CN105293304B - It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight - Google Patents

It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight Download PDF

Info

Publication number
CN105293304B
CN105293304B CN201510829590.3A CN201510829590A CN105293304B CN 105293304 B CN105293304 B CN 105293304B CN 201510829590 A CN201510829590 A CN 201510829590A CN 105293304 B CN105293304 B CN 105293304B
Authority
CN
China
Prior art keywords
balancing weight
jib
counter
counterweight
slideway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510829590.3A
Other languages
Chinese (zh)
Other versions
CN105293304A (en
Inventor
郑冬冬
王克军
许常敏
郑杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHANGJIAGANG ZHONGLIAN CONSTRUCTION MACHINERY Co.,Ltd.
Original Assignee
ZHENHAI CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENHAI CONSTRUCTION GROUP Co Ltd filed Critical ZHENHAI CONSTRUCTION GROUP Co Ltd
Priority to CN201510829590.3A priority Critical patent/CN105293304B/en
Publication of CN105293304A publication Critical patent/CN105293304A/en
Application granted granted Critical
Publication of CN105293304B publication Critical patent/CN105293304B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight, it is related to a kind of constructional engineering machinery, crane arm and the counter-jib are set on a spinstand, crane arm and the counter-jib position are relative, top is provided with counterweight lowering or hoisting gear in jacking stock, counterweight lowering or hoisting gear can be moved up and down inside the standard knot, the counterweight slideway being engaged with counterweight lowering or hoisting gear is provided with counter-jib, the fixing device of fixed weight block and the airbag apparatus of protection balancing weight are additionally provided with counter-jib, airbag apparatus includes being arranged on the repeatable inflated airbag of counter-jib top bottom.Compared with prior art, the present invention can dismantle balancing weight with Fast Installation, balancing weight can be pulled down rapidly under typhoon or other strong wind states and keep tower body steadily of centre of gravity, also solving conventional balancing weight needs crane to install, installation effectiveness is low, slow-footed problem, further, the present invention can also wrap balancing weight when balancing weight is inadvertently fallen off, and prevent balancing weight from being splashed after breaking into pieces the problem of hurt sb.'s feelings.

Description

It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight
Technical field
The present invention relates to a kind of constructional engineering machinery, more particularly, to a kind of construction site derrick crane.
Background technology
Derrick crane abbreviation tower crane, also known as tower crane, originating from West Europe.It is exactly the rotation that swing arm is mounted in towering tower body top Turn crane.Derrick crane working space is big, is mainly used in housing construction the vertically and horizontally conveying of material and builds Build the installation of component.It is made up of metal structure, operating mechanism and the part of electrical system three.Metal structure include tower body, swing arm and Base etc..There are raising, luffing, four parts of revolution and walking in operating mechanism.Electrical system include motor, controller, power distribution cabinet, Connection line, signal and lighting device etc..With the progress of engineering technology, the floor more and more higher built now so that required Derrick crane also more and more higher, but too high derrick crane has the problem of stability is poor, especially in southeastern coast During typhoon, often occurs the event that derrick crane is created greater casualties in typhoon day by extension.In addition, derrick crane is all Need that balancing weight is installed, balancing weight is hung on derrick crane with other loop wheel machines mostly, installing/dismounting trouble so that tower Crane can not realize fast-assembling.
The content of the invention
The present invention for it is of the prior art it is not enough there is provided it is a kind of can be with the tower crane of fast assembling-disassembling balancing weight, the present invention Balancing weight can be dismantled with Fast Installation, balancing weight can be pulled down rapidly under typhoon or other strong wind states and keep tower body Steadily of centre of gravity, also solving conventional balancing weight needs crane to install, and installation effectiveness is low, slow-footed problem, further, the present invention Balancing weight can also be wrapped when balancing weight is inadvertently fallen off, prevent balancing weight from being splashed after breaking into pieces the problem of hurt sb.'s feelings.
In order to solve the above-mentioned technical problem, the present invention is addressed by following technical proposals:One kind can be with fast assembling-disassembling The tower crane of balancing weight, including pedestal, tower body, jacking stock, turntable, crane arm, counter-jib and balancing weight, described tower body by Several standard knots are built, and the jacking stock can be moved on the standard knot, and the turntable is arranged on the top Set top of the trellis is risen, the crane arm and the counter-jib are arranged on the turntable, the crane arm and counter-jib position Put top in relative, described jacking stock and be provided with counterweight lowering or hoisting gear, the counterweight lowering or hoisting gear can be in the standard knot Portion is moved up and down, and the counterweight slideway being engaged with the counterweight lowering or hoisting gear, described counter-jib are provided with the counter-jib On be additionally provided with the fixing device of the fixed balancing weight and protect the airbag apparatus of the balancing weight, described airbag apparatus bag The repeatable inflated airbag for being arranged on counter-jib top bottom is included, described air bag is the cuboid of opening upwards, institute Fast connection interface is provided between the air bag stated and described counter-jib.
In above-mentioned technical proposal, it is preferred that described counterweight lowering or hoisting gear includes setting on lifter, described lifter Have and counterweight fixed station be provided with some drawstrings, described drawstring, fixed station slideway is provided with described counterweight fixed station, On described fixed station slideway slide be provided with several balancing weight fixed mounts, described counterweight slideway be provided with it is described solid Determine the alignment device that platform slideway is engaged.
In above-mentioned technical proposal, it is preferred that be provided with connection on the alignment device electric rotation shaft, described electric rotation shaft The connection slideway with the fixed station slideway and counterweight slideway cooperation, described company are provided with plate, described connecting plate It is additionally provided with several electric expansion limited posts, described fixed station and is provided with and the electric expansion limited post phase on fishplate bar The spacing hole matched somebody with somebody.
In above-mentioned technical proposal, it is preferred that described spacing hole is tapered, is inwardly gradually reduced at opening.
In above-mentioned technical proposal, it is preferred that protection framework, motor and electricity are provided with described balancing weight fixed mount It is dynamic locked piece.
In above-mentioned technical proposal, it is preferred that be respectively arranged with inside fixed lobe on described protection framework biside plate, The fixed groove being engaged with the fixed lobe is provided with described balancing weight.
In above-mentioned technical proposal, it is preferred that several supports are provided between the counterweight slideway and the counter-jib and are connected Extension bar.
Existing balancing weight is lifted by crane, and one piece one piece of installation is needed during lifting, not only installs effect Rate is low, and the time is long, and dismounting operation can not be also carried out when bad environments, once projection strong wind, balancing weight can not unload non- The crank of tower crane is often easily caused, jeopardizes production and construction safety.It is of the invention then be by being arranged on inside derrick crane Counterweight lowering or hoisting gear carry out the installation of balancing weight, without external force, and be not affected by the weather, as long as derrick crane can enter Row work, it is possible to carry out the dismounting of balancing weight.Its cardinal principle forms transport channel using standard knot inner space, leads to herein The rise of balancing weight is carried out in road with putting down, is then moved to after balancing weight rises to top by the counterweight slideway on counter-jib The end of counter-jib, is fixed finally by the fixing device on counter-jib.It is consistent when principle is with installing when balancing weight is unloaded, First pass through fixing device and release fixation, then slide onto on counterweight lowering or hoisting gear, be finally down to ground.In order to reach this effect Really, counterweight lowering or hoisting gear of the invention includes lifter, is provided with some drawstrings, drawstring on lifter and is provided with counterweight and consolidates Determine to be provided with platform, counterweight fixed station on fixed station slideway, fixed station slideway and be provided with balancing weight fixed mount.Balancing weight, which is put into, matches somebody with somebody On pouring weight fixed mount, the fixed station slideway on counterweight fixed station can be directed at insertion with counterweight slideway, complete to match somebody with somebody by lifter The rise and fall of pouring weight, complete balancing weight further through counterweight slideway and fixed station slideway and are moved on counter-jib.Again because matching somebody with somebody Weight lowering or hoisting gear can once transport multiple balancing weights or single balancing weight so that derrick crane in use can be quick Increase reduces breeding, it is thus also avoided that need to replace all balancing weight problems again now.Gas is additionally provided with counter-jib Bag apparatus, airbag apparatus wraps balancing weight, and when there is contingency so that balancing weight drops, airbag apparatus is in balancing weight One piece is dropped in the presence of gravity, can prevent that fragment that balancing weight fragmentation has been splashed from hurting sb.'s feelings thing when dropping to ground.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention can dismantle balancing weight, Ke Yi with Fast Installation Rapid balancing weight of pulling down keeps tower body steadily of centre of gravity under typhoon or other strong wind states, also solves conventional balancing weight needs Crane is installed, and installation effectiveness is low, and slow-footed problem, further, the present invention can also be wrapped up when balancing weight is inadvertently fallen off Firmly balancing weight, prevents that balancing weight from splashing the problem of hurting sb.'s feelings after breaking into pieces.
Brief description of the drawings
Fig. 1 is front schematic view of the present invention.
Fig. 2 is contraction state schematic diagram of the present invention.
Fig. 3 is contraction process schematic diagram of the present invention.
Fig. 4 is use state schematic diagram of the present invention.
Fig. 5 is connecting plate schematic diagram of the present invention.
Fig. 6 is balancing weight fixed mount side schematic view of the present invention.
Fig. 7 is balancing weight fixed mount front schematic view of the present invention.
Fig. 8 is standard knot schematic diagram of the present invention.
Fig. 9 is partial enlarged drawing schematic diagram at A in Fig. 4 of the present invention.
Figure 10 is partial enlarged drawing schematic diagram at B in Fig. 4 of the present invention.
Embodiment
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings.
As shown in Figures 1 to 10, it is a kind of can be with the tower crane of fast assembling-disassembling balancing weight, including pedestal 1, tower body 2, jacking stock 3rd, turntable 6, tower top 7, crane arm 5, counter-jib 4 and balancing weight 11, described tower body 2 built by several standard knots 21 and Into the jacking stock 3 can be moved on the standard knot 21, and the turntable 6 is arranged on the top of jacking stock 3, institute Tower top 7 is stated to be arranged on the turntable 6.
Lifting rotating shaft 63 and balance rotating shaft 61 are respectively arranged with the turntable 6, crane arm 5 is rotatably arranged on lifting and turned On axle 63, counter-jib 4 is rotatably arranged in balance rotating shaft 61, and crane arm 5 and the counter-jib 4 position is relative, described It is provided with several first electric expansion fix bars 64, described turntable 6 to be provided with weighing arm 5 and consolidates with the first electric expansion Several second electric expansion fix bars 62, described rotation are provided with the first fixing groove that fixed pole 64 is engaged, the counter-jib 4 The second fixing groove being engaged with the second electric expansion fix bar 62, the crane arm 5 and the counter-jib 4 are provided with platform 6 First Guyed Towers 55 and second Guyed Towers 48 are respectively arranged with the top of top, the tower top 7 is provided with first tubing sections device 73 and second Tubing sections device 71, is connected between the first Guyed Towers 55 and the first tubing sections device 73 by first rope 74, described Pass through second rope connection 72, described first rope 74 and described second between second Guyed Towers 48 and the second tubing sections device 71 Rope 72 all twists into for some steel wire ropes.The described top of counter-jib 4 rotates and is provided with electronic drag hook 46, described electronic drawing Hook 46 can hang over the junction between two standard knots 21.The top of crane arm 5 is provided with to be connected with the lifting slideway 51 The cambered way 53 connect, has occluding device 54 between described lifting slideway 51 and the cambered way 53.Described lifting Arm 5 and the described top end of counter-jib 4 are respectively arranged with first cable lifter 56 and second cable lifter 47, described pedestal The fixed hook 13 with the first cable lifter 56 and the second cable lifter 47 cooperation is provided with 1.
Top is provided with counterweight lowering or hoisting gear 8 in described jacking stock 3, and the counterweight lowering or hoisting gear 8 can be in the standard Moved up and down inside section 21, the counterweight slideway 41 being engaged with the counterweight lowering or hoisting gear 8, institute are provided with the counter-jib 4 State and several supporting linkages 42 are provided between counterweight slideway 41 and the counter-jib 4.Described counterweight lowering or hoisting gear 8 includes It is provided with lifter 81, described lifter 81 on some drawstrings 82, described drawstring 82 and is provided with counterweight fixed station 83, It is provided with to slide on fixed station slideway 84, described fixed station slideway 84 on described counterweight fixed station 83 and is provided with several and matches somebody with somebody Protection framework 853, motor 851 and electronic locked piece are provided with pouring weight fixed mount 85, described balancing weight fixed mount 85 852.It is respectively arranged with inside fixed lobe 854, described balancing weight 11 and sets on the described biside plate of protection framework 853 There is the fixed groove being engaged with the fixed lobe 854.It is provided with described counterweight slideway 41 and the fixed station slideway 84 alignment devices 43 being engaged.The alignment device 43 includes being provided with electric rotation shaft 431, described electric rotation shaft 431 The connection with the fixed station slideway 84 and the counterweight slideway 41 cooperation is provided with connecting plate 432, described connecting plate 432 It is additionally provided with several electric expansion limited posts 434, described fixed station 83 and sets on slideway 433, described connecting plate 432 There is the spacing hole 86 matched with the electric expansion limited post 434.Described spacing hole 86 is tapered, at opening inwardly gradually Reduce.
The fixing device 44 of the fixed balancing weight 11 is additionally provided with described counter-jib 4 and the balancing weight 11 is protected Airbag apparatus 45, described fixing device 44, which includes being provided with electric turnover frame 441, described electric turnover frame 441, stretches Fixed dam 443 is provided with contracting cylinder 442, described telescopic cylinder 442.Described airbag apparatus 45 is described including being arranged on The repeatable inflated airbag of the top bottom of counter-jib 4, described air bag 451 is the cuboid of opening upwards, described air bag Fast connection interface 452 is provided between 451 and described counter-jib 4.Several electronic windings are provided with described jacking stock 3 Device 32, described electronic coiler 32 includes being provided with fixed hawser 33, described pedestal 1 and matched with the fixed hawser 33 The hook 12 of conjunction.
Tower crane of the present invention rapid removal balancing weight 11 and can pack up the He of crane arm 5 before bad weather arrives Counter-jib 4, changes tower crane center of gravity and wind surface by this measure, several with reduce that the tower crane under strong wind weather topples Rate.Balancing weight 11 and expansion crane arm 5 can quickly be reinstalled again after weather improves and counter-jib 4 allows tower crane to put into work at once Make.Its cardinal principle is to first pass through counterweight lowering or hoisting gear 8 to unload to pedestal 1 balancing weight 11.Firstly the need of passing through fixing device 44 unclamp the fixed dam 443 being pressed against on balancing weight 11, then store solid by electric turnover frame 441 and telescopic cylinder 442 Determine baffle plate 443 and allow whole fixing device 44 away from counterweight slideway 41, the sliding of balancing weight fixed mount 85 is not influenceed.Then rotate The connection slideway 433 that alignment device 43 allows on alignment device 43 and the UNICOM of counterweight slideway 41.Moved up and down and matched somebody with somebody by lifter 81 Weight fixed station 83, allows counterweight fixed station 83 substantially to be alignd with connecting plate 432, and the electric expansion on its relief connecting plate 432 is spacing Post 434 stretches out, and is inserted into the spacing hole 86 on counterweight fixed station 83.Because spacing hole 86 it is tapered and at opening inwardly by It is tapered small, in the case where counterweight fixed station 83 and connecting plate 432 have certain deviation electric expansion limited post 434 can be allowed to stretch Enter into spacing hole 86, and electric expansion limited post 434 be fully inserted into after counterweight fixed station 83 and connecting plate 432 can be allowed complete Alignment, now connects slideway 433, counterweight slideway 41 and is connected with the fixed station slideway 84 on counterweight fixed station 83, allow balancing weight to consolidate The motor 851 determined on frame 85 starts, on automatic sliding to counterweight fixed station 83, when all balancing weight fixed mounts 85 are all slided After moving on on counterweight fixed station 83, start electronic locked piece 852 on balancing weight fixed mount 85, prevent balancing weight fixed mount 85 from existing Fixed station slideway 84 is slided.Counterweight fixed station 83 is moved on on pedestal 1 finally by lifter 81.
Balancing weight 11 is moved on to after pedestal 1, first rope 74 between tensioning first Guyed Towers 55 and first tubing sections device 73 and Second rope connection 72 between second Guyed Towers 48 and second tubing sections device 71, then allows crane arm 5, counter-jib 4 and turntable 6 Between fixation producing means separation, both unclamped first electric expansion fix bar 64 and second electric expansion fix bar 62.Subsequently exist First tubing sections device 73 and putting for second tubing sections device 71 slowly turn lower crane arm 5 and counter-jib 4 in rope action.Rising , it is necessary to which withdrawal alignment dress is deflated and bent to the air bag 451 being arranged on counter-jib 4 before weighing arm 5 and counter-jib 4 are rotated down Put 43;The occluding device 54 between lifting slideway 51 and cambered way 53 on crane arm 5 is unclamped, allows lifting slideway 51 to be slided with arc The UNICOM of road 53, facilitates suspender 52 to be moved on cambered way 53.Crane arm 5 and counter-jib 4 can allow after the completion of rotating and be arranged on The first cable lifter 56 and second cable lifter 47 of crane arm 5 and the top end of counter-jib 4 fall connection rope, and rope Tie up on the fixed hook 13 on pedestal 1, can so prevent crane arm 5 in inclement weather and counter-jib 4 from can swing with the wind Generation accident.The junction between two standard knots 21 can also be hung over by the electronic drag hook 46 on counter-jib 4 if necessary, So that counter-jib 4 is preferably fixed.
Only need to carry out reverse operating during installation, both first passed through first tubing sections device 73 and second tubing sections device 71 crane arms 5 and the pull-up again of counter-jib 4, are then allowed by first electric expansion fix bar 64 and second electric expansion fix bar 62 Crane arm 5 and counter-jib 4 are fixed with turntable 6.After the completion of fixation, both balancing weight fixed mount 85 was risen can again, by even Connect slideway 433 and counterweight slideway 41 and balancing weight fixed mount 85 is moved to the top of counter-jib 4.Balancing weight fixed mount 85 moves to counter-jib Behind 4 tops, balancing weight fixed mount 85 is propped up by the fixed dam 443 in fixing device 44, balancing weight fixed mount 85 is kept It is stable.Because balancing weight fixed mount 85 can install single balancing weight 11 additional, so can operationally carry out balancing weight at any time 11 installing additional and dismantling, keeps dynamic balance different between crane arm 5 and counter-jib 4.Air bag 451 has two kinds when reclaiming Mode, one kind is direct deflation, is folded together followed by counter-jib 4, another directly put down by fast connection interface 452. Air bag 451 is if there is toppling and balancing weight 11 drops situation, air bag 451 can be allowed to wrap up counterweight in the effect of the present invention Block 11, although air bag 451 can not prevent dropping for balancing weight 11, but air bag 451 can prevent balancing weight 11 from being splashed after breaking into pieces Particle, prevent these particles splash hurt sb.'s feelings and damage machine.The present invention sets limited location to lead also on jacking stock 3 simultaneously Groove 31, limit guide groove 31 can be provided with and be engaged with limit guide groove 31 with the installation of auxiliary criteria section 21 at the top of standard knot 21 Sliver 22, the bottom of standard knot 21 be provided be engaged with the sliver 22 agree with groove 23, the opening of limit guide groove 31 is in loudspeaker Mouthful, when standard knot 21 is installed additional in jacking stock 3, sliver 22 can be allowed to be moved along limit guide groove 31, it is easier to alignment, Guide groove 31 also agrees with agreeing with groove 23 after alignment, facilitates the standard knot 21 of upper-lower position to be aligned and agrees with, has and utilize next step standard The fixation of section 21.

Claims (7)

1. it is a kind of can with the tower crane of fast assembling-disassembling balancing weight, including pedestal (1), tower body (2), jacking stock (3), turntable (6), Crane arm (5), counter-jib (4) and balancing weight (11), described tower body (2) are built by several standard knots (21), described Jacking stock (3) can be moved on the standard knot (21), and the turntable (6) is arranged at the top of the jacking stock (3), its It is characterized as, the crane arm (5) and the counter-jib (4) are arranged on the turntable (6), the crane arm (5) and described Counter-jib (4) position is relative, and counterweight lowering or hoisting gear (8), the counterweight lowering or hoisting gear are provided with described jacking stock (3) (8) it can move up and down, be provided with the counter-jib (4) and the counterweight lowering or hoisting gear (8) inside the standard knot (21) The fixing device of the fixed balancing weight (11) is additionally provided with the counterweight slideway (41) being engaged, described counter-jib (4) (44) and the protection balancing weight (11) airbag apparatus (45), described airbag apparatus (45) includes being arranged on the counter-jib (4) the repeatable inflated airbag (451) of top bottom, described air bag (451) is the cuboid of opening upwards, described gas It is provided between capsule (451) and described counter-jib (4) on fast connection interface (452), the turntable (6) and is respectively arranged with lifting Rotating shaft (63) and balance rotating shaft (61), crane arm (5) are rotatably arranged in lifting rotating shaft (63), and counter-jib (4) is rotatably arranged on Balance in rotating shaft (61), the crane arm (5) and the counter-jib (4) position are relative, are provided with the crane arm (5) some It is provided with and matches with the first electric expansion fix bar (64) on individual first electric expansion fix bar (64), described turntable (6) Several second electric expansion fix bars (62), described turntable (6) are provided with the first fixing groove of conjunction, the counter-jib (4) On be provided with the second fixing groove being engaged with the second electric expansion fix bar (62).
2. it is according to claim 1 it is a kind of can with the tower crane of fast assembling-disassembling balancing weight, it is characterized in that, described counterweight lifting Device (8) includes being provided with some drawstrings (82), described drawstring (82) on lifter (81), described lifter (81) It is provided with counterweight fixed station (83), described counterweight fixed station (83) and is provided with fixed station slideway (84), described fixed station On slideway (84) slide be provided with several balancing weight fixed mounts (85), described counterweight slideway (41) be provided with it is described solid Determine the alignment device (43) that platform slideway (84) is engaged.
3. it is according to claim 2 it is a kind of can with the tower crane of fast assembling-disassembling balancing weight, it is characterized in that, the alignment device (43) include being provided with connecting plate (432), described connecting plate on electric rotation shaft (431), described electric rotation shaft (431) (432) the connection slideway (433) with the fixed station slideway (84) and the counterweight slideway (41) cooperation is provided with, it is described Be additionally provided with connecting plate (432) on several electric expansion limited posts (434), described counterweight fixed station (83) be provided with The spacing hole (86) that the electric expansion limited post (434) matches.
4. it is according to claim 3 it is a kind of can with the tower crane of fast assembling-disassembling balancing weight, it is characterized in that, described spacing hole (86) it is tapered, inwardly it is gradually reduced at opening.
5. it is according to claim 2 it is a kind of can with the tower crane of fast assembling-disassembling balancing weight, it is characterized in that, described balancing weight is consolidated Determine to be provided with protection framework (853), motor (851) and electronic locked piece (852) on frame (85).
6. it is according to claim 5 it is a kind of can with the tower crane of fast assembling-disassembling balancing weight, it is characterized in that, described protection framework (853) it is respectively arranged with inside fixed lobe (854), described balancing weight (11) and is provided with and the fixation on biside plate The fixed groove that raised (854) are engaged.
7. it is according to claim 1 it is a kind of can with the tower crane of fast assembling-disassembling balancing weight, it is characterized in that, the counterweight slideway (41) several supporting linkages (42) are provided between the counter-jib (4).
CN201510829590.3A 2015-11-25 2015-11-25 It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight Active CN105293304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510829590.3A CN105293304B (en) 2015-11-25 2015-11-25 It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510829590.3A CN105293304B (en) 2015-11-25 2015-11-25 It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight

Publications (2)

Publication Number Publication Date
CN105293304A CN105293304A (en) 2016-02-03
CN105293304B true CN105293304B (en) 2017-09-19

Family

ID=55191260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510829590.3A Active CN105293304B (en) 2015-11-25 2015-11-25 It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight

Country Status (1)

Country Link
CN (1) CN105293304B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106629405B (en) * 2016-12-13 2018-04-24 泰山石膏(江阴)有限公司 A kind of large-scale weak wind apparatus of plasterboard crane
CN107244610B (en) * 2016-12-13 2019-06-14 江苏博阳智慧电气股份有限公司 A kind of security monitoring system of hoister
CN112239160B (en) * 2020-11-04 2023-08-04 常德市荣程机械有限公司 Node connection structure of tower machine forearm

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4567990A (en) * 1983-08-16 1986-02-04 Bellio Stephen L Self-balancing crane
CN2793032Y (en) * 2005-03-17 2006-07-05 辽宁工程技术大学 Adjustable counterweight tower shaped crane
CN203513191U (en) * 2013-10-28 2014-04-02 安徽德摩新能源叉车股份有限公司 Forklift with anti-collision structure
CN203998711U (en) * 2014-08-25 2014-12-10 中铁十一局集团有限公司 Civil engineering tower crane

Also Published As

Publication number Publication date
CN105293304A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105271024B (en) Tower crane with windproof structure
CN105293304B (en) It is a kind of can be with the tower crane of fast assembling-disassembling balancing weight
CN105293301B (en) Windproof tower crane
CN104176648A (en) Luffing fixed crane for wire rope of single-arm rack
CN103817507B (en) Replacement method for pitching hinged point bearing of reclaimer
CN105293299B (en) Windproof derrick crane for building
CN105293302B (en) Tower crane with wind-shielding function
CN105293312B (en) A kind of derrick crane
CN105293321B (en) Derrick crane
CN205527438U (en) Portable transformer hoist device
CN105293300B (en) Can be with the tower crane of fast assembling-disassembling balancing weight
CN105293316B (en) A kind of windproof tower crane
CN203998705U (en) Single arm frame steel wire rope luffing stationary crane
CN105293311B (en) A kind of tower crane with wind-shielding function
CN105293310B (en) A kind of tower crane with windproof structure
CN105293303B (en) A kind of windproof derrick crane for building
CN203635907U (en) Novel steel ladle tipper
CN2921182Y (en) Improved concrete support concreting machine
CN105155506B (en) Dynamic compaction machine and dynamic compaction method
CN108657968A (en) One kind prevents steel cable from falling off telescopic crane
CN203212250U (en) Special compression bar for automatic disassembly-assembly method of dynamic compactor counter weight
CN205000318U (en) Dynamic compaction machine
CN205289314U (en) Take alarming function's looper machine pay off rack convenient to installation
CN111170168B (en) Pole operation hoisting device
CN207105281U (en) Batching plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191023

Address after: 314511 room 1-402, building 647, Shiji Avenue, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee after: Jiaxing Juteng Information Technology Co., Ltd.

Address before: 315202 West Village, Jiulong Town, Zhenhai District, Zhejiang, Ningbo

Patentee before: ZHENHAI CONSTRUCTION GROUP CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210525

Address after: 215611 Changyin Sha Zhujiang Road, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee after: ZHANGJIAGANG ZHONGLIAN CONSTRUCTION MACHINERY Co.,Ltd.

Address before: Room 1-402, building 647, Century Avenue, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee before: Jiaxing Juteng Information Technology Co.,Ltd.

TR01 Transfer of patent right