CN105114707A - Fixing structure for roof apparatus pipeline - Google Patents
Fixing structure for roof apparatus pipeline Download PDFInfo
- Publication number
- CN105114707A CN105114707A CN201510488994.0A CN201510488994A CN105114707A CN 105114707 A CN105114707 A CN 105114707A CN 201510488994 A CN201510488994 A CN 201510488994A CN 105114707 A CN105114707 A CN 105114707A
- Authority
- CN
- China
- Prior art keywords
- fixed
- support pier
- tie
- pipeline
- roofing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/26—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting the pipes all along their length, e.g. pipe channels or ducts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
Abstract
The invention relates to a fixing structure for a roof apparatus pipeline. The fixing structure comprises supporting piers, a connecting beam and supporting frame bodies, wherein the supporting piers are fixedly arranged on a roof and are arranged along the direction of the pipeline; the connecting beam is supported among the adjacent supporting piers which are located on the same side of the pipeline; and the supporting frame bodies are erected on the connecting beam and are used for supporting the pipeline. The connecting beam is supported among the supporting piers; the supporting frame bodies are supported and connected by the connecting beam, so that the number of the supporting piers on the roof is reduced, and a waterproof layer on the roof is protected. The integrality of the connecting beam is good, the pipeline vibrating load resisting capacity is strong, the incidental load resisting capacity is also strong, and the stability is good. The fixing structure for the roof apparatus pipeline has the advantages that the structural design is reasonable; the structure is simple; the economical benefits are high; and the construction is convenient.
Description
Technical field
The present invention relates to the realm of building construction, refer in particular to a kind of fixed structure of roofing equipment pipe.
Background technique
The conventional Utilities such as market, office building has a large amount of roofing equipment, and room conditioning airduct is walked out by the horizontal hole of roofing concrete structure, is connected with roofing air-conditioner set equipment.The supporting structure of existing roofing equipment pipe adopts as shown in Figure 1, utilizes the trend along pipeline 102 to arrange buttress 103, the buttress 103 that pipeline 102 both sides are arranged arranges supporting frame 104, utilizes supporting frame 104 supporting pipeline 102.As shown in Figures 2 and 3, show the structure at the connected node place of supporting frame 104 and buttress 103, on roofing 101, interval is provided with buttress 103, roofing 101 comprises construction layer successively, screed-coat, watertightness barrier, thermal insulation layer, and coat of plaster 1011, buttress 103 includes construction layer successively, sloping layer, screed-coat, coating layer, watertightness barrier, and coat of plaster 1011, connecting plate 105 is provided with in the coat of plaster 1011 of buttress 103, the bottom welding of supporting frame 104 is fixed on connecting plate 105, then connecting plate 105 is fixed on buttress 103 by EXPANSION ANCHOR BOLTS 106, EXPANSION ANCHOR BOLTS 106 and connecting plate 105 are also coated with the thick coating layer of 1.5mm 107, play the effect of waterproof.
When pipeline is more, the buttress quantity of above-mentioned supporting structure will increase, and causes waterproofing node to increase like this, and water-proofing material consumption is many, and labour force has high input, and construction period is longer.Meanwhile, the node processing such as more waterproof negative and positive angle, considerably increase the probability that roof waterproof hidden danger occurs.
Summary of the invention
The object of the invention is to the defect overcoming prior art, a kind of fixed structure of roofing equipment pipe is provided, solves that the waterproofing node that existing supporting structure exists is many, water-proofing material consumption is many, labour force has high input, long construction period, waterproof negative and positive corner node add the problems such as the probability that roof waterproof hidden danger occurs more.
The technological scheme realizing above-mentioned purpose is:
The fixed structure of a kind of roofing equipment pipe of the present invention, comprising:
Be fixedly arranged on roofing and the support pier arranged along pipeline rout;
Prop up the tie-beam be located between described support pier at described pipeline homonymy and adjacent, described tie-beam and described support pier are connected and fixed; And
Be erected on the supporting frame on described tie-beam, support frame as described above body comprises the vertical rod being erected on described pipeline both sides and the strut being connected described vertical rod, and described vertical rod is fixedly connected with described tie-beam, and described they sup-port is in the bottom of described pipeline.
Adopting tie-beam to prop up is located between support pier, by tie-beam support and connection supporting frame, effectively reduces roofing buttress quantity, thus protects roof waterproof layer.Tie-beam good integrity simultaneously, opposing pipe vibration weight bearing power is strong, and opposing accidental load ability is also strong, has good steadiness.Reasonable in design of the present invention, structure are simple, high financial profit and easy construction.
The further improvement of the fixed structure of roofing equipment pipe of the present invention is, described support pier is be formed at the concrete structure on described roofing, described concrete structure outer surface is coated with watertightness barrier, and described watertightness barrier extends to form lap segment on roof covering water-proof structure.
The further improvement of the fixed structure of roofing equipment pipe of the present invention is, is provided with screed-coat and coating layer between described concrete structure and described watertightness barrier, described watertightness barrier outer application matcoveredn.
The further improvement of the fixed structure of roofing equipment pipe of the present invention is, is connected and fixed between described tie-beam and described support pier by linkage structure.
The further improvement of the fixed structure of roofing equipment pipe of the present invention is, described linkage structure comprises the dunnage and the relative fixed plate being located at described support pier side of being located at described support pier end face, connecting bolt by running through described support pier between described fixed plate is connected and fixed, described fixed plate is fixedly connected with described dunnage, and described tie-beam is set up and is fixed in described dunnage.
The further improvement of the fixed structure of roofing equipment pipe of the present invention is, described linkage structure comprises the connecting plate of end plate and the vertical described end plate setting being relatively located at described support pier side, connecting bolt by running through described support pier between described end plate is connected and fixed, and described connecting plate and described tie-beam are connected and fixed.
The further improvement of the fixed structure of roofing equipment pipe of the present invention is, described linkage structure comprises the connecting bolt be anchored in described support pier, described connecting bolt stretches out the end face of described support pier and wears the tie-beam being positioned at described support pier end face, is fastenedly connected by double nut.
The further improvement of the fixed structure of roofing equipment pipe of the present invention is, described tie-beam is installed with the bracket base connecting support frame as described above body, described bracket base comprises the U-shaped frame being fixedly arranged on base plate on described tie-beam and being erected on described base plate, and the described vertical rod of support frame as described above body to be inserted in described U-shaped frame and to be connected and fixed with described U-shaped frame.
The further improvement of the fixed structure of roofing equipment pipe of the present invention is, support frame as described above body also comprises the upper cross bar connecting described vertical rod, and described upper cross bar is located at the top of described pipeline.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the supporting structure of roofing equipment pipe in prior art.
Fig. 2 is the structural representation of the connected node of buttress and supporting frame in the supporting structure of Fig. 1.
Fig. 3 is the close-up schematic view at A place in Fig. 2.
Fig. 4 is the schematic diagram of the fixed structure of roofing equipment pipe of the present invention.
Fig. 5 is the side view of the fixed structure of roofing equipment pipe of the present invention.
Fig. 6 is the close-up schematic view at B place in Fig. 5.
Fig. 7 is the structural representation of the first embodiment of the connected node of tie-beam and support pier in the present invention.
Fig. 8 is the structural representation of the second embodiment of the connected node of tie-beam and support pier in the present invention.
Fig. 9 is the structural representation of the 3rd embodiment of the connected node of tie-beam and support pier in the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the invention will be further described.
The invention provides a kind of fixed structure of roofing equipment pipe, for supporting the pipeline of roofing equipment, such as airduct, water pipe etc., the present invention adopts and arranges support pier at roofing, tie-beam is installed between the adjacent support pier of pipeline homonymy, effectively can reduce the quantity of support pier like this, compare existing way waterproofing node obviously to reduce, save water-proofing material, greatly reduce roof waterproof hidden danger, tie-beam erects supporting frame, by supporting frame supporting pipeline, fixed structure is connected to form an entirety, tie-beam adopts girder steel, good integrity, opposing airduct vibrating load ability is strong, opposing accidental load ability is strong.Consider to put in place at the design and construction initial stage, the feature such as there is easy construction, high financial profit, security and stability is strong, popularizing prospect is large.Be described below in conjunction with the fixed structure of accompanying drawing to roofing equipment pipe of the present invention.
Consult Fig. 4, show the schematic diagram of the fixed structure of roofing equipment pipe of the present invention.Below in conjunction with Fig. 4, the fixed structure of roofing equipment pipe of the present invention is described.
As shown in Figure 4, the fixed structure of roofing equipment pipe of the present invention comprises support pier 21, tie-beam 22, and supporting frame 23, this fixed structure is used for the pipeline 40 that supports cloth is located at roofing, this support pier 21 set firmly be formed on roofing and along pipeline 40 move towards arrange, this support pier 21 is arranged with fixed intervals, support beam 22 is located between support pier 21 at pipeline 40 homonymy and adjacent, support beam 22 and adjacent support pier 21 are connected and fixed by linkage structure, by the setting of support beam 22, effectively can reduce the quantity of support pier 21, fixed intervals between the support pier 21 of pipeline 40 homonymy are more than 3 times of spacing between buttress in existing supporting structure, in Fig. 1 in existing buttress supporting structure, what be positioned at the buttress of pipeline homonymy is spaced apart 2400mm, and the fixed intervals between the support pier 21 of pipeline 40 homonymy in Fig. 4 are 7200mm, compare the structure that existing structure saves a large amount of support piers 21, the available protecting watertightness barrier of roofing.Supporting frame 23 is erected on tie-beam 22, and this supporting frame 23 is for supporting pipeline 40.
As shown in Figure 5 and Figure 6, supporting frame 23 erects and is fixed on tie-beam 22, more than this supporting frame 23 comprises, group is opposed is located at the vertical rod of pipeline both sides and the strut of connecting upright pole, the each group of spacing between vertical rod and strut is 2400mm, identical with the span of buttress in existing structure, to guarantee the firm support to pipeline 40, strut is located at the bottom of pipeline 40, by they sup-port pipeline 40, relative vertical rod is also connected with upper cross bar, upper cross bar is located at the top of pipeline 40, pass through upper cross bar, strut, and a pair vertical rod is carried out spacing to pipeline 40, while pipeline 40 is provided support, also pipeline 40 is played to the effect of protection, and supporting frame 23 can resist the vibrating load of pipeline 40, there is good steadiness feature.Tie-beam 22 is installed with the bracket base 231 connecting supporting frame 23, this bracket base 231 comprises the base plate 2311 be installed on tie-beam 22 and the U-shaped frame 2312 be erected on base plate 2311, supporting frame 23 to be inserted in U-shaped frame 2312 and to be connected and fixed with U-shaped frame 2312, this U-shaped each side of frame 2312 is provided with attachment hole, is fixedly connected with supporting frame 23 by the connecting bolt worn.The base plate 2311 of bracket base 231 is fixedly welded on tie-beam 22.
As shown in Figure 7, support pier 21 is for being formed at the concrete structure on roofing 30, watertightness barrier 211 is coated with at the concrete structure outer surface of support pier 21, the concrete structure of support pier 21 wraps up and extend to form lap segment 2111 on roof covering water-proof structure 301 by this watertightness barrier 211, the water-proof function at support pier 21 place is guaranteed by watertightness barrier 211, this watertightness barrier 211 stretches into overlap on roof covering water-proof structure 301 and with roof covering water-proof structure 301 and is connected, and improves water-proof performance.The concrete structure of support pier 21 and the construction layer 302 of roofing 30 are together built, roofing 30 comprises construction layer 302, the screed-coat 303 that construction layer 302 is laid, the coat of plaster 305 be located at the roof covering water-proof structure 301 on screed-coat 303, be located at the thermal insulation layer 304 on roof covering water-proof structure 301 and be located on thermal insulation layer 304.Support pier 21 comprises concrete structure, the screed-coat of coated concrete structure and coating layer, is located at the watertightness barrier 211 outside coating layer, is located at the protective layer 212 outside watertightness barrier 211, and this protective layer 212 adopts C35 pea gravel concreten together to be formed with coat of plaster 305.After the roof covering water-proof structure 301 of roofing 30 has been laid, arrange the watertightness barrier 211 of support pier 21, the bottom of watertightness barrier 211 has been overlapped on last point of roof covering water-proof structure 301, the length of overlap joint such as to be greater than at the 250mm, guarantees waterproofing effect.The screed-coat of support pier 21 adopts 25mm thick 1:3 cement mortar screeding layer, and coating layer adopts the thick SC coating of 1.5mm, and watertightness barrier 211 adopts the thick water-proof self-adhesion coiled material of two-layer 1.5mm, and protective layer is the C35 pea gravel concreten that 25mm is thick.
Be connected and fixed by linkage structure 24 between tie-beam 22 and support pier 21, this linkage structure 24 has several structure to be formed, that adopt in Fig. 7 is the first embodiment, as shown in Figure 7, linkage structure 24 comprises the dunnage 241 and the relative fixed plate 242 being located at support pier 21 side of being located at support pier 21 end face, the fixed plate 242 being positioned at support pier 21 both sides is connected and fixed by the connecting bolt 243 running through support pier 21, fixed plate 242 is fixedly connected with dunnage 241, so just dunnage 241 is fixed on support pier 21, and do not destroy the structure of support pier 21, protect the watertightness barrier 211 of support pier 21.Fixed plate 242 is L shaped plate, and side is sticked in the side of support pier 21, and side is sticked in the bottom of dunnage 241, is connected and fixed by bolt and dunnage 241.Tie-beam 22 is set up and is fixed in dunnage 241, and this tie-beam 22 adopts the square tube of 100mm*200mm*10mm, and dunnage 241 adopts the steel plate of 16mm*300mm*550mm, adopts and be welded and fixed between tie-beam 22 and dunnage 241.Fixed plate 242 adopts the angle steel of 200mm*125mm*12mm.Connecting bolt 243 adopts the chemical anchor bolts of 4M16.
As shown in Figure 8, the structural representation of the second embodiment of the connected node of tie-beam and support pier is shown.In the present embodiment, the end of tie-beam 22 and the side of support pier 21 are connected and fixed, this linkage structure 24 comprises the connecting plate 245 of end plate 244 and vertical end plate 244 setting being relatively located at support pier side, connecting bolt 246 by running through support pier 21 between two end plates 244 is connected and fixed, connecting plate 245 and tie-beam 22 are connected and fixed, this tie-beam 22 adopts the H profile steel of 200mm*200mm, and connecting plate 245 is sticked on the middle web of H profile steel, is then connected and fixed by high-strength bolt.End plate 244 adopts the steel plate of 16mm*220mm*225mm, and connecting plate 245 adopts the steel plate of 10mm*120mm*140mm.
As shown in Figure 9, the structural representation of the 3rd embodiment of the connected node of tie-beam and support pier is shown.In the present embodiment, tie-beam 22 is located at the end face of support pier 21, this linkage structure comprises the connecting bolt 247 be anchored in support pier 21, this connecting bolt 247 stretches out the end face of support pier 21 and wears the tie-beam 22 being positioned at support pier 21 end face, be fastenedly connected by double nut and tie-beam 22, between double nut and tie-beam 22, be provided with backing plate.This attaching nut 247 is positioned at protective layer 212 place and is provided with nut 249, and the bottom pad of this nut 249 is provided with coating layer 248.The end that connecting bolt 247 is anchored in support pier 21 is provided with folded end, increases the structural strength of connecting bolt 247.
The fixed structure of roofing equipment pipe of the present invention provide a kind of reasonable in design, structure simple, high financial profit, easy construction the structure way of device support.Realize as follows: with reference to equipment installation Deepen Design drawing and designing requirement determination roofing set spacing.Consider according to load, pipeline trend and economic benefit etc., choose the girder steel in suitable cross section.According to the girder steel designed and buttress, the connected node of girder steel and girder steel, all sets up complete by girder steel.According to the roofing set spacing determined, by support welding on girder steel.
Effect of the present invention comprises: this way only need be considered put in place at the design and construction initial stage, the feature such as have easy construction, high financial profit, security and stability is strong, popularizing prospect is large.
Below embodiment is to invention has been detailed description by reference to the accompanying drawings, and those skilled in the art can make many variations example to the present invention according to the above description.Thus, some details in embodiment should not form limitation of the invention, the present invention by the scope that defines using appended claims as protection scope of the present invention.
Claims (9)
1. a fixed structure for roofing equipment pipe, is characterized in that, comprising:
Be fixedly arranged on roofing and the support pier arranged along pipeline rout;
Prop up the tie-beam be located between described support pier at described pipeline homonymy and adjacent, described tie-beam and described support pier are connected and fixed; And
Be erected on the supporting frame on described tie-beam, support frame as described above body comprises the vertical rod being erected on described pipeline both sides and the strut being connected described vertical rod, and described vertical rod is fixedly connected with described tie-beam, and described they sup-port is in the bottom of described pipeline.
2. the fixed structure of roofing equipment pipe as claimed in claim 1, it is characterized in that, described support pier is be formed at the concrete structure on described roofing, and described concrete structure outer surface is coated with watertightness barrier, and described watertightness barrier extends to form lap segment on roof covering water-proof structure.
3. the fixed structure of roofing equipment pipe as claimed in claim 2, is characterized in that, be provided with screed-coat and coating layer between described concrete structure and described watertightness barrier, described watertightness barrier outer application matcoveredn.
4. the fixed structure of roofing equipment pipe as claimed in claim 1 or 2, be is characterized in that, be connected and fixed between described tie-beam and described support pier by linkage structure.
5. the fixed structure of roofing equipment pipe as claimed in claim 4, it is characterized in that, described linkage structure comprises the dunnage and the relative fixed plate being located at described support pier side of being located at described support pier end face, connecting bolt by running through described support pier between described fixed plate is connected and fixed, described fixed plate is fixedly connected with described dunnage, and described tie-beam is set up and is fixed in described dunnage.
6. the fixed structure of roofing equipment pipe as claimed in claim 4, it is characterized in that, described linkage structure comprises the connecting plate of end plate and the vertical described end plate setting being relatively located at described support pier side, connecting bolt by running through described support pier between described end plate is connected and fixed, and described connecting plate and described tie-beam are connected and fixed.
7. the fixed structure of roofing equipment pipe as claimed in claim 4, it is characterized in that, described linkage structure comprises the connecting bolt be anchored in described support pier, described connecting bolt stretches out the end face of described support pier and wears the tie-beam being positioned at described support pier end face, is fastenedly connected by double nut.
8. the fixed structure of roofing equipment pipe as claimed in claim 1, it is characterized in that, described tie-beam is installed with the bracket base connecting support frame as described above body, described bracket base comprises the U-shaped frame being fixedly arranged on base plate on described tie-beam and being erected on described base plate, and the described vertical rod of support frame as described above body to be inserted in described U-shaped frame and to be connected and fixed with described U-shaped frame.
9. the fixed structure of roofing equipment pipe as claimed in claim 8, it is characterized in that, support frame as described above body also comprises the upper cross bar connecting described vertical rod, and described upper cross bar is located at the top of described pipeline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510488994.0A CN105114707B (en) | 2015-08-11 | 2015-08-11 | The fixed structure of roofing equipment pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510488994.0A CN105114707B (en) | 2015-08-11 | 2015-08-11 | The fixed structure of roofing equipment pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105114707A true CN105114707A (en) | 2015-12-02 |
CN105114707B CN105114707B (en) | 2019-02-26 |
Family
ID=54662759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510488994.0A Active CN105114707B (en) | 2015-08-11 | 2015-08-11 | The fixed structure of roofing equipment pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105114707B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110553385A (en) * | 2019-08-12 | 2019-12-10 | 世源科技工程有限公司 | Outdoor fresh air wallboard header |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102563214A (en) * | 2010-12-08 | 2012-07-11 | 沈阳铝镁设计研究院有限公司 | Road crossing multilayer pipeline support structure |
CN104006218A (en) * | 2014-06-12 | 2014-08-27 | 无锡金顶石油管材配件制造有限公司 | Pipeline support structure |
JP2014181493A (en) * | 2013-03-19 | 2014-09-29 | Lonseal Corp | Support frame fixing structure |
CN203924521U (en) * | 2014-05-28 | 2014-11-05 | 中机国能电力工程有限公司 | A kind of roofing mounting system |
CN204006613U (en) * | 2014-08-11 | 2014-12-10 | 北京纳源丰科技发展有限公司 | A kind of collector lifting fixed support |
-
2015
- 2015-08-11 CN CN201510488994.0A patent/CN105114707B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102563214A (en) * | 2010-12-08 | 2012-07-11 | 沈阳铝镁设计研究院有限公司 | Road crossing multilayer pipeline support structure |
JP2014181493A (en) * | 2013-03-19 | 2014-09-29 | Lonseal Corp | Support frame fixing structure |
CN203924521U (en) * | 2014-05-28 | 2014-11-05 | 中机国能电力工程有限公司 | A kind of roofing mounting system |
CN104006218A (en) * | 2014-06-12 | 2014-08-27 | 无锡金顶石油管材配件制造有限公司 | Pipeline support structure |
CN204006613U (en) * | 2014-08-11 | 2014-12-10 | 北京纳源丰科技发展有限公司 | A kind of collector lifting fixed support |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110553385A (en) * | 2019-08-12 | 2019-12-10 | 世源科技工程有限公司 | Outdoor fresh air wallboard header |
Also Published As
Publication number | Publication date |
---|---|
CN105114707B (en) | 2019-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205875395U (en) | Prestressing force is from restoring to throne assembled concrete frame beam column node | |
CN110512647B (en) | Partial assembly type subway station structure design and construction method | |
CN102704491B (en) | Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin | |
US8359793B2 (en) | Earthquake force absorption system | |
CN107237402A (en) | A kind of low damage Self-resetting assembly concrete two-way frame bean column node | |
CN101845857B (en) | Metal mesh built-in insulating outer wall and construction method thereof | |
CN204139327U (en) | Gas concrete out-hung panel waves node | |
CN202611016U (en) | Thermal insulating wall on concrete overhanging eaves board | |
CN104195959A (en) | Construction technology for prefabricating a corrugated steel web PC I beam into combined box girder bridge | |
CN103572866A (en) | Assembly type wall | |
WO2024001680A1 (en) | Waterproof uplift-resistant pile and construction method | |
JP3981949B2 (en) | Seismic reinforcement structure | |
CN109057014A (en) | Self-resetting can assemble multistage joist steel frame after shake | |
CN210163948U (en) | Construction system for pouring post-cast strip of basement roof | |
WO2011018056A1 (en) | Construction module for demountable prefabricated buildings | |
CN105114707A (en) | Fixing structure for roof apparatus pipeline | |
CN206768861U (en) | A kind of reinforcement ring retaining wall | |
CN207003685U (en) | A kind of connecting node of Side fascia and floor | |
CN106939671A (en) | Metal sandwich roof plate construction method | |
CN102261184B (en) | Method for building anti-seismic storied building by utilizing steel wire mesh frame polystyrene sandwich plates | |
CN204676533U (en) | A kind of soil-nail wall support system based on the recyclable technique of assembling | |
CN215254002U (en) | A lightweight roofing waterproof construction for building transformation | |
CN102251581B (en) | Steel beam-reinforced concrete floor structure and construction method thereof | |
CN204609232U (en) | A kind of extra-high voltage electric equipment test hall ground shielding | |
CN213038567U (en) | Fabricated steel structure anti-theft sound-insulation heat-insulation fireproof earthquake-resistant building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |