CN105133716A - House construction drainage system - Google Patents
House construction drainage system Download PDFInfo
- Publication number
- CN105133716A CN105133716A CN201510579753.7A CN201510579753A CN105133716A CN 105133716 A CN105133716 A CN 105133716A CN 201510579753 A CN201510579753 A CN 201510579753A CN 105133716 A CN105133716 A CN 105133716A
- Authority
- CN
- China
- Prior art keywords
- pipe
- charge
- sedimentation basin
- collecting
- tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Landscapes
- Sewage (AREA)
Abstract
The invention relates to the technical field of devices used for household construction, in particular to a house construction drainage system. The house construction drainage system is good in purification effect and can be recycled. The length can be regulated. The house construction drainage system comprises a plurality of sewage drainage pipes, a plurality of rainwater drainage pipes, a sewage main pipe and a rainwater main pipe, and further comprises a first water collection pool and a second water collection pool. Each sewage drainage pipe comprises a first upper branch pipe, a first lower branch pipe and a first sleeve. Each rainwater drainage pipe comprises a second upper branch pipe, a second lower branch pipe and a second sleeve. The house construction drainage system further comprises a first sedimentation pool, a second sedimentation pool and a purification pool.
Description
Technical field
The present invention relates to the technical field of building construction equipment, particularly relate to a kind of building construction drainage system.
Background technology
As everyone knows, building construction refers to that people carry out producing, live, live or the house of other activities or place, as industrial construction, civilian construction, agricultural buildings etc.; And the drainage system of building construction is mainly used in collecting sanitary sewage and rainwater and discharging; Existing building construction drainage system comprises multiple sewage drainage pipe, multiple rainwater drainage pipe, main sewer, rainwater supervisor and collecting-tank; Multiple sewage drainage Guan Junyu main sewer is communicated with, and main sewer was communicated with collecting-tank communicating pipe by first time, and multiple rainwater drainage pipe is all responsible for rainwater and is communicated with, and rainwater supervisor be communicated with collecting-tank by second time communicating pipe; This building construction drainage system finds in using, and because its sewage drainage pipe and rainwater drainage pipe are regular length, therefore often cannot use because duct length is effective during its docking resident family; And can only discharge after its sanitary sewage and rainwater-collecting, cannot recycle.
Summary of the invention
For solving the problems of the technologies described above, the invention provides a kind of clean-up effect better, thus can recycle; And the building construction drainage system of length adjustment can be carried out.
Building construction drainage system of the present invention, comprises multiple sewage drainage pipe, multiple rainwater drainage pipe, main sewer and rainwater supervisor, also comprise the first collecting-tank and the second collecting-tank, described multiple sewage drainage pipe includes on first to be in charge of, be in charge of for first time and the first sleeve pipe, the described bottom be in charge of for first time is communicated with main sewer, the bottom be in charge of on described first and the top be in charge of for first time are provided with external thread structure, the inside of described first sleeve pipe is provided with female thread structure, the bottom be in charge of on described first and the top be in charge of for first time are all inserted also spiral shell and are contained in the inside of described first sleeve pipe, described multiple rainwater drainage pipe includes on second to be in charge of, be in charge of for second time and the second sleeve pipe, the described bottom be in charge of for second time is responsible for rainwater and is communicated with, the bottom be in charge of on described second and the top be in charge of for second time are provided with external thread structure, the inside of described second sleeve pipe is provided with female thread structure, the bottom be in charge of on described second and the top be in charge of for second time are all inserted also spiral shell and are contained in the inside of described second sleeve pipe, described main sewer is by being communicated with the first collecting-tank the first communicating pipe, described rainwater supervisor was communicated with the second collecting-tank by the second communicating pipe, and be provided with control valve and water pump in the first communicating pipe and the second communicating pipe, also comprise the first sedimentation basin, the second sedimentation basin and purifying pond, described first collecting-tank is communicated with the first sedimentation basin by third connecting pipe, first sedimentation basin is by being communicated with the second collecting-tank the 4th communicating pipe, second collecting-tank is by being communicated with the second sedimentation basin the 5th communicating pipe, second sedimentation basin by being communicated with purifying pond the 6th communicating pipe, and is provided with outlet pipe on purifying pond, described third connecting pipe, the 4th communicating pipe, the 5th communicating pipe, the 6th communicating pipe and outlet pipe are provided with control pump.
Building construction drainage system of the present invention, is provided with the first screen cloth in described first sedimentation basin, and the first screen cloth is in third connecting pipe and the first sedimentation basin connectivity part with between the 4th communicating pipe and the first sedimentation basin connectivity part; Be provided with the second screen cloth in described second sedimentation basin, and the second screen cloth is in the 5th communicating pipe and the second sedimentation basin connectivity part with between the 6th communicating pipe and the second sedimentation basin connectivity part.
Building construction drainage system of the present invention, described first collecting-tank, the second collecting-tank, the first sedimentation basin, the second sedimentation basin and purifying pond are provided with access door.
Compared with prior art beneficial effect of the present invention is: by above-mentioned setting, can by be in charge of on first, be in charge of for first time with the first sleeve pipe, second on be in charge of, be in charge of for second time and while rotation first sleeve pipe and the second sleeve pipe, carry out length adjustment with the second sleeve pipe, thus better adapt to user's height of house; And repeatedly precipitate by the first collecting-tank, the second collecting-tank, the first sedimentation basin, the second sedimentation basin and purifying pond and purify, better can strengthen clean-up effect, thus reusing by outlet pipe connection subscriber household water pipe.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is described in further detail.Following examples for illustration of the present invention, but are not used for limiting the scope of the invention.
As shown in Figure 1, building construction drainage system of the present invention, comprises multiple sewage drainage pipe, multiple rainwater drainage pipe, main sewer and rainwater supervisor, also comprise the first collecting-tank and the second collecting-tank, multiple sewage drainage pipe includes on first to be in charge of, be in charge of for first time and the first sleeve pipe, the bottom be in charge of for first time is communicated with main sewer, the bottom be in charge of on first and the top be in charge of for first time are provided with external thread structure, the inside of the first sleeve pipe is provided with female thread structure, the bottom be in charge of on first and the top be in charge of for first time are all inserted also spiral shell and are contained in the inside of the first sleeve pipe, multiple rainwater drainage pipe includes on second to be in charge of, be in charge of for second time and the second sleeve pipe, the bottom be in charge of for second time is responsible for rainwater and is communicated with, the bottom be in charge of on second and the top be in charge of for second time are provided with external thread structure, the inside of the second sleeve pipe is provided with female thread structure, the bottom be in charge of on second and the top be in charge of for second time are all inserted also spiral shell and are contained in the inside of the second sleeve pipe, main sewer is by being communicated with the first collecting-tank the first communicating pipe, rainwater supervisor be communicated with the second collecting-tank by the second communicating pipe, and be provided with control valve and water pump in the first communicating pipe and the second communicating pipe, also comprise the first sedimentation basin, the second sedimentation basin and purifying pond, first collecting-tank is communicated with the first sedimentation basin by third connecting pipe, first sedimentation basin is by being communicated with the second collecting-tank the 4th communicating pipe, second collecting-tank is by being communicated with the second sedimentation basin the 5th communicating pipe, second sedimentation basin by being communicated with purifying pond the 6th communicating pipe, and is provided with outlet pipe on purifying pond, third connecting pipe, the 4th communicating pipe, the 5th communicating pipe, the 6th communicating pipe and outlet pipe are provided with control pump, by above-mentioned setting, can by be in charge of on first, be in charge of for first time with the first sleeve pipe, second on be in charge of, be in charge of for second time and while rotation first sleeve pipe and the second sleeve pipe, carry out length adjustment with the second sleeve pipe, thus better adapt to user's height of house, and repeatedly precipitate by the first collecting-tank, the second collecting-tank, the first sedimentation basin, the second sedimentation basin and purifying pond and purify, better can strengthen clean-up effect, thus reusing by outlet pipe connection subscriber household water pipe.
Building construction drainage system of the present invention, is provided with the first screen cloth in the first sedimentation basin, and the first screen cloth is in third connecting pipe and the first sedimentation basin connectivity part with between the 4th communicating pipe and the first sedimentation basin connectivity part; Be provided with the second screen cloth in second sedimentation basin, and the second screen cloth is in the 5th communicating pipe and the second sedimentation basin connectivity part with between the 6th communicating pipe and the second sedimentation basin connectivity part.
Building construction drainage system of the present invention, the first collecting-tank, the second collecting-tank, the first sedimentation basin, the second sedimentation basin and purifying pond are provided with access door.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the technology of the present invention principle; can also make some improvement and modification, these improve and modification also should be considered as protection scope of the present invention.
Claims (3)
1. a building construction drainage system, comprises multiple sewage drainage pipe, multiple rainwater drainage pipe, main sewer and rainwater supervisor, it is characterized in that, also comprise the first collecting-tank and the second collecting-tank, described multiple sewage drainage pipe includes on first to be in charge of, be in charge of for first time and the first sleeve pipe, the described bottom be in charge of for first time is communicated with main sewer, the bottom be in charge of on described first and the top be in charge of for first time are provided with external thread structure, the inside of described first sleeve pipe is provided with female thread structure, the bottom be in charge of on described first and the top be in charge of for first time are all inserted also spiral shell and are contained in the inside of described first sleeve pipe, described multiple rainwater drainage pipe includes on second to be in charge of, be in charge of for second time and the second sleeve pipe, the described bottom be in charge of for second time is responsible for rainwater and is communicated with, the bottom be in charge of on described second and the top be in charge of for second time are provided with external thread structure, the inside of described second sleeve pipe is provided with female thread structure, the bottom be in charge of on described second and the top be in charge of for second time are all inserted also spiral shell and are contained in the inside of described second sleeve pipe, described main sewer is by being communicated with the first collecting-tank the first communicating pipe, described rainwater supervisor was communicated with the second collecting-tank by the second communicating pipe, and be provided with control valve and water pump in the first communicating pipe and the second communicating pipe, also comprise the first sedimentation basin, the second sedimentation basin and purifying pond, described first collecting-tank is communicated with the first sedimentation basin by third connecting pipe, first sedimentation basin is by being communicated with the second collecting-tank the 4th communicating pipe, second collecting-tank is by being communicated with the second sedimentation basin the 5th communicating pipe, second sedimentation basin by being communicated with purifying pond the 6th communicating pipe, and is provided with outlet pipe on purifying pond, described third connecting pipe, the 4th communicating pipe, the 5th communicating pipe, the 6th communicating pipe and outlet pipe are provided with control pump.
2. building construction drainage system as claimed in claim 1, is characterized in that, be provided with the first screen cloth in described first sedimentation basin, and the first screen cloth is in third connecting pipe and the first sedimentation basin connectivity part with between the 4th communicating pipe and the first sedimentation basin connectivity part; Be provided with the second screen cloth in described second sedimentation basin, and the second screen cloth is in the 5th communicating pipe and the second sedimentation basin connectivity part with between the 6th communicating pipe and the second sedimentation basin connectivity part.
3. building construction drainage system as claimed in claim 2, is characterized in that, described first collecting-tank, the second collecting-tank, the first sedimentation basin, the second sedimentation basin and purifying pond are provided with access door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510579753.7A CN105133716A (en) | 2015-09-14 | 2015-09-14 | House construction drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510579753.7A CN105133716A (en) | 2015-09-14 | 2015-09-14 | House construction drainage system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105133716A true CN105133716A (en) | 2015-12-09 |
Family
ID=54719263
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510579753.7A Pending CN105133716A (en) | 2015-09-14 | 2015-09-14 | House construction drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105133716A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360618A (en) * | 2018-04-04 | 2018-08-03 | 深圳市建艺装饰集团股份有限公司 | A kind of building drainage system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008008487A (en) * | 2006-05-31 | 2008-01-17 | Asahi Organic Chem Ind Co Ltd | Tube connection construction |
CN201785809U (en) * | 2010-01-14 | 2011-04-06 | 柴换成 | Water supply and drainage circulating device for communities |
CN103485409A (en) * | 2013-08-11 | 2014-01-01 | 深圳市文浩建材科技有限公司 | Comprehensive processing and utilizing system for rainwater and domestic sewage |
CN104047329A (en) * | 2014-04-11 | 2014-09-17 | 温州旭升装饰有限公司 | Device for recycling rainwater and domestic water in whole building |
CN104060653A (en) * | 2014-06-27 | 2014-09-24 | 温州科逸卫浴设备有限公司 | Integrated bathroom with same-floor drainage device |
CN204285661U (en) * | 2014-10-28 | 2015-04-22 | 北京建筑大学 | Air conditioner outdoor machine adjustment type nozzle assembly |
-
2015
- 2015-09-14 CN CN201510579753.7A patent/CN105133716A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008008487A (en) * | 2006-05-31 | 2008-01-17 | Asahi Organic Chem Ind Co Ltd | Tube connection construction |
CN201785809U (en) * | 2010-01-14 | 2011-04-06 | 柴换成 | Water supply and drainage circulating device for communities |
CN103485409A (en) * | 2013-08-11 | 2014-01-01 | 深圳市文浩建材科技有限公司 | Comprehensive processing and utilizing system for rainwater and domestic sewage |
CN104047329A (en) * | 2014-04-11 | 2014-09-17 | 温州旭升装饰有限公司 | Device for recycling rainwater and domestic water in whole building |
CN104060653A (en) * | 2014-06-27 | 2014-09-24 | 温州科逸卫浴设备有限公司 | Integrated bathroom with same-floor drainage device |
CN204285661U (en) * | 2014-10-28 | 2015-04-22 | 北京建筑大学 | Air conditioner outdoor machine adjustment type nozzle assembly |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360618A (en) * | 2018-04-04 | 2018-08-03 | 深圳市建艺装饰集团股份有限公司 | A kind of building drainage system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205688461U (en) | Pipe gallery section structure | |
CN204510449U (en) | Shunting cuts dirty well | |
CN105133716A (en) | House construction drainage system | |
CN104047329A (en) | Device for recycling rainwater and domestic water in whole building | |
CN102966144A (en) | Domestic wastewater collecting and recycling system | |
CN202990039U (en) | Domestic wastewater recycling system | |
CN205822671U (en) | Toilet entirety chassis | |
CN205063405U (en) | Intelligence room of having a shower with wastewater recovery function | |
CN104594444A (en) | High-rise building automatic water saving system without energy consumption | |
CN204369671U (en) | A kind of tap water terminal processing device | |
CN204369672U (en) | A kind of novel tap water terminal processing device | |
CN202899213U (en) | Domestic sewage collection and recycle utilization system | |
CN208219751U (en) | A kind of ecological, environmental protective building of rainwater recycle | |
CN208533675U (en) | A kind of secondary drainage device | |
CN204401687U (en) | A kind of rainwater and living water use recycle device | |
CN205742400U (en) | In architecture construction, hydrops gets rid of pipeline | |
CN204418428U (en) | Without power consumption highrise building automatic water-saving system | |
CN204401692U (en) | A kind of building multivariate water supply and daily life sewage recovery system | |
CN205444295U (en) | External water reuse system of residential building | |
CN203021396U (en) | Household water purification system | |
CN204040128U (en) | Residence toilet washes utilizes system | |
CN210947871U (en) | Water purification type shower shelter | |
CN210195068U (en) | House building drain pipe | |
CN211898732U (en) | Sewage and waste separation and drainage structure for rural self-building toilet | |
CN202882061U (en) | Improved wash basin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151209 |