CN105227919A CN201510638473.9A CN201510638473A CN105227919A CN 105227919 A CN105227919 A CN 105227919A CN 201510638473 A CN201510638473 A CN 201510638473A CN 105227919 A CN105227919 A CN 105227919A
Authority
CN
China
Prior art keywords
work progress
supervision
full
view camera
control end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510638473.9A
Other languages
English (en)
Inventor
李栋
李飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU GUANGSI INFORMATION NETWORK CO Ltd
Original Assignee
GUIZHOU GUANGSI INFORMATION NETWORK CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU GUANGSI INFORMATION NETWORK CO Ltd filed Critical GUIZHOU GUANGSI INFORMATION NETWORK CO Ltd
Priority to CN201510638473.9A priority Critical patent/CN105227919A/zh
Publication of CN105227919A publication Critical patent/CN105227919A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种通过全景记录仪改进施工过程监督的方法,在施工过程中采用在现场安装全景摄像头,在控制端设置数据处理中心并通过无线传输形式将全景摄像头所采集的信息传入控制端,实现对施工现场的远程监控,从而完成对施工过程的监督,本发明通过将信息技术引入容易情绪化违背标准规范的施工小团体中,不仅仅只验收难以全面测试的结果,将过程暴露于更专业的监督团队,完善施工的监督过程和手段,达到关键项目质量完全可控的程度。

Description

一种通过全景记录仪改进施工过程监督的方法
技术领域
本发明涉及一种通过全景记录仪改进施工过程监督的方法,属于施工技术领域。
背景技术
在各类重要的项目施工过程中,虽然有项目质量和最后的验收,但仍然不能避免事故发生,因为关键原因是施工的关键过程没有受到多个责任链的监督,忽视了过程而只关注结果,但结果在验收时未必能很有效的验证。
在电网的安全事故中,常有这样的忽视过程的监督发生,将当时的施工过程过度依赖在现场的极少数质量监督人员,增加了风险。
发明内容
本发明的目的是:针对现有技术的上的缺陷,提供一种通过全景记录仪改进施工过程监督的方法,大大提高了监测的准确性和实时性,以克服现有技术的不足。
本发明的技术方案
一种通过全景记录仪改进施工过程监督的方法,在施工过程中采用在现场安装全景摄像头,在控制端设置数据处理中心并通过无线传输形式将全景摄像头所采集的信息传入控制端,实现对施工现场的远程监控,从而完成对施工过程的监督。
前述的一种通过全景记录仪改进施工过程监督的方法中,具体实施步骤为:
步骤一、现场配置全景摄像头以及各施工人员头盔的360度全景摄像头,可以录全景和声音,将整个施工过程全程记录,即施工全程全景记录仪;
步骤二、过程实时受远程监督,事后连上处理系统,由质量验收监督团队而不是现场单一的质量监督人员回放,寻找过程中的问题,将过程暴露在监督之下;
步骤三、验收时不仅要对结果同时要对上述过程进行验收把关,从而保证施工过程的正确和结果的正确,才能验收合格。
由于采用了上述技术方案,与现有技术相比,本发明通过将信息技术引入容易情绪化违背标准规范的施工小团体中,不仅仅只验收难以全面测试的结果,将过程暴露于更专业的监督团队,完善施工的监督过程和手段,达到关键项目质量完全可控的程度。
具体实施方式
下面本发明用作进一步的详细说明,但不作为对本发明的任何限制。
本发明的实施例:一种通过全景记录仪改进施工过程监督的方法,在施工过程中采用在现场安装全景摄像头,在控制端设置数据处理中心并通过无线传输形式将全景摄像头所采集的信息传入控制端,实现对施工现场的远程监控,从而完成对施工过程的监督。
具体实施步骤为:
步骤一、现场配置全景摄像头以及各施工人员头盔的360度全景摄像头,可以录全景和声音,将整个施工过程全程记录,即施工全程全景记录仪;
步骤二、过程实时受远程监督,事后连上处理系统,由质量验收监督团队而不是现场单一的质量监督人员回放,寻找过程中的问题,将过程暴露在监督之下;
步骤三、验收时不仅要对结果同时要对上述过程进行验收把关,从而保证施工过程的正确和结果的正确,才能验收合格。
本实施例通过将信息技术引入容易情绪化违背标准规范的施工小团体中,不仅仅只验收难以全面测试的结果,将过程暴露于更专业的监督团队,完善施工的监督过程和手段,达到关键项目质量完全可控的程度。

Claims (2)

1.一种通过全景记录仪改进施工过程监督的方法,其特征在于:在施工过程中采用在现场安装全景摄像头,在控制端设置数据处理中心并通过无线传输形式将全景摄像头所采集的信息传入控制端,实现对施工现场的远程监控,从而完成对施工过程的监督。
2.根据权利要求1所述的一种通过全景记录仪改进施工过程监督的方法,其特征在于:具体实施步骤为:
步骤一、现场配置全景摄像头以及各施工人员头盔的360度全景摄像头,可以录全景和声音,将整个施工过程全程记录,即施工全程全景记录仪;
步骤二、过程实时受远程监督,事后连上处理系统,由质量验收监督团队而不是现场单一的质量监督人员回放,寻找过程中的问题,将过程暴露在监督之下;
步骤三、验收时不仅要对结果同时要对上述过程进行验收把关,从而保证施工过程的正确和结果的正确,才能验收合格。
CN201510638473.9A 2015-09-30 2015-09-30 一种通过全景记录仪改进施工过程监督的方法 Pending CN105227919A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510638473.9A CN105227919A (zh) 2015-09-30 2015-09-30 一种通过全景记录仪改进施工过程监督的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510638473.9A CN105227919A (zh) 2015-09-30 2015-09-30 一种通过全景记录仪改进施工过程监督的方法

Publications (1)

Publication Number Publication Date
CN105227919A true CN105227919A (zh) 2016-01-06

Family

ID=54996563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510638473.9A Pending CN105227919A (zh) 2015-09-30 2015-09-30 一种通过全景记录仪改进施工过程监督的方法

Country Status (1)

Country Link
CN (1) CN105227919A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113141901A (zh) * 2021-01-29 2021-07-23 山东汇友市政园林集团有限公司 一种分体式乔灌木远程验收修剪机及验收方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013034142A (ja) * 2011-08-03 2013-02-14 Nippon Seiki Co Ltd 周辺画像表示装置
CN103517040A (zh) * 2013-09-13 2014-01-15 湖州泰仑电力自动化工程有限公司 一种互动式基建现场安全管理系统

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013034142A (ja) * 2011-08-03 2013-02-14 Nippon Seiki Co Ltd 周辺画像表示装置
CN103517040A (zh) * 2013-09-13 2014-01-15 湖州泰仑电力自动化工程有限公司 一种互动式基建现场安全管理系统

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113141901A (zh) * 2021-01-29 2021-07-23 山东汇友市政园林集团有限公司 一种分体式乔灌木远程验收修剪机及验收方法

Similar Documents

Publication Publication Date Title
CN104202086B (zh) 一种光缆故障定位方法
CN110427882A (zh) 用于巡视的智能分析方法、装置、设备及其存储介质
CN105306925A (zh) 一种视频监控前端设备监测系统及监测方法
CN102300082A (zh) 一种核电站数字视频监控系统及方法
CN111062504A (zh) 一种基于ar技术的智能配电站运维系统及方法
CN110850911B (zh) 一种用于变电站带电设备温度监测的便携式远程监测系统
CN109982037A (zh) 智能巡检装置
CN104218679A (zh) 一种基于遥视系统的变电站远程自动巡检方法
CN115293508B (zh) 一种可视化的光缆运行状态监控方法及系统
CN108984899B (zh) 一种bim项目实时进度监管方法
CN115496329A (zh) 一种应用bim+gis技术的高速公路建设项目管理系统及方法
CN103454982A (zh) 一种scada系统与安防系统集成的控制系统及其应用
JP2006285639A (ja) 立会業務支援システム及び立会業務支援車両
CN115861173A (zh) 基于数字孪生和ai的分光器资源准确性自动检测系统和方法
CN105469324A (zh) 一种配电网数据采录及运维管理系统及数据录入方法
CN105227919A (zh) 一种通过全景记录仪改进施工过程监督的方法
CN112989099A (zh) 基于图像通信的智慧施工管理系统和方法
CN101777248A (zh) 一种在安防联网中系统维护的实现方法
CN112804499A (zh) 一种全息施工安全监控系统
CN202632078U (zh) 一种scada系统与安防系统集成的控制系统
CN110445763A (zh) 一种具有安全性的弱电智能监控系统
CN112218040A (zh) 高压电缆附件安装用后台监视装置、系统
CN103645977A (zh) 电子产品自动调试系统及调试方法
CN211352329U (zh) 设备异常远程监视系统
CN114531439A (zh) 一种基于图像识别的仪表数据云边协同采集处理系统及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160106