CN105094010B CN201510379642.1A CN201510379642A CN105094010B CN 105094010 B CN105094010 B CN 105094010B CN 201510379642 A CN201510379642 A CN 201510379642A CN 105094010 B CN105094010 B CN 105094010B
Authority
CN
China
Prior art keywords
protective relaying
relaying device
backup file
plug
backup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510379642.1A
Other languages
Chinese (zh)
Other versions
CN105094010A (en
Inventor
盛海华
张乔宾
方愉冬
李晓朋
方天宇
杨智德
徐灵江
张宇迪
张志峥
杜文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuji Group Co Ltd
State Grid Zhejiang Electric Power Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuji Group Co Ltd
State Grid Zhejiang Electric Power Co Ltd
XJ Electric Co Ltd
Xuchang XJ Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuji Group Co Ltd, State Grid Zhejiang Electric Power Co Ltd, XJ Electric Co Ltd, Xuchang XJ Software Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510379642.1A priority Critical patent/CN105094010B/en
Publication of CN105094010A publication Critical patent/CN105094010A/en
Application granted granted Critical
Publication of CN105094010B publication Critical patent/CN105094010B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured

Abstract

The present invention relates to a kind of protective relaying device plug and play management method and system, belong to technical field of relay protection.The present invention carries out a key automated back-up of FCL data one by one when intelligent substation operating status is good by disposing all protective relaying devices of terminal-pair whole station, and backup file is submitted to main website and is managed;During protective relaying device failure; the backup file of protective relaying device is downloaded from main website; after completing plug-in unit and replacing; one key of backup file is automatically restored in failed equipment using terminal is disposed; pass through consistency check; ensure device recover after data message and backup before completely the same, the plug and play that realization device plug-in unit is replaced, achieveed the purpose that simplified O&M flow, improved O&M efficiency, ensure O&M quality.Solve the problems, such as that once relay protection device of intelligent substation plug-in card configuration complexity, failure are difficult to replace.

Description

A kind of protective relaying device plug and play management method and system
Technical field
The present invention relates to a kind of protective relaying device plug and play management method and system, belongs to Protection Technology neck Domain.
Background technology
Relay protection device of intelligent substation plug-in unit species is various, forms complicated;Each plug-in unit is (similar by hardware, firmware In operating system+protective program), three layers of composition such as configuration file (description virtual secondary circuit), the particularly configuration such as CID, CCD File has very big otherness for corresponding to each device example, often requires that corresponding solid according to the lower dress in actual conditions scene Part and configuration file.
Intelligent substation lacks relevant experience, especially as a new things in terms of equipment operation maintenance at the same time It is the operation defect elimination of equipment, higher requirement is proposed to operation maintenance personnel.It is uneven in view of service personnel's professional skill, it is wrong Configuration is likely to result in the malfunction or tripping of protective device by mistake, seriously affects the safety of electric system.
The content of the invention
The object of the present invention is to provide a kind of protective relaying device plug and play management method and system, to realize that relay is protected The plug and play that protection unit plug-in unit is replaced.
The present invention provides a kind of protective relaying device plug and play management method, the management method to achieve the above object Comprise the following steps:
1) according to the equipment identities code in relay protection device of intelligent substation and whole station engineering configuration file, determine after Electrical protective device model and device example;
2) using disposing target program in terminal-pair intelligent substation in each each plug-in unit of protective relaying device, engineering configuration Backed up with definite value Parameter data information, and backup file is submitted to configuration management main website;
3) when protective relaying device failure needs replacing plug-in unit, relay is downloaded from configuration management main website by disposing terminal The backup file of protective device, after completing plug-in unit and replacing, using disposing terminal by backup file access pattern into failed equipment.
By backup file access pattern to consistency check need to be carried out during failure protective relaying device in the step 3), to ensure It is completely the same before data message and backup after protective relaying device recovery, realize inserting i.e. for protective relaying device plug-in unit replacement With.
The deployment terminal is when carrying out data backup, the synchronous check code for calculating backup file, as backup file one The foundation of cause property.
In the step 3) in backup file access pattern, using on special deployment terminal scanning failure protective relaying device Equipment identities code electronic tag determines the backup file of failed equipment, to ensure backup file and protective relaying device identity Uniformity.
During the backup file access pattern, the write-in of a data module is often completed, will be to the data content of write-in Consistency desired result is carried out, to ensure the correctness of the data module of each write-in.
Present invention also offers a kind of protective relaying device plug and play management system, which includes special deployment Terminal and configuration management main website, special deployment terminal is used to connect protective relaying device debugging mouth by Ethernet, to being deployed in Target program, engineering configuration and definite value Parameter data information in each plug-in unit of protective relaying device are backed up and recovered, and will The file of backup is submitted to configuration management main website;The configuration management main website is standby for storing and managing whole station protective relaying device Part file, and will backup file download to disposing terminal.
The deployment terminal need to carry out consistency check when by backup file access pattern to failure protective relaying device, with true It is completely the same before data message and backup after guarantor's protective relaying device recovery, realize that protective relaying device plug-in unit is replaced i.e. slotting Use.
The deployment terminal is when carrying out data backup, the synchronous check code for calculating backup file, as backup file one The foundation of cause property.
For the deployment terminal in backup file access pattern, deployment terminal is by scanning the equipment on failure protective relaying device Identity code electronic tag determines the backup file of failed equipment, to ensure that backup file is consistent with protective relaying device identity Property.
During the backup file access pattern, the write-in of a data module is often completed, will be to the data content of write-in Consistency desired result is carried out, to ensure the correctness of the data module of each write-in.
The beneficial effects of the invention are as follows:The present invention is when intelligent substation operating status is good by disposing terminal-pair whole station All protective relaying devices carry out a key automated back-up of FCL data one by one, and backup file is submitted to main website and carries out pipe Reason;During protective relaying device failure, the backup file of protective relaying device is downloaded from main website, after completing plug-in unit and replacing, is utilized Deployment terminal automatically restores to one key of backup file in failed equipment, passes through consistency check, it is ensured that the number after device recovery It is believed that breath and completely the same, the plug and play that realization device plug-in unit is replaced before backup, have reached simplified O&M flow, have improved O&M Efficiency, the purpose for ensureing O&M quality.Solves relay protection device of intelligent substation plug-in card configuration complexity, once failure is difficult to The problem of replacement.
Brief description of the drawings
Fig. 1 is the principle schematic of protective relaying device plug and play management system of the present invention;
Fig. 2 is the flow diagram of protective relaying device plug and play management method of the present invention.
Embodiment
The embodiment of the present invention is described further below in conjunction with the accompanying drawings.
For the problem that digital relay protection device configure it is complicated, plug-in unit replace it is difficult, the present invention provides one kind after Electrical protective device plug and play management method and system, the present invention rely on a key automated back-up and the recovery of special deployment terminal Technology, the backup management technology of configuration management main website, realizes inserting for relay protection device of intelligent substation plug-in unit replacement in fact Use, achieveed the purpose that simplified O&M flow, improved O&M efficiency, ensure O&M quality.
A kind of embodiment of protective relaying device plug and play management method of the present invention
1. according to the equipment identities code in relay protection device of intelligent substation and whole station engineering configuration file, determine after Electrical protective device model and device example;
2) target program, engineering configuration and the definite value supplemental characteristic disposed in each plug-in unit of terminal-pair protective relaying device are utilized Information is backed up, and backup file is submitted to configuration management main website.
It is that protective relaying device debugging mouth is connected by Ethernet in the present embodiment, to disposing in each plug-in unit in a device Target program, engineering configuration and definite value parameter carry out a key automated back-up, and whole backup procedure is directly perceived visible, and generation is standby Its check code is synchronously calculated during part file, MD5 codes, the foundation as backup file consistence are used in the present embodiment.
After the FCL data backup of whole station device is completed, the backup files through network of whole station device is submitted in the lump Configuration main website is stored and managed, and such as the 2nd steps of Fig. 2, operation maintenance personnel can be by Web mode login configurations main website, to whole station The backup file of device is checked and managed, such as checks the submission time of each backup file, contained content, software version The information such as sheet, definite value parameter, it is ensured that device backup file is transparent, controllable to operation maintenance personnel, such as the 3rd steps of Fig. 2.
3. when protective relaying device failure needs replacing plug-in unit, relay is downloaded from configuration management main website by disposing terminal The backup file of protective device, after completing plug-in unit and replacing, using disposing terminal by backup file access pattern into failed equipment, such as 4th step in Fig. 2.Detailed process is as follows:
After reaching substation field, failure plug-in unit first is replaced with the spare plug-in unit of same model, then utilizes special deployment Equipment identities code electronic tag on terminal scanning failure protective relaying device, failure relay protection is automatically selected according to label The backup file of device, accomplishes that the selection of backup file is anti-error, ensures backup file and the uniformity of protective relaying device identity, And MD5 calculating is carried out again to the protective relaying device backup file of selection, the MD5 codes carried with backup file carry out uniformity Compare, it is ensured that protective relaying device backup file is safe and reliable.After completing uniformity comparison, attachment device debugging mouth, according to According to the directoryof in backup file, FCL data recovery is carried out to protective relaying device, a recovery failure can also be selected to insert The data of part.In recovery process, the write-in of a data module is often completed, uniformity will be carried out to the data content of write-in Verification, it is ensured that the data module each write is correct.Complete the recovery write-in of all data modules of protective relaying device Afterwards, the data before the protective relaying device data after plug-in unit put into operation with protective relaying device are replaced with regard to completely the same.Again on After electricity, protective relaying device can come into operation, without experimental verification again, so as to reach the replacement of protective relaying device plug-in unit Plug and play.
A kind of embodiment of protective relaying device plug and play management system of the present invention
Protective relaying device plug and play management system in the present embodiment as shown in Figure 1, including special deployment terminal and Main website is configured, wherein special deployment terminal is used exclusively for realizing one key automated back-up of protective relaying device forward data and recovery Portable set, which is used in conjunction in succeeding electrical protective device debugging mouth by Ethernet, for being deployed in, device is each to be inserted The data message batches such as target program, engineering configuration and definite value parameter in part are read and writen;Configuration management main website It is used exclusively for storing and manages the information management system of whole station protective relaying device backup file, the system is towards relay protection Device defines the file directory inventory of extensive compatibility, suitable for most protective relaying device products of domestic mainstream producer, Building station, interval, the tree-like hierarchy structure of device are stored and managed to whole station backup file.By Web modes to user The information inquiry services such as catalogue, version, definite value parameter and the operation historical record of device backup file are provided.System is in realization The links of plug-and-play all devise corresponding consistency check.Carrying out device FCL data backup generation backup file When, deployment terminal synchronously calculates the check code of backup file, ensures file consistence when backup file circulates in systems; When selection device carries out Backup and Restore, using the identification code electronic tag for disposing terminal scanning protective relaying device, Ensure backup file and the uniformity of device identity;In recovery device data, by the check code in directoryof, ensure every The content consistency of the data module of a write-in.Workflow such as Fig. 2 of above-mentioned protective relaying device plug and play management system Shown, detailed process is as follows:
Intelligent substation constructs the example of whole station protective relaying device in configuration management main website, specifies each relay protection Interval, product type and equipment identities code belonging to device, form intelligent substation engineering configuration file.
When intelligent substation completion debugging preparation puts into operation, using special deployment terminal, to the protective relaying device of whole station FCL data backup is carried out one by one, such as the 1st steps of Fig. 2.Specific method is using disposing setting on terminal scanning protective relaying device Standby identity code electronic tag, with reference to whole station engineering configuration file, determines protective relaying device model and device example.Then lead to Cross ether net connecting device debugging mouth, to be deployed in target program in protective relaying device in each plug-in unit, engineering configuration and Definite value parameter carries out a key automated back-up, and whole backup procedure is directly perceived visible;Its MD5 is synchronously calculated when generating backup file Code, the foundation as backup file consistence.
After the FCL data backup of whole station protective relaying device is completed, the backup file of whole station protective relaying device is led to Cross network be submitted in the lump configuration main website stored and managed, such as the 2nd steps of Fig. 2, operation maintenance personnel can be logged in by Web modes Main website is configured, the backup file to whole station protective relaying device is checked and managed, such as checks carrying for each backup file Hand over time, contained content, software version, the information such as definite value parameter, it is ensured that protective relaying device backup file is to operation maintenance personnel It is transparent, controllable, such as the 3rd steps of Fig. 2.
Protective relaying device break down need carry out plug-in unit replacement when, operation maintenance personnel first uses special deployment terminal, The backup file of whole station is downloaded from configuration management main website by network, such as the 4th steps of Fig. 2.After reaching substation field, homotype is first used Number spare plug-in unit replace failure plug-in unit, then using it is special deployment terminal scanning failure protective relaying device on equipment body Part code electronic tag, automatically selects the backup file of failure protective relaying device, accomplishes that the selection of backup file is anti-error;It is and right The protective relaying device backup file of selection carries out MD5 calculating again, and the MD5 codes carried with backup file carry out uniformity ratio It is right, it is ensured that protective relaying device backup file is safe and reliable.After completing uniformity comparison, connection protective relaying device debugging Mouth, according to the directoryof in backup file, FCL data recovery is carried out to protective relaying device, can also select only to recover event Hinder the data of plug-in unit.In recovery process, the write-in of a data module is often completed, one will be carried out to the data content of write-in Cause property verification, it is ensured that the data module each write is correct.Complete the recovery of all data modules of protective relaying device After write-in, the data before the protective relaying device data after plug-in unit put into operation with protective relaying device are replaced with regard to completely the same.Weight Newly after the power is turned on, protective relaying device can come into operation, without experimental verification again, so as to reach protective relaying device plug-in unit more The plug and play changed.

Claims (6)

1. a kind of protective relaying device plug and play management method, it is characterised in that the management method comprises the following steps:
1)Using the equipment identities code electronic tag disposed in terminal scanning relay protection device of intelligent substation, with reference to whole station Engineering configuration file, determines protective relaying device model and device example;The deployment terminal is to be used for realization relay protection dress Put one key automated back-up of forward data and the portable set recovered;
2)Using dispose in terminal-pair intelligent substation in each each plug-in unit of protective relaying device target program, engineering configuration and fixed Value parameter data message is backed up, and backup file is submitted to configuration management main website;The deployment terminal is carrying out data During backup, the synchronous check code for calculating backup file, the foundation as backup file consistence;
3)When protective relaying device failure needs replacing plug-in unit, relay protection is downloaded from configuration management main website by disposing terminal The backup file of device, after completing plug-in unit and replacing, using disposing terminal by backup file access pattern into failed equipment;Backing up During file access pattern, event is determined using the equipment identities code electronic tag on special deployment terminal scanning failure protective relaying device The backup file of fault device, check code calculating is carried out to the protective relaying device backup file of selection again, with backup file certainly The check code of band carries out uniformity contrast, to ensure backup file and the uniformity of protective relaying device identity.
2. protective relaying device plug and play management method according to claim 1, it is characterised in that the step 3)In By backup file access pattern to consistency check need to be carried out during failure protective relaying device, after ensuring that protective relaying device recovers Data message with backup before it is completely the same, realize protective relaying device plug-in unit replace plug and play.
3. protective relaying device plug and play management method according to claim 2, it is characterised in that the backup file In recovery process, the write-in of a data module is often completed, consistency desired result will be carried out to the data content of write-in, to ensure The correctness of the data module each write.
4. a kind of protective relaying device plug and play management system, it is characterised in that the management system includes special deployment terminal With configuration management main website, special deployment terminal is used to connect protective relaying device debugging mouth by Ethernet, to being deployed in relay Target program, engineering configuration and definite value Parameter data information in each plug-in unit of protective device are backed up and recovered, and will backup File be submitted to configuration management main website;The configuration management main website is used to storing and managing whole station protective relaying device backup text Part, and by backup file download to deployment terminal;The deployment terminal is to be used for realization one key of protective relaying device forward data Automated back-up and the portable set recovered;
Before backup, using the equipment identities code disposed in terminal scanning relay protection device of intelligent substation, with reference to whole station Engineering configuration file, determines protective relaying device model and device example;The deployment terminal is synchronous when carrying out data backup Calculate the check code of backup file, the foundation as backup file consistence;
The deployment terminal carries out check code meter again in backup file access pattern to the protective relaying device backup file of selection Calculate, carry out uniformity contrast with the check code of backup file subband, deployment terminal is by scanning on failure protective relaying device Equipment identities code electronic tag determines the backup file of failed equipment, to ensure backup file and protective relaying device identity Uniformity.
5. protective relaying device plug and play management system according to claim 4, it is characterised in that the deployment terminal Consistency check need to be carried out when by backup file access pattern to failure protective relaying device, after ensuring that protective relaying device recovers Data message and backup before it is completely the same, realize protective relaying device plug-in unit replace plug and play.
6. protective relaying device plug and play management system according to claim 5, it is characterised in that the backup file In recovery process, the write-in of a data module is often completed, consistency desired result will be carried out to the data content of write-in, to ensure The correctness of the data module each write.
CN201510379642.1A 2015-07-01 2015-07-01 A kind of protective relaying device plug and play management method and system Active CN105094010B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510379642.1A CN105094010B (en) 2015-07-01 2015-07-01 A kind of protective relaying device plug and play management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510379642.1A CN105094010B (en) 2015-07-01 2015-07-01 A kind of protective relaying device plug and play management method and system

Publications (2)

Publication Number Publication Date
CN105094010A CN105094010A (en) 2015-11-25
CN105094010B true CN105094010B (en) 2018-04-27

Family

ID=54574703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510379642.1A Active CN105094010B (en) 2015-07-01 2015-07-01 A kind of protective relaying device plug and play management method and system

Country Status (1)

Country Link
CN (1) CN105094010B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106228101A (en) * 2016-08-04 2016-12-14 邦奇智能科技(上海)股份有限公司 A kind of NFC/RFID smart machine rapid configuration system and method
CN106168784B (en) * 2016-08-31 2019-03-19 许继集团有限公司 A kind of protective relaying device operation change processing method and control device
CN110554931A (en) * 2019-07-29 2019-12-10 南京兆伏电力科技有限公司 Relay protection device and data backup and recovery method thereof
CN112269590A (en) * 2020-09-16 2021-01-26 许继集团有限公司 Operation and maintenance master station on-site protection device software version management method and system
CN113741998B (en) * 2021-08-16 2023-10-20 国网河北省电力有限公司检修分公司 Data processing system and method of relay protection device with multiple plug-ins

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100346607C (en) * 2003-09-02 2007-10-31 华为技术有限公司 Method for interface back-up in interface hot connect-disconnect supporting system
CN100550783C (en) * 2003-09-29 2009-10-14 华为技术有限公司 The detection of hot plug and processing method
WO2009046132A1 (en) * 2007-10-01 2009-04-09 Gridpoint, Inc. Modular electrical grid interface device
KR101504363B1 (en) * 2007-11-21 2015-03-20 삼성전자주식회사 Method and system for handling framework shutdown in a network
CN101447697A (en) * 2008-12-08 2009-06-03 中国电力科学研究院 Microcomputer measuring and controlling protective device for centralized type digital transformer substation
CN102647025B (en) * 2012-04-13 2014-03-26 广东省电力调度中心 Method for realizing plug and play of protective device based on center server manner
CN203111826U (en) * 2013-02-01 2013-08-07 山东电力集团公司莱芜供电公司 Intelligent relay protection plug-in board storing cabinet
CN103593742A (en) * 2013-11-29 2014-02-19 国家电网公司 Secondary circuit configuration controlling method and system for intelligent substation

Also Published As

Publication number Publication date
CN105094010A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN105094010B (en) A kind of protective relaying device plug and play management method and system
CN103051065B (en) The distributed FA interlock method of testing of a kind of power distribution automation and system
CN102035202B (en) Network reconfiguration system
CN103580283B (en) Based on electric network protection device definite value nucleus correcting system and the method for protecting communication system
CN102170342B (en) IEC (integrated Ethernet chip) 104 communication host-standby switching method under high redundancy configuration
CN103067206A (en) Internet of things across-machine room distributed type full automatic hot standby server switching system
CN105808394A (en) Server self-healing method and device
CN109472476B (en) Power failure identification analysis method and system
Lim et al. Design of a backup IED for IEC 61850-based substation
CN102647025A (en) Method for realizing plug and play of protective device based on center server manner
CN105259860B (en) A kind of master-slave mode intelligent power device method of automatic configuration
CN107615610A (en) For operating the method and system of multiple photovoltaics (PV) power generating equipment being connected with mains network
CN108510727A (en) The remote upgrade method of bandwidth carrier communication and acquisition module based on DLMS
CN104734353B (en) Intelligent substation hovering fault monitoring method based on network message
US11309699B2 (en) Control system for and method of fault location, isolation and supply restoration
CN105337772A (en) System and method for backing up and restoring configuration of network equipment
CN106855991A (en) The Accident Handling Method and system of a kind of main distribution one
CN202652238U (en) Fault list automatic distribution system
CN109142988A (en) A kind of distribution network fault location method and system based on electric energy quality monitoring data
CN116540029B (en) Active power distribution network fault section positioning method and device based on node distortion correction
CN106452911A (en) City-wide disaster backup system
CN110502496B (en) Distributed file system repair method, system, terminal and storage medium
CN105117840A (en) Risk assessment method of power system considering role of information system
CN104734356A (en) Control method, device and system for electrical equipment
CN106845648A (en) Data processing method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant