CN105138757A - 基于Autodesk Revit的电力电缆工程可视化模型的建立方法 - Google Patents

基于Autodesk Revit的电力电缆工程可视化模型的建立方法 Download PDF

Info

Publication number
CN105138757A
CN105138757A CN201510502575.8A CN201510502575A CN105138757A CN 105138757 A CN105138757 A CN 105138757A CN 201510502575 A CN201510502575 A CN 201510502575A CN 105138757 A CN105138757 A CN 105138757A
Authority
CN
China
Prior art keywords
power
power cable
cable
tunnel
visual model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510502575.8A
Other languages
English (en)
Other versions
CN105138757B (zh
Inventor
李艳
杜志航
鲁斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Economic and Technological Research Institute
Shanghai Electric Power Design Institute Co Ltd
Original Assignee
Shanghai Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Power Design Institute Co Ltd filed Critical Shanghai Electric Power Design Institute Co Ltd
Priority to CN201510502575.8A priority Critical patent/CN105138757B/zh
Publication of CN105138757A publication Critical patent/CN105138757A/zh
Application granted granted Critical
Publication of CN105138757B publication Critical patent/CN105138757B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Instructional Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种基于Autodesk?Revit的电力电缆工程可视化模型的建立方法,它涉及电力系统的输变电工程设计领域。Autodesk?Revit软件常被用于建筑行业三维可视化模型的设计,其最大的特点是可实现多专业协同操作。在电力系统的输变电工程设计中,一方面很少进行三维可视化建模设计,另一方面极少有变电部分和线路部分在同一平台下实现协同可视化建模设计。本发明通过专业平面图准备、设置工作集、专业协同、电力隧道内电力电缆可视化模型的建立等步骤实现了用Autodesk?Revit建立电力电缆工程可视化模型。

Description

基于Autodesk Revit的电力电缆工程可视化模型的建立方法
技术领域
本发明涉及的是电力系统的输变电工程设计领域,具体涉及基于AutodeskRevit建立电力电缆工程可视化模型。
背景技术
AutodeskRevit软件常被用于建筑行业三维可视化模型的设计,其最大的特点是可实现多专业协同操作。其概念非常超前,不仅是绘图的工具,而是综合型设计软件,是协同工作、精细化设计、高效设计的体现。同一项目人员可以在权限以内实现实时共享,促进整个设计团队工作效率和工作质量的提高。
在电力系统的输变电工程设计中,一方面很少进行三维可视化建模设计,另一方面极少有变电部分和线路部分在同一平台下实现协同可视化建模设计。
基于此,设计一种基于AutodeskRevit的电力电缆工程可视化模型的建立方法还是很有必要的。
发明内容
针对现有技术上存在的不足,本发明目的是在于提供一种基于AutodeskRevit的电力电缆工程可视化模型的建立方法,可以利用AutodeskRevit多专业协同操作的特点,实现变电部分和线路部分在同一平台下三维可视化建模设计。有利于对工程设计进行总体的把握调度,同时提高整体效率。
为了实现上述目的,本发明是通过如下的技术方案来实现:一种基于AutodeskRevit的电力电缆工程可视化模型的建立方法,包括如下步骤:
1)各专业平面图准备;
2)设置工作集;
3)各专业协同步骤;
4)电力隧道内电力电缆可视化模型的建立。
第一步:各专业平面图准备
平面图是进行可视化建模的基础。平面图准备的内容包括:平面图、断面图、主要部分的标高、输变电设备的位置。
第二步:设置工作集
工作集是实现各专业协同作业的平台。根据专业分类,在Revit中预先设置按专业分类的工作集,不同专业可以修改本专业工作集中的内容,而其他专业仅能在软件中看到其他专业的内容,但不能修改。
第三步:各专业协同步骤
确定合理的协同步骤是在实现输变电工程可视化模型建立的关键部分。一方面可以大大缩短协同周期减少工作量,另一方面可以实时进行冲突检查,便于修改完善。
1)变电站内电缆可视化建模协同步骤:
(1)变电建筑专业在Revit中绘制各层建筑平面图并发布,照明、暖通、给排水等专业在建筑专业协同后布置照明、暖通、给排水等设备和管道等;
(2)变电一次专业在图中布置一次设备位置,变电站与线路部分接口等;
(3)送电结构完成电缆支架设计,电缆支架必须为独立族;
(4)送电电气将电缆支架布置于电缆层内,并根据电缆层内电缆敷设高度、交叉跨越等修改支架形式;
(5)进行碰撞检查,将检查结果反馈至其他专业,并协同修改。
第四步:电力隧道内电力电缆可视化模型的建立
(1)隧道本体的建模:圆形盾构隧道本体的建模采用样条放样形式,根据隧道不同区段的标高设置放样曲线的高度和半径,矩形隧道本体的建模采用方形拉伸方式建立空心隧道本体模型。
(2)隧道内支架和夹具等的建模:根据实际尺寸建立模型,并放置于隧道本体内,调节支架位置和支架间距。
(3)隧道内电力电缆建模:电力电缆采用软管模型,根据支架位置设置电缆节点,两节点间增加一个顶点,作为电力电缆蛇形敷设形式的拉伸点。
本发明的有益效果:
本发明可以利用AutodeskRevit多专业协同操作的特点,实现变电部分和线路部分在同一平台下三维可视化建模设计。
本发明有利于对工程设计进行总体的把握调度,同时提高整体效率。
附图说明
图1为本发明的系统框图。
具体实施方式
为使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本发明。
参照图1,本发明具体实施方式采用以下技术方案:一种基于AutodeskRevit的电力电缆工程可视化模型的建立方法,包括如下步骤:
1)各专业平面图准备;
2)设置工作集;
3)各专业协同步骤;
4)电力隧道内电力电缆可视化模型的建立。
第一步:各专业平面图准备
平面图是进行可视化建模的基础。平面图准备的内容包括:平面图、断面图、主要部分的标高、输变电设备的位置。
第二步:设置工作集
工作集是实现各专业协同作业的平台。根据专业分类,在Revit中预先设置按专业分类的工作集,不同专业可以修改本专业工作集中的内容,而其他专业仅能在软件中看到其他专业的内容,但不能修改。
第三步:各专业协同步骤
确定合理的协同步骤是在实现输变电工程可视化模型建立的关键部分。一方面可以大大缩短协同周期减少工作量,另一方面可以实时进行冲突检查,便于修改完善。
1)变电站内电缆可视化建模协同步骤:
(1)变电建筑专业在Revit中绘制各层建筑平面图并发布,照明、暖通、给排水等专业在建筑专业协同后布置照明、暖通、给排水等设备和管道等;
(2)变电一次专业在图中布置一次设备位置,变电站与线路部分接口等;
(3)送电结构完成电缆支架设计,电缆支架必须为独立族;
(4)送电电气将电缆支架布置于电缆层内,并根据电缆层内电缆敷设高度、交叉跨越等修改支架形式;
(5)进行碰撞检查,将检查结果反馈至其他专业,并协同修改。
第四步:电力隧道内电力电缆可视化模型的建立
(1)隧道本体的建模:圆形盾构隧道本体的建模采用样条放样形式,根据隧道不同区段的标高设置放样曲线的高度和半径,矩形隧道本体的建模采用方形拉伸方式建立空心隧道本体模型。
(2)隧道内支架和夹具等的建模:根据实际尺寸建立模型,并放置于隧道本体内,调节支架位置和支架间距。
(3)隧道内电力电缆建模:电力电缆采用软管模型,根据支架位置设置电缆节点,两节点间增加一个顶点,作为电力电缆蛇形敷设形式的拉伸点。
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (5)

1.一种基于AutodeskRevit的电力电缆工程可视化模型的建立方法,其特征在于,包括如下步骤:
1)各专业平面图准备;
2)设置工作集;
3)各专业协同步骤;
4)电力隧道内电力电缆可视化模型的建立。
2.根据权利要求1所述的基于AutodeskRevit的电力电缆工程可视化模型的建立方法,其特征在于,所述各专业平面图准备步骤包括:平面图、断面图、主要部分的标高、输变电设备的位置。
3.根据权利要求1所述的基于AutodeskRevit的电力电缆工程可视化模型的建立方法,其特征在于,根据专业分类,在Revit中预先设置按专业分类的工作集,不同专业可以修改本专业工作集中的内容,而其他专业仅能在软件中看到其他专业的内容,但不能修改。
4.根据权利要求1所述的基于AutodeskRevit的电力电缆工程可视化模型的建立方法,其特征在于,所述各专业协同步骤包括:
(1)变电建筑专业在Revit中绘制各层建筑平面图并发布,照明、暖通、给排水等专业在建筑专业协同后布置照明、暖通、给排水等设备和管道等;
(2)变电一次专业在图中布置一次设备位置,变电站与线路部分接口等;
(3)送电结构完成电缆支架设计,电缆支架必须为独立族;
(4)送电电气将电缆支架布置于电缆层内,并根据电缆层内电缆敷设高度、交叉跨越等修改支架形式;
(5)进行碰撞检查,将检查结果反馈至其他专业,并协同修改。
5.根据权利要求1所述的基于AutodeskRevit的电力电缆工程可视化模型的建立方法,其特征在于,所述电力隧道内电力电缆可视化模型的建立步骤包括:
(1)隧道本体的建模:圆形盾构隧道本体的建模采用样条放样形式,根据隧道不同区段的标高设置放样曲线的高度和半径,矩形隧道本体的建模采用方形拉伸方式建立空心隧道本体模型;
(2)隧道内支架和夹具等的建模:根据实际尺寸建立模型,并放置于隧道本体内,调节支架位置和支架间距;
(3)隧道内电力电缆建模:电力电缆采用软管模型,根据支架位置设置电缆节点,两节点间增加一个顶点,作为电力电缆蛇形敷设形式的拉伸点。
CN201510502575.8A 2015-08-17 2015-08-17 基于Autodesk Revit的电力电缆工程可视化模型的建立方法 Active CN105138757B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510502575.8A CN105138757B (zh) 2015-08-17 2015-08-17 基于Autodesk Revit的电力电缆工程可视化模型的建立方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510502575.8A CN105138757B (zh) 2015-08-17 2015-08-17 基于Autodesk Revit的电力电缆工程可视化模型的建立方法

Publications (2)

Publication Number Publication Date
CN105138757A true CN105138757A (zh) 2015-12-09
CN105138757B CN105138757B (zh) 2018-01-12

Family

ID=54724104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510502575.8A Active CN105138757B (zh) 2015-08-17 2015-08-17 基于Autodesk Revit的电力电缆工程可视化模型的建立方法

Country Status (1)

Country Link
CN (1) CN105138757B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106202622A (zh) * 2016-06-27 2016-12-07 武汉开目信息技术有限责任公司 一种三维装配仿真中沿螺旋路径快速敷设电线的方法
CN106407505A (zh) * 2016-08-24 2017-02-15 江苏国泰新点软件有限公司 基于Revit平台在桥架上布线的方法和装置
CN106530391A (zh) * 2016-10-11 2017-03-22 上海电力设计院有限公司 基于gis的城市地下电缆三维设计方法
CN107679322A (zh) * 2017-09-29 2018-02-09 中国电建集团贵阳勘测设计研究院有限公司 一种交通隧洞断面及轴线设置方法
CN108491645A (zh) * 2018-03-27 2018-09-04 中国水利水电第十工程局有限公司 基于Autodesk Inventor Professional软件的拱肋放样操作方法
CN109033631A (zh) * 2018-07-25 2018-12-18 中国长江电力股份有限公司 一种基于设计信息的电站光缆或电缆路由三维展示方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003060569A (ja) * 2001-08-21 2003-02-28 Hitachi Software Eng Co Ltd 光ケーブルネットワークにおけるケーブル敷設計画立案支援システム、ケーブル敷設計画立案支援方法及びケーブル敷設計画立案支援プログラム
CN103617646A (zh) * 2013-10-23 2014-03-05 山东康威通信技术股份有限公司 一种电力隧道环境的三维模型库建立方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003060569A (ja) * 2001-08-21 2003-02-28 Hitachi Software Eng Co Ltd 光ケーブルネットワークにおけるケーブル敷設計画立案支援システム、ケーブル敷設計画立案支援方法及びケーブル敷設計画立案支援プログラム
CN103617646A (zh) * 2013-10-23 2014-03-05 山东康威通信技术股份有限公司 一种电力隧道环境的三维模型库建立方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨科 等: "基于BIM的建筑多专业协同设计流程探析与实践", 《江苏建筑》 *
胡嵩炜 等: "大型项目BIM模型构建协同工作的实现", 《四川建筑科学研究》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106202622A (zh) * 2016-06-27 2016-12-07 武汉开目信息技术有限责任公司 一种三维装配仿真中沿螺旋路径快速敷设电线的方法
CN106407505A (zh) * 2016-08-24 2017-02-15 江苏国泰新点软件有限公司 基于Revit平台在桥架上布线的方法和装置
CN106530391A (zh) * 2016-10-11 2017-03-22 上海电力设计院有限公司 基于gis的城市地下电缆三维设计方法
CN107679322A (zh) * 2017-09-29 2018-02-09 中国电建集团贵阳勘测设计研究院有限公司 一种交通隧洞断面及轴线设置方法
CN107679322B (zh) * 2017-09-29 2021-02-12 中国电建集团贵阳勘测设计研究院有限公司 一种交通隧洞断面及轴线设置方法
CN108491645A (zh) * 2018-03-27 2018-09-04 中国水利水电第十工程局有限公司 基于Autodesk Inventor Professional软件的拱肋放样操作方法
CN108491645B (zh) * 2018-03-27 2021-08-31 中国水利水电第十一工程局有限公司 基于Autodesk Inventor Professional软件的拱肋放样操作方法
CN109033631A (zh) * 2018-07-25 2018-12-18 中国长江电力股份有限公司 一种基于设计信息的电站光缆或电缆路由三维展示方法

Also Published As

Publication number Publication date
CN105138757B (zh) 2018-01-12

Similar Documents

Publication Publication Date Title
CN105138757A (zh) 基于Autodesk Revit的电力电缆工程可视化模型的建立方法
CN104835079B (zh) 一种基于bim和gis的变电站模型构建方法
CN110401145B (zh) 一种电缆敷设方法
CN104966154A (zh) 一种基于bim技术的临水临电管理方法及系统
CN103093007B (zh) 输电铁塔三维虚拟装配方法
CN104268319B (zh) 卫星电缆三维标注方法
CN106372309B (zh) 一种基于gis和bim的电力隧道数字化敷设方法和系统
CN204303029U (zh) 用于地铁管线碰撞检测及后期运营维护的bim数据库系统
ATE367674T1 (de) Verfahren zur projektierung einer elektrischen anlage und projektierungsvorrichtung
CN104778747A (zh) 电力地下管网三维建模方法
CN104063529A (zh) 一种数字化汽车工厂布局规划仿真的方法
CN112257160A (zh) 一种基于bim的垃圾焚烧发电厂标准化正向设计方法
CN109460595A (zh) 一种动力电缆敷设设计方法
CN102222132A (zh) 基于图拓扑结构的图纸数据一致性检查方法
CN103838935A (zh) 用于地铁信号系统设计的绘图系统和方法
CN103383707B (zh) 基于厂站和杆塔经纬度坐标自动生成电网系统接线图的方法
CN104715079A (zh) 一种电缆系统三维模型模体系的架构方法
CN107657087A (zh) 基于bim技术的管线综合布置方法
CN102479359A (zh) 基于图形操作的电网检修计划编制方法
CN104298800A (zh) 一种智能变电站的三维集成化模型
CN202167019U (zh) 一种通过bim进行施工模拟的装置
CN104298792A (zh) 基于核电站的模块设计方法和系统
CN110083874A (zh) 一种电缆网组件数字化设计系统
CN105389300A (zh) 一种导入二维表格数据至配网GIS系统自动生成10kV设备数据的方法
CN108920860A (zh) 一种gil管廊工程数字化建模方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Li Yan

Inventor after: Du Zhihang

Inventor after: Lu Bin

Inventor after: Hu Junhui

Inventor after: Gou Xiaotong

Inventor before: Li Yan

Inventor before: Du Zhihang

Inventor before: Lu Bin

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160810

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: State Power Economic Research Institute

Applicant after: Shanghai Electric Power Design Institute Limited

Address before: 200025 Shanghai Huangpu District Chongqing South Road, building 18-22, No. 310

Applicant before: Shanghai Electric Power Design Institute Limited

GR01 Patent grant
GR01 Patent grant