CN105244802A - Novel multi-functional rush-repair material box for high-voltage power distribution line pole tower - Google Patents
Novel multi-functional rush-repair material box for high-voltage power distribution line pole tower Download PDFInfo
- Publication number
- CN105244802A CN105244802A CN201510613036.1A CN201510613036A CN105244802A CN 105244802 A CN105244802 A CN 105244802A CN 201510613036 A CN201510613036 A CN 201510613036A CN 105244802 A CN105244802 A CN 105244802A
- Authority
- CN
- China
- Prior art keywords
- box
- hanging
- power distribution
- voltage power
- distribution line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Patch Boards (AREA)
Abstract
本发明提供一种新型多功能高压配电线路杆塔用抢修材料箱,包括箱体,吊环,箱门,合页,拉杆,滑轮,站柱,小号抽屉箱,大号抽屉箱,拉手,放置腔,连接板,挂钩,挂环,挂槽,箱锁和挂板,所述的吊环设置在箱体的上部;所述的箱门通过合页安装在箱体的前部;所述的拉杆安装在箱体上端的后部位置。本发明通过箱体,吊环,箱门,合页,拉杆,滑轮,小号抽屉箱,大号抽屉箱,挂钩,挂环,挂槽和挂板的设置,有利于在高压配电杆塔作业中,起吊方便、安全,便于在杆塔上悬挂放置,可放置不同规格、形状不一的配电线路常用配件,实现对配电线路常用工具的立体存放,取用方便快捷,实现抢修材料箱的多功能性,进而节省时间、人力,提高工作效率。
The invention provides a novel multi-functional high-voltage power distribution line pole tower repair material box, including a box body, a suspension ring, a box door, a hinge, a pull rod, a pulley, a stand column, a small drawer box, a large drawer box, a handle, and a Cavity, connecting plate, hook, hanging ring, hanging groove, box lock and hanging plate, the hanging ring is arranged on the upper part of the box body; the box door is installed on the front part of the box body through a hinge; the pull rod Installed at the rear position of the upper end of the cabinet. The present invention is beneficial to the operation of high-voltage power distribution poles and towers through the arrangement of box body, suspension ring, box door, hinge, pull rod, pulley, small drawer box, large drawer box, hook, hanging ring, hanging groove and hanging plate. , convenient and safe to lift, easy to hang and place on the tower, can place common accessories of distribution lines of different specifications and shapes, realize three-dimensional storage of common tools for distribution lines, convenient and quick access, and realize multiple emergency repair material boxes Functionality, thus saving time, manpower and improving work efficiency.
Description
技术领域technical field
本发明属于配电工具技术领域,尤其涉及一种新型多功能高压配电线路杆塔用抢修材料箱。The invention belongs to the technical field of power distribution tools, and in particular relates to a novel multifunctional emergency repair material box for towers of high-voltage power distribution lines.
背景技术Background technique
目前,10kV配电线路支线跌落和保险丝型号较多,故障后,抢修人员需要携带较多型号的物资到达现场,根据现场使用相应的抢修物资,延长了抢修的时间,不能快速进行故障处理,增加运维人员的工作量,无法快速恢复居民用户正常用电,易引起用户不满而投诉,影响企业生产用电,现有的材料箱箱体内均没有用于材料固定的固定装置,由于操作均为高空作业,当操作时不小心会使材料箱倾斜至材料发生脱落现象。现有专利号为CN104037651A的一种适用于10kV配电线路杆塔用抢修材料箱,包括箱体、设置在箱体上可拆卸的废料收集部,所述箱体上设有放置腔,所述放置腔内设有至少一块将放置腔分隔成至少两个放料腔的水平隔板,每个所述放料腔上均活动连接有至少一块活动板,所述活动板上设有放料槽,在放置腔与箱体之间形成供废料流动至废料收集部的进料间隙,所述进料间隙的底端截面为圆弧形,所述箱体上设有至少一个与进料间隙相通的进料口,所述废料收集部的顶端开有截面成上大下小的喇叭口形的进料孔,在进料孔下方的废料收集部设有与进料孔相通的收料槽,所述废料收集部上设有若干个散热孔,所述箱体的底端设有供箱体安装的安装部,所述废料收集部设置在安装部的下方,所述箱体上转动连接有将放置腔密封的密封板,所述密封板的一端通过合页转动连接在箱体上,所述密封板的另一端通过锁扣锁紧在所述箱体上。此种抢修材料箱减少了抢修准备时间,提高了抢修效率,但确存在着功能单一,使用携带不方便,不能进一步的适应高压配电线路维修的问题。At present, there are many types of 10kV distribution line branch drops and fuses. After a fault, emergency repair personnel need to bring more types of materials to the scene. According to the corresponding emergency repair materials used on site, the time for emergency repair is prolonged, and the fault cannot be quickly handled. Due to the workload of operation and maintenance personnel, it is impossible to quickly restore the normal power consumption of residential users, which may easily cause dissatisfaction and complaints from users, and affect the production power consumption of enterprises. There is no fixing device for material fixing in the existing material box. When working at high altitude, the material box will be tilted to cause the material to fall off due to carelessness during operation. The existing patent number is CN104037651A, which is suitable for a repair material box for 10kV distribution line towers, including a box body and a detachable waste collection part arranged on the box body. The box body is provided with a placement cavity, and the placement The cavity is provided with at least one horizontal partition that separates the placement cavity into at least two discharge cavities, each of the discharge cavities is movably connected with at least one movable plate, and the movable plate is provided with a discharge trough, A feed gap for waste materials to flow to the waste material collection part is formed between the placement cavity and the box body. The top of the waste material collection part is provided with a feed hole in the shape of a trumpet shape with a large upper part and a smaller lower part. The waste material collection part below the feed hole is provided with a receiving trough communicated with the feed hole. The waste collection part is provided with several cooling holes, the bottom of the box is provided with a mounting part for the installation of the box, the waste collection part is arranged below the installation part, and the box is rotatably connected with a A sealing plate for cavity sealing, one end of the sealing plate is rotatably connected to the box body through a hinge, and the other end of the sealing plate is locked on the box body through a lock. This kind of emergency repair material box reduces the preparation time for emergency repair and improves the efficiency of emergency repair, but it does have the problems of single function, inconvenient use and carrying, and cannot be further adapted to the maintenance of high-voltage power distribution lines.
因此,发明一种新型多功能高压配电线路杆塔用抢修材料箱显得非常必要。Therefore, it is very necessary to invent a kind of novel multifunctional high-voltage power distribution line pole tower with emergency repair material box.
发明内容Contents of the invention
为了解决上述技术问题,本发明提供一种新型多功能高压配电线路杆塔用抢修材料箱,以解决现有的高压配电线路杆塔用抢修材料箱存在着功能单一,使用携带不方便,不能进一步的适应高压配电线路维修的问题。一种新型多功能高压配电线路杆塔用抢修材料箱,包括箱体,吊环,箱门,合页,拉杆,滑轮,站柱,小号抽屉箱,大号抽屉箱,拉手,放置腔,连接板,挂钩,挂环,挂槽,箱锁和挂板,所述的吊环设置在箱体的上部;所述的箱门通过合页安装在箱体的前部;所述的拉杆安装在箱体上端的后部位置;所述的滑轮安装固定在箱体的底部的后侧位置;所述的站柱安装固定在箱体的底部的前侧位置;所述的小号抽屉箱安装在箱体内的上部;所述的大号抽屉箱设置在小号抽屉箱的下部;所述的拉手分别安装在小号抽屉箱或者大号抽屉箱上;所述的放置腔设置在大号抽屉箱的下部;所述的挂钩或者挂环分别通过连接板安装固定在箱门上;所述的挂槽焊接固定在挂环的下部;所述的箱锁安装在箱体的右侧边位置;所述的挂板焊接固定在箱体的背面。In order to solve the above-mentioned technical problems, the present invention provides a novel multifunctional high-voltage power distribution line tower repair material box to solve the problem that the existing high-voltage power distribution line pole tower repair material box has a single function, is inconvenient to use and carry, and cannot be further used. The problem of adapting to the maintenance of high-voltage distribution lines. A new type of multi-functional high-voltage power distribution line pole tower repair material box, including box body, lifting ring, box door, hinge, pull rod, pulley, stand column, small drawer box, large drawer box, handle, placement cavity, connection plate, hook, hanging ring, hanging groove, box lock and hanging plate, the hanging ring is arranged on the upper part of the box body; the box door is installed on the front part of the box body through a hinge; The rear position of the upper end of the body; the pulley is installed and fixed at the rear position of the bottom of the box; the station column is installed and fixed at the front side of the bottom of the box; The upper part of the body; the large drawer box is set at the bottom of the small drawer box; the handles are respectively installed on the small drawer box or the large drawer box; the placement cavity is set on the large drawer box Bottom; said hook or hanging ring are respectively installed and fixed on the box door through the connecting plate; said hanging groove is welded and fixed on the lower part of the hanging ring; said box lock is installed on the right side of the box; said The hanging plate is welded and fixed on the back of the box.
所述的吊环具体采用半圆形环,所述的吊环活动设置在箱体的上部,所述的吊环具体设置为2个,有利于在高压配电杆塔作业中,起吊方便、安全,进而节省时间、人力,提高工作效率。The lifting ring specifically adopts a semicircular ring, and the lifting ring is movably arranged on the upper part of the box body, and the number of the lifting ring is specifically set to 2, which is conducive to convenient and safe lifting in the operation of high-voltage power distribution towers, thereby saving time, manpower, and improve work efficiency.
所述的合页具体采用180度任意定位液压合页,通过与箱门和箱体的配合安装,有利于箱门根据工作需要灵活定位开关的位置,方便工具的取用,进而节省时间,提高工作效率。The hinge specifically adopts a 180-degree arbitrary positioning hydraulic hinge, which is conducive to the flexible positioning of the switch according to the work needs of the door through the cooperative installation with the box door and the box body, and facilitates the access of tools, thereby saving time and improving work efficiency.
所述的拉杆具体采用可伸缩式拉杆,所述的拉杆活动连接在箱体的上部,通过与箱体和滑轮的配合安装,有利于箱体移动携带方便,减轻工人的劳动强度,进一步的适应配电线路的维修工作。The pull rod specifically adopts a retractable pull rod, and the pull rod is movably connected to the upper part of the box body. By cooperating with the box body and the pulley, it is convenient to move and carry the box body, reduce the labor intensity of workers, and further adapt to the Maintenance work on distribution lines.
所述的滑轮具体采用聚氨酯材质制成的定向轮,通过与箱体和站柱的配合安装,有利于箱体移动方便,放置平稳,增加材料箱的多功能性。The pulley is specifically made of directional wheels made of polyurethane material, which is facilitated to move the box body, place it stably, and increase the versatility of the material box by cooperating with the box body and the stand column.
所述的小号抽屉箱具体采用长宽高为30*20*10cm的长方体箱,所述的小号抽屉箱具体设置为6个,所述的大号抽屉箱具体采用长宽高为30*20*20cm的长方体箱,所述的大号抽屉箱具体设置为2个,通过在箱体内的设置,有利于分类放置不同规格、形状不一的配电线路常用配件,满足高压配电线路的抢修需求。The small drawer box specifically adopts a cuboid box with a length, width and height of 30*20*10cm, and the number of small drawer boxes is specifically set to 6, and the large drawer box specifically adopts a length, width and height of 30*10cm. 20*20cm cuboid box, the above-mentioned large-sized drawer box is specifically set to 2, through the setting in the box body, it is beneficial to classify and place commonly used accessories of power distribution lines of different specifications and shapes, and meet the needs of high-voltage power distribution lines. Repair needs.
所述的挂钩、挂环或者挂槽分别通过连接板焊接固定在箱门内侧,所述的挂钩、挂环或者挂槽具体呈上下均匀排列设置,通过与箱体的配合安装,有利于实现对配电线路常用工具的立体存放,取用方便快捷,实现抢修材料箱的多功能性。The described hooks, hanging rings or hanging grooves are respectively welded and fixed on the inner side of the box door through the connecting plate, and the described hooks, hanging rings or hanging grooves are arranged evenly up and down. The three-dimensional storage of commonly used tools for power distribution lines is convenient and quick to access, realizing the versatility of the emergency repair material box.
所述的挂板具体采用宽度为2cm至5cm的倒L形板,所述的挂板具体在箱体的背面平行焊接设置有两个,有利于在高压配电线路抢修过程中,便与箱体在杆塔上悬挂放置,方便维修工作的顺利进行。The hanging board specifically adopts an inverted L-shaped board with a width of 2cm to 5cm. Specifically, two hanging boards are welded in parallel on the back of the box body, which is beneficial to the high-voltage distribution line repair process. The body is suspended and placed on the pole tower to facilitate the smooth progress of maintenance work.
所述的箱体具体采用厚度为1mm至3mm的不锈钢板制成的,有利于防锈,耐腐蚀,适应在各种复杂天气情况下的使用,延长使用寿命,进而节约成本。The box body is specifically made of stainless steel plate with a thickness of 1 mm to 3 mm, which is beneficial to rust prevention and corrosion resistance, adapts to use in various complicated weather conditions, prolongs service life, and saves cost.
与现有技术相比,本发明具有如下有益效果:本发明通过箱体,吊环,箱门,合页,拉杆,滑轮,小号抽屉箱,大号抽屉箱,挂钩,挂环,挂槽和挂板的设置,有利于在高压配电杆塔作业中,起吊方便、安全,便与在杆塔上悬挂放置,可放置不同规格、形状不一的配电线路常用配件,实现对配电线路常用工具的立体存放,取用方便快捷,实现抢修材料箱的多功能性,进而节省时间、人力,提高工作效率。Compared with the prior art, the present invention has the following beneficial effects: the present invention has the following beneficial effects: the present invention passes through casing, suspension ring, chamber door, hinge, pull rod, pulley, small drawer box, large drawer box, hook, hanging ring, hanging groove and The setting of the hanging board is conducive to the convenient and safe lifting during the operation of the high-voltage power distribution tower. The three-dimensional storage is convenient and fast, and the multi-functionality of the emergency repair material box is realized, which saves time and manpower and improves work efficiency.
附图说明Description of drawings
图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图2是本发明的箱体内部结构示意图。Fig. 2 is a schematic diagram of the internal structure of the box of the present invention.
图3是本发明的侧面结构示意图。Fig. 3 is a schematic view of the side structure of the present invention.
图中:In the picture:
1-箱体,2-吊环,3-箱门,4-合页,5-拉杆,6-滑轮,7-站柱,8-小号抽屉箱,9-大号抽屉箱,10-拉手,11-放置腔,12-连接板,13-挂钩,14-挂环,15-挂槽,16-箱锁,17-挂板。1-box, 2-ring, 3-door, 4-hinge, 5-tie rod, 6-pulley, 7-post, 8-small drawer box, 9-large drawer box, 10-handle, 11-placement cavity, 12-connecting plate, 13-hook, 14-hanging ring, 15-hanging groove, 16-case lock, 17-hanging plate.
具体实施方式detailed description
以下结合附图对本发明做进一步描述:The present invention will be further described below in conjunction with accompanying drawing:
实施例:Example:
如附图1至附图3所示:As shown in accompanying drawing 1 to accompanying drawing 3:
本发明提供一种新型多功能高压配电线路杆塔用抢修材料箱,包括箱体1,吊环2,箱门3,合页4,拉杆5,滑轮6,站柱7,小号抽屉箱8,大号抽屉箱9,拉手10,放置腔11,连接板12,挂钩13,挂环14,挂槽15,箱锁16和挂板17,所述的吊环2设置在箱体1的上部;所述的箱门3通过合页4安装在箱体1的前部;所述的拉杆5安装在箱体1上端的后部位置;所述的滑轮6安装固定在箱体1的底部的后侧位置;所述的站柱7安装固定在箱体1的底部的前侧位置;所述的小号抽屉箱8安装在箱体1内的上部;所述的大号抽屉箱9设置在小号抽屉箱8的下部;所述的拉手10分别安装在小号抽屉箱8或者大号抽屉箱9上;所述的放置腔11设置在大号抽屉箱9的下部;所述的挂钩13或者挂环14分别通过连接板12安装固定在箱门3上;所述的挂槽15焊接固定在挂环14的下部;所述的箱锁16安装在箱体1的右侧边位置;所述的挂板17焊接固定在箱体1的背面。The present invention provides a novel multifunctional high-voltage power distribution line tower repair material box, which includes a box body 1, a suspension ring 2, a box door 3, a hinge 4, a pull rod 5, a pulley 6, a station post 7, a small drawer box 8, Large drawer box 9, handle 10, placement cavity 11, connecting plate 12, hook 13, hanging ring 14, hanging groove 15, box lock 16 and hanging plate 17, and the described hanging ring 2 is arranged on the top of the box body 1; The box door 3 is installed on the front of the box body 1 through the hinge 4; the pull rod 5 is installed at the rear position of the upper end of the box body 1; the pulley 6 is installed and fixed on the rear side of the bottom of the box body 1 position; the station column 7 is installed and fixed on the front side of the bottom of the box body 1; the small drawer box 8 is installed on the upper part of the box body 1; the large drawer box 9 is arranged on the small The bottom of the drawer box 8; the handle 10 is respectively installed on the small drawer box 8 or the large drawer box 9; the described placement chamber 11 is arranged on the bottom of the large drawer box 9; The rings 14 are installed and fixed on the box door 3 through the connecting plate 12 respectively; the hanging groove 15 is welded and fixed on the bottom of the hanging ring 14; the box lock 16 is installed on the right side of the box body 1; Hanging plate 17 is welded and fixed on the back side of casing 1 .
所述的吊环2具体采用半圆形环,所述的吊环2活动设置在箱体1的上部,所述的吊环2具体设置为2个,有利于在高压配电杆塔作业中,起吊方便、安全,进而节省时间、人力,提高工作效率。The lifting ring 2 specifically adopts a semicircular ring, and the lifting ring 2 is movably arranged on the upper part of the box body 1, and the number of the lifting rings 2 is specifically set to two, which is conducive to convenient lifting and Safety, thereby saving time, manpower and improving work efficiency.
所述的合页4具体采用180度任意定位液压合页,通过与箱门3和箱体1的配合安装,有利于箱门3根据工作需要灵活定位开关的位置,方便工具的取用,进而节省时间,提高工作效率。The hinge 4 specifically adopts a 180-degree arbitrary positioning hydraulic hinge. By cooperating with the box door 3 and the box body 1, it is beneficial for the box door 3 to flexibly locate the position of the switch according to the work needs, and facilitate the taking of tools. Save time and improve work efficiency.
所述的拉杆5具体采用可伸缩式拉杆,所述的拉杆5活动连接在箱体1的上部,通过与箱体1和滑轮6的配合安装,有利于箱体移动携带方便,减轻工人的劳动强度,进一步的适应配电线路的维修工作。The pull rod 5 specifically adopts a retractable pull rod, and the pull rod 5 is movably connected to the upper part of the box body 1. By cooperating with the box body 1 and the pulley 6, the box body is convenient to move and carry, and the labor of the workers is reduced. Strength, and further adapt to the maintenance work of distribution lines.
所述的滑轮6具体采用聚氨酯材质制成的定向轮,通过与箱体1和站柱7的配合安装,有利于箱体1移动方便,放置平稳,增加材料箱的多功能性。Described pulley 6 specifically adopts the directional wheel that polyurethane material is made, and through the cooperating installation with box body 1 and station post 7, is conducive to box body 1 to move conveniently, place stably, increase the versatility of material box.
所述的小号抽屉箱8具体采用长宽高为30*20*10cm的长方体箱,所述的小号抽屉箱8具体设置为6个,所述的大号抽屉箱9具体采用长宽高为30*20*20cm的长方体箱,所述的大号抽屉箱9具体设置为2个,通过在箱体1内的设置,有利于分类放置不同规格、形状不一的配电线路常用配件,满足高压配电线路的抢修需求。The small drawer box 8 specifically adopts a cuboid box with a length, width and height of 30*20*10cm, and the number of the small drawer boxes 8 is specifically set to 6, and the large drawer box 9 specifically adopts a length, width and height It is a cuboid box of 30*20*20cm, and the large-sized drawer box 9 is specifically set to two, and through the setting in the box body 1, it is beneficial to classify and place commonly used accessories of power distribution lines with different specifications and shapes. Meet the emergency repair needs of high-voltage distribution lines.
所述的挂钩13、挂环14或者挂槽15分别通过连接板12焊接固定在箱门3内侧,所述的挂钩13、挂环14或者挂槽15具体呈上下均匀排列设置,通过与箱体1的配合安装,有利于实现对配电线路常用工具的立体存放,取用方便快捷,实现抢修材料箱的多功能性。Described hook 13, hanging ring 14 or hanging groove 15 are welded and fixed on the inner side of box door 3 respectively by connecting plate 12, and described hook 13, hanging ring 14 or hanging groove 15 are arranged evenly up and down specifically, and pass through with casing 1, it is beneficial to realize the three-dimensional storage of commonly used tools for power distribution lines, which is convenient and quick to take and use, and realizes the versatility of the emergency repair material box.
所述的挂板17具体采用宽度为2cm至5cm的倒L形板,所述的挂板17具体在箱体1的背面平行焊接设置有两个,有利于在高压配电线路抢修过程中,便与箱体1在杆塔上悬挂放置,方便维修工作的顺利进行。The hanging board 17 specifically adopts an inverted L-shaped board with a width of 2cm to 5cm, and two of the hanging boards 17 are specifically welded in parallel on the back side of the box body 1, which is conducive to the repair process of high-voltage distribution lines. Just hang and place with box body 1 on the pole tower, facilitate the smooth progress of maintenance work.
所述的箱体1具体采用厚度为1mm至3mm的不锈钢板制成的,有利于防锈,耐腐蚀,适应在各种复杂天气情况下的使用,延长使用寿命,进而节约成本。The box body 1 is specifically made of stainless steel plate with a thickness of 1 mm to 3 mm, which is beneficial to rust prevention and corrosion resistance, adapts to use in various complicated weather conditions, prolongs service life, and saves cost.
工作原理working principle
本发明是这样来实现的,本发明在使用时根据配电线路维修工作需求,将所需用的零配件分别放置在小号抽屉箱8、大号抽屉箱9或者放置腔11内,将常用工具分类分别悬挂放置在箱门3内侧的挂钩13、挂环14或者挂槽15内;在进行维修作业时,通过拉杆5和滑轮6将抢修箱拉到所需维修现场,通过吊环2吊至工作面,通过挂板17悬挂好,使用时打开箱门3,根据维修需求,灵活方便取用工具或者零配件,进而方便配电线路的维修,节省时间,提高工作效率。The present invention is realized in this way. When the present invention is in use, according to the maintenance work requirements of the power distribution line, the required spare parts are respectively placed in the small drawer box 8, the large drawer box 9 or the placement cavity 11, and the commonly used The tool classification is suspended and placed in the hook 13, the hanging ring 14 or the hanging groove 15 on the inner side of the box door 3; The working face is suspended by the hanging board 17, and the box door 3 is opened during use. According to maintenance requirements, it is flexible and convenient to take tools or spare parts, thereby facilitating the maintenance of power distribution lines, saving time and improving work efficiency.
利用本发明所述的技术方案,或本领域的技术人员在本发明技术方案的启发下,设计出类似的技术方案,而达到上述技术效果的,均是落入本发明的保护范围。Utilize the technical solution described in the present invention, or those skilled in the art design a similar technical solution under the inspiration of the technical solution of the present invention, and achieve the above-mentioned technical effect, all fall into the protection scope of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510613036.1A CN105244802A (en) | 2015-09-23 | 2015-09-23 | Novel multi-functional rush-repair material box for high-voltage power distribution line pole tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510613036.1A CN105244802A (en) | 2015-09-23 | 2015-09-23 | Novel multi-functional rush-repair material box for high-voltage power distribution line pole tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105244802A true CN105244802A (en) | 2016-01-13 |
Family
ID=55042338
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510613036.1A Pending CN105244802A (en) | 2015-09-23 | 2015-09-23 | Novel multi-functional rush-repair material box for high-voltage power distribution line pole tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105244802A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106199873A (en) * | 2016-08-15 | 2016-12-07 | 常州凌凯特电子科技有限公司 | Roller type PLC optical branching device |
| CN106532564A (en) * | 2016-12-14 | 2017-03-22 | 国网山东省电力公司龙口市供电公司 | Distribution network repair box |
| CN106549332A (en) * | 2016-12-07 | 2017-03-29 | 国网山东省电力公司烟台供电公司 | A kind of power distribution network rushes to repair case |
| CN108439079A (en) * | 2018-03-26 | 2018-08-24 | 衢州市昊博专利技术推广有限公司 | A kind of device convenient for folding and unfolding 10KV ground wires |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202656174U (en) * | 2012-08-02 | 2013-01-09 | 山东电力集团公司滨州供电公司 | Electric power emergency first-aid repair tool case |
| CN202862206U (en) * | 2012-11-06 | 2013-04-10 | 重庆市电力公司信息通信分公司 | Electric power system maintenance box |
| CN203973518U (en) * | 2014-06-19 | 2014-12-03 | 张文豪 | A kind of groove-splitting tool box with suspension arrangement |
| CN204068052U (en) * | 2014-09-16 | 2014-12-31 | 国家电网公司 | A kind of tool box special of high-voltage hot-line work |
| CN104440856A (en) * | 2014-11-20 | 2015-03-25 | 国网河南鄢陵县供电公司 | Novel electric system overhauling device |
| CN204354108U (en) * | 2014-11-05 | 2015-05-27 | 中国南方电网有限责任公司超高压输电公司天生桥局 | A kind of electric power overhaul Special tool vehicle |
| CN104908017A (en) * | 2015-04-15 | 2015-09-16 | 国网四川省电力公司技能培训中心 | Suspended type tool box for aerial lift device with insulating boom |
-
2015
- 2015-09-23 CN CN201510613036.1A patent/CN105244802A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202656174U (en) * | 2012-08-02 | 2013-01-09 | 山东电力集团公司滨州供电公司 | Electric power emergency first-aid repair tool case |
| CN202862206U (en) * | 2012-11-06 | 2013-04-10 | 重庆市电力公司信息通信分公司 | Electric power system maintenance box |
| CN203973518U (en) * | 2014-06-19 | 2014-12-03 | 张文豪 | A kind of groove-splitting tool box with suspension arrangement |
| CN204068052U (en) * | 2014-09-16 | 2014-12-31 | 国家电网公司 | A kind of tool box special of high-voltage hot-line work |
| CN204354108U (en) * | 2014-11-05 | 2015-05-27 | 中国南方电网有限责任公司超高压输电公司天生桥局 | A kind of electric power overhaul Special tool vehicle |
| CN104440856A (en) * | 2014-11-20 | 2015-03-25 | 国网河南鄢陵县供电公司 | Novel electric system overhauling device |
| CN104908017A (en) * | 2015-04-15 | 2015-09-16 | 国网四川省电力公司技能培训中心 | Suspended type tool box for aerial lift device with insulating boom |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106199873A (en) * | 2016-08-15 | 2016-12-07 | 常州凌凯特电子科技有限公司 | Roller type PLC optical branching device |
| CN106549332A (en) * | 2016-12-07 | 2017-03-29 | 国网山东省电力公司烟台供电公司 | A kind of power distribution network rushes to repair case |
| CN106532564A (en) * | 2016-12-14 | 2017-03-22 | 国网山东省电力公司龙口市供电公司 | Distribution network repair box |
| CN106532564B (en) * | 2016-12-14 | 2018-01-23 | 国网山东省电力公司龙口市供电公司 | Case is rushed to repair in a kind of distribution |
| CN108439079A (en) * | 2018-03-26 | 2018-08-24 | 衢州市昊博专利技术推广有限公司 | A kind of device convenient for folding and unfolding 10KV ground wires |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105244802A (en) | Novel multi-functional rush-repair material box for high-voltage power distribution line pole tower | |
| CN203624990U (en) | Feeding turning platform | |
| CN207338269U (en) | An easy-to-install circuit breaker | |
| CN203269328U (en) | Large nut hoisting device | |
| CN206111071U (en) | Distribution automation overhauls cat ladder of usefulness | |
| CN212968636U (en) | Intelligent transformer of portable cabinet of being qualified for next round of competitions | |
| CN203014222U (en) | A power-on temporary fixing device of a 10kV isolating knife switch | |
| CN206116905U (en) | Low -voltage distribution cabinet top lid mounting structure | |
| CN203715156U (en) | Convenient crane | |
| CN203883374U (en) | Rush-repair material box suitable for 10kV distribution line tower | |
| CN103457213B (en) | The wire clip body of earth potential working non-bearing connecting clip | |
| CN210485060U (en) | Mounting bracket for UPS power supply | |
| CN205304259U (en) | Anti harmonic intelligence power capacitor device | |
| CN207450771U (en) | A kind of petroleum vapor recovery tank body support construction | |
| CN106711821A (en) | Low-voltage capacitor element replacing device for 500kV transformer station | |
| CN203957109U (en) | A kind of cement balancing weight build tool | |
| CN204658418U (en) | A kind of installation of electrical equipment instrument put in order dolly | |
| CN206825382U (en) | A kind of power plant's maintenance portable tool box | |
| CN206130864U (en) | But solar panel of convenient to detach battery integration street lamp | |
| CN104358467A (en) | Auxiliary mounting tool for concrete pole cross arm | |
| CN110654710A (en) | Hopper equipment for electrolytic aluminum | |
| CN210879568U (en) | A multifunctional disassembly table for machinery | |
| CN205100282U (en) | Loader counter weight bolt stop gear | |
| CN211958475U (en) | Power distribution cabinet capable of freely moving | |
| CN203976902U (en) | A kind of work rest for vertical vacuum film coating apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160113 |