims rather than by the foregoing description. All changes within the meaning and range of equivalents of the elements are embraced in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510746390.1A CN105293701B (en) | 2015-11-06 | 2015-11-06 | Carbon source reserve type IBR bioreactor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510746390.1A CN105293701B (en) | 2015-11-06 | 2015-11-06 | Carbon source reserve type IBR bioreactor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105293701A CN105293701A (en) | 2016-02-03 |
| CN105293701B true CN105293701B (en) | 2022-11-01 |
Family
ID=55191644
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510746390.1A Active CN105293701B (en) | 2015-11-06 | 2015-11-06 | Carbon source reserve type IBR bioreactor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105293701B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107973402B (en) * | 2017-11-28 | 2020-12-11 | 华夏碧水环保科技有限公司 | Plug Flow AO Reactor |
| CN108083435B (en) * | 2017-12-06 | 2022-01-25 | 山东建筑大学 | Buried phosphate fertilizer on-site recycling device and sewage treatment method |
| CN113666584A (en) * | 2021-09-09 | 2021-11-19 | 海南天鸿市政设计股份有限公司 | Tubular JBR biomembrane sewage treatment device |
| CN117164096A (en) * | 2023-10-11 | 2023-12-05 | 武汉芳笛环保股份有限公司 | Sewage advanced treatment contact biochemical reactor |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013005913A1 (en) * | 2011-07-05 | 2013-01-10 | 대웅이엔에스 (주) | Composite microorganism reactor, and apparatus and method for water treatment using same |
| CN202729953U (en) * | 2012-07-31 | 2013-02-13 | 武汉芳笛环保工程有限公司 | Intermission biological reactor (IBR) continuous-flow integration sewage processing device |
| CN103408202A (en) * | 2013-08-30 | 2013-11-27 | 中水珠江规划勘测设计有限公司 | High-density sedimentation internal circulating integrated sewage treatment equipment |
| CN103936151A (en) * | 2014-04-10 | 2014-07-23 | 北京工业大学 | Efficient nitrogen and phosphorus removal device and method for low carbon source municipal sewage |
| CN104003522A (en) * | 2014-06-18 | 2014-08-27 | 中国科学院城市环境研究所 | Improved step-feed multi-section A/O denitrification process and design method thereof |
| CN104512963A (en) * | 2014-11-29 | 2015-04-15 | 北京工业大学 | Integral multistage simultaneous nitrification and denitrification biological membrane system denitrification method and device |
| CN104743669A (en) * | 2015-04-03 | 2015-07-01 | 兰州交通大学 | Step-feed CAST nitrite denitrifying phosphorus removal method and process control device thereof |
-
2015
- 2015-11-06 CN CN201510746390.1A patent/CN105293701B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013005913A1 (en) * | 2011-07-05 | 2013-01-10 | 대웅이엔에스 (주) | Composite microorganism reactor, and apparatus and method for water treatment using same |
| CN202729953U (en) * | 2012-07-31 | 2013-02-13 | 武汉芳笛环保工程有限公司 | Intermission biological reactor (IBR) continuous-flow integration sewage processing device |
| CN103408202A (en) * | 2013-08-30 | 2013-11-27 | 中水珠江规划勘测设计有限公司 | High-density sedimentation internal circulating integrated sewage treatment equipment |
| CN103936151A (en) * | 2014-04-10 | 2014-07-23 | 北京工业大学 | Efficient nitrogen and phosphorus removal device and method for low carbon source municipal sewage |
| CN104003522A (en) * | 2014-06-18 | 2014-08-27 | 中国科学院城市环境研究所 | Improved step-feed multi-section A/O denitrification process and design method thereof |
| CN104512963A (en) * | 2014-11-29 | 2015-04-15 | 北京工业大学 | Integral multistage simultaneous nitrification and denitrification biological membrane system denitrification method and device |
| CN104743669A (en) * | 2015-04-03 | 2015-07-01 | 兰州交通大学 | Step-feed CAST nitrite denitrifying phosphorus removal method and process control device thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105293701A (en) | 2016-02-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111138024B (en) | An integrated vertical circulation reactor for nitrogen and phosphorus removal from sewage | |
| CN103570129B (en) | A kind of circulation flow ring-shaped membrane bioreactor effluent treatment process | |
| CN106565017B (en) | A kind of bicirculating denitrogenation dephosphorizing waste water treatment system and its method | |
| CN101205110A (en) | Sewage treatment device and method thereof | |
| CN101792230A (en) | Non-reflux continuous aeration type sewage treatment system and treatment method | |
| CN104724827A (en) | Integrated sewage nitrogen removal and phosphorous removal reactor and process method thereof | |
| CN208071539U (en) | A kind of sewage disposal system | |
| CN202729953U (en) | Intermission biological reactor (IBR) continuous-flow integration sewage processing device | |
| CN206970300U (en) | Nitrification liquid reflux and biological reaction pool for biological reaction pool | |
| CN1376642A (en) | Equipment and process for treating sewage by integrated oxidizing ditch with 3D circulation | |
| CN207986809U (en) | The AAO biochemical treatment tanks of treated sewage | |
| CN206289048U (en) | Sewage combination biochemistry and sludge static state deposition separating treatment integrated apparatus | |
| CN1193949A (en) | Process for purifying waste water | |
| CN105366888B (en) | A kind of method and device for small flow sewage deep denitrogenation dephosphorizing | |
| CN105293701A (en) | Carbon source reserve type immobilized bioreactor (IBR) | |
| CN207313242U (en) | A kind of split reflux declines oxygen denitrification reactor | |
| CN219950801U (en) | Anaerobic device for reducing biochemical excess sludge | |
| CN208617486U (en) | A kind of high-performance bio integrated sewage treatment unit | |
| CN107381817A (en) | A kind of micro- oxygen denitrification reactor of cavitation-preventive | |
| CN216808515U (en) | AAO biological combination pond of multi-mode operation | |
| CN201240970Y (en) | Integrated circulation biological reaction waste water treating device | |
| CN205258129U (en) | Low discharge sewage degree of depth nitrogen and phosphorus removal device | |
| CN205099465U (en) | Carbon source deposit formula IBR bioreactor | |
| CN205527997U (en) | An italic oxidation ditch | |
| CN115818840A (en) | A LBBR sewage treatment device and process with high treatment efficiency and stable operation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Carbon Reserve IBR Bioreactor Granted publication date: 20221101 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN FUND ENVIRONMENT PROTECTION Co.,Ltd. Registration number: Y2024980001213 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20221101 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN FUND ENVIRONMENT PROTECTION Co.,Ltd. Registration number: Y2024980001213 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right |