CN105178163B - 连续梁式轨道 - Google Patents
连续梁式轨道 Download PDFInfo
- Publication number
- CN105178163B CN105178163B CN201510572865.XA CN201510572865A CN105178163B CN 105178163 B CN105178163 B CN 105178163B CN 201510572865 A CN201510572865 A CN 201510572865A CN 105178163 B CN105178163 B CN 105178163B
- Authority
- CN
- China
- Prior art keywords
- track
- connecting elements
- ribbed stiffener
- blocking plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510572865.XA CN105178163B (zh) | 2015-09-10 | 2015-09-10 | 连续梁式轨道 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510572865.XA CN105178163B (zh) | 2015-09-10 | 2015-09-10 | 连续梁式轨道 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105178163A CN105178163A (zh) | 2015-12-23 |
CN105178163B true CN105178163B (zh) | 2017-07-04 |
Family
ID=54900553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510572865.XA Active CN105178163B (zh) | 2015-09-10 | 2015-09-10 | 连续梁式轨道 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105178163B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107178013A (zh) * | 2017-05-04 | 2017-09-19 | 中铁工程设计咨询集团有限公司 | 跨座式可移动对接的轨道梁及其使用方法 |
CN107604819B (zh) * | 2017-09-14 | 2019-06-25 | 中铁第四勘察设计院集团有限公司 | 一种采用过渡装置的跨座式单轨轨道梁架设方法 |
CN108221508B (zh) * | 2018-03-21 | 2023-08-04 | 成都市新筑交通科技有限公司 | 一种集成式单轨梁端部预埋装置 |
CN108894106A (zh) * | 2018-06-28 | 2018-11-27 | 安徽东方钢结构有限公司 | 一种轨道梁长距离架空装置 |
CN109235265A (zh) * | 2018-09-17 | 2019-01-18 | 中国建筑第八工程局有限公司 | 用于施工轨道梁的系统 |
CN112878194B (zh) * | 2019-11-29 | 2023-02-10 | 比亚迪股份有限公司 | 用于桥梁的调节定位装置 |
CN111206507B (zh) * | 2020-02-05 | 2021-06-29 | 石家庄铁道大学 | 骑挂式支承结构及先简支后连续桥梁施工方法 |
CN114000651A (zh) * | 2021-11-10 | 2022-02-01 | 贵州建工集团第一建筑工程有限责任公司 | 一种劲性型钢结构及劲性型钢结构的加工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2426489Y (zh) * | 2000-06-07 | 2001-04-11 | 国营重庆重型铸锻厂 | 单轨交通pc轨道梁铸钢支座 |
KR100565384B1 (ko) * | 2003-08-12 | 2006-04-28 | (주)서현컨스텍 | 빔 연결부재와 강재가로보를 이용한 프리캐스트 피에스씨빔의 연속화 구조 및 이를 이용한 교량시공방법 |
KR100621539B1 (ko) * | 2003-12-23 | 2006-09-13 | 동양종합건업 주식회사 | 스틸브라켓에 의한 피.에스.씨-i빔의 연속결합방법 및 구조 |
CN101210413B (zh) * | 2006-12-29 | 2011-02-16 | 上海磁浮交通工程技术研究中心 | 一种轨道梁用抗拉可调连接机构 |
CN203174446U (zh) * | 2013-04-12 | 2013-09-04 | 北京交通大学 | 一种跨座式单轨交通刚构体系 |
CN103215886B (zh) * | 2013-04-12 | 2015-06-24 | 北京交通大学 | 一种新型的短节段钢箱-混凝土组合梁 |
CN204919297U (zh) * | 2015-09-10 | 2015-12-30 | 重庆市轨道交通设计研究院有限责任公司 | 新型连续梁式轨道 |
-
2015
- 2015-09-10 CN CN201510572865.XA patent/CN105178163B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105178163A (zh) | 2015-12-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105178163B (zh) | 连续梁式轨道 | |
CN103898836B (zh) | 斜拉桥h型索塔高上横梁钢斜腿预应力支架施工方法 | |
CN105088969B (zh) | 一种多塔单索面斜拉桥的合龙方法 | |
CN103669224A (zh) | 斜置拱塔双索面预应力混凝土斜拉桥中拱塔施工方法及钢管支架 | |
CN109826090A (zh) | 装配式分片盖梁及其连接方法 | |
CN210066507U (zh) | 一种组合式高墩盖梁施工支架 | |
CN205857032U (zh) | 一种落地支架与三角托架相结合的钢混结合段施工支撑装置 | |
CN107905124B (zh) | 一种对称式刚构连续梁施工工艺 | |
CN101440598B (zh) | 钢箱-砼组合箱板拱结构及其施工方法 | |
CN205636474U (zh) | 一种装配式牛腿结构 | |
CN105178194B (zh) | 连续梁式轨道建设施工方法 | |
CN105804400A (zh) | 一种曲面网架提升施工方法 | |
CN104831632A (zh) | 一种桥梁索塔上横梁与下横梁施工方法 | |
CN105088961B (zh) | 一种边跨合拢段与现浇段合并的施工方法 | |
CN201665823U (zh) | 桥梁挂篮现浇施工三角后锚反扣轮加强型轨道 | |
CN102605717A (zh) | 墩顶纵向支撑膺架法 | |
CN207498835U (zh) | 小横梁组合钢板梁桥面板现浇施工滑动模架系统 | |
CN110219242A (zh) | 一种双层同步梁内起梁的安装施工方法 | |
CN113832850A (zh) | 一种防裂型桥面连续结构及其施工方法 | |
CN105274939B (zh) | Pc轨道梁连接装置 | |
CN204919297U (zh) | 新型连续梁式轨道 | |
CN214401391U (zh) | 采用桁式钢结构加劲纵梁加固的下承式拱桥悬吊桥道系 | |
CN101476295A (zh) | 上行式移动模架造桥机提前过孔施工方法 | |
CN112482241A (zh) | 箱梁翼缘板后浇段行走式吊架及其施工方法 | |
CN204959578U (zh) | Pc轨道梁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Wu Tian Inventor after: Tu Hai Inventor after: Zeng Wubing Inventor after: Lai Li Inventor after: Zhao Xiaobo Inventor after: Chen Bo Inventor after: Li Yanqing Inventor after: Zhang Fugui Inventor after: Guo Hongfei Inventor after: Zhou Shengyi Inventor after: Zhang Jiong Inventor after: Wang Bo Inventor before: Zhao Xiaobo Inventor before: Wang Bo Inventor before: Tu Hai Inventor before: Wu Huanjun Inventor before: Wu Tian Inventor before: Chen Bo Inventor before: Li Yanqing Inventor before: Zhang Fugui Inventor before: Guo Hongfei Inventor before: Zhou Shengyi Inventor before: Zhang Jiong |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |