CN105226541A - 隔离开关电动检修平台 - Google Patents
隔离开关电动检修平台 Download PDFInfo
- Publication number
- CN105226541A CN105226541A CN201410277506.7A CN201410277506A CN105226541A CN 105226541 A CN105226541 A CN 105226541A CN 201410277506 A CN201410277506 A CN 201410277506A CN 105226541 A CN105226541 A CN 105226541A
- Authority
- CN
- China
- Prior art keywords
- plate
- attachment strap
- guardrail
- rectangular attachment
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 18
- 238000005096 rolling process Methods 0.000 claims abstract description 10
- 239000000725 suspension Substances 0.000 claims abstract description 9
- 230000000875 corresponding Effects 0.000 claims description 9
- 238000000034 method Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 7
- 229910052573 porcelain Inorganic materials 0.000 description 4
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000737 periodic Effects 0.000 description 1
Abstract
一种隔离开关电动检修平台,包括两个水泥柱和固设在水泥柱上的水平滑道,其特殊之处是:在每个水泥柱上通过抱箍连接有支架,二个支架上两侧分别设有长条搭板,两块长条搭板的间隙处通过插接的方式设有前、中、后连接板,所述长条搭板的外边缘间隔设有多组套管,每组套管内套接有护栏,所述护栏之间通过插销连接形成封闭的围栏,所述水平滑道一侧设有可拆卸的转动盘,转动盘上设有立柱,所述立柱上部固设有吊架,所述吊架上安装有电动葫芦。其有益效果是:使用电动葫芦能节省人力,能保证提升过程的持续性,能将设备的损害降到最低,平台上具有宽阔的工作区域,可保证设备和在检修平台上的工作人员的人身安全。
Description
技术领域
[0001] 本发明涉及一种隔离开关安装或维修时使用的隔离开关电动检修平台。
背景技术
[0002] 隔离开关是变电站的重要运行设备,也是电网企业最多的设备,平均为断路器数量的3— 4倍,对电网的安全运行起着至关重要的作用。
[0003] GW5型隔离开关是一种长期运行在户外自然条件下的敞开式设备,在长期运行的过程中需要周期性更换,以保证电网设备的安全运行。
[0004] 以前隔离开关的更换步骤为:拆除引线6个,平均用时10分钟/组;拆除导电杆6个,平均用时20分钟/组;拆除瓷柱6个,平均用时30分钟/组;搬运瓷柱6个,平均用时30分钟/组;轴承及伞轮拆除,平均用时30分钟/组;拆除底座3个,平均用时20分钟/组;安装底座3个,平均用时30分钟/组;安装轴承及伞轮,平均用时30分钟/组;安装瓷柱6个,平均用时30分钟/组;安装导电杆6个,平均用时40分钟/组;传动拉杆(一、二、三拉杆及机构)安装调试2小时/组;安装引线6个,平均用时10分钟/组。
[0005] 由此可以看出以前完成此项工作共用时400分钟即6个半小时左右,还不包括工作人员休息时间,且需要5人配合才能完成,又如安装和拆除瓷柱需要多人配合但由于全部工作都需要站在机架或绝缘梯子上完成,全部由工作人员力量支撑,安全风险增大。
发明内容
[0006] 为解决现有技术存在的问题,本发明提供一种隔离开关电动检修平台。
[0007] 本发明的技术解决方案是:
一种隔离开关电动检修平台,包括两个水泥柱和固设在两个水泥柱上的水平滑道,其特殊之处是:在每个水泥柱上分别通过抱箍连接有支架,二个支架上两侧分别设有长条搭板,所述长条搭板与支架通过固设在支架上的Z型压板连接固定,在两块长条搭板的间隙处通过插接的方式设有前连接板、中连接板和后连接板,所述二个水泥柱分别由前连接板和中连接板之间的间隙以及后连接板和中连接板的间隙处穿出,所述长条搭板的外边缘间隔设有多组套管,每组套管内套接有护栏,所述长条搭板外边缘挂设有梯子,所述护栏之间通过插销连接形成封闭的围栏,所述护栏向下穿出套管部位设有销孔,所述长条搭板上靠近套管处固设有铰链,铰链另一端固接销轴,所述销轴插接在对应的护栏的销孔内,所述水平滑道上一侧设有可拆卸的转动盘,转动盘上设有立柱,所述立柱上部固设有吊架,所述吊架上安装有电动葫芦。
[0008] 所述长条搭板与前、中、后连接板底面对应其连接处分别固设有插槽和插块,所述插块插装在对应的插槽内。
[0009] 本发明的有益效果是:
1.隔离开关电动检修平台上由于在提升的过程中使用电动葫芦,因此节省人力。
[0010] 2.在提升的过程中由于采用电动葫芦,因此能保证提升过程的持续性,能将设备的损害降到最低。
[0011] 3.检修平台上带有封闭的围栏与长条搭板、前连接板、中连接板和后连接板组成宽阔工作区域,能最大限度的保证在检修平台上的工作人员的人身安全。
[0012] 4、整个检修平台拆装方便,连接牢固,围栏与各板之间通过带有铰链的销轴连接,起到防脱落保险作用,确保操作安全,防止围栏脱落。
附图说明
[0013] 图1是本发明的结构示意图;
图2是图1的俯视图;
图3是图1的A部放大图;
图4是支架与长条搭板的连接示意图;
图5是长条搭板与前连接条的连接结构图。
[0014] 图中;1-水泥柱,2-水平滑道,3-长条搭板,4-前连接板,5-中连接板,6_后连接板,7-护栏,701-销孔,8-插销,9-支架,10-电动葫芦,11-吊架,12-立柱,13-套管,14-铰链,15-销轴,16-梯子,17-转动盘,18-Z型压板,19-插块,20-插槽,21-转动盘。
具体实施方式
[0015] 如图所示,本发明涉及的隔离开关电动检修平台,包括两个水泥柱I和固设在水泥柱I上的水平滑道2,在每个水泥柱I上分别通过抱箍连接有支架9,二个支架9上两侧分别设有长条搭板3,所述长条搭板3外边缘挂设有梯子16,所述长条搭板3与支架9通过固设在支架9上的Z型压板18连接固定,在两块长条搭板3的间隙处通设有前连接板4、中连接板5和后连接板6,所述二个水泥柱I分别由前连接板4和中连接5板之间的间隙以及后连接板6和中连接板5的间隙处穿出,所述长条搭板3与前连接板4、中连接板5和后连接板6的底面对应其间连接处分别固设有插槽20和插块19,通过插槽20和插块19实现插接,图5反映的是长条搭板3与前连接条4的插接结构。所述长条搭板3的外边缘间隔设有多组套管13,每组套管13内套接有表面设有警示标志的护栏7,相邻的二个护栏7之间通过插销8连接形成封闭的围栏,所述护栏7向下穿出套管13部位设有销孔701,所述长条搭板3上靠近套管13处固设有铰链14,铰链14另一端固接销轴15,所述销轴15插接在对应的护栏7的销孔701内,所述水平滑道2上一侧安装有可拆卸的转动盘17,转动盘17上设有立柱12,所述立柱12上部固设有吊架11,所述吊架11上安装有电动葫芦10。
[0016] 操作过程:
首先搭建隔离开关电动检修平台,搭建平台后工作人员将梯子挂接在长条搭板上,工作人员登上梯子打开对应的护栏,进入平台内将护栏关闭,开始工作,拆除原有的隔离开关,将刀闸移开原位置,利用电动葫芦逐一将每相拆卸的刀闸移动到地面,通过地面上的车运走,再逐一将新的刀闸用电动葫芦由地面提升到安装位置对应的高度,然后放置在水平滑道上平移至安装位置,进行新的刀闸组装。安装完成后,将该隔离开关电动检修平台拆卸,将其安装至下一作业地点。
[0017] 利用该隔离开关电动检修平台更换隔离开关的步骤为:拆除引线6个,平均用时10分钟/组;刀闸整体拆除,平均用时10分钟/组;采用电动吊装下台,平均用时30分钟/组;采用电动吊装上台,平均用时30分钟/组;刀闸整体安装,平均用时10分钟/组;传动拉杆(一、二、三拉杆及机构)安装调试80分钟/组;安装引线6个,平均用时10分钟/组。
[0018] 由此可知:该隔离开关电动检修平台有益效果非常明显,不仅减轻了工作人员的劳动强度,工作的时间上也相对的减少,对设备和人身的安全有了更好的保证。
Claims (2)
1.一种隔离开关电动检修平台,包括两个水泥柱和固设在两个水泥柱上的水平滑道,其特征是:在每个水泥柱上分别通过抱箍连接有支架,二个支架上两侧分别设有长条搭板,所述长条搭板与支架通过固设在支架上的Z型压板连接固定,在两块长条搭板的间隙处通过插接的方式设有前连接板、中连接板和后连接板,所述二个水泥柱分别由前连接板和中连接板之间的间隙以及后连接板和中连接板的间隙处穿出,所述长条搭板的外边缘间隔设有多组套管,每组套管内套接有护栏,所述长条搭板外边缘挂设有梯子,所述护栏之间通过插销连接形成封闭的围栏,所述护栏向下穿出套管部位设有销孔,所述长条搭板上靠近套管处固设有铰链,铰链另一端固接销轴,所述销轴插接在对应的护栏的销孔内,所述水平滑道上一侧设有可拆卸的转动盘,转动盘上设有立柱,所述立柱上部固设有吊架,所述吊架上安装有电动葫芦。
2.根据权利要求1所述的隔离开关电动检修平台,其特征是:所述长条搭板与前、中、后连接板底面对应其连接处分别固设有插槽和插块,所述插块插装在对应的插槽内。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410277506.7A CN105226541B (zh) | 2014-06-20 | 2014-06-20 | 隔离开关电动检修平台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410277506.7A CN105226541B (zh) | 2014-06-20 | 2014-06-20 | 隔离开关电动检修平台 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105226541A true CN105226541A (zh) | 2016-01-06 |
CN105226541B CN105226541B (zh) | 2017-07-04 |
Family
ID=54995333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410277506.7A Active CN105226541B (zh) | 2014-06-20 | 2014-06-20 | 隔离开关电动检修平台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105226541B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106097849A (zh) * | 2016-08-08 | 2016-11-09 | 国网江苏省电力公司徐州供电公司 | 一种分接开关解体检修实训操作平台装置 |
US10259372B2 (en) | 2016-06-20 | 2019-04-16 | State Grid Henan Electric Power Corporation Maintenance Company | Mobile-type power equipment maintenance device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63194511A (en) * | 1987-02-06 | 1988-08-11 | Sanwa Koki Kk | Elevating stage for maintenance and inspection of insulator in substation |
CN202513451U (zh) * | 2012-04-20 | 2012-10-31 | 沈阳华威电力设备有限公司 | 一种组合式高强度全绝缘的变压器承载装置 |
CN102891451A (zh) * | 2012-10-23 | 2013-01-23 | 四川省电力公司自贡电业局 | 一种管型母线支柱绝缘子检修平台 |
CN203014220U (zh) * | 2012-12-02 | 2013-06-19 | 河南省电力公司郑州供电公司 | Gw5隔离开关检修平台 |
-
2014
- 2014-06-20 CN CN201410277506.7A patent/CN105226541B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63194511A (en) * | 1987-02-06 | 1988-08-11 | Sanwa Koki Kk | Elevating stage for maintenance and inspection of insulator in substation |
CN202513451U (zh) * | 2012-04-20 | 2012-10-31 | 沈阳华威电力设备有限公司 | 一种组合式高强度全绝缘的变压器承载装置 |
CN102891451A (zh) * | 2012-10-23 | 2013-01-23 | 四川省电力公司自贡电业局 | 一种管型母线支柱绝缘子检修平台 |
CN203014220U (zh) * | 2012-12-02 | 2013-06-19 | 河南省电力公司郑州供电公司 | Gw5隔离开关检修平台 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10259372B2 (en) | 2016-06-20 | 2019-04-16 | State Grid Henan Electric Power Corporation Maintenance Company | Mobile-type power equipment maintenance device |
CN106097849A (zh) * | 2016-08-08 | 2016-11-09 | 国网江苏省电力公司徐州供电公司 | 一种分接开关解体检修实训操作平台装置 |
Also Published As
Publication number | Publication date |
---|---|
CN105226541B (zh) | 2017-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201220050Y (zh) | 一种大型变压器检修作业安全带保险绳系挂装置 | |
CN102664358B (zh) | 带电更换220kV软母线静触头的方法 | |
CN103383400B (zh) | 一种绝缘安全工器具预防性试验装置 | |
CN105226541A (zh) | 隔离开关电动检修平台 | |
CN104563843B (zh) | 一种应用于电力线路检修的爬梯 | |
CN103175998B (zh) | 一种用于输电线路绝缘子串高压性能检测的便捷式试验杆塔 | |
CN202562960U (zh) | 一种10kV避雷器试验台架 | |
CN103422808A (zh) | 输电线路维修爬梯 | |
CN202920859U (zh) | 一种插槽式安全带悬挂器 | |
CN205791238U (zh) | 一种10kV配网线路直线段三相导线带电提升器 | |
CN205061496U (zh) | 一种新型改进结构的变压器套管检修安全梯 | |
CN204558970U (zh) | 10kV、35kV开关室桥架吊装工具 | |
CN204679238U (zh) | 电力施工安全带悬挂器的检测装置 | |
CN105384097A (zh) | 一种应用于高压线路作业的操作平台结构 | |
CN201285999Y (zh) | 高压线路检修用软梯 | |
CN110905387A (zh) | 一种便捷式登高作业检修梯 | |
CN208690822U (zh) | 66Kv隔离开关专用检修平台 | |
CN202949163U (zh) | 一种管型母线支柱绝缘子检修平台 | |
CN104779545A (zh) | 一种10kV、35kV开关室桥架吊装工具 | |
CN204205258U (zh) | 高空拆装接地线装置 | |
CN104158104B (zh) | 集成式10kv柱上变电站 | |
CN201774165U (zh) | 一种设备检修装置 | |
CN102510029A (zh) | 一种地电位带电调换杆刀装置的方法 | |
CN203800449U (zh) | 变电站支柱上设备的检修平台 | |
CN200992805Y (zh) | 闸刀检修脚手架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |