CN105084229A - Roof crane and application to roof-midspan longitudinal steel beam hoisting - Google Patents

Roof crane and application to roof-midspan longitudinal steel beam hoisting Download PDF

Info

Publication number
CN105084229A
CN105084229A CN201510468835.4A CN201510468835A CN105084229A CN 105084229 A CN105084229 A CN 105084229A CN 201510468835 A CN201510468835 A CN 201510468835A CN 105084229 A CN105084229 A CN 105084229A
Authority
CN
China
Prior art keywords
roofing
wheel machine
loop wheel
connecting rod
span centre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510468835.4A
Other languages
Chinese (zh)
Other versions
CN105084229B (en
Inventor
钱俊
姜忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangzhou Jiangong Construction Group Co Ltd
Original Assignee
Jiangsu Yangzhou Jiangong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangzhou Jiangong Construction Group Co Ltd filed Critical Jiangsu Yangzhou Jiangong Construction Group Co Ltd
Priority to CN201510468835.4A priority Critical patent/CN105084229B/en
Publication of CN105084229A publication Critical patent/CN105084229A/en
Application granted granted Critical
Publication of CN105084229B publication Critical patent/CN105084229B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a roof crane and application to roof-midspan longitudinal steel beam hoisting, which belongs to the technical field of building construction. The roof crane can be formed by using local materials on roof site, each roof-midspan longitudinal steel beam can be hoisted in sequence on a roof through the crane and is mounted. The roof-midspan longitudinal steel beam can be demounted after being mounted, and rod pieces can be recycled, so that the investment of the cost per large and medium machine per team can be effectively reduced, the expense of other measure cost can be saved, and meanwhile the time limit for a project can also be effectively ensured.

Description

A kind of roofing loop wheel machine and the application in the longitudinal steel beam lifting of roofing span centre thereof
Technical field
The present invention relates to technical field of building construction, particularly the operating technique of the reinforced concrete frame structure factory building of large span, the large scale of construction, multi storied factory building installation steel roof joist.
Background technology
At present, along with the development of social process of industrialization, the land resources needed for industrial premises construction is more in short supply, and this just requires that the construction of factory building must develop towards multilayer.The form that multi storied industrial factory building generally adopts reinforced concrete frame structure, steel structure colored steel roof combines.Compared with steel-structure factory building, have the advantages that floor area is little, can bear large and medium-sized mechanical equipment heavy load.
When the industrial premises roofing of Multistory reinforced conceete frame Structure carries out steel beam lifting, wheel crane handling less for tonnage along factory building surrounding lifting steel roof joist, or is carried out the lifting of steel roof joist by usual employing large-tonnage wheel crane again to flooring according to girder steel weight.
In view of above-mentioned hanging method, if select large-tonnage wheel crane to lift, then first to carry out ruleization to factory building surrounding wheel crane track route and necessary process is carried out to road foundation, making it meet the requirement of bearing capacity, also will pay high One-Shift Costs simultaneously; If select, wheel crane handling is carried out steel beam lifting operation to flooring, when occurring that floor concrete Bars In Poured Concrete Slab Lack of support carries out lifting operation to bear wheel crane, this needs again to take necessary reinforcement measure to floor concrete, and this undoubtedly also can be very uneconomical and can affect carrying out of other subsequent handlings.
Summary of the invention
For the construction difficult problem of Multistory reinforced conceete frame Structure factory building roof hoisting steel beam, the present invention proposes that a kind of simple structure, processing and fabricating are easy, little from heavy and light, volume, lifting construction facility easily of walking.
The present invention includes the base being provided with U-shaped framework, below base, connect at least four group cardan wheels, base is fixed load-bearing vertical rod, connect electric block in the upper end of vertical rod.
The present invention's making is drawn materials extensive, cheap, can to gather materials on the spot at roofing scene assembling, compared with traditional lifting mode, both effectively to reduce the input of big-and-middle-sized mechanical one-shift expense, can save again the expenditure of other measure cost, the duration have also been obtained effective guarantee simultaneously.Particularly wherein be provided with the base of U-shaped framework, greatly can facilitate whole the movement of loop wheel machine on roofing.This loop wheel machine both conveniently can lift the longitudinal girder steel of roofing span centre, the longitudinal girder steel of roofing end bay, can lift bundled purlin again, greatly can shorten man-hour, reduce labour intensity.
Further, the base being provided with U-shaped framework of the present invention comprises two mobile jibs be parallel to each other, the plane of two mobile jibs welds first connecting rod, second connecting rod and third connecting rod respectively between two mobile jibs, three connecting rods are parallel to each other, three connecting rods and two mobile jibs are arranged vertically respectively, second connecting rod is arranged between first connecting rod and third connecting rod, surrounds the U-shaped plane cavity that roofing column can be made to stretch between described first connecting rod and two mobile jibs; Described cardan wheel is connected to the below of two mobile jibs.This is simple and reasonable for structure, makes the center of gravity of whole loop wheel machine remain on middle part, improves the stability of the loop wheel machine in handling process.
Described load-bearing vertical rod comprises a main vertical rod and two auxiliary vertical rods, the lower end of described main vertical rod is welded on the middle part of first connecting rod, the lower end of two auxiliary vertical rods is welded on second connecting rod respectively, described main vertical rod and two auxiliary vertical rods are parallel to each other and perpendicular to the plane at two mobile jib places, between described main vertical rod and two auxiliary vertical rods, weld some pipe links; Weld a cantilever steel girder in the upper end overhanging type of main vertical rod, described electric block is connected on described cantilever steel girder.
In order to strengthen two auxiliary vertical rods, so the support strength of whole load-bearing vertical rod, and the present invention is also welding with one end of stirrup respectively on two differing heights of the auxiliary vertical rod of every root, and the other end of each stirrup is welded on corresponding mobile jib respectively.
Further, some connecting rods are also welded between two stirrups that also can weld same auxiliary vertical rod.
In order to improve Joint strenght further, the present invention also welds the first small rod between first connecting rod and second connecting rod, welds the second small rod between second connecting rod and third connecting rod.
Another object of the present invention proposes the application of above loop wheel machine in the longitudinal steel beam lifting of roofing span centre, i.e. using method.
Comprise the following steps:
1) form described steel roof joist in roofing assembling to construct unpowered walking loop wheel machine;
2) by cardan wheel by described loop wheel machine horizontal sliding below the roofing column of the longitudinal girder steel of roofing span centre to be installed, and make described roofing column be positioned at the base of the U-shaped framework of described loop wheel machine, rotate the base of described loop wheel machine, make the axis of the vertical concrete beam above base and described roofing column be the angle of 45 ± 20 °;
3) paved by the base of cushion block by described loop wheel machine, make cardan wheel leave flooring plane;
4) above base steel roof joist to be lifted being held on described loop wheel machine;
5) fix at the middle part of the longitudinal girder steel of roofing span centre described to be lifted and fasteningly unload first;
6) the fastening first of unloading at the middle part being positioned at the longitudinal girder steel of roofing span centre to be lifted is docked with the suspension hook of electric block, connect a bearing of body in the air separately at the two ends of the longitudinal girder steel of roofing span centre and control hauling rope;
7) electric block is started, and by pulling two bearing of body in the air to control hauling rope at roofing, what make the longitudinal girder steel of roofing span centre stands to above along the vertical promotion of described roofing column to the pre-embedded bolt exceeding described roofing column upper top, a bearing of body in the air is kept to control the pulling force of hauling rope, after the free end of another root bearing of body in the air control hauling rope is passed from the vertical concrete beam top at the top of described roofing column, controlling hauling rope by this bearing of body in the air of traction again makes the longitudinal girder steel of roofing span centre rotate in the horizontal plane, until the longitudinal girder steel of roofing span centre is vertical with vertical concrete beam,
8) loopback two bearing of body in the air control hauling rope and electric block, bolt hole in the middle part of longitudinal for roofing span centre girder steel is aimed at the pre-embedded bolt of described roofing column upper top, in the bolt hole that pre-embedded bolt is inserted in the middle part of the longitudinal girder steel of roofing span centre, complete the fixed installation of the longitudinal girder steel of roofing span centre and described roofing column immediately;
9) to remove on the longitudinal girder steel of described roofing span centre fastening unloads first, remove after the bearing of body in the air be connected with the two ends of roofing span centre longitudinal direction girder steel controls hauling rope, removes below the base of described loop wheel machine cushion block, removes described loop wheel machine.
The inventive method is simple, reasonable, roofing can carry out order to the longitudinal girder steel of every root roofing span centre and lift and complete installation.Also dismountable after installing, the recyclable recycling of each rod member had both effectively reduced the input of big-and-middle-sized mechanical one-shift expense, can save again the expenditure of other measure cost, and the duration have also been obtained effective guarantee simultaneously.
In addition, in step 3), the distance of electric block and load-bearing vertical rod outer side edges is greater than the distance of load-bearing vertical rod outer side edges apart from post angle, roofing column farthest.Its objective is: electric block and roofing column outer corners have one section of safety distance, do not collide roofing column when guaranteeing steel beam lifting.
Accompanying drawing explanation
Fig. 1 is that standing of loop wheel machine of the present invention sees figure to signal.
Fig. 2 is the direction view of bowing of Fig. 1.
The direction view of bowing that when Fig. 3 is lifting roofing longitudinal span centre girder steel, loop wheel machine is in place.
Detailed description of the invention
One, form steel roof joist in roofing assembling to construct unpowered walking loop wheel machine:
As shown in Figure 1, 2, the base being provided with U-shaped framework of the present invention is made up of two mobile jibs be parallel to each other 1, first connecting rod 2, second connecting rod 3, third connecting rod 4, first small rod 5 and the second small rod 6.First connecting rod 2, second connecting rod 3 and third connecting rod 4 is welded respectively in the plane of two mobile jibs 1 and between two mobile jibs 1, three connecting rods 2,3,4 are parallel to each other, three connecting rods 2,3,4 are also arranged vertically respectively with two mobile jibs 1, between first connecting rod 2 and second connecting rod 3, weld the first small rod 5, between second connecting rod 3 and third connecting rod 4, weld the second small rod 6.
The U-shaped plane cavity that roofing column can be made to stretch into is surrounded between first connecting rod 2 and two mobile jibs 1.
In the below of two mobile jibs 1, symmetry connects four cardan wheels 7.
Load-bearing vertical rod includes a main vertical rod 8 and two auxiliary vertical rods 9, the lower end of main vertical rod 8 is welded on the middle part of first connecting rod 2 by sheet steel plate, the lower end of two auxiliary vertical rods 9 is welded on second connecting rod 3 respectively by two blocks of sheet steel plates, main vertical rod 8 and two auxiliary vertical rods 9 are parallel to each other, and respectively perpendicular to the plane at two mobile jib 1 places.Weld some pipe links 10 between main vertical rod 8 and two auxiliary vertical rods 9 also densely coveredly.
Weld a cantilever steel girder 11 in the upper end overhanging type of main vertical rod 8, cantilever steel girder connects electric block 12 by hook.
Between the auxiliary vertical rod 9 of every root and corresponding mobile jib 1, weld two stirrups 13 respectively, the upper end of each stirrup 13 is welded on two differing heights of auxiliary vertical rod 9 respectively, and the lower end of each stirrup 13 is welded on corresponding mobile jib 1 respectively.Some connecting rods 14 are also welded between two stirrups 13 that same auxiliary vertical rod 9 is welded.
Two, the application example of loop wheel machine:
1, examination is hung: load is 2 times of single girder steel maximum weight, and weight-lifting equipment adopts the steel rope of 10t electric block and Φ 20mm.With self-control horizontal transport car, girder steel being transported to base top puts steadily, slowly put down steel rope, fastening and carry out examination and carry with unloading first, check loop wheel machine triangle steel tube column, base deformation, confirm safe and punctual after slowly sling, hang seating plane 200 ~ 300 ㎜ and hold lotus about 10 minutes, again checking loop wheel machine triangle steel tube column and base deformation, guarantee that loop wheel machine has enough load-carrying capacitys and safe reliability.
2, by cardan wheel by loop wheel machine horizontal sliding below the roofing column of the longitudinal girder steel of roofing span centre to be installed, and make described roofing column be positioned at the base of the U-shaped framework of described loop wheel machine, rotate the base of described loop wheel machine, make the axis of the vertical concrete beam above base and described roofing column be the angle of 45 ± 20 °.
3, paved by the base of flitch by described loop wheel machine, make cardan wheel leave flooring plane.And make the distance of electric block and load-bearing vertical rod outer side edges be greater than the distance at roofing column and load-bearing vertical rod center.
4, above base steel roof joist to be lifted being held on loop wheel machine.
5, fix at the middle part of the longitudinal girder steel of roofing span centre to be lifted and fasteningly unload first.
6, the fastening first of unloading at the middle part being positioned at the longitudinal girder steel of roofing span centre to be lifted is docked with the suspension hook of electric block, connect a bearing of body in the air separately at the two ends of the longitudinal girder steel of roofing span centre and control hauling rope.
7, start electric block, and by pulling two bearing of body in the air to control hauling rope at roofing, what make the longitudinal girder steel of roofing span centre stands to above along the vertical promotion of described roofing column to the pre-embedded bolt exceeding described roofing column upper top, a bearing of body in the air is kept to control the pulling force of hauling rope, after the free end of another root bearing of body in the air control hauling rope is passed from the vertical concrete beam top at the top of described roofing column, controlling hauling rope by this bearing of body in the air of traction again makes the longitudinal girder steel of roofing span centre rotate in the horizontal plane, until the longitudinal girder steel of roofing span centre is vertical with vertical concrete beam.
8, loopback two bearing of body in the air control hauling rope and electric block, the slightly longitudinal girder steel of below roofing span centre, bolt hole in the middle part of longitudinal for roofing span centre girder steel is aimed at the pre-embedded bolt of described roofing column upper top, in the bolt hole that pre-embedded bolt is inserted in the middle part of the longitudinal girder steel of roofing span centre, complete the fixed installation of the longitudinal girder steel of roofing span centre and described roofing column immediately.
9, to remove on the longitudinal girder steel of described roofing span centre fastening unloads first, the bearing of body in the air that the two ends of removing girder steel longitudinal with roofing span centre are connected controls hauling rope, cushion block below the base removing described loop wheel machine, then removes described loop wheel machine, enters the lifting of the longitudinal girder steel of next block face span centre.

Claims (8)

1. a roofing loop wheel machine, is characterized in that comprising the base being provided with U-shaped framework, connects at least four group cardan wheels, base is fixed load-bearing vertical rod below base, connects electric block in the upper end of vertical rod.
2. roofing loop wheel machine according to claim 1, the base being provided with U-shaped framework described in it is characterized in that comprises two mobile jibs be parallel to each other, the plane of two mobile jibs welds first connecting rod, second connecting rod and third connecting rod respectively between two mobile jibs, three connecting rods are parallel to each other, three connecting rods and two mobile jibs are arranged vertically respectively, second connecting rod is arranged between first connecting rod and third connecting rod, surrounds the U-shaped plane cavity that roofing column can be made to stretch between described first connecting rod and two mobile jibs; Described cardan wheel is connected to the below of two mobile jibs.
3. roofing loop wheel machine according to claim 2, it is characterized in that described load-bearing vertical rod comprises a main vertical rod and two auxiliary vertical rods, the lower end of described main vertical rod is welded on the middle part of first connecting rod, the lower end of two auxiliary vertical rods is welded on second connecting rod respectively, described main vertical rod and two auxiliary vertical rods are parallel to each other and perpendicular to the plane at two mobile jib places, between described main vertical rod and two auxiliary vertical rods, weld some pipe links; Weld a cantilever steel girder in the upper end overhanging type of main vertical rod, described electric block is connected on described cantilever steel girder.
4. roofing loop wheel machine according to claim 3, it is characterized in that welding with one end of stirrup respectively on two differing heights of the auxiliary vertical rod of every root, the other end of each stirrup is welded on corresponding mobile jib respectively.
5. roofing loop wheel machine according to claim 4, is characterized in that also welding some connecting rods between two stirrups welding same auxiliary vertical rod.
6. roofing loop wheel machine according to Claims 2 or 3 or 4 or 5, is characterized in that between first connecting rod and second connecting rod, weld the first small rod, welds the second small rod between second connecting rod and third connecting rod.
7. the application of the roofing loop wheel machine as described in claim 1 or 2 or 3 or 4 or 5 in the longitudinal steel beam lifting of roofing span centre, is characterized in that comprising the following steps:
1) form described steel roof joist in roofing assembling to construct unpowered walking loop wheel machine;
2) by cardan wheel by described loop wheel machine horizontal sliding below the roofing column of the longitudinal girder steel of roofing span centre to be installed, and make described roofing column be positioned at the base of the U-shaped framework of described loop wheel machine, rotate the base of described loop wheel machine, make the axis of the vertical concrete beam above base and described roofing column be the angle of 45 ± 20 °;
3) paved by the base of cushion block by described loop wheel machine, make cardan wheel leave flooring plane;
4) above base steel roof joist to be lifted being held on described loop wheel machine;
5) fix at the middle part of the longitudinal girder steel of roofing span centre described to be lifted and fasteningly unload first;
6) the fastening first of unloading at the middle part being positioned at the longitudinal girder steel of roofing span centre to be lifted is docked with the suspension hook of electric block, connect a bearing of body in the air separately at the two ends of the longitudinal girder steel of roofing span centre and control hauling rope;
7) electric block is started, and by pulling two bearing of body in the air to control hauling rope at roofing, what make the longitudinal girder steel of roofing span centre stands to above along the vertical promotion of described roofing column to the pre-embedded bolt exceeding described roofing column upper top, a bearing of body in the air is kept to control the pulling force of hauling rope, after the free end of another root bearing of body in the air control hauling rope is passed from the vertical concrete beam top at the top of described roofing column, controlling hauling rope by this bearing of body in the air of traction again makes the longitudinal girder steel of roofing span centre rotate in the horizontal plane, until the longitudinal girder steel of roofing span centre is vertical with vertical concrete beam,
8) loopback two bearing of body in the air control hauling rope and electric block, bolt hole in the middle part of longitudinal for roofing span centre girder steel is aimed at the pre-embedded bolt of described roofing column upper top, in the bolt hole that pre-embedded bolt is inserted in the middle part of the longitudinal girder steel of roofing span centre, complete the fixed installation of the longitudinal girder steel of roofing span centre and described roofing column immediately;
9) to remove on the longitudinal girder steel of described roofing span centre fastening unloads first, remove after the bearing of body in the air be connected with the two ends of roofing span centre longitudinal direction girder steel controls hauling rope, removes below the base of described loop wheel machine cushion block, removes described loop wheel machine.
8. application according to claim 7, is characterized in that in step 3), and the distance of electric block and load-bearing vertical rod outer side edges is greater than the distance of load-bearing vertical rod outer side edges apart from post angle, roofing column farthest.
CN201510468835.4A 2015-08-04 2015-08-04 Roof crane and application to roof-midspan longitudinal steel beam hoisting Expired - Fee Related CN105084229B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510468835.4A CN105084229B (en) 2015-08-04 2015-08-04 Roof crane and application to roof-midspan longitudinal steel beam hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510468835.4A CN105084229B (en) 2015-08-04 2015-08-04 Roof crane and application to roof-midspan longitudinal steel beam hoisting

Publications (2)

Publication Number Publication Date
CN105084229A true CN105084229A (en) 2015-11-25
CN105084229B CN105084229B (en) 2017-05-17

Family

ID=54565694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510468835.4A Expired - Fee Related CN105084229B (en) 2015-08-04 2015-08-04 Roof crane and application to roof-midspan longitudinal steel beam hoisting

Country Status (1)

Country Link
CN (1) CN105084229B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105110203A (en) * 2015-08-04 2015-12-02 江苏扬州建工建设集团有限公司 Roof crane and application thereof in hoisting roof side-span longitudinal steel beams

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB586486A (en) * 1944-08-09 1947-03-20 Wilson James Portable hydraulic jack crane
CN101927963A (en) * 2009-06-23 2010-12-29 上海海星阀门总厂 Lift-press lock catch foldable crane
CN105110203A (en) * 2015-08-04 2015-12-02 江苏扬州建工建设集团有限公司 Roof crane and application thereof in hoisting roof side-span longitudinal steel beams

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB586486A (en) * 1944-08-09 1947-03-20 Wilson James Portable hydraulic jack crane
CN101927963A (en) * 2009-06-23 2010-12-29 上海海星阀门总厂 Lift-press lock catch foldable crane
CN105110203A (en) * 2015-08-04 2015-12-02 江苏扬州建工建设集团有限公司 Roof crane and application thereof in hoisting roof side-span longitudinal steel beams

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105110203A (en) * 2015-08-04 2015-12-02 江苏扬州建工建设集团有限公司 Roof crane and application thereof in hoisting roof side-span longitudinal steel beams

Also Published As

Publication number Publication date
CN105084229B (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN101537973A (en) Method for continuously hoisting rolling mill housings by hydraulic pushing and lifting
CN115506604B (en) Method for installing first truss of large-span steel structure
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN115583584A (en) Unequal-height double-fulcrum full-rotation type light truss hoisting device and construction method
CN205205685U (en) Span wire pier is function portal device at most
CN103086276B (en) A construction method for hoisting a bridge crane in a high-rise well-tower-type building
CN116853963B (en) A hoisting device and hoisting method for main beam of cable-stayed bridge
CN215055466U (en) Discharging platform for high-rise building
CN111779274A (en) Construction method for integrally lifting temporary hoisting point of large-span unequal-height steel structure net rack
CN213865012U (en) Asymmetric multi-lifting-point balance beam for hoisting module prying block
CN105084229B (en) Roof crane and application to roof-midspan longitudinal steel beam hoisting
CN215717067U (en) Construction platform suitable for concrete composite shear wall structure
CN105110203A (en) Roof crane and application thereof in hoisting roof side-span longitudinal steel beams
CN216515179U (en) Movable trolley for mounting and dismounting bridge guardrail template
CN217102749U (en) Roof large-scale steel beam sliding system
CN215331380U (en) Rail type suspension platform
CN210659321U (en) Trolley structure for binding concrete reinforcing steel bars
CN110469126B (en) Binding trolley for concrete reinforcing steel bars and binding construction method thereof
CN115367616A (en) Furnace shell hoisting device for blast furnace overhaul and installation and use method thereof
CN204980935U (en) Unpowered walking loop wheel machine of roofing girder steel construction
CN206917297U (en) A kind of large-span steel girder upper air installing system in place
CN216235766U (en) High-rise building steel vestibule hoisting device
CN112482241A (en) Walking type hanging bracket for post-pouring section of box girder flange plate and construction method thereof
CN216583828U (en) Combination turnover type vertical steel member mounting platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517