CN105139292B - Project of transmitting and converting electricity construction stage environment supervises cruising inspection system and method - Google Patents

Project of transmitting and converting electricity construction stage environment supervises cruising inspection system and method Download PDF

Info

Publication number
CN105139292B
CN105139292B CN201510603537.1A CN201510603537A CN105139292B CN 105139292 B CN105139292 B CN 105139292B CN 201510603537 A CN201510603537 A CN 201510603537A CN 105139292 B CN105139292 B CN 105139292B
Authority
CN
China
Prior art keywords
inspection
supervision
project
task
transmitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510603537.1A
Other languages
Chinese (zh)
Other versions
CN105139292A (en
Inventor
臧玉魏
谢连科
张永
刘辉
马新刚
张国英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Electric Power Research Institute
Original Assignee
Shandong Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Electric Power Research Institute filed Critical Shandong Electric Power Research Institute
Priority to CN201510603537.1A priority Critical patent/CN105139292B/en
Publication of CN105139292A publication Critical patent/CN105139292A/en
Application granted granted Critical
Publication of CN105139292B publication Critical patent/CN105139292B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of project of transmitting and converting electricity construction stage environment to supervise cruising inspection system, includes the mobile intelligent terminal and information management platform being communicatively coupled by internet;Mobile intelligent terminal is the optimal path that user record and planning reach inspection scene by dynamic adjustment algorithm, and carry out collection in worksite to the relevant information of task of supervision for obtaining task of supervision and carrying out GPS positioning to user;Information management platform is used to carry out storage and dynamic analysis according to the field data that mobile intelligent terminal is acquired, and formulates corrective measure according to live rating level and sends out warning information, automatically generates the environment supervision inspection Log Report of the construction stage where user.The present invention also provides a kind of project of transmitting and converting electricity construction stage environment to supervise method for inspecting.Implement technical solution provided by the invention, construction site data acquisition modes can be improved, improve supervision inspection working efficiency, effectively problem of environmental pollution of the control project of transmitting and converting electricity in the construction stage.

Description

Project of transmitting and converting electricity construction stage environment supervises cruising inspection system and method
Technical field
The present invention relates to network system technical fields more particularly to a kind of project of transmitting and converting electricity construction stage environment to supervise inspection Method and system.
Background technology
In links such as Electric Power Network Planning, project verification, design, construction, examination and operations, by the environment of project of transmitting and converting electricity Influence the measurement index important as one.In project of transmitting and converting electricity life cycle management in links, construction stage environment is protected Nurse makees to seem relatively weak.
Currently, China has carried out the environmental protection work of project of transmitting and converting electricity construction stage numerous infrastructure constructions Intermediate item.Infrastructure construction intermediate item effect on environment starts from exploration, planning stage, but environmental problem takes place mostly in and applies The work construction period, thus to acceptance stage when, ecology and soil erosion, noise, surrounding air, construction solid waste, construction sewage, The environmental problems such as waste water change already.
In order to solve the weakness of construction stage environment supervision, mitigate construction project to eco-environmental impact and destruction, The prior art carries out supervision processing to the environmental problem in project of transmitting and converting electricity work progress, still, project of transmitting and converting electricity at present Environmental protection supervision in process of construction is scattered by manual record field condition, task complexity and data information, construction process In environmental protective measure implementation of conditions and management method it is cumbersome persistently exposed with the problems such as loss of learning, such as:Specification is not formed The flow and system of change, environment supervision can not be weighed effectively, are stronger to the ability level dependence of environment supervisor etc. Defect.Although existing electric system has the power grid environment conservative management system of a set of maturation, untapped corresponding function Module is analyzed and is handled to the information of process of construction.
Invention content
The technical problem to be solved by the invention is to provide a kind of project of transmitting and converting electricity construction stage environment to supervise inspection technology Scheme improves construction site data acquisition modes, improves supervision inspection working efficiency, effectively controls project of transmitting and converting electricity in construction rank The problem of environmental pollution of section.
In order to solve the above technical problems, on the one hand, the embodiment of the present invention provides a kind of project of transmitting and converting electricity construction stage environment Cruising inspection system is supervised, includes the mobile intelligent terminal and information management platform being communicatively coupled by internet;
The mobile intelligent terminal passes through dynamic adjustment algorithm for obtaining task of supervision and carrying out GPS positioning to user The optimal path at inspection scene is reached for user record and planning, and scene is carried out to the relevant information of the task of supervision and is adopted Collection;
Described information management platform, the field data for being acquired according to the mobile intelligent terminal are stored and are moved State is analyzed, and is formulated corrective measure according to live rating level and is sent out warning information, automatically generates the construction stage where user Environment supervise inspection Log Report.
Preferably, the mobile intelligent terminal includes GPS positioning module, data acquisition module, information inquiry module sum number According to synchronization module;The GPS positioning module obtains the trace information of user for being positioned in real time to user;The data Acquisition module, for according to the task of supervision, being taken pictures using scene, voice description, writing record, one of video acquisition or Multinomial mode records field data;Described information enquiry module, for being produced in every task of supervision implementation procedure Raw various data are inquired, including each task execution during acquire historical data, engineering inspection Log Report, go through Secondary inspection route and environment protectment protection;The data simultaneous module, for the field data of acquisition to be uploaded to described information Management platform, the field data include one or more in picture, voice, word and video.
Preferably, described information management platform further includes database server, application server and client;
The database server, produced by being supervised in cruising inspection system to the project of transmitting and converting electricity construction stage environment Each item data carry out it is centrally stored;The application server, for disposing the project of transmitting and converting electricity construction stage environment supervision The function module of cruising inspection system;The client is added in the application server and is waited for for accessing the application server The parameter information of the project of transmitting and converting electricity of construction.
Further, the application server includes engineering project module, environmental protection measure module, task formulation module, number According to analysis module, information inquiry module, report management module;The engineering project module, for what is inputted according to client Parameter information is adjusted the task of supervision parameter of project of transmitting and converting electricity to be onstructed;The environmental protection measure module, for adding Each bid section needs the environmental element of on-the-spot make an inspection tour management;The environmental element includes ecology and soil erosion, noise, environment sky Gas, construction solid waste, construction sewage and waste water and environment monitoring in the works one or more;The task is formulated Module determines the human observer and geography of the environment supervision inspection of each bid section for project of transmitting and converting electricity to be divided into multiple bid sections Information, and determine engineering phase residing for transmission line of electricity or substation;The data analysis module, for according to the database The data that server is stored are analyzed by dynamic adjustment algorithm and formulate best polling path, according to on-site evaluation social estate system Determine corrective measure, and message of giving notice when pinpointing the problems;Described information enquiry module, for being held in every task of supervision The various data that row generates in the process are inquired, including the historical data of acquisition, engineering inspection during each task execution Log Report, all previous inspection route and environment protectment protection;The report management module is completed for constructing in each bid section Afterwards, it automatically generates environment corresponding with each bid section and supervises inspection Log Report.
Further, the mobile intelligent terminal is additionally operable to carry out optimal path planning using GIS map, and passes through nothing Line communication network obtains the task of supervision stored in the database server.
On the other hand, a kind of project of transmitting and converting electricity construction stage environment of the embodiment of the present invention supervises method for inspecting, including:
Task of supervision is obtained by mobile intelligent terminal and GPS positioning is carried out to user, is to use by dynamic adjustment algorithm Family records and planning reaches the optimal path at inspection scene, and carries out collection in worksite to the relevant information of the task of supervision;
Using information management platform, storage and dynamic point are carried out according to the field data that the mobile intelligent terminal is acquired Analysis formulates corrective measure according to live rating level and sends out warning information, automatically generates the ring of the construction stage where user Supervise inspection Log Report in border.
Preferably, described that task of supervision is obtained by mobile intelligent terminal and GPS positioning is carried out to user, it is adjusted by dynamic Whole algorithm is that user record and planning reach the optimal path at inspection scene, and show to the relevant information of the task of supervision Field acquisition, specifically includes:
User is positioned in real time, obtains the trace information of user;
According to the task of supervision, taken pictures using scene, voice description, writing record, video acquisition it is one or more Mode records field data;
The various data generated in every task of supervision implementation procedure are inquired, including each task execution process Historical data, engineering inspection Log Report, all previous inspection route and the environment protectment protection of middle acquisition;
The field data of acquisition is uploaded to described information management platform, the field data includes picture, voice, word With it is one or more in video.
Further, described to utilize information management platform, the field data acquired according to the mobile intelligent terminal into Row storage and dynamic analysis formulate corrective measure according to live rating level and send out warning information, automatically generate user place Construction stage environment supervise inspection Log Report, specifically include:
Generated each item data in project of transmitting and converting electricity construction stage environment supervision cruising inspection system concentrate and is deposited Storage;
Dispose the various functions of the project of transmitting and converting electricity construction stage environment supervision cruising inspection system;
The application server in described information management platform is accessed, defeated change to be onstructed is added in the application server The parameter information of electrical engineering.
Further, the various functions of the deployment project of transmitting and converting electricity construction stage environment supervision cruising inspection system, tool Body includes:
The parameter information inputted according to client adjusts the task of supervision parameter of project of transmitting and converting electricity to be onstructed It is whole;
Add the environmental element that each bid section needs on-the-spot make an inspection tour management;The environmental element includes ecology and water and soil stream Mistake, noise, surrounding air, construction solid waste, construction sewage and waste water and environment monitoring in the works one or more ?;
Project of transmitting and converting electricity is divided into multiple bid sections, determines the human observer of the environment supervision inspection of each bid section and geographical letter Breath, and determine engineering phase residing for transmission line of electricity or substation;
Best polling path is analyzed and formulated by dynamic adjustment algorithm, and corrective measure is formulated according to on-site evaluation grade, And message of giving notice when pinpointing the problems;
The various data generated in every task of supervision implementation procedure are inquired, including each task execution process Historical data, engineering inspection Log Report, all previous inspection route and the environment protectment protection of middle acquisition;
After the completion of each bid section is constructed, automatically generates environment corresponding with each bid section and supervise inspection daily record report It accuses.
Preferably, project of transmitting and converting electricity construction stage environment supervision method for inspecting further includes:It is carried out using GIS map Optimal path planning, and network obtains task of supervision by radio communication.
Project of transmitting and converting electricity construction stage environment provided in an embodiment of the present invention supervises inspection technical solution, passes through intelligent movable Terminal and information management platform realize standardization record and intelligent acquisition to project of transmitting and converting electricity construction stage environmental protection information, real The existing complete closed-loop control of environmental protective measure and management;And it is possible to guide environmental protection supervision by GIS map and GPS navigation Patrol officer goes to relevant work live, and all previous inspection flight path can be recorded using mobile intelligent terminal, is adjusted by dynamic Algorithm Analysis and the best polling path of formulation;By protecting situation by normal, abnormal, serious, critical grading point site environment Each bid section environmental protection work is analysed, so that environmental protection work develops towards beneficial direction during guiding construction, is subtracted as far as possible The small negative effect to ecological environment.
Description of the drawings
Fig. 1 is the structure of one embodiment of project of transmitting and converting electricity construction stage environment supervision cruising inspection system provided by the invention Schematic diagram.
Fig. 2 is a kind of structural schematic diagram of realization method of mobile intelligent terminal provided by the invention.
Fig. 3 is a kind of structural schematic diagram of realization method of application server provided by the invention.
The step of Fig. 4 is one embodiment of project of transmitting and converting electricity construction stage environment supervision method for inspecting provided by the invention Flow chart.
Fig. 5 is a kind of realization method provided by the invention that task of supervision and information collection are obtained by mobile intelligent terminal Step flow chart.
Fig. 6 is a kind of realization method provided by the invention that data analysis and environment supervision are carried out using information management platform Step flow chart.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes.
It is one embodiment of project of transmitting and converting electricity construction stage environment supervision cruising inspection system provided by the invention referring to Fig. 1 Structural schematic diagram.
In the present embodiment, the described project of transmitting and converting electricity construction stage environment supervision cruising inspection system include by internet into The mobile intelligent terminal 100 and information management platform 200 of row communication connection.Specifically, mobile intelligent terminal 100 is with Web Service interfaces are carrier, wireless or Wi-Fi realizes the data interaction with information management platform 200 by 4G;The internet Preferably use the Ethernet of HTTP (Hyper Text Transfer Protocol, hypertext transfer protocol) security protocol.
Wherein, the mobile intelligent terminal 100, for obtaining task of supervision and carrying out GPS (Global to user Positioning System, global positioning system) positioning is that user record and planning reach inspection by dynamic adjustment algorithm The optimal path at scene, and collection in worksite is carried out to the relevant information of the task of supervision;Preferably, mobile intelligent terminal 100 It is additionally operable to carry out optimal path rule using GIS (Geographic Information System, GIS-Geographic Information System) map It draws.
Described information management platform 200, the field data for being acquired according to the mobile intelligent terminal 100 are deposited Storage and dynamic analysis are formulated according to live rating level and corrective measure and send out warning information, and applying where user is automatically generated The environment in work stage supervises inspection Log Report.
It is a kind of structural schematic diagram of realization method of mobile intelligent terminal provided by the invention referring to Fig. 2.
Preferably, the mobile intelligent terminal 100 includes GPS positioning module 101, data acquisition module 102, information inquiry Module 103 and data simultaneous module 104.
The GPS positioning module 101 obtains the track of user for being positioned in real time to user.
The data acquisition module 102, for according to the task of supervision, being taken pictures using scene, voice describes, word is remembered It records, one or more modes of video acquisition record field data.
Described information enquiry module 103, for being carried out to the various data generated in every task of supervision implementation procedure Historical data, engineering inspection Log Report, all previous inspection route and the environment acquired during inquiry, including each task execution Protective standard.
The data simultaneous module 104, for the field data of acquisition to be uploaded to described information management platform 200, institute It includes one or more in picture, voice, word and video to state field data.
Synchronous task determines that flight path instructional environment supervises patrol officer and goes to construction bid section by GIS navigation programmings, Patrol officer can adjust according to path actual conditions into Mobile state in navigation procedure, and system can record all flight paths, pass through dynamic Adjustment algorithm records and planning optimal path when next inspection to provide, while when reaching inspection scene, to supervising inspection Personnel carry out GPS positioning, to be supervised to its work.
Using the data acquisition module 102 of mobile intelligent terminal 100, on-the-spot record is carried out to the task that needs are supervised, is adopted Taken pictures with scene, voice description, writing record, the modes such as video recording record field condition, be aided with measuring apparatus and intelligently remember Picture recording related parameter, and grade to field condition, including:Normally, abnormal, serious, critical four grades, if being protected for environment Nurse makees then to belong to the normal condition bid section in the reasonable scope and can subsequently continue to construct, and is uploaded to if in abnormal conditions Information management platform is judged by the information of acquisition in order to avoid causing the further destruction to environment.
The present embodiment by mobile intelligent terminal 100 and information management platform 200 complete the upload of data in work progress, Download and synchronizing information.Wherein, GIS map path planning mode can be analyzed and be handled to spatial information, and it is unique to generate Visualization effect, have and acquire, manage, analyze and export the abilities of a variety of geospatial informations, and support man-machine interactive Spatial decision, it is intuitive, accurate, intelligently user is instructed to arrive at.Utilize GIS map path planning and GPS positioning work( Can, inspection working efficiency is improved, is reached to the complete closed-loop control of environmental protective measure and management, project of transmitting and converting electricity construction is promoted Environmental protection supervision is horizontal in the process.
As illustrated in fig. 1, it is preferred that described information management platform 200 further includes database server 201, application server 202 and client 203.
Wherein, the database server 201, for supervising cruising inspection system to the project of transmitting and converting electricity construction stage environment In generated each item data carry out it is centrally stored;
The application server 202 supervises the work(of cruising inspection system for disposing the project of transmitting and converting electricity construction stage environment It can module;
The client 203 adds in the application server 202 for accessing the application server 202 and waits applying The parameter information of the project of transmitting and converting electricity of work.
In the present embodiment, the mobile intelligent terminal 100 is additionally operable to carry out optimal path planning using GIS map, and Network obtains the task of supervision stored in the database server 201 by radio communication.Specifically, mobile intelligent terminal 100 may be used Android development environments and SQLite light-weight databases, embedded various application programs, including GPS positioning, The functions such as data acquire, information inquiry is synchronous with data, pass through 4G (the 4th Generation Mobile Communication, forth generation mobile communication) network or Wi-Fi obtain task of supervision in database server 201, it is downloaded to Mobile intelligent terminal 100.
When it is implemented, project of transmitting and converting electricity construction stage environment supervision cruising inspection system provided in this embodiment uses Oracle Database and Java platform exploitation, database server 201 are used to carry out centrally stored, application server to whole system data 202 are used for deployment system program.Specifically, the Functional Module of the project of transmitting and converting electricity construction stage environment supervision cruising inspection system It includes but is not limited to engineering project module, environmental protection measure module, task and formulate module, data analysis module, information inquiry module, report Accuse management module.
Referring to Fig. 3, be application server provided by the invention a kind of realization method structural schematic diagram.
Specifically, the application server 202 includes engineering project module 2021, environmental protection measure module 2022, task system Cover half block 2023, data analysis module 2024, information inquiry module 2025, report management module 2026.
The engineering project module 2021, the parameter information for being inputted according to client, to power transmission and transformation to be onstructed The task of supervision parameter of engineering is adjusted.When it is implemented, system can be accessed by client 203 in engineering project module The project of transmitting and converting electricity various parameters information that addition will construct in 2021, including but not limited to account information, such as engineering name, Unit in charge of construction, engineering type etc..
The environmental protection measure module 2022, the environmental element of on-the-spot make an inspection tour management is needed for adding each bid section;It is described Environmental element includes ecology and soil erosion, noise, surrounding air, construction solid waste, construction sewage and waste water, Yi Jihuan It is one or more in guarantor's monitoring plan, specify indices.
The task formulates module 2023 and determines the ring of each bid section for project of transmitting and converting electricity to be divided into multiple bid sections The human observer and geography information of inspection are supervised in border, and determine engineering phase residing for transmission line of electricity or substation.Wherein, power transmission line Road includes but not limited to foundation excavation, concrete is cast, basal plane is handled, the transport of tower material, tower erection, the setting of stretching field, frame In the stages such as line, task, which formulates module 2023, to formulate supervision task according to the daily period.
The data analysis module 2024, the data for being stored according to the database server 201 pass through dynamic Best polling path is analyzed and formulated to adjustment algorithm, formulates corrective measure according to on-site evaluation grade, and send out when pinpointing the problems It puts up a notice message.Data analysis module 2024 in application server 202 can be by the number of 100 collection in worksite of mobile intelligent terminal Dynamic analysis are carried out according to, hidden danger information etc., corrective measure is formulated according to live rating level, and to carry out short message logical there are problem Know, after the completion of the construction of each bid section, automatically generates the bid section environment using report management module 2026 and supervise inspection daily record report It accuses.
Described information enquiry module 2025, for being carried out to the various data generated in every task of supervision implementation procedure Historical data, engineering inspection Log Report, all previous inspection route and the environment acquired during inquiry, including each task execution Protective standard.When it is implemented, system is provided which information searching function in mobile intelligent terminal 100 and information management platform 200, It is main to realize to the historical information of acquisition, environmental protection relevant laws and regulations standard, Other Engineering inspection Log Report, all previous patrol Examine the information search-read functions such as route.
The report management module 2026, for after the completion of each bid section is constructed, automatically generating and each bid section Corresponding environment supervises inspection Log Report.
Project of transmitting and converting electricity construction stage environment provided in this embodiment supervises cruising inspection system, passes through mobile intelligent terminal and letter It ceases management platform and realizes that the standardization record to project of transmitting and converting electricity construction stage environmental protection information is acquired with intelligent, realize that environment is protected The complete closed-loop control of shield measure and management;And it is possible to guide environmental protection supervision patrol officer by GIS map and GPS navigation It goes to relevant work live, and all previous inspection flight path can be recorded using mobile intelligent terminal, analyzed by dynamic adjustment algorithm With the best polling path of formulation;By protecting situation to analyze each mark by normal, abnormal, serious, critical grading site environment Section environmental protection work reduces as far as possible so that environmental protection work develops towards beneficial direction during guiding construction to ecology The negative effect of environment.
Corresponding with the project of transmitting and converting electricity construction stage environment supervision cruising inspection system that above-described embodiment provides, the present invention also carries A kind of specific implementation mode of project of transmitting and converting electricity construction stage environment supervision method for inspecting is supplied.
It is one embodiment of project of transmitting and converting electricity construction stage environment supervision method for inspecting provided by the invention referring to Fig. 4 Step flow chart.
Specifically, project of transmitting and converting electricity construction stage environment supervision method for inspecting includes mainly:
Step S401:Task of supervision is obtained by mobile intelligent terminal and GPS positioning is carried out to user, is adjusted by dynamic Algorithm is the optimal path that user record and planning reach inspection scene, and carries out scene to the relevant information of the task of supervision Acquisition;
Step S402:Using information management platform, the field data acquired according to the mobile intelligent terminal is deposited Storage and dynamic analysis are formulated according to live rating level and corrective measure and send out warning information, and applying where user is automatically generated The environment in work stage supervises inspection Log Report.
The basic functional principle of project of transmitting and converting electricity construction stage environment provided in this embodiment supervision method for inspecting with it is above-mentioned The basic functional principle for the project of transmitting and converting electricity construction stage environment supervision cruising inspection system that embodiment provides is consistent, no longer superfluous herein It states, corresponding related content in as detailed above.
It is a kind of reality provided by the invention that task of supervision and information collection are obtained by mobile intelligent terminal referring to Fig. 5 The step flow chart of existing mode.
As shown in figure 5, in a kind of achievable mode, the step S401 is specifically included:
Step S501:User is positioned in real time, obtains the trace information of user;
Step S502:According to the task of supervision, taken pictures using scene, voice description, writing record, video acquisition one Item or multinomial mode record field data;
Step S503:The various data generated in every task of supervision implementation procedure are inquired, including each Historical data, engineering inspection Log Report, all previous inspection route and the environment protectment protection acquired in business implementation procedure;
Step S504:The field data of acquisition is uploaded to described information management platform, the field data include picture, It is one or more in voice, word and video.
It is a kind of reality provided by the invention that data analysis and environment supervision are carried out using information management platform referring to Fig. 6 The step flow chart of existing mode.
In a kind of achievable mode, the step S402 is specifically included:
Step S601:To the project of transmitting and converting electricity construction stage environment supervise cruising inspection system in generated each item data into Row is centrally stored;
Step S602:Dispose the various functions of the project of transmitting and converting electricity construction stage environment supervision cruising inspection system;
Step S603:The application server in described information management platform is accessed, adds and waits in the application server The parameter information of the project of transmitting and converting electricity of construction.
When it is implemented, in the step S603, i.e., the described deployment project of transmitting and converting electricity construction stage environment supervision The various functions of cruising inspection system, specifically include:
The parameter information inputted according to client adjusts the task of supervision parameter of project of transmitting and converting electricity to be onstructed It is whole;
Add the environmental element that each bid section needs on-the-spot make an inspection tour management;The environmental element includes ecology and water and soil stream Mistake, noise, surrounding air, construction solid waste, construction sewage and waste water and environment monitoring in the works one or more ?;
Project of transmitting and converting electricity is divided into multiple bid sections, determines the human observer of the environment supervision inspection of each bid section and geographical letter Breath, and determine engineering phase residing for transmission line of electricity or substation;
Best polling path is analyzed and formulated by dynamic adjustment algorithm, and corrective measure is formulated according to on-site evaluation grade, And message of giving notice when pinpointing the problems;
The various data generated in every task of supervision implementation procedure are inquired, including each task execution process Historical data, engineering inspection Log Report, all previous inspection route and the environment protectment protection of middle acquisition;
After the completion of each bid section is constructed, automatically generates environment corresponding with each bid section and supervise inspection daily record report It accuses.
In the present embodiment, project of transmitting and converting electricity construction stage environment supervision method for inspecting further includes:Using GIS Figure carries out optimal path planning, and network obtains task of supervision by radio communication.
The basic functional principle of project of transmitting and converting electricity construction stage environment provided in this embodiment supervision method for inspecting with it is above-mentioned The basic functional principle for the project of transmitting and converting electricity construction stage environment supervision cruising inspection system that embodiment provides is consistent, no longer superfluous herein It states, corresponding related content in as detailed above.
Implement project of transmitting and converting electricity construction stage environment supervision inspection technical solution provided in an embodiment of the present invention, has following Advantage:
(1), it is realized to project of transmitting and converting electricity construction stage environmental protection information by mobile intelligent terminal and information management platform Standardization record and intelligent acquisition complete the upload, download of data, synchronizing information in work progress, realize that environmental protection is arranged Apply complete closed-loop control and management;
(2), environmental protection supervision patrol officer can be guided to go to relevant work live by GIS map and GPS navigation, and energy All previous inspection flight path enough is recorded using mobile intelligent terminal, analyzes and formulate best polling path by dynamic adjustment algorithm;
(3), it is protected by protecting situation to analyze each bid section environment by normal, abnormal, serious, critical grading site environment Nurse makees, so that environmental protection work develops towards beneficial direction during guiding construction, reduces born to ecological environment as far as possible Face is rung.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also considered as Protection scope of the present invention.

Claims (6)

1. a kind of project of transmitting and converting electricity construction stage environment supervises cruising inspection system, which is characterized in that including being led to by internet Believe the mobile intelligent terminal and information management platform of connection;
The mobile intelligent terminal is to use by dynamic adjustment algorithm for obtaining task of supervision and carrying out GPS positioning to user Family records and planning reaches the optimal path at inspection scene, and carries out collection in worksite to the relevant information of the task of supervision;
Described information management platform, the field data for being acquired according to the mobile intelligent terminal carry out storage and dynamic point Analysis formulates corrective measure according to live rating level and sends out warning information, automatically generates the ring of the construction stage where user Supervise inspection Log Report in border;
Described information management platform further includes database server, application server and client;
The database server, it is generated each in cruising inspection system for being supervised to the project of transmitting and converting electricity construction stage environment Item data carries out centrally stored;
The application server supervises the function module of cruising inspection system for disposing the project of transmitting and converting electricity construction stage environment;
The client adds power transmission and transformation work to be onstructed for accessing the application server in the application server The parameter information of journey;
The application server includes engineering project module, environmental protection measure module, task formulation module, data analysis module, letter Cease enquiry module, report management module;
The engineering project module, the parameter information for being inputted according to client, to the prison of project of transmitting and converting electricity to be onstructed Pipe task parameters are adjusted;
The environmental protection measure module, the environmental element of on-the-spot make an inspection tour management is needed for adding each bid section;The environmental element Including ecology and soil erosion, noise, surrounding air, construction solid waste, construction sewage and waste water and environment monitoring meter It is one or more in drawing;
The task formulates module, for project of transmitting and converting electricity to be divided into multiple bid sections, determines that the environment supervision of each bid section is patrolled The human observer and geography information of inspection, and determine engineering phase residing for transmission line of electricity or substation;
The data analysis module, the data for being stored according to the database server pass through dynamic adjustment algorithm point Best polling path is analysed and formulated, corrective measure, and message of giving notice when pinpointing the problems are formulated according to on-site evaluation grade;
Described information enquiry module is wrapped for inquiring the various data generated in every task of supervision implementation procedure Include historical data, engineering inspection Log Report, all previous inspection route and the environmental protection mark acquired during each task execution It is accurate;
The report management module, for after the completion of each bid section is constructed, automatically generating corresponding with each bid section Environment supervises inspection Log Report.
2. project of transmitting and converting electricity construction stage environment as described in claim 1 supervises cruising inspection system, which is characterized in that the movement Intelligent terminal includes GPS positioning module, data acquisition module, information inquiry module and data simultaneous module;
The GPS positioning module obtains the trace information of user for being positioned in real time to user;
The data acquisition module, for according to the task of supervision, taken pictures using scene, voice description, writing record, video One or more modes of acquisition record field data;
Described information enquiry module is wrapped for inquiring the various data generated in every task of supervision implementation procedure Include historical data, engineering inspection Log Report, all previous inspection route and the environmental protection mark acquired during each task execution It is accurate;
The data simultaneous module, for the field data of acquisition to be uploaded to described information management platform, the field data Including one or more in picture, voice, word and video.
3. project of transmitting and converting electricity construction stage environment as described in claim 1 supervises cruising inspection system, which is characterized in that
The mobile intelligent terminal is additionally operable to carry out optimal path planning using GIS map, and network obtains by radio communication The task of supervision stored in the database server.
4. a kind of project of transmitting and converting electricity construction stage environment supervises method for inspecting, which is characterized in that including:
Task of supervision is obtained by mobile intelligent terminal and GPS positioning is carried out to user, is remembered for user by dynamic adjustment algorithm Record and planning reach the optimal path at inspection scene, and carry out collection in worksite to the relevant information of the task of supervision;
Using information management platform, storage and dynamic analysis are carried out according to the field data that the mobile intelligent terminal is acquired, Corrective measure is formulated according to live rating level and sends out warning information, automatically generates the environment prison of the construction stage where user Pipe inspection Log Report;
It is described to utilize information management platform, storage and dynamic point are carried out according to the field data that the mobile intelligent terminal is acquired Analysis formulates corrective measure according to live rating level and sends out warning information, automatically generates the ring of the construction stage where user Inspection Log Report is supervised in border, is specifically included:
It is centrally stored that generated each item data progress in cruising inspection system is supervised to the project of transmitting and converting electricity construction stage environment;
Dispose the various functions of the project of transmitting and converting electricity construction stage environment supervision cruising inspection system;
The application server in described information management platform is accessed, power transmission and transformation work to be onstructed is added in the application server The parameter information of journey;
The various functions of the deployment project of transmitting and converting electricity construction stage environment supervision cruising inspection system, specifically include:
The parameter information inputted according to client is adjusted the task of supervision parameter of project of transmitting and converting electricity to be onstructed;
Add the environmental element that each bid section needs on-the-spot make an inspection tour management;The environmental element includes ecology and soil erosion, makes an uproar Sound, surrounding air, construction solid waste, construction sewage and waste water and environment monitoring in the works one or more;
Project of transmitting and converting electricity is divided into multiple bid sections, determines the human observer and geography information of the environment supervision inspection of each bid section, And determine engineering phase residing for transmission line of electricity or substation;
Best polling path is analyzed and formulated by dynamic adjustment algorithm, according to the formulation corrective measure of on-site evaluation grade, and It gives notice when pinpointing the problems message;
The various data generated in every task of supervision implementation procedure are inquired, including are adopted during each task execution Historical data, engineering inspection Log Report, all previous inspection route and the environment protectment protection of collection;
After the completion of each bid section is constructed, automatically generates environment corresponding with each bid section and supervise inspection Log Report.
5. project of transmitting and converting electricity construction stage environment as claimed in claim 4 supervises method for inspecting, which is characterized in that described to pass through Mobile intelligent terminal obtains task of supervision and carries out GPS positioning to user, is user record and planning by dynamic adjustment algorithm The optimal path at inspection scene is reached, and collection in worksite is carried out to the relevant information of the task of supervision, is specifically included:
User is positioned in real time, obtains the trace information of user;
According to the task of supervision, taken pictures using scene, voice description, writing record, video acquisition one or more modes Field data is recorded;
The various data generated in every task of supervision implementation procedure are inquired, including are adopted during each task execution Historical data, engineering inspection Log Report, all previous inspection route and the environment protectment protection of collection;
The field data of acquisition is uploaded to described information management platform, the field data includes picture, voice, word and regards It is one or more in frequency.
6. project of transmitting and converting electricity construction stage environment as claimed in claim 4 supervises method for inspecting, which is characterized in that the method Further include:
Optimal path planning is carried out using GIS map, and network obtains task of supervision by radio communication.
CN201510603537.1A 2015-09-21 2015-09-21 Project of transmitting and converting electricity construction stage environment supervises cruising inspection system and method Expired - Fee Related CN105139292B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510603537.1A CN105139292B (en) 2015-09-21 2015-09-21 Project of transmitting and converting electricity construction stage environment supervises cruising inspection system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510603537.1A CN105139292B (en) 2015-09-21 2015-09-21 Project of transmitting and converting electricity construction stage environment supervises cruising inspection system and method

Publications (2)

Publication Number Publication Date
CN105139292A CN105139292A (en) 2015-12-09
CN105139292B true CN105139292B (en) 2018-10-30

Family

ID=54724627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510603537.1A Expired - Fee Related CN105139292B (en) 2015-09-21 2015-09-21 Project of transmitting and converting electricity construction stage environment supervises cruising inspection system and method

Country Status (1)

Country Link
CN (1) CN105139292B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106127409A (en) * 2016-07-04 2016-11-16 中国科学院深圳先进技术研究院 A kind of remote power cooperation interaction method and system based on intelligent glasses
CN106844657A (en) * 2017-01-23 2017-06-13 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity noise circumstance Forecasting Methodology based on environment sensitive Motion parameters
CN106780154B (en) * 2017-01-23 2020-10-16 国网山东省电力公司电力科学研究院 Multithread information aggregation power transmission and transformation project construction process environmental protection measure monitoring system and method
CN107727941B (en) * 2017-08-31 2020-08-14 国网山东省电力公司电力科学研究院 Environment sensitive area mobile electromagnetic environment information monitoring and management method and system
CN108574734A (en) * 2018-04-10 2018-09-25 上海电力高压实业有限公司 Overhead power line construction overall process quality managing and control system based on mobile terminal and method
CN109800990A (en) * 2019-01-22 2019-05-24 武汉瑞莱保能源技术有限公司 A kind of engineering environmental protection monitoring and managing method and system
CN110009762B (en) * 2019-04-25 2021-01-01 上海市政工程设计研究总院(集团)有限公司 Special intelligent inspection system for biological reaction tank of sewage treatment plant
CN110084530A (en) * 2019-05-07 2019-08-02 万翼科技有限公司 Analytical equipment and its method, the movement inspection device and storage medium of mobile inspection
WO2020248266A1 (en) * 2019-06-14 2020-12-17 胡永生 Constructional engineering internet of things information management system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于GIS的输变电巡检管理系统研究;李嵩;《中国优秀硕士学位论文全文数据库工程科技II辑》;20130415(第4期);第C042-244页 *
输变电工程建设过程环保措施监控方法;谢连科等;《山东电力技术》;20150731;第42卷(第7期);第14-17页 *

Also Published As

Publication number Publication date
CN105139292A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
Li et al. From digital earth to smart earth
Su et al. Smart city and the applications
US20150356482A1 (en) Aerial drone for well-site and signal survey
CN103942941B (en) Mobile monitoring convergence platform based on GIS
CN103595813B (en) Wisdom pipe network application system and implementation method
Galmarini et al. Coordination and harmonization of the multi-scale, multi-model activities HTAP2, AQMEII3, and MICS-Asia3: simulations, emission inventories, boundary conditions, and model output formats
US8494774B2 (en) Apparatus and method for providing environmental predictive indicators to emergency response managers
CN101901244B (en) Geological geographic information system processing method
CN105516925B (en) Personnel management methods based on geography fence
CN104680320A (en) BIM-based project management system and method
CN103456136B (en) Internet of Things framework type system for monitoring and early warning of major accident potential safety hazards of water conservancy and hydropower project
US20120297028A1 (en) Integrated remote pollution monitoring and indexing system and method thereof
CN104866952B (en) Hydropower Project project three-dimensional digital management implementation method
CN104460609A (en) Remote monitoring method and system for oil and gas production
CN106408453A (en) GIS-based power transmission line intelligent inspection system
CN103200051B (en) Intelligent substation message emulating is tested and is associated message analysis system and method
CN102354431B (en) Monitoring and prewarning system and method for geological disasters
EP2551990B1 (en) Situational awareness for an electrical distribution system
CN205898761U (en) Air quality monitoring system
CN104656719A (en) Dust removing system
CN104729587B (en) A kind of monitoring system and method for large-scale power Material Transportation
CN102044094B (en) Line polling management system and method
CN104598692B (en) Power plant emission smoke contamination simulation method
CN103020871A (en) Electric power transmission line and disaster geographic information system
CN104850596A (en) Distribution network data processing method based on mobile GIS (Geographic Information System) and RTK (Real Time Kinematic) positioning

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181030

Termination date: 20190921