CN105257024A - All-interior top board and wallboard connection structure for unit bathroom - Google Patents

All-interior top board and wallboard connection structure for unit bathroom Download PDF

Info

Publication number
CN105257024A
CN105257024A CN201510557100.9A CN201510557100A CN105257024A CN 105257024 A CN105257024 A CN 105257024A CN 201510557100 A CN201510557100 A CN 201510557100A CN 105257024 A CN105257024 A CN 105257024A
Authority
CN
China
Prior art keywords
wallboard
top board
ceiling
connecting portion
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510557100.9A
Other languages
Chinese (zh)
Other versions
CN105257024B (en
Inventor
陈忠义
胡福涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Cozy Sanitary Wares Equipment Co ltd
Original Assignee
SUZHOU COZY HOUSE EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU COZY HOUSE EQUIPMENT CO Ltd filed Critical SUZHOU COZY HOUSE EQUIPMENT CO Ltd
Priority to CN201510557100.9A priority Critical patent/CN105257024B/en
Publication of CN105257024A publication Critical patent/CN105257024A/en
Application granted granted Critical
Publication of CN105257024B publication Critical patent/CN105257024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Residential Or Office Buildings (AREA)
  • Finishing Walls (AREA)

Abstract

The invention provides an all-interior top board and wallboard connection structure for a unit bathroom. The structure comprises a civil ceiling and a civil wall, a top board, a wallboard, and first and second connectors, the top board comprises a ceiling connection portion and a wall connection portion located on the right side of the ceiling connection portion, the top of the wallboard is connected with the wall connection portion, the first connector extends up through the ceiling connection portion and is connected with the civil ceiling, the second connector extends from left to right through the wallboard and is connected with the wallboard connection portion. The all-interior top board and wallboard connection structure for the unit bathroom according to embodiments of the invention needs no mounting space to be reserved and makes effective use of limited space.

Description

For the complete in-built top board-panel joining structure of integral bathroom
Technical field
The present invention relates to a kind of complete in-built top board-panel joining structure for integral bathroom.
Background technology
In correlation technique, as shown in Figure 1, top board 10 ' is fastened on the top of wallboard 20 ' for the top board of integral bathroom and the syndeton of wallboard, then both is connected by screw 30 '.Due to civil engineering ceiling 410 ' and the restriction of civil engineering wall 420 ', and due to the length of wallboard 20 ' almost contour with the height of wall, then during mounting screw 30 ', must from top board 10 ' downwards with the top of wallboard 20 ' to being connected.Like this, installing needs at top board 10 ' larger installing space reserved with civil engineering ceiling 410 ', space availability ratio is caused to reduce.
Summary of the invention
The present invention is intended to solve one of technical problem in correlation technique at least to a certain extent.
For this reason, one object of the present invention is to propose the complete in-built top board-panel joining structure for integral bathroom that a kind of structure is simple, improve space availability ratio.
According to the syndeton of the complete in-built top board-wallboard for integral bathroom of the embodiment of the present invention, comprising: civil engineering ceiling and civil engineering wall; Top board, described top board comprises ceiling connecting portion and is positioned at the wallboard connecting portion on right side of described ceiling connecting portion; Wallboard, the top of described wallboard is connected with described wallboard connecting portion; First connector and the second connector, described first connector is upward through described ceiling connecting portion and is connected with described civil engineering ceiling, and described second connector passes described wallboard from left to right and is connected with described wallboard connecting portion.
According to the syndeton of the complete in-built top board-wallboard for integral bathroom of the embodiment of the present invention, described first connector is upward through described ceiling connecting portion and is connected with described civil engineering ceiling, described second connector passes described wallboard from left to right and is connected with described wallboard connecting portion, without the need to installing space reserved between top board and civil engineering ceiling, effectively utilize the confined space.
In addition, the syndeton of the complete in-built top board-wallboard for integral bathroom according to the above embodiment of the present invention can also have following additional technical characteristic:
According to an example of the present invention, the syndeton of described complete in-built top board-wallboard for integral bathroom also comprises top board line ball, described top board also has the mounting groove portion be positioned on the left of described ceiling connecting portion, and described top board line ball is located in described mounting groove portion.
According to an example of the present invention, described top board is SMC top board, and described wallboard is SMC wallboard.
According to an example of the present invention, described first connector is swell fixture, and described second connector is tapping screw.
Additional aspect of the present invention and advantage will part provide in the following description, and part will become obvious from the following description, or be recognized by practice of the present invention.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the syndeton of the complete in-built top board-wallboard for integral bathroom in correlation technique.
Fig. 2 is according to an embodiment of the invention for the schematic diagram of the syndeton of the complete in-built top board-wallboard of integral bathroom.
Fig. 3 is the close-up schematic view of A in Fig. 2.
Detailed description of the invention
Be described below in detail embodiments of the invention, the example of described embodiment is shown in the drawings, and wherein same or similar label represents same or similar element or has element that is identical or similar functions from start to finish.Be exemplary below by the embodiment be described with reference to the drawings, be intended to for explaining the present invention, and can not limitation of the present invention be interpreted as.
Below with reference to the accompanying drawings the syndeton of the complete in-built top board-wallboard for integral bathroom according to the embodiment of the present invention is described in detail.
As shown in Figures 2 and 3, according to the syndeton of the complete in-built top board-wallboard for integral bathroom of the embodiment of the present invention, comprising: civil engineering ceiling 110, civil engineering wall 120, top board 20, wallboard 30, the first connector 40, second connector 50.
Specifically, top board 20 comprises ceiling connecting portion 201 and is positioned at the wallboard connecting portion 202 of the right side (direction namely indicated by arrow right as shown in Figure 2) side of ceiling connecting portion 201.Top board 20 can be SMC top board
Top (namely indicated on the arrow as shown in Figure 2 direction) portion of wallboard 30 is connected with wallboard connecting portion 201.Be understandable that, the right flank of wallboard 30 is close to civil engineering wall 120 and the top of wallboard 30 is connected with wallboard connecting portion 201.In other words, wallboard connecting portion 201 is between the right flank and civil engineering wall 120 of wallboard 30.Wallboard 30 can be SMC wallboard.
First connector 40 of such as swell fixture upwards (namely indicated on arrow as shown in Figure 2 direction) is connected with civil engineering ceiling 110 through ceiling connecting portion 201, to be fixed on civil engineering ceiling 110 by top board 20.
Second connector 50 of such as tapping screw is connected with wallboard connecting portion 202 through wallboard 30 by left (direction namely indicated by an arrow left side as shown in Figure 2) to the right side (direction namely indicated by arrow right as shown in Figure 2), with make top board 20 and wallboard 30 fastened to each other.
In other words, according to the syndeton of the complete in-built top board-wallboard for integral bathroom of the embodiment of the present invention when mounted, first by relative with civil engineering ceiling for the ceiling connecting portion 201 of top board 20 and make the wallboard connecting portion 202 of top board 20 relative with civil engineering wall 120.The first connector 40 is adopted to be upward through ceiling connecting portion 201, to be fixed on civil engineering ceiling 110 by top board 20.The top of wallboard 30 is connected with wallboard connecting portion 201.Adopt the second connector 50 pass wallboard 30 from left to right and be connected with wallboard connecting portion 202, interfix to make top board 20 and wallboard 30.
That is, install within the space that the first connector 40 and the second connector 50 can be formed at top board 20 and wallboard 30.Compared in correlation technique, screw needs are installed outside the space that top board 20 and wallboard 30 are formed, and without the need to installing space reserved between top board 20 and civil engineering ceiling 110, effectively can utilize the confined space.
Advantageously, according to an example of the present invention, the syndeton of described complete in-built top board-wallboard for integral bathroom also comprises top board line ball 60.Top board 20 also has the mounting groove portion 203 being positioned at ceiling connecting portion 201 left side (direction namely indicated by an arrow left side as shown in Figure 2) side, top board line ball 60 is located in mounting groove portion 203, to eliminate the fit clearance between top board 20 and civil engineering ceiling 110.
Be understandable that, the syndeton according to the complete in-built top board-wallboard for integral bathroom of the embodiment of the present invention also comprises middle seam/corner section bar 70.That is, in the stitching portion of multiple wallboard, and between the wallboard at corner place, middle seam/corner section bar 70 can eliminate the fit clearance between the stitching portion of multiple wallboard and the wallboard at corner place.
In describing the invention, it will be appreciated that, term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", " on ", D score, " front ", " afterwards ", " left side ", " right side ", " vertically ", " level ", " top ", " end " " interior ", " outward ", " clockwise ", " counterclockwise ", " axis ", " radial direction ", orientation or the position relationship of the instruction such as " circumference " are based on orientation shown in the drawings or position relationship, only the present invention for convenience of description and simplified characterization, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore limitation of the present invention can not be interpreted as.
In addition, term " first ", " second " only for describing object, and can not be interpreted as instruction or hint relative importance or imply the quantity indicating indicated technical characteristic.Thus, be limited with " first ", the feature of " second " can express or impliedly comprise one or more these features.In describing the invention, the implication of " multiple " is two or more, unless otherwise expressly limited specifically.
In the present invention, unless otherwise clearly defined and limited, the term such as term " installation ", " being connected ", " connection ", " fixing " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or integral; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals or the interaction relationship of two elements.For the ordinary skill in the art, above-mentioned term concrete meaning in the present invention can be understood as the case may be.
In the present invention, unless otherwise clearly defined and limited, fisrt feature second feature " on " or D score can be that the first and second features directly contact, or the first and second features are by intermediary mediate contact.And, fisrt feature second feature " on ", " top " and " above " but fisrt feature directly over second feature or oblique upper, or only represent that fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " below " and " below " can be fisrt feature immediately below second feature or tiltedly below, or only represent that fisrt feature level height is less than second feature.
In the description of this manual, specific features, structure, material or feature that the description of reference term " embodiment ", " some embodiments ", " example ", " concrete example " or " some examples " etc. means to describe in conjunction with this embodiment or example are contained at least one embodiment of the present invention or example.In this manual, to the schematic representation of above-mentioned term not must for be identical embodiment or example.And the specific features of description, structure, material or feature can combine in one or more embodiment in office or example in an appropriate manner.In addition, when not conflicting, the feature of the different embodiment described in this manual or example and different embodiment or example can carry out combining and combining by those skilled in the art.
Although illustrate and describe embodiments of the invention above, be understandable that, above-described embodiment is exemplary, can not be interpreted as limitation of the present invention, and those of ordinary skill in the art can change above-described embodiment within the scope of the invention, revises, replace and modification.

Claims (4)

1., for a syndeton for the complete in-built top board-wallboard of integral bathroom, it is characterized in that, comprising:
Civil engineering ceiling and civil engineering wall;
Top board, described top board comprises ceiling connecting portion and is positioned at the wallboard connecting portion on right side of described ceiling connecting portion;
Wallboard, the top of described wallboard is connected with described wallboard connecting portion;
First connector and the second connector, described first connector is upward through described ceiling connecting portion and is connected with described civil engineering ceiling, and described second connector passes described wallboard from left to right and is connected with described wallboard connecting portion.
2. the syndeton of the complete in-built top board-wallboard for integral bathroom according to claim 1, it is characterized in that, also comprise top board line ball, described top board also has the mounting groove portion be positioned on the left of described ceiling connecting portion, and described top board line ball is located in described mounting groove portion.
3. the syndeton of the complete in-built top board-wallboard for integral bathroom according to claim 1, it is characterized in that, described top board is SMC top board, and described wallboard is SMC wallboard.
4. the syndeton of the complete in-built top board-wallboard for integral bathroom according to claim 1, it is characterized in that, described first connector is swell fixture, and described second connector is tapping screw.
CN201510557100.9A 2015-09-02 2015-09-02 Complete built-in top plate panel joining structure for integral bathroom Active CN105257024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510557100.9A CN105257024B (en) 2015-09-02 2015-09-02 Complete built-in top plate panel joining structure for integral bathroom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510557100.9A CN105257024B (en) 2015-09-02 2015-09-02 Complete built-in top plate panel joining structure for integral bathroom

Publications (2)

Publication Number Publication Date
CN105257024A true CN105257024A (en) 2016-01-20
CN105257024B CN105257024B (en) 2017-12-22

Family

ID=55096926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510557100.9A Active CN105257024B (en) 2015-09-02 2015-09-02 Complete built-in top plate panel joining structure for integral bathroom

Country Status (1)

Country Link
CN (1) CN105257024B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4660332A (en) * 1983-05-05 1987-04-28 Shanni International, Inc. Prefabricated folding structure
CN2549081Y (en) * 2002-05-22 2003-05-07 中山市雅立洁具有限公司 Structure of sectional materials
CN101812862A (en) * 2010-03-31 2010-08-25 周毅 Integral foldable integral hoisting dismountable mobile toilet
CN201756864U (en) * 2010-07-03 2011-03-09 中山市莎丽卫浴设备有限公司 Fixing clamp for shower door
CN101988337A (en) * 2009-08-04 2011-03-23 侯国山 Flat-plate type roofed solar bathroom
CN202154602U (en) * 2011-05-25 2012-03-07 阿波罗(中国)有限公司 Shower room

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4660332A (en) * 1983-05-05 1987-04-28 Shanni International, Inc. Prefabricated folding structure
CN2549081Y (en) * 2002-05-22 2003-05-07 中山市雅立洁具有限公司 Structure of sectional materials
CN101988337A (en) * 2009-08-04 2011-03-23 侯国山 Flat-plate type roofed solar bathroom
CN101812862A (en) * 2010-03-31 2010-08-25 周毅 Integral foldable integral hoisting dismountable mobile toilet
CN201756864U (en) * 2010-07-03 2011-03-09 中山市莎丽卫浴设备有限公司 Fixing clamp for shower door
CN202154602U (en) * 2011-05-25 2012-03-07 阿波罗(中国)有限公司 Shower room

Also Published As

Publication number Publication date
CN105257024B (en) 2017-12-22

Similar Documents

Publication Publication Date Title
CN204335267U (en) Air conditioner and electric-controlled box assembly thereof
CN203774715U (en) Refrigerator and wire outlet structure thereof
CN204335266U (en) The electric-controlled box radiator structure of air conditioner
CN105063968A (en) Washing machine
CN105257024A (en) All-interior top board and wallboard connection structure for unit bathroom
CN105934093A (en) Flexible-rigid combined printed circuit board
CN203907904U (en) Fixing part
JP5515950B2 (en) Electrical equipment mounting structure
CN204434996U (en) Washing machine
CN204385486U (en) Washing machine
CN102997569B (en) Compressor installation board and refrigerator with same
CN203698207U (en) Anti-theft horn, anti-theft horn fixing support and automobile provided with anti-theft horn and anti-theft horn fixing support
CN102544785A (en) A device for positioning at least one multiple round plug
CN103625428A (en) Wiper motor fixing system
CN204100506U (en) The auxiliary hot assembly of electricity of air-conditioner and the auxiliary hot mounting structure of electricity of air-conditioner
CN104600898A (en) Plug assembly, motor with the same, and compressor
CN204628808U (en) Cableties assembly and there is its air conditioner
CN205747506U (en) The expansion drum mounting structure of hot water machine and there is its hot water machine
CN204104232U (en) Electric-controlled box and there is the dehumidifier of this electric-controlled box
CN203415916U (en) Wire harness support, wire harness support apparatus and gearbox with wire harness support apparatus
CN204027201U (en) The aobvious control plate mounting box assembly of refrigerator
CN204153987U (en) For the temperature controller component of electric heater
CN203339493U (en) Mounting structure used for current transformer in ring main unit
CN204177037U (en) Case courage assembly and the refrigeration plant with it
CN205012060U (en) Washing machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231016

Address after: 241000 Wuhu Mechanical Industrial Park, Wuhu, Anhui

Patentee after: WUHU COZY SANITARY WARES EQUIPMENT Co.,Ltd.

Address before: 215000 No.189, Wangjiang Road, Weiting, Suzhou Industrial Park, Jiangsu Province

Patentee before: SUZHOU COZY HOUSE EQUIPMENT Co.,Ltd.

TR01 Transfer of patent right