CN105186375A - Side phase wire insulation support rod for charged operation - Google Patents
Side phase wire insulation support rod for charged operation Download PDFInfo
- Publication number
- CN105186375A CN105186375A CN201510641800.6A CN201510641800A CN105186375A CN 105186375 A CN105186375 A CN 105186375A CN 201510641800 A CN201510641800 A CN 201510641800A CN 105186375 A CN105186375 A CN 105186375A
- Authority
- CN
- China
- Prior art keywords
- bar
- baffle
- rod
- latch
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Distribution Board (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
一种带电作业用边相导线绝缘撑杆,应用在带电导线下方拆除或安装线杆时,保证带电导线之间的安全距离。它包括第一杆、第二杆、顶板、插销、绳子、转轴和手柄,第二杆为两个并分别套置在第一杆的两端,在第一杆与第二杆之间设有螺栓;在每一第二杆自由端的内腔中固定有第一挡板和第二挡板,在第一挡板与第二挡板之间设有导向管,在第一挡板上滑动安装有插销,在插销与第二挡板之间设有弹簧,在第一挡板的下部固定有连接板,在连接板的自由端固定有顶板;在插销的外壁上设有支耳,在第二杆的安装端转动安装转轴,在转轴与支耳之间系有绳子。本发明可方便的将边相导线撑开,以方便线杆的安装和拆卸。
The utility model relates to an insulated support rod for side-phase conductors used in live work, which is used to ensure a safe distance between live conductors when removing or installing poles under live conductors. It includes a first rod, a second rod, a top plate, a latch, a rope, a rotating shaft and a handle. Bolt; a first baffle and a second baffle are fixed in the cavity at the free end of each second rod, and a guide tube is arranged between the first baffle and the second baffle, and is slidably installed on the first baffle There is a bolt, a spring is arranged between the bolt and the second baffle, a connecting plate is fixed on the lower part of the first baffle, and a top plate is fixed on the free end of the connecting plate; The mounting ends of the two rods are rotated to install the rotating shaft, and a rope is tied between the rotating shaft and the lug. The invention can conveniently stretch the side-phase wires to facilitate the installation and disassembly of the poles.
Description
技术领域technical field
本发明涉及电力施工技术领域,具体地说是一种带电作业用边相导线绝缘撑杆。The invention relates to the technical field of electric power construction, in particular to an insulating support rod for side-phase wires for live work.
背景技术Background technique
电力施工过程中,例如在带电导线下方组立或拆除杆塔时,线路的中相导线会干扰施工过程。因此需要将中相导线移开,同时还要保证中相导线与边相导线之间的安全距离。由于两个边相导线重量和间距较大,因此斗臂车无法将这两相导线一并吊起,这就为施工过程带来的诸多不便。During electrical construction, such as erecting or dismantling towers under live conductors, the neutral phase conductor of the line interferes with the construction process. Therefore, it is necessary to remove the middle-phase conductor, and at the same time, ensure a safe distance between the middle-phase conductor and the side-phase conductor. Due to the large weight and distance between the two side-phase conductors, the bucket arm truck cannot lift the two phase conductors together, which brings a lot of inconvenience to the construction process.
发明内容Contents of the invention
本发明的目的在于提供一种带电作业用边相导线绝缘撑杆,应用在带电导线下方拆除或安装线杆时,保证带电导线之间的安全距离。The purpose of the present invention is to provide a side-phase conductor insulation support rod for live work, which can ensure the safe distance between live conductors when removing or installing poles under live conductors.
本发明解决其技术问题所采取的技术方案是:一种带电作业用边相导线绝缘撑杆,其特征是,它包括第一杆、第二杆、顶板、插销、绳子、转轴和手柄,所述第二杆为两个并分别套置在第一杆的两端,在所述第一杆与第二杆之间设有螺栓;每一所述第二杆的安装端套在第一杆上,每一所述第二杆的自由端为中空结构,在每一所述第二杆的自由端的内腔中固定有第一挡板和第二挡板,且所述第一挡板位于第二杆自由端的端面上,在所述第一挡板与第二挡板之间设有导向管,在所述第一挡板上滑动安装有插销,所述插销的一端伸入到导向管的内腔中并在该端的插销上固定有定位板,所述定位板与导向管的内壁滑动连接,在所述定位板与第二挡板之间设有弹簧,所述插销的另一端伸出第二杆,在所述第一挡板的下部固定有连接板,在所述连接板的自由端固定有顶板,所述顶板与连接板垂直设置,在弹簧的作用下所述插销的作用端插入到顶板上的凹槽中,在所述插销的作用端设有倾斜面,所述插销、顶板、连接板与第一挡板之间围成限制导线活动范围的限位腔;The technical solution adopted by the present invention to solve the technical problem is: a side-phase wire insulating support rod for live work, which is characterized in that it includes a first rod, a second rod, a top plate, a latch, a rope, a rotating shaft and a handle, and the There are two second rods and they are respectively sleeved on both ends of the first rod, and bolts are arranged between the first rod and the second rod; the mounting end of each second rod is sleeved on the first rod Above, the free end of each of the second rods is a hollow structure, a first baffle and a second baffle are fixed in the cavity of the free end of each of the second rods, and the first baffle is located at On the end surface of the free end of the second rod, a guide tube is provided between the first baffle plate and the second baffle plate, and a latch is slidably installed on the first baffle plate, and one end of the latch pin extends into the guide tube In the inner cavity of the inner cavity and on the bolt at this end, a positioning plate is fixed, the positioning plate is slidably connected with the inner wall of the guide pipe, a spring is arranged between the positioning plate and the second baffle plate, the other end of the latch extends Out of the second rod, a connecting plate is fixed at the bottom of the first baffle plate, and a top plate is fixed at the free end of the connecting plate, and the top plate is vertically arranged with the connecting plate. Under the action of the spring, the bolt acts The end is inserted into the groove on the top plate, and an inclined surface is provided at the active end of the bolt, and a limiting cavity is formed between the bolt, the top plate, the connecting plate and the first baffle to limit the movable range of the wire;
在所述插销的外壁上设有支耳,在所述第二杆的安装端转动安装有转轴,在所述转轴外壁与支耳之间系有绳子,在所述转轴的驱动端设有手柄。An lug is provided on the outer wall of the bolt, a rotating shaft is installed on the mounting end of the second rod, a rope is tied between the outer wall of the rotating shaft and the lug, and a handle is arranged at the driving end of the rotating shaft. .
进一步地,在所述第二杆安装端的外壁上设有缺口,所述螺栓置于缺口中。Further, a notch is provided on the outer wall of the installation end of the second rod, and the bolt is placed in the notch.
进一步地,在所述第一杆的外壁上设有若干与螺栓的螺杆插接配合的插孔。Further, on the outer wall of the first rod, there are a number of sockets which are plugged and fitted with the screw rods of the bolts.
进一步地,所述顶板的顶部为圆弧形。Further, the top of the top plate is arc-shaped.
进一步地,所述支耳为圆弧形绝缘板,所述支耳的内圆弧朝向第一杆所在的一侧。Further, the lug is an arc-shaped insulating plate, and the inner arc of the lug faces the side where the first rod is located.
进一步地,在所述第二杆的外壁上设有轴承,所述转轴的下部固定在轴承的内圈中。Further, a bearing is provided on the outer wall of the second rod, and the lower part of the rotating shaft is fixed in the inner ring of the bearing.
本发明的有益效果是:本发明提供的一种带电作业用边相导线绝缘撑杆,使用时,使第一杆与第二杆相对移动,以实现整个绝缘撑杆的伸开。将边相导线置于两端的限位腔中,此时便将边相导线撑开。然后通过其他设备将位于中间的导线移开,此时,便可将吊起的线杆从上方放入,直至线杆的下部伸入到基础中的直孔中。本发明可将边相导线撑开,以方便线杆的拆除或安装。The beneficial effects of the present invention are: the insulating strut for side-phase wires for live work provided by the present invention, when in use, the first rod and the second rod are relatively moved to realize the stretching of the entire insulating strut. Place the side-phase wires in the limiting cavities at both ends, and then stretch the side-phase wires. Then the conductor in the middle is removed by other equipment, at this time, the suspended wire rod can be put in from above until the lower part of the wire rod extends into the straight hole in the foundation. The invention can stretch the side-phase wires to facilitate the removal or installation of the poles.
附图说明Description of drawings
图1为本发明的示意图;Fig. 1 is a schematic diagram of the present invention;
图2为固定总成的示意图;Fig. 2 is the schematic diagram of fixed assembly;
图3为导线滑入顶板中时的示意图;Fig. 3 is a schematic diagram when the wire slides into the top plate;
图4为导线进入顶板中后的示意图;Fig. 4 is a schematic diagram after the wire enters the top plate;
图5为本发明收缩后的示意图;Fig. 5 is the schematic diagram after shrinkage of the present invention;
图6为第一杆与第二杆的配合示意图;Fig. 6 is a schematic diagram of cooperation between the first rod and the second rod;
图7为使用本发明撑开导线后的示意图;Fig. 7 is a schematic diagram after using the present invention to stretch the wire;
图8为吊入线杆时的示意图;Fig. 8 is the schematic diagram when hoisting into wire rod;
图中:1第一杆,11插孔,2第二杆,21缺口,22滑槽,3顶板,31连接板,32第一挡板,33第二挡板,34导向管,35弹簧,4插销,41倾斜面,42插入端,43定位板,44支耳,5导线,51限位腔,6绳子,61转轴,62手柄,63轴承,7螺栓,81A相导线,82B相导线,83C相导线,9线杆。Among the figure: 1 first rod, 11 jack, 2 second rod, 21 gap, 22 chute, 3 top plate, 31 connecting plate, 32 first baffle plate, 33 second baffle plate, 34 guide tube, 35 spring, 4 pins, 41 inclined surfaces, 42 insertion ends, 43 positioning plates, 44 lugs, 5 wires, 51 limiting cavity, 6 ropes, 61 rotating shafts, 62 handles, 63 bearings, 7 bolts, 81A phase wires, 82B phase wires, 83C phase wire, 9 poles.
具体实施方式Detailed ways
如图1至图8所示,本发明主要包括第一杆1、第二杆2、顶板3、连接板31、第一挡板32、第二挡板33、导向管34、弹簧35、插销4、定位板43、支耳44、绳子6、转轴61、手柄62、轴承63和螺栓7,下面结合附图对本发明进行描述。As shown in Figures 1 to 8, the present invention mainly includes a first rod 1, a second rod 2, a top plate 3, a connecting plate 31, a first baffle 32, a second baffle 33, a guide tube 34, a spring 35, a latch 4. Positioning plate 43, lug 44, rope 6, rotating shaft 61, handle 62, bearing 63 and bolt 7, the present invention will be described below in conjunction with accompanying drawing.
如图1所示,第一杆1为圆形的绝缘杆,在第一杆的两端分别套置有第二杆2,第二杆也为圆形的绝缘杆,第一杆的两端分别位于两第二杆的滑槽中。如图6所示,在第一杆的两端分别设有若干插孔11,在第二杆的外壁上分别设有螺栓7,螺栓的螺杆插入到插孔时可实现第一杆与第二杆的相对固定。为方便螺栓的安装,在第二杆的一端设有缺口21,螺栓设置在缺口中,并在缺口位置的第二杆上设有螺纹孔,螺栓置于螺纹孔中。As shown in Figure 1, the first rod 1 is a circular insulating rod, the two ends of the first rod are respectively sleeved with the second rod 2, the second rod is also a circular insulating rod, the two ends of the first rod Be respectively located in the chute of two second rods. As shown in Figure 6, a number of sockets 11 are respectively provided at both ends of the first rod, and bolts 7 are respectively provided on the outer wall of the second rod, and the first rod and the second rod can be realized when the screw rod of the bolt is inserted into the socket The rod is relatively fixed. For the convenience of bolt installation, one end of the second bar is provided with a notch 21, and the bolt is arranged in the notch, and the second bar at the notch position is provided with a threaded hole, and the bolt is placed in the threaded hole.
如图2所示,第二杆的自由端也为中空结构,在第二杆的自由端的内腔中设有第一挡板32和第二挡板33,第一、第二挡板的外形与第二杆的自由端的内腔形状相适应。其中,第一挡板置于第二杆自由端的端面上,第二挡板置于第二杆的自由端的内部。在第一挡板与第二挡板之间设有一导向管34,在第一挡板上设有通孔,在通孔中设有插销4,插销可在通孔中滑动,在插销的一端设有定位板43,定位板滑动安装在套管中,通孔的孔径小于导向管的内径,以防止插销从导向管中滑脱。插销的一端置于导向管中,插销的另一端置于第二杆之外,且置于第二杆外部的插销一端设有倾斜面41。在第二杆自由端的端面上固定有连接板31,在连接板的自由端固定有顶板3,顶板与连接板垂直设置成形。插销的插入端朝向顶板,在定位板与第二挡板之间设有弹簧35,在弹簧的作用下,插销的插入端42插在顶板上的凹槽中。在插销的顶部固定有支耳44,支耳为圆弧形的绝缘板,支耳的内圆弧朝向第一杆。顶板顶部为圆弧形,可便于导线顺利滑向插销。As shown in Figure 2, the free end of the second rod is also a hollow structure, and a first baffle plate 32 and a second baffle plate 33 are arranged in the cavity of the free end of the second rod, and the profiles of the first and second baffle plates Adapt to the shape of the inner cavity of the free end of the second rod. Wherein, the first baffle is placed on the end surface of the free end of the second rod, and the second baffle is placed inside the free end of the second rod. A guide pipe 34 is arranged between the first baffle plate and the second baffle plate, and a through hole is provided on the first baffle plate, and a latch 4 is arranged in the through hole, and the latch can slide in the through hole, and at one end of the latch A positioning plate 43 is provided, and the positioning plate is slidably installed in the casing, and the aperture of the through hole is smaller than the inner diameter of the guide tube, so as to prevent the latch from slipping off from the guide tube. One end of the bolt is placed in the guide tube, the other end of the bolt is placed outside the second rod, and one end of the bolt placed outside the second rod is provided with an inclined surface 41 . On the end face of the free end of the second rod, a connecting plate 31 is fixed, and a top plate 3 is fixed on the free end of the connecting plate, and the top plate and the connecting plate are vertically arranged as shape. The insertion end of the bolt faces the top plate, and a spring 35 is arranged between the positioning plate and the second baffle plate. Under the action of the spring, the insertion end 42 of the bolt is inserted into the groove on the top plate. A lug 44 is fixed on the top of the bolt, the lug is an arc-shaped insulating plate, and the inner arc of the lug is towards the first rod. The top of the top plate is arc-shaped, which can facilitate the smooth sliding of the wires to the latch.
在远离顶板的第二杆的一端设有转轴61,在第二杆上设有轴承63,转轴的下部固定在轴承的内圈中,在转轴的驱动端固定有手柄62,在转轴外壁与支耳的内圆弧之间设有绳子6。转动手柄时,绳子不断的缠绕在转轴上,并拉动插销向远离顶板的一侧移动。顶板、连接板、第一挡板与插销之间围成对导线进行限位的限位腔51。One end of the second bar away from the top plate is provided with a rotating shaft 61, and the second bar is provided with a bearing 63. The bottom of the rotating shaft is fixed in the inner ring of the bearing, and a handle 62 is fixed at the driving end of the rotating shaft. A rope 6 is provided between the inner arcs of the ears. When the handle is turned, the rope is continuously wound on the rotating shaft, and the bolt is pulled to move to the side away from the top plate. The top plate, the connecting plate, the first baffle plate and the plug pin enclose a limiting cavity 51 for limiting the wires.
需要夹持固定导线时,如图3所示,将插销的倾斜面靠近导线5,导线与插销的倾斜面挤压,进而推动插销向远离顶板的一侧移动。如图4所示,导线绕过插销后进入到限位腔中。需要将导线从限位腔中拉出时,转动手柄,使得插销从限位腔的上方移开即可。When it is necessary to clamp and fix the wire, as shown in Figure 3, the inclined surface of the bolt is brought close to the wire 5, and the wire and the inclined surface of the bolt are squeezed, thereby pushing the bolt to move away from the top plate. As shown in Fig. 4, the wire enters into the limiting cavity after bypassing the bolt. When the wire needs to be pulled out from the limiting cavity, the handle is turned so that the latch is removed from above the limiting cavity.
如图5所示,需要调节第一杆与第二杆的相对位置时,松开螺栓使得第一杆与第二杆相对移动即可。As shown in FIG. 5 , when it is necessary to adjust the relative positions of the first rod and the second rod, it is sufficient to loosen the bolts so that the first rod and the second rod move relatively.
使用时,如图7、图8所示,通过限位腔固定住A相导线81和C相导线82,调节第一杆与第二杆的相对位置,以使得该支撑杆将A相导线和C相导线撑开。然后通过其它设备将B相导线向一侧拉动,此时可将待安装线杆9从上空吊入,直至线杆的下部位于基础中的直孔中。When in use, as shown in Fig. 7 and Fig. 8, the A-phase conductor 81 and the C-phase conductor 82 are fixed through the limiting cavity, and the relative positions of the first rod and the second rod are adjusted so that the support rod connects the A-phase conductor and the C-phase conductor. The C-phase wire is stretched. Then pull the B-phase conductor to one side by other equipment, and now the utility pole 9 to be installed can be hoisted in from the sky until the bottom of the utility pole is positioned in the straight hole in the foundation.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510641800.6A CN105186375B (en) | 2015-09-30 | 2015-09-30 | A kind of livewire work side phase conductor insulation brace rod |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510641800.6A CN105186375B (en) | 2015-09-30 | 2015-09-30 | A kind of livewire work side phase conductor insulation brace rod |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105186375A true CN105186375A (en) | 2015-12-23 |
| CN105186375B CN105186375B (en) | 2017-07-07 |
Family
ID=54908306
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510641800.6A Active CN105186375B (en) | 2015-09-30 | 2015-09-30 | A kind of livewire work side phase conductor insulation brace rod |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105186375B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106472482A (en) * | 2016-11-22 | 2017-03-08 | 国网山东省电力公司商河县供电公司 | A kind of bird-scaring unit of convenient disassembly |
| CN107681534A (en) * | 2017-03-16 | 2018-02-09 | 国网浙江省电力公司衢州供电公司 | One kind is vertical to remove bar and struts positioner with wire |
| CN107681533A (en) * | 2017-03-16 | 2018-02-09 | 国网浙江省电力公司衢州供电公司 | A kind of wire device for spreading |
| CN107681601A (en) * | 2017-03-29 | 2018-02-09 | 国网浙江省电力公司衢州供电公司 | Vertical rod construction is aided in support mechanism |
| CN109449851A (en) * | 2018-08-23 | 2019-03-08 | 国网浙江省电力有限公司丽水供电公司 | Telescoping cable spacing expander |
| CN111779667A (en) * | 2020-08-04 | 2020-10-16 | 赣州市闻誉科技有限公司 | A can shift water pump fast for fire control work |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2462557Y (en) * | 2000-12-02 | 2001-11-28 | 吾兰 | Short-circuit earthing bar |
| JP2010129534A (en) * | 2008-11-26 | 2010-06-10 | Taiwa Denki Kogyo Kk | Electric wire support |
| CN201829897U (en) * | 2010-10-27 | 2011-05-11 | 河南电力工业学校 | Interphase range extender for overhead conductors |
| CN202633545U (en) * | 2012-06-25 | 2012-12-26 | 湖南省电力公司湘潭高压管理所 | Spring compression type grounding wire clamp |
| CN203650310U (en) * | 2013-11-15 | 2014-06-18 | 国家电网公司 | Rapid pin taking device |
| CN204497667U (en) * | 2015-04-03 | 2015-07-22 | 赵吴鹏 | A kind of installation clamp of live line working wire clamp |
-
2015
- 2015-09-30 CN CN201510641800.6A patent/CN105186375B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2462557Y (en) * | 2000-12-02 | 2001-11-28 | 吾兰 | Short-circuit earthing bar |
| JP2010129534A (en) * | 2008-11-26 | 2010-06-10 | Taiwa Denki Kogyo Kk | Electric wire support |
| CN201829897U (en) * | 2010-10-27 | 2011-05-11 | 河南电力工业学校 | Interphase range extender for overhead conductors |
| CN202633545U (en) * | 2012-06-25 | 2012-12-26 | 湖南省电力公司湘潭高压管理所 | Spring compression type grounding wire clamp |
| CN203650310U (en) * | 2013-11-15 | 2014-06-18 | 国家电网公司 | Rapid pin taking device |
| CN204497667U (en) * | 2015-04-03 | 2015-07-22 | 赵吴鹏 | A kind of installation clamp of live line working wire clamp |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106472482A (en) * | 2016-11-22 | 2017-03-08 | 国网山东省电力公司商河县供电公司 | A kind of bird-scaring unit of convenient disassembly |
| CN106472482B (en) * | 2016-11-22 | 2019-04-19 | 国网山东省电力公司商河县供电公司 | An easy-to-remove bird repellent |
| CN107681534A (en) * | 2017-03-16 | 2018-02-09 | 国网浙江省电力公司衢州供电公司 | One kind is vertical to remove bar and struts positioner with wire |
| CN107681533A (en) * | 2017-03-16 | 2018-02-09 | 国网浙江省电力公司衢州供电公司 | A kind of wire device for spreading |
| CN107681534B (en) * | 2017-03-16 | 2019-06-25 | 国网浙江省电力公司衢州供电公司 | A wire-pulling and positioning device for standing and withdrawing rods |
| CN107681601A (en) * | 2017-03-29 | 2018-02-09 | 国网浙江省电力公司衢州供电公司 | Vertical rod construction is aided in support mechanism |
| CN109449851A (en) * | 2018-08-23 | 2019-03-08 | 国网浙江省电力有限公司丽水供电公司 | Telescoping cable spacing expander |
| CN109449851B (en) * | 2018-08-23 | 2020-06-05 | 国网浙江省电力有限公司丽水供电公司 | Telescopic cable spacing expander |
| CN111779667A (en) * | 2020-08-04 | 2020-10-16 | 赣州市闻誉科技有限公司 | A can shift water pump fast for fire control work |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105186375B (en) | 2017-07-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105186375B (en) | A kind of livewire work side phase conductor insulation brace rod | |
| CN110593635A (en) | Lifting cross arm for live-wire work and use method thereof | |
| CN104167687A (en) | Tool for live-line replacement of suspension insulator and using working method thereof | |
| CN107732767A (en) | The adjustable pillar insulator live replacing device of gear-rack drive | |
| CN108847616A (en) | A kind of livewire work wire lifting device | |
| CN106516884A (en) | Cable take-up mechanism | |
| CN202340093U (en) | Equipment live mounting hoist device on power supply circuit post | |
| CN203871718U (en) | Special suspender for replacing 66kVSF6 breaker | |
| CN107069533B (en) | A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool | |
| CN105305305A (en) | Device for live replacement of cross arm and insulator string and application method | |
| CN202231355U (en) | Ground wire lifting device | |
| CN108683121A (en) | Lightning conducter suspension clamp replaces tool | |
| CN205543906U (en) | Cubical switchboard hoisting accessory | |
| CN207530430U (en) | A kind of automatic traction insulating shielding device | |
| CN208014935U (en) | A trolley-type grounding wire device | |
| CN204696553U (en) | A kind of automobile-used insulator crossarm | |
| CN203056454U (en) | 500kV ground wire support upturned pulley | |
| CN204424798U (en) | 800 kilovolts of DC power transmission line six-multiple conductor line lifters | |
| CN202712744U (en) | Universal wire-hanging hook of 66-220 kV composite conducting wire | |
| CN202474691U (en) | Pulley component for overturning type tackle device | |
| CN203582376U (en) | Slidably mounting and lifting structure | |
| CN203481724U (en) | Aluminium pipe crimping device | |
| CN203931680U (en) | A kind of composite insulator one-shot forming compression bonding apparatus | |
| CN202905452U (en) | Transformer bushing coil out installation rack | |
| CN205791271U (en) | Fixing sleeve for wire stripper |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |