CN105114119A - A structure and implementation method for improving gas drainage with vertical hole drainage - Google Patents
A structure and implementation method for improving gas drainage with vertical hole drainage Download PDFInfo
- Publication number
- CN105114119A CN105114119A CN201510516492.4A CN201510516492A CN105114119A CN 105114119 A CN105114119 A CN 105114119A CN 201510516492 A CN201510516492 A CN 201510516492A CN 105114119 A CN105114119 A CN 105114119A
- Authority
- CN
- China
- Prior art keywords
- drainage
- hole
- pipe
- gas
- extraction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000000605 extraction Methods 0.000 claims abstract description 51
- 229920000742 Cotton Polymers 0.000 claims abstract description 11
- 230000000903 blocking effect Effects 0.000 claims abstract 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 16
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 239000011083 cement mortar Substances 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- DERZBLKQOCDDDZ-JLHYYAGUSA-N cinnarizine Chemical compound C1CN(C(C=2C=CC=CC=2)C=2C=CC=CC=2)CCN1C\C=C\C1=CC=CC=C1 DERZBLKQOCDDDZ-JLHYYAGUSA-N 0.000 claims 3
- 239000003245 coal Substances 0.000 description 11
- 238000010276 construction Methods 0.000 description 3
- 238000005553 drilling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000000843 powder Substances 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003818 cinder Substances 0.000 description 1
- 239000003034 coal gas Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 239000004047 hole gas Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种俯孔排水提高瓦斯抽采结构及其实施方法,属于煤矿采集领域。 The invention relates to a structure for improving gas drainage through a vertical hole drainage and an implementation method thereof, belonging to the field of coal mine collection.
背景技术 Background technique
当前井下瓦斯抽采钻孔按角度分类有:正度孔,负度孔和平孔。负度孔也叫俯孔,由于煤层赋存条件比较复杂,有倾斜煤层和水平煤层,煤矿瓦斯灾害严重,瓦斯作为一种清洁能源,具有很高的利用价值,瓦斯抽采不仅能降低瓦斯灾害程度,并能开采清洁能源,因而得到普遍使用。随着社会发展,能源需求量不断增加,煤矿开采深度延伸和开采强度的加大,矿井瓦斯灾害越来越严重,煤矿瓦斯涌出量不断增加,瓦斯抽采越显重要。但由于受施工条件、施工工艺限制在预抽煤体瓦斯时不得不施工下行钻孔,在下行孔施工过程中受水文地质及煤层含水率等自然因素影响,孔内往往会积存大量的水和煤渣而不易排出。进而阻塞煤层中瓦斯流动的裂隙通道,增大瓦斯抽采阻力,并且在松软煤层中,钻孔中积水长时间浸泡孔壁煤体还可能会导致钻孔踏孔,瓦斯流动通道被堵,钻孔失效、瓦斯抽采效果也会因此受到严重影响。 The current underground gas drainage drilling holes are classified according to angle: positive hole, negative hole and flat hole. Negative degree holes are also called downholes. Due to the complex occurrence conditions of coal seams, such as inclined coal seams and horizontal coal seams, coal mine gas disasters are serious. As a clean energy source, gas has high utilization value. Gas drainage can not only reduce gas disasters level, and can exploit clean energy, so it is widely used. With the development of society, the demand for energy continues to increase, the depth of coal mine mining is extended and the intensity of mining is increased, mine gas disasters are becoming more and more serious, and the amount of gas emitted from coal mines is increasing, so gas drainage is becoming more and more important. However, due to the limitation of construction conditions and construction technology, the downhole drilling has to be constructed during the pre-pumping of coal gas. During the construction of the downhole, affected by natural factors such as hydrogeology and coal seam moisture content, a large amount of water and water will often accumulate in the hole. Cinder is not easy to discharge. Then block the crack channel of gas flow in the coal seam, increase the resistance of gas extraction, and in the soft coal seam, the water in the drill hole soaks the coal body on the hole wall for a long time may also cause the drill hole to step on the hole, and the gas flow channel is blocked. Borehole failure and gas drainage effect will also be seriously affected.
发明内容 Contents of the invention
本发明要解决的技术问题是:提供一种俯孔排水提高瓦斯抽采结构及其实施方法,以解决现有俯孔瓦斯抽采过程中,因孔内积水影响瓦斯抽采效果的问题。 The technical problem to be solved by the present invention is to provide a structure and its implementation method for improving gas drainage by drainage through the downward holes, so as to solve the problem that the gas drainage effect is affected by the water accumulation in the existing downward hole gas drainage process.
本发明的技术方案是:一种俯孔排水提高瓦斯抽采结构,它包括孔内结构(A)通过孔内和孔外连接部分与孔外排水装置(B)连通,孔内结构(A)包括集气室和抽采管连通,集气室位于孔内结构(A)前端,抽采管从集气室一端向外依次通过马丽散棉纱封堵段和注浆封堵段固定;排水管设置于抽采管内;孔外排水装置(B)包括抽采管连接管与抽采管连通,排水管孔外长度与抽采管连接管长度相同,排水管外端口设置排水出口螺丝排水出口螺母;抽采管连接管侧面开口与瓦斯抽采出口和压风入口及测流孔相通。 The technical solution of the present invention is: a structure for improving gas drainage through a vertical hole drainage, which includes the structure in the hole (A) communicating with the drainage device (B) outside the hole through the connection part inside and outside the hole, and the structure in the hole (A) Including the connection between the gas collection chamber and the drainage pipe, the gas collection chamber is located at the front end of the hole structure (A), and the drainage pipe is fixed from one end of the gas collection chamber to the outside through the plugging section of Mari loose cotton yarn and the plugging section of grouting; drainage The pipe is set in the extraction pipe; the drainage device outside the hole (B) includes the connection pipe of the extraction pipe connected with the extraction pipe, the outer length of the drainage pipe hole is the same as the length of the connection pipe of the extraction pipe, and the outlet port of the drainage pipe is provided with a drainage outlet screw drainage outlet Nut; the side opening of the drainage pipe connection pipe communicates with the gas drainage outlet, the compressed air inlet and the flow measuring hole.
瓦斯抽采出口设置阀门。 Valves are set at the gas drainage outlet.
压风入口及测流孔与压风管连通。 The compressed air inlet and the flow measuring hole are connected with the compressed air pipe.
抽采管前端1-3m为抽采管筛孔段,抽采管筛孔段每隔50mm打一个直径10mm小孔。 The 1-3m front end of the extraction pipe is the sieve section of the extraction pipe, and a small hole with a diameter of 10mm is punched every 50mm in the sieve section of the extraction pipe.
排水管前端1-3m为排水管筛孔段,排水管筛孔段每隔50mm打一个直径10mm小孔。 The 1-3m front end of the drainage pipe is the sieve section of the drainage pipe, and a small hole with a diameter of 10mm is punched every 50mm in the sieve section of the drainage pipe.
抽采管直径小于钻孔孔径,排水管长度大于钻孔深度,直径16mm普通PVC管,排水管连接头为直径20mm普通连接软管。 The diameter of the extraction pipe is smaller than that of the borehole, and the length of the drainage pipe is greater than the depth of the borehole. The diameter is 16mm ordinary PVC pipe, and the drainpipe connector is an ordinary connecting hose with a diameter of 20mm.
压风入口及测流孔孔径为10mm,压风管孔径为10mm,排水出口螺丝直径为16mm,排水出口螺母直径为16mm。 The diameter of the compressed air inlet and flow measuring hole is 10mm, the diameter of the compressed air pipe is 10mm, the diameter of the drainage outlet screw is 16mm, and the diameter of the drainage outlet nut is 16mm.
一种俯孔排水提高瓦斯抽采结构的实施方法,包含以下步骤: An implementation method for improving the structure of gas drainage by vertical hole drainage, comprising the following steps:
步骤一:在抽采管前端1-3m处每隔5cm加工一个孔径为1cm的小孔作为筛孔段; Step 1: Process a small hole with a diameter of 1cm every 5cm at the front end of the extraction pipe 1-3m as a sieve section;
步骤二:在筛孔段后先将马丽散绑在抽采管上,然后螺旋式缠绕棉纱将马丽散包裹在抽采管上,形成马丽散棉纱封堵段,然后取下马丽散袋上截止阀,将其里面的两部份混合均匀,送入孔内,待马丽散膨胀过后注入水泥砂浆,形成注浆封堵段;将排水管前段1-2m每隔5cm打一个1cm小孔形成排水管筛孔段,并将排水管通过抽采管插入钻孔底部,形成孔内结构(A)。 Step 2: After the sieve section, tie the Malisan on the extraction pipe first, then wrap the Malisan on the extraction pipe by spirally winding the cotton yarn to form the Malisan cotton yarn plugging section, and then remove the Malisan The stop valve on the bag, mix the two parts inside it evenly, send it into the hole, inject cement mortar after the expansion of Malisan, and form a grouting plugging section; make a 1cm every 5cm in the front section of the drain pipe 1-2m The small holes form the sieve section of the drainage pipe, and the drainage pipe is inserted into the bottom of the borehole through the extraction pipe to form the structure in the hole (A).
步骤三:将孔外部分(B)插入抽采管内并用铁丝缠绕,形成孔内结构(A)和孔外结构(B)相连部分; Step 3: Insert the part outside the hole (B) into the extraction pipe and wrap it with iron wire to form the connection part between the structure inside the hole (A) and the structure outside the hole (B);
步骤四:关闭阀门,将压风软管一端连接压风入口及测流入口另一端连接压风管路,打开排水出口螺丝,打开压风,使风流随着风流方向进入孔内结构(A),并靠风压将孔内积水沿着水流方向将水通过该结构排出空外; Step 4: Close the valve, connect one end of the compressed air hose to the compressed air inlet and the other end of the flow measurement inlet to the compressed air pipeline, open the drain outlet screw, and open the compressed air, so that the air flow enters the hole structure along the direction of the air flow (A) , and rely on the wind pressure to discharge the accumulated water in the hole along the direction of water flow through the structure;
步骤五:孔内水排出后,将排水出口螺丝上好并保持不漏气,关闭压风入口并保持不漏气,打开阀门将抽采管出口与抽采管路相连,进行瓦斯抽采; Step 5: After the water in the hole is discharged, fix the drainage outlet screw and keep it airtight, close the compressed air inlet and keep it airtight, open the valve and connect the outlet of the extraction pipe with the extraction pipeline for gas extraction;
步骤六:二次排水时,重复步骤四和步骤五。 Step 6: Repeat steps 4 and 5 when draining water for the second time.
本发明的有益效果:本发明设计将孔内用马丽散棉纱封堵,形成孔末端集气室,保证集气室正常收集瓦斯,孔外利用压风排水,将孔内积水排出,增加了瓦斯流动通道,减小瓦斯流动阻力,提高瓦斯抽采效率,降低瓦斯抽采成本,矿井实现安全生产,实现清洁能源高效开采和利用,减少环境污染。 Beneficial effects of the present invention: the present invention designs to block the hole with Mali loose cotton yarn to form a gas collection chamber at the end of the hole to ensure that the gas collection chamber normally collects gas. The gas flow channel is opened, the gas flow resistance is reduced, the gas drainage efficiency is improved, the cost of gas drainage is reduced, the mine can achieve safe production, realize the efficient exploitation and utilization of clean energy, and reduce environmental pollution.
附图说明 Description of drawings
图1为本发明设计结构剖面示意图。 Fig. 1 is a schematic cross-sectional view of the design structure of the present invention.
具体实施方式 Detailed ways
如图1所示,一种俯孔排水提高瓦斯抽采结构,它包括孔内结构(A)通过孔内和孔外连接部分10与孔外排水装置(B)连通,孔内结构(A)包括集气室1和抽采管8连通,集气室1位于孔内结构(A)前端,抽采管8从集气室1一端向外依次通过马丽散棉纱封堵段4和注浆封堵段6固定;排水管7设置于抽采管8内;孔外排水装置(B)包括抽采管连接管11与抽采管8连通,排水管7孔外长度与抽采管连接管11长度相同,排水管7外端口设置排水出口螺丝16排水出口螺母17;抽采管连接管11侧面开口与瓦斯抽采出口13和压风入口及测流孔14相通。瓦斯抽采出口13设置阀门12。压风入口及测流孔14与压风管15连通。抽采管8前端1-3m为抽采管筛孔段3,抽采管筛孔段3每隔50mm打一个直径10mm小孔。排水管7前端1-3m为排水管筛孔段2,排水管筛孔段2每隔50mm打一个直径10mm小孔。 As shown in Figure 1, a structure for improving gas drainage with a vertical hole drainage, which includes the structure in the hole (A) communicated with the drainage device (B) outside the hole through the connection part 10 inside and outside the hole, and the structure in the hole (A) The gas collection chamber 1 is connected with the extraction pipe 8. The gas collection chamber 1 is located at the front end of the hole structure (A), and the extraction pipe 8 passes through the plugging section 4 of Mari loose cotton yarn and the grouting sequentially from the end of the gas collection chamber 1 to the outside. The plugging section 6 is fixed; the drainage pipe 7 is set in the drainage pipe 8; the drainage device outside the hole (B) includes the drainage pipe connection pipe 11 connected with the drainage pipe 8, and the outer length of the drainage pipe 7 is connected with the drainage pipe connection pipe 11 have the same length, and the outer port of the drain pipe 7 is provided with a drain outlet screw 16 and a drain outlet nut 17; The gas extraction outlet 13 is provided with a valve 12 . The compressed air inlet and the flow measuring hole 14 communicate with the compressed air pipe 15 . The front end 1-3m of the extraction pipe 8 is the extraction pipe sieve section 3, and the extraction pipe sieve section 3 punches a small hole with a diameter of 10mm every 50mm. The front end 1-3m of the drainpipe 7 is the drainpipe sieve section 2, and the drainpipe sieve section 2 makes a small hole with a diameter of 10mm every 50mm.
抽采管8直径小于钻孔孔径,排水管7长度大于钻孔深度,直径16mm普通PVC管,排水管连接头9为直径20mm普通连接软管。压风入口及测流孔14孔径为10mm,压风管15孔径为10mm,排水出口螺丝16直径为16mm,排水出口螺母17直径为16mm。 Drainage pipe 8 diameter is less than borehole aperture, and drainpipe 7 length is greater than borehole depth, and diameter 16mm common PVC pipe, and drainpipe connector 9 is common connection flexible pipe with diameter 20mm. The air pressure inlet and flow measuring hole 14 apertures are 10mm, the air pressure pipe 15 apertures are 10mm, the drainage outlet screw 16 has a diameter of 16mm, and the drainage outlet nut 17 has a diameter of 16mm.
一种俯孔排水提高瓦斯抽采结构的实施方法,包含以下步骤: An implementation method for improving the structure of gas drainage by vertical hole drainage, comprising the following steps:
步骤一:在抽采管8前端1-3m处每隔5cm加工一个孔径为1cm的小孔作为筛孔段3; Step 1: Process a small hole with a diameter of 1 cm every 5 cm at the front end of the extraction pipe 8 at 1-3 m as the sieve section 3;
步骤二:在筛孔段3后先将马丽散绑在抽采管8上,然后螺旋式缠绕棉纱将马丽散包裹在抽采管8上,形成马丽散棉纱封堵段4,然后取下马丽散袋上截止阀,将其里面的两部份混合均匀,送入孔内,待马丽散膨胀过后注入水泥砂浆,形成注浆封堵段6。将排水管7前段1-2m每隔5cm打一个1cm小孔形成排水管筛孔段2,并将排水管7通过抽采管8插入钻孔底部,形成孔内结构(A)。 Step 2: After the sieve section 3, first bind the Mali powder on the extraction pipe 8, and then wrap the Ma Li powder on the extraction pipe 8 by spirally winding cotton yarn to form the Ma Li loose cotton yarn plugging section 4, and then Remove the stop valve on the Malisan bag, mix the two parts inside it evenly, and send it into the hole. After the Malisan expands, inject cement mortar to form the grouting plugging section 6. Drill a 1cm hole every 5cm in the front section of the drainage pipe 7 to form a drainage pipe mesh section 2, and insert the drainage pipe 7 into the bottom of the borehole through the extraction pipe 8 to form the structure in the hole (A).
步骤三:将孔外部分(B)插入抽采管8内并用铁丝缠绕,形成孔内结构(A)和孔外结构(B)相连部分10; Step 3: Insert the part outside the hole (B) into the extraction pipe 8 and wrap it with iron wire to form the connecting part 10 between the structure inside the hole (A) and the structure outside the hole (B);
步骤四:关闭阀门12,将压风软管15一端连接压风入口及测流入口14另一端连接压风管路,打开排水出口螺丝16,打开压风,使风流随着风流方向18进入孔内结构(A),并靠风压将孔内积水沿着水流方向19将水通过该结构排出空外; Step 4: Close the valve 12, connect one end of the compressed air hose 15 to the compressed air inlet and the other end of the flow measurement inlet 14 to the compressed air pipeline, open the drain outlet screw 16, and open the compressed air, so that the air flow enters the hole along with the air flow direction 18 Inner structure (A), and the accumulated water in the hole is discharged through the structure along the water flow direction 19 by wind pressure;
步骤五:孔内水排出后,将排水出口螺丝16上好并保持不漏气,关闭压风入口14并保持不漏气,打开阀门12将抽采管出口13与抽采管路相连,进行瓦斯抽采。 Step 5: After the water in the hole is discharged, install the drain outlet screw 16 and keep it airtight, close the compressed air inlet 14 and keep it airtight, open the valve 12 and connect the extraction pipe outlet 13 with the extraction pipeline, and carry out Gas extraction.
步骤六:二次排水时,重复步骤四和步骤五。 Step 6: Repeat steps 4 and 5 when draining water for the second time.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510516492.4A CN105114119A (en) | 2015-08-21 | 2015-08-21 | A structure and implementation method for improving gas drainage with vertical hole drainage |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510516492.4A CN105114119A (en) | 2015-08-21 | 2015-08-21 | A structure and implementation method for improving gas drainage with vertical hole drainage |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105114119A true CN105114119A (en) | 2015-12-02 |
Family
ID=54662205
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510516492.4A Pending CN105114119A (en) | 2015-08-21 | 2015-08-21 | A structure and implementation method for improving gas drainage with vertical hole drainage |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105114119A (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105401915A (en) * | 2015-12-30 | 2016-03-16 | 贵州盘江精煤股份有限公司 | Downlink borehole drainage method and device |
| CN105888723A (en) * | 2016-06-24 | 2016-08-24 | 安徽理工大学 | Drainage device and method for gas pressure measurement in downward cross hole drilling |
| CN107882585A (en) * | 2017-11-06 | 2018-04-06 | 贵州五轮山煤业有限公司 | To drilling integrate draining gas pumping integrated apparatus under one kind |
| CN110374673A (en) * | 2019-06-11 | 2019-10-25 | 平顶山天安煤业股份有限公司八矿 | A kind of suction road downlink layer-through drilling is calmed the anger drainage and hole sealing method |
| CN111608723A (en) * | 2020-06-09 | 2020-09-01 | 四川川煤华荣能源股份有限公司 | Drainage method for gas extraction hole |
| CN112682100A (en) * | 2020-12-31 | 2021-04-20 | 煤炭科学技术研究院有限公司 | Coal seam is taken out down and is taken out swift drainage device of drilling |
| CN121162231A (en) * | 2025-09-30 | 2025-12-19 | 中国安全生产科学研究院 | Directional long-drilled hole continuous drainage pumping-promoting device and method |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203145996U (en) * | 2013-02-28 | 2013-08-21 | 山西潞安环保能源开发股份有限公司 | Downward wet hole drainage |
| CN103557030A (en) * | 2013-10-25 | 2014-02-05 | 河南理工大学 | Downward drilling hole draining device |
| CN204899969U (en) * | 2015-08-21 | 2015-12-23 | 贵州大学 | Hole drainage of bowing improves gas drainage structure |
-
2015
- 2015-08-21 CN CN201510516492.4A patent/CN105114119A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203145996U (en) * | 2013-02-28 | 2013-08-21 | 山西潞安环保能源开发股份有限公司 | Downward wet hole drainage |
| CN103557030A (en) * | 2013-10-25 | 2014-02-05 | 河南理工大学 | Downward drilling hole draining device |
| CN204899969U (en) * | 2015-08-21 | 2015-12-23 | 贵州大学 | Hole drainage of bowing improves gas drainage structure |
Non-Patent Citations (2)
| Title |
|---|
| 司春风: "下向钻孔抽采被保护层煤巷条带瓦斯的工艺技术研究", 《矿业安全与环保》 * |
| 闻昆鹏等: "下行瓦斯抽采钻孔施工工艺优化", 《煤矿安全》 * |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105401915A (en) * | 2015-12-30 | 2016-03-16 | 贵州盘江精煤股份有限公司 | Downlink borehole drainage method and device |
| CN105401915B (en) * | 2015-12-30 | 2019-03-01 | 贵州盘江精煤股份有限公司 | A kind of downlink drilling water discharge method and device |
| CN105888723A (en) * | 2016-06-24 | 2016-08-24 | 安徽理工大学 | Drainage device and method for gas pressure measurement in downward cross hole drilling |
| CN107882585A (en) * | 2017-11-06 | 2018-04-06 | 贵州五轮山煤业有限公司 | To drilling integrate draining gas pumping integrated apparatus under one kind |
| CN110374673A (en) * | 2019-06-11 | 2019-10-25 | 平顶山天安煤业股份有限公司八矿 | A kind of suction road downlink layer-through drilling is calmed the anger drainage and hole sealing method |
| CN111608723A (en) * | 2020-06-09 | 2020-09-01 | 四川川煤华荣能源股份有限公司 | Drainage method for gas extraction hole |
| CN111608723B (en) * | 2020-06-09 | 2021-08-24 | 四川川煤华荣能源股份有限公司 | Drainage method for gas extraction hole |
| CN112682100A (en) * | 2020-12-31 | 2021-04-20 | 煤炭科学技术研究院有限公司 | Coal seam is taken out down and is taken out swift drainage device of drilling |
| CN121162231A (en) * | 2025-09-30 | 2025-12-19 | 中国安全生产科学研究院 | Directional long-drilled hole continuous drainage pumping-promoting device and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107387159B (en) | An intelligent drainage and slag discharge system for downward drilling of coal mine gas drainage and its application | |
| CN201963342U (en) | Device for draining water accumulated in gas drill hole under coal mine well by means of pumping | |
| CN203145996U (en) | Downward wet hole drainage | |
| CN102865104A (en) | Downward extraction drilling drainage device | |
| CN103334714A (en) | Bag device for quickly sealing holes | |
| CN203515458U (en) | Double-hole pipe slurry filling hole sealing device | |
| CN202560318U (en) | Water guide structure of laneway seal wall | |
| CN203476278U (en) | Grouting type hole sealing and automatic water discharging device for underground drilling gas extraction | |
| CN204899969U (en) | Hole drainage of bowing improves gas drainage structure | |
| CN205297635U (en) | Drainage device drills down | |
| CN104832130B (en) | Help residual coal gasification recovery method in opencut end | |
| CN111852392A (en) | Gas drainage drilling hole leak detection and progressive secondary sealing device and using method | |
| CN103993901B (en) | A kind of projecting coal bed drilling waterpower is handled up anti-reflection method | |
| CN107476784A (en) | A kind of CBM Drainage mining method of oil pipe production aquatic products gas | |
| CN108252278B (en) | The row of replaceable filtration core seeps device and filtration core replacing options in Tailings Dam | |
| CN203430471U (en) | Air bag device for sealing hole rapidly | |
| CN105525941A (en) | Method for improving stability of permanent gas extraction system of outburst mine | |
| CN105735939B (en) | Mash gas extraction backfills pouch slip casting type hole packer and application method with drilling cuttings | |
| CN205349408U (en) | Equipment of putting is taken out to high -pressure coal mine gas of many units | |
| CN203335015U (en) | Gas drainage coal seam water injection air-bag type hole sealing device | |
| CN209908434U (en) | A downthehole drainage device for angle of depression drilling | |
| CN104453983B (en) | On a kind of half-edge coal seam layer-through drilling, anti-reflection and pumping method is let out in pressure | |
| CN209227570U (en) | Stratum dewatering construction device | |
| CN202788934U (en) | Underground coal mine downward hole drainage device | |
| CN204921021U (en) | Flat hole gas drainage structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151202 |