CN105129633B - A kind of auxiliary tower crane disassemblerassembler and preparation method thereof - Google Patents

A kind of auxiliary tower crane disassemblerassembler and preparation method thereof Download PDF

Info

Publication number
CN105129633B
CN105129633B CN201510461185.0A CN201510461185A CN105129633B CN 105129633 B CN105129633 B CN 105129633B CN 201510461185 A CN201510461185 A CN 201510461185A CN 105129633 B CN105129633 B CN 105129633B
Authority
CN
China
Prior art keywords
tower crane
rectangular box
bracing frame
disassemblerassembler
carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510461185.0A
Other languages
Chinese (zh)
Other versions
CN105129633A (en
Inventor
叶浩文
邹俊
杨玮
孙晖
冯晓军
晏瑾
李�杰
李嘉伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
First Construction Co Ltd of China Construction Third Engineering Division
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
China Construction Science and Technology Group Co Ltd
China Construction Third Bureau Group Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Third Engineering Bureau Co Ltd
First Construction Co Ltd of China Construction Third Engineering Division
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Third Engineering Bureau Co Ltd, First Construction Co Ltd of China Construction Third Engineering Division, Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201510461185.0A priority Critical patent/CN105129633B/en
Publication of CN105129633A publication Critical patent/CN105129633A/en
Application granted granted Critical
Publication of CN105129633B publication Critical patent/CN105129633B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of auxiliary tower crane disassemblerassembler and preparation method thereof, the shaped steel stiffener that the equipment includes standard section of tower crane and is arranged on 4 root post of standard section of tower crane, being fixed in the lower floor of every root post and upper strata shaped steel stiffener respectively has lower rectangular box and upper rectangular box, carriage is erected with using 4 lower rectangular box of 4 root post lower floors as fulcrum and around 4 root posts, in the outside of carriage, symmetrically chain connection has a pair of supporting, the outside of bracing frame is fixed in upper rectangular box by steel wire rope drawknot, one group of support door frame is provided with each bracing frame, electrical hoist is installed with supporting in door frame.The present invention rides upon the bracing frame with electrical hoist on standard section of tower crane, so just can pass through the component needed for electrical hoist handling tower crane climbing, need not account for construction period main line, and accelerating construction progress saves construction cost.

Description

A kind of auxiliary tower crane disassemblerassembler and preparation method thereof
Technical field
The present invention relates to a kind of auxiliary tower crane disassemblerassembler and preparation method thereof, belongs to construction auxiliary equipment technology neck Domain.
Background technology
Tower crane is a kind of crane gear the most frequently used on construction site, rises working reinforcing bar, wooden a tree, used in making timber for boats, scaffold tubes for hanging Deng construction raw material.From tower crane being climbed before and after climbing, need voluntarily handling or have enough to meet the need itself institute using other tower crane auxiliary handlings The supporting member for needing, all need handling once due to climbing every time, so not only accounts for construction period main line, affects construction speed, And supporting member quantity is various, cause the increase of handling number of times, increase construction cost.
The content of the invention
It is an object of the invention to provide it is a kind of simple structure, easy to operate, and the auxiliary of tower crane climbing efficiency can be improved Tower crane disassemblerassembler and preparation method thereof is helped, to overcome the deficiencies in the prior art.
Technical scheme:A kind of auxiliary tower crane disassemblerassembler, including standard section of tower crane and it is arranged on tower crane mark Shaped steel stiffener on 4 root posts of quasi- section, being fixed in the lower floor of every root post and upper strata shaped steel stiffener respectively has lower rectangle Square frame and upper rectangular box, are erected with support using 4 lower rectangular box of 4 root post lower floors as fulcrum and around 4 root posts Frame, is fixed on by steel wire rope drawknot in the outside of the carriage outside that symmetrically chain connection has a pair of supporting, bracing frame In upper rectangular box, one group of support door frame is provided with each bracing frame, electronic elevator is installed with supporting in door frame Machine.
Aforesaid lower rectangular box and upper rectangular box are fixed using mode connects for screw by U-shaped clip and sealing bar and are formed, The first otic placode fixed with steel wire rope drawknot is additionally provided with upper rectangular box.
Aforesaid carriage is provided with the second otic placode near bracing frame side, and the second otic placode passes through on the inside of bearing pin and bracing frame Third ear plate chain connection, be provided with the 4th otic placode on the outside of bracing frame, the 4th otic placode passes through steel wire rope and upper rectangle side The first otic placode drawknot on frame is fixed.
The present invention also provides a kind of method for making above-mentioned auxiliary tower crane disassemblerassembler simultaneously, first in standard section of tower crane Fix lower rectangular box and upper rectangular box in lower floor and upper strata shaped steel stiffener per root post respectively, then with 4 root posts 4 lower rectangular box of lower floor set up carriage as fulcrum and around 4 root posts, then in the symmetrical Floor hinge in outside of carriage Connection a pair of supporting, while the outside of bracing frame is fixed in upper rectangular box, then at each by steel wire rope drawknot One group of support door frame is installed on bracing frame, finally fixedly mount in door frame electrical hoist supporting.
Aforesaid standard section of tower crane is the standard section of tower crane from the tower crane that climbs
The heavy load that rises of aforesaid electrical hoist is 5T, is to meet safe handling to require, only allows its lifting turnover 3T And the component of following weight.
It is an advantage of the current invention that:The present invention rides upon the bracing frame with electrical hoist on standard section of tower crane, this Sample just can be by bearing down on one on the tower crane pipe support needed for electrical hoist handling tower crane climbing, tower crane auxiliary K supports, tower crane bracket And other primary structural components, construction period main line need not be accounted for, accelerating construction progress saves construction cost.Simultaneously as bracing frame is It is hingedly connected on carriage, therefore when not needing electrical hoist to carry out auxiliary handling, can be by bracing frame to tower crane standard Draw in section, it is to avoid take tower crane construction space.Therefore, the present invention be not only simple in structure, it is easy to operate, and tower can be improved Efficiency of must climbing is hung, construction period main line is not affected, is accelerated construction speed, reduced construction cost and increase, be worth building Build construction industry to be promoted.
Description of the drawings
Fig. 1 is the structural representation front view of the present invention;
Left views of the Fig. 2 for Fig. 1;
Upward views of the Fig. 3 for Fig. 1;
Fig. 4 is the structural representation of lower rectangular box in the present invention;
Fig. 5 is the structural representation of upper rectangular box in the present invention;
Fig. 6 is the structural representation of carriage in the present invention;
Fig. 7 is the structural representation of bracing frame in the present invention.
Description of reference numerals:1- columns, 2- shaped steel stiffeners, 3- steel wire ropes, 4- electrical hoists, 5- carriages, under 6- Rectangular box, the upper rectangular box of 7-, 8- support door frames, 9- bracing frames, 10-U shape clips, 11- sealing bars, the first otic placodes of 12-, The second otic placodes of 13-, 14- third ear plates, the 4th otic placodes of 15-.
Specific embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, with reference to the accompanying drawings and examples to this It is bright to be described in further detail.
Embodiments of the invention:Aid in the structural representation of tower crane disassemblerassembler as shown in Figures 1 to 3, including tower crane standard Section and the shaped steel stiffener 2 that is arranged on 4 root post 1 of standard section of tower crane, every root post 1 lower floor and upper strata shaped steel put more energy into On plate 2 respectively fix have lower rectangular box 6 and upper rectangular box 7, using 4 lower rectangular box 6 of 4 root post, 1 lower floor as Put and surround 4 root posts 1 and be erected with carriage 5, symmetrically chain connection has a pair of supporting 9 in the outside of carriage 5, support The outside of frame 9 is fixed in upper rectangular box 7 by 3 drawknot of steel wire rope, and one group of support door frame is provided with each bracing frame 9 8, electrical hoist 4 is installed with supporting in door frame 8.Referring to Fig. 4 and Fig. 5, described lower rectangular box 6 and upper rectangle side Frame 7 is fixed using mode connects for screw by U-shaped clip 10 and sealing bar 11 and is formed, and referring to Fig. 5, is also set up in upper rectangular box 7 There is the first otic placode 12 fixed with 3 drawknot of steel wire rope.Referring to Fig. 6 and referring to Fig. 7, described carriage 5 is that have 4 square steel to adopt Mode connects for screw is fixed and is formed, and 9 side of bracing frame is provided with the second otic placode 13 in carriage 5, and the second otic placode 13 passes through bearing pin 14 chain connection of third ear plate with the inside of bracing frame 9, is provided with the 4th otic placode 15, the 4th otic placode 15 in the outside of bracing frame 9 Fixed with 12 drawknot of the first otic placode in upper rectangular box 7 by steel wire rope 3.
Below from climbing type M1280D and M900D tower crane as reference, to make further in detail to the installation process of the present invention Describe in detail bright:
During installation, referring to Fig. 1~3, in lower floor first in standard section of tower crane per root post 1 and upper strata shaped steel stiffener 2 Lower rectangular box 6 and upper rectangular box 7 are fixed respectively, then using 4 lower rectangular box 6 of 4 root post, 1 lower floor as fulcrum simultaneously Carriage 5 is set up around 4 root posts 1, then in the outside of carriage 5 symmetrically chain connection a pair of supporting 9, while bracing frame 9 outside is fixed in upper rectangular box 7 by 3 drawknot of steel wire rope, and one group of support door is being installed on each bracing frame 9 then Frame 8, is finally supporting fixed installation electrical hoist 4 in door frame 8, and the heavy load that rises of described electrical hoist 4 is 5T, is full Foot safe handling requirement, only allows the component of its lifting turnover 3T and following weight.

Claims (6)

1. a kind of auxiliary tower crane disassemblerassembler, including standard section of tower crane and 4 root post of standard section of tower crane is arranged on(1)On type Steel stiffener(2), it is characterised in that:In every root post(1)Lower floor's shaped steel stiffener and upper strata shaped steel stiffener(2)Upper difference Fixing has lower rectangular box(6)With upper rectangular box(7), with 4 root posts(1)4 lower rectangular box of lower floor(6)As fulcrum And surround 4 root posts(1)It is erected with carriage(5), in carriage(5)Symmetrically chain connection has a pair of supporting in outside (9), bracing frame(9)Outside pass through steel wire rope(3)Drawknot is fixed on rectangular box(7)On, in each bracing frame(9)On set It is equipped with one group of support door frame(8), supporting door frame(8)Electrical hoist is installed with inside(4).
It is 2. according to claim 1 to aid in tower crane disassemblerassembler, it is characterised in that:Described lower rectangular box(6)With it is upper Rectangular box(7)By U-shaped clip(10)With sealing bar(11)Fixed using mode connects for screw and formed, in upper rectangular box(7)On It is additionally provided with and steel wire rope(3)The first otic placode that drawknot is fixed(12).
It is 3. according to claim 1 to aid in tower crane disassemblerassembler, it is characterised in that:Described carriage(5)Near support Frame(9)Side is provided with the second otic placode(13), the second otic placode(13)By bearing pin and bracing frame(9)The third ear plate of inner side(14) Chain connection, in bracing frame(9)Outside be provided with the 4th otic placode(15), the 4th otic placode(15)By steel wire rope(3)With upper square Shape square frame(7)On the first otic placode(12)Drawknot is fixed.
4. a kind of for making the method for aiding in tower crane disassemblerassembler described in claims 1 to 3 any one, its feature exists In:First in standard section of tower crane per root post(1)Lower floor's shaped steel stiffener and upper strata shaped steel stiffener(2)Under upper fixing respectively Rectangular box(6)With upper rectangular box(7), then with 4 root posts(1)4 lower rectangular box of lower floor(6)As fulcrum and enclose Around 4 root posts(1)Set up carriage(5), then in carriage(5)Outside symmetrically chain connection a pair of supporting(9), while Bracing frame(9)Outside pass through steel wire rope(3)Drawknot is fixed on rectangular box(7)On, then in each bracing frame(9)On One group of support door frame is installed(8), finally supporting door frame(8)Interior fixed installation electrical hoist(4).
5. it is according to claim 4 for make auxiliary tower crane disassemblerassembler method, it is characterised in that:Described tower crane Standard knot is the standard section of tower crane from the tower crane that climbs.
6. it is according to claim 4 for make auxiliary tower crane disassemblerassembler method, it is characterised in that:Described is electronic Hoist engine(4)Rise heavy load be 5T, be meet safe handling require, only allow its lifting turnover 3T and following weight structure Part.
CN201510461185.0A 2015-07-31 2015-07-31 A kind of auxiliary tower crane disassemblerassembler and preparation method thereof Active CN105129633B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510461185.0A CN105129633B (en) 2015-07-31 2015-07-31 A kind of auxiliary tower crane disassemblerassembler and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510461185.0A CN105129633B (en) 2015-07-31 2015-07-31 A kind of auxiliary tower crane disassemblerassembler and preparation method thereof

Publications (2)

Publication Number Publication Date
CN105129633A CN105129633A (en) 2015-12-09
CN105129633B true CN105129633B (en) 2017-03-29

Family

ID=54715298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510461185.0A Active CN105129633B (en) 2015-07-31 2015-07-31 A kind of auxiliary tower crane disassemblerassembler and preparation method thereof

Country Status (1)

Country Link
CN (1) CN105129633B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109095362A (en) * 2018-09-06 2018-12-28 中建三局集团有限公司 No platform environment inferior pyramidal tower is preced with the big arm configuration of plug-in tower crane and its method for dismounting

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101691191B (en) * 2009-09-18 2011-10-05 中国建筑第四工程局有限公司 Self-climbing tower crane
CN201999655U (en) * 2011-01-30 2011-10-05 中建三局建设工程股份有限公司 Conversion device connecting tower crane and self-jacking construction platform
CN202704887U (en) * 2012-07-19 2013-01-30 山东电力建设第二工程公司 Auxiliary lifting device of lift type tower crane
CN103264966A (en) * 2013-05-17 2013-08-28 山东锦华建设集团有限公司 Self-hoisting device and method of dismounting member of tower crane
CN203545501U (en) * 2013-09-06 2014-04-16 中建三局建设工程股份有限公司 Auxiliary lifting device of inner crawl type tower crane in small space
CN103523683B (en) * 2013-10-16 2015-07-15 温州建设集团有限公司 Construction method for dismantling tower crane by use of small hoisting equipment
CN203715115U (en) * 2013-12-16 2014-07-16 中国石油天然气第一建设公司 Supporting point structure for self-hoisting system of portal crane
CN204980945U (en) * 2015-07-31 2016-01-20 中国建筑第四工程局有限公司 Supplementary tower crane dismounting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109095362A (en) * 2018-09-06 2018-12-28 中建三局集团有限公司 No platform environment inferior pyramidal tower is preced with the big arm configuration of plug-in tower crane and its method for dismounting
CN109095362B (en) * 2018-09-06 2020-02-14 中建三局集团有限公司 Large arm structure of conical tower crown external hanging tower crane in platform-free environment and dismantling method thereof

Also Published As

Publication number Publication date
CN105129633A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN106219419B (en) The large-scale swing arm tower crane original position of high-rise building is converted to plug-in construction method by interior climb
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN109399432A (en) A kind of hoistway job platform that climbs certainly
CN104477736A (en) Shaft elevator installation method
WO2023240812A1 (en) Overall construction platform structure and method for adding core tube wall body in air
CN107304631A (en) The installation method and system of a kind of high-rise building large area cell cube curtain wall block
CN103288002B (en) Simple combination door frame high-altitude weight hanging apparatus
CN202577925U (en) Lifting type platform in elevator shaft
CN105129633B (en) A kind of auxiliary tower crane disassemblerassembler and preparation method thereof
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN204024013U (en) A kind of self-climbing lifting material platform
CN204980945U (en) Supplementary tower crane dismounting device
CN109555257B (en) Combined supporting and hanging rod type suspended ceiling and construction method
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN205740123U (en) Sound barrier panel hoisting machine under high-voltage fence
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN211499699U (en) Ladder-climbing type operation rack for hanging cage
CN209367692U (en) It is a kind of to rise gantry type two-way lifter device certainly
CN108868098B (en) Support frame used outside hoistway and mounting method thereof
CN203229334U (en) Lifting framework for lifting and translating single steel member
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN205369874U (en) Elevartor shaft outer wall cantilever frame
CN203808486U (en) Steel pipe scaffold follow-up platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Ganping Gan Yin Tong Road 550006 Guizhou city of Guiyang province No. 4

Co-patentee after: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee after: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Co-patentee after: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

Co-patentee after: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.

Address before: Ganping Gan Yin Tong Road 550006 Guizhou city of Guiyang province No. 4

Co-patentee before: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU Co.,Ltd.

Patentee before: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Co-patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

Co-patentee before: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20170815

Address after: Ganping Gan Yin Tong Road 550006 Guizhou city of Guiyang province No. 4

Co-patentee after: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee after: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Co-patentee after: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

Co-patentee after: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.

Co-patentee after: CHINA CONSTRUCTION SCIENCE & TECHNOLOGY Co.,Ltd.

Address before: Ganping Gan Yin Tong Road 550006 Guizhou city of Guiyang province No. 4

Co-patentee before: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee before: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Co-patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

Co-patentee before: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: Ganping Gan Yin Tong Road 550006 Guizhou city of Guiyang province No. 4

Co-patentee after: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee after: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Co-patentee after: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

Co-patentee after: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.

Co-patentee after: China Construction Technology Group Co.,Ltd.

Address before: Ganping Gan Yin Tong Road 550006 Guizhou city of Guiyang province No. 4

Co-patentee before: CHINA CONSTRUCTION THIRD CONSTRUCTION ENGINEERING Co.,Ltd.

Patentee before: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Co-patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

Co-patentee before: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.

Co-patentee before: CHINA CONSTRUCTION SCIENCE & TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder