CN105068886A - Disaster backup intelligent switching control method based on GoldenGate - Google Patents

Disaster backup intelligent switching control method based on GoldenGate Download PDF

Info

Publication number
CN105068886A
CN105068886A CN201510458516.5A CN201510458516A CN105068886A CN 105068886 A CN105068886 A CN 105068886A CN 201510458516 A CN201510458516 A CN 201510458516A CN 105068886 A CN105068886 A CN 105068886A
Authority
CN
China
Prior art keywords
goldengate
data
calamity
node host
source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510458516.5A
Other languages
Chinese (zh)
Other versions
CN105068886B (en
Inventor
程永新
林小勇
温伟灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI XINJU NETWORK INFORMATION TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI XINJU NETWORK INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI XINJU NETWORK INFORMATION TECHNOLOGY Co Ltd filed Critical SHANGHAI XINJU NETWORK INFORMATION TECHNOLOGY Co Ltd
Priority to CN201510458516.5A priority Critical patent/CN105068886B/en
Publication of CN105068886A publication Critical patent/CN105068886A/en
Application granted granted Critical
Publication of CN105068886B publication Critical patent/CN105068886B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention discloses a disaster backup intelligent switching control method based on GoldenGate. The method comprises the following steps of deploying GoldedGate software separately on node hosts of a source terminal and a disaster backup target terminal to perform data synchronous backup; before each switching, stopping RAC monitoring at the source terminal, acquiring an SPID of each example on the node hosts of the source terminal and the disaster backup target terminal, and automatically generating a KILL script to stop the SPID of each example; performing cyclic detection on the node host of the source terminal and stopping an extraction process and a delivery process; starting a reversely synchronous duplication process on the node host of the source terminal; performing cyclic detection on the duplication process on the node host of the target terminal, stopping a forwardly synchronous duplication process, and starting a reversely synchronous extraction process; and finally, starting the delivery process on the node host of the target terminal. Not only is the disaster backup intelligent switching control method based on GoldenGate safe and reliable and data loss is effectively avoided, but also the switching can be completed within a short time, so that time for production stop is greatly reduced.

Description

Calamity based on GoldenGate cuts control method for intelligence
Technical field
The present invention relates to a kind of database main preparation system changing method, particularly relate to a kind of calamity based on GoldenGate and cut control method for intelligence.
Background technology
When daily servicing GOLDENGATE disaster recovery and backup systems (two ends are all ORACLE databases), whether what often will check between production system (source) with disaster recovery and backup systems (destination end) is synchronous normal, whether data syn-chronization is consistent, two ends are all consistent, could maintenance business produce efficiently.Verify it is that most is convictive by the switching to production system and disaster recovery and backup systems, switchback, but often manually carry out switching, switchback, need the time of operation long, reach more than 30min, the business that has a strong impact on is produced.
The subject matter of existing manual switching is as follows: one, operated by manpower intervention, operating process and step more, and easily make mistakes, the time once switched is longer; Two, manual switching due to blocked operation flow process improper, or check not in place, easily occur loss of data; Three, a stock switches when Multi-instance, and complicacy increases; Four, often also have data to revise in source after having switched, application program stops thorough not, makes synchronously going wrong between production system with disaster recovery and backup systems.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of calamity based on GoldenGate and cuts control method for intelligence, not only safe and reliable, effectively avoids loss of data, and can complete switching at short notice, and the business that substantially reduces stops the time of producing.
The present invention solves the problems of the technologies described above the technical scheme adopted to be to provide a kind of calamity based on GoldenGate and to cut control method for intelligence, comprises the steps: S1: carry out data syn-chronization backup in source and calamity for the node host of destination end being disposed respectively GoldenGate software; S2: before each switching, stops Real Application Clusters monitoring in source, avoids application system to be connected in example; S3: obtain source and the calamity SPID for example each on the node host of destination end, and automatically generate the SPID that KILL script stops each example, disconnect session, ensure inert business process in example; S4: detect extraction process in the cocycle of source end node main frame, to judge whether data pick-up all completes, completes and then stops extraction process; S5: deliver process in source end node main frame cycle detection, to judge whether data delivery all completes, completes and then stops delivery process; S6: at the duplicating process of source end node host-initiated reverse sync, and get out the data receiving reverse sync in advance; S7: at destination end node host cycle detection duplicating process, to judge whether data Replica all completes, complete the duplicating process then stopping forward synchronous, and peek starts the extraction process of reverse sync from current time; S8: finally start delivery process on destination end node host.
The above-mentioned calamity based on GoldenGate cuts control method for intelligence, wherein, after the duplicating process of described source end node host-initiated reverse sync, also start AEXTCHK detecting process, to extract the data that GoldenGate produces synchronously, the deposit data extracted, in this locality, determines whether by data syn-chronization to destination end according to user's request again, avoids loss of data.
The above-mentioned calamity based on GoldenGate cuts control method for intelligence, wherein, if source and calamity exist Multi-instance on the node host of destination end, then each by script execution switching example.
The above-mentioned calamity based on GoldenGate cuts control method for intelligence, wherein, GoldenGate in described step S1 on source end node main frame utilizes extraction process and database journal to obtain the increment change of data, incremental data is converted into GoldenGate form and after adopting the compressibility compressing data of 10:1, utilize delivery process on disaster tolerance link directly by TCP/IP Internet Transmission to calamity for destination end node host; GoldenGate on described destination end node host, by transaction restructuring, loads the speed accelerating data delivery and efficiency in batches, realizes copying of incremental data in submicrosecond level.
The above-mentioned calamity based on GoldenGate cuts control method for intelligence, wherein, in described step S7, destination end node host obtains calamity No. SCN of finally applying for destination end, inquire about this No. SCN corresponding time point, and peek starts the extraction process of reverse sync from this time point.
The present invention contrasts prior art following beneficial effect: the calamity based on GoldenGate provided by the invention cuts control method for intelligence, not only safe and reliable, effectively avoid loss of data, and switching can be completed at short notice, the business that substantially reduces stops the time of producing, and has robotization, intellectuality, integrality, conforming feature.
Accompanying drawing explanation
Fig. 1 is that the calamity that the present invention is based on GoldenGate cuts control flow schematic diagram for intelligence;
Fig. 2 is that the many examples calamity that the present invention is based on GoldenGate cuts control configuration diagram for intelligence.
Embodiment
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is that the calamity that the present invention is based on GoldenGate cuts control flow schematic diagram for intelligence.
Refer to Fig. 1, the calamity based on GoldenGate provided by the invention cuts control method for intelligence, comprises the steps:
S1: carry out data syn-chronization backup for the node host of destination end being disposed respectively GoldenGate software in source and calamity; GoldenGate on described source end node main frame utilizes extraction process and database journal to obtain the increment change of data, incremental data is converted into GoldenGate form and after adopting the compressibility compressing data of 10:1, utilize delivery process on disaster tolerance link directly by TCP/IP Internet Transmission to calamity for destination end node host; GoldenGate on described destination end node host, by transaction restructuring, loads the speed accelerating data delivery and efficiency in batches, realizes copying of incremental data in submicrosecond level;
S2: before each switching, stops RAC (RealApplicationClusters, Real Application Clusters is monitored) in source, avoids application system to be connected in example;
S3: obtain source and the calamity SPID (SystemProcessID for example each on the node host of destination end, i.e. operating system process ID), and automatically generate the SPID that KILL script stops each example, disconnect session, ensure inert business process in example;
S4: detect extraction process in the cocycle of source end node main frame, to judge whether data pick-up all completes, completes and then stops extraction process;
S5: deliver process in source end node main frame cycle detection, to judge whether data delivery all completes, completes and then stops delivery process;
S6: at the duplicating process of source end node host-initiated reverse sync, and get out the data receiving reverse sync in advance; In order to avoid loss of data, also can start AEXTCHK detecting process in source, with obtain GOLDENGATE synchronous outside the data that produce, object is carried out synchronous in order to other operations produce aborning data still can obtain out;
S7: at destination end node host cycle detection duplicating process, to judge whether data Replica all completes, complete the duplicating process then stopping forward synchronous, and peek starts the extraction process of reverse sync from current time; Destination end node host can obtain No. SCN (SystemChangeNumber) that calamity is finally applied for destination end, inquires about this No. SCN corresponding time point, and peek starts the extraction process of reverse sync from this time point;
S8: finally start delivery process on destination end node host.
Switch for guaranteeing to produce can realize smoothly, rapidly with disaster recovery and backup systems, the present invention can write a set of intelligence and switch script, is deployed in each node, realizes seamless switching.A set of script comprises 8 scripts, and brief introduction is as follows:
Fetch_session_spid.sh: the RAC of many examples, obtain the spid of present node, and generate KILL script;
Fetch_session_spid_other_node.sh: the spid obtaining another node, and generate KILL script;
Kill_session_spid.sh: enter journey script, comprises present node and another node (trusting access by ssh);
Set_env.sh: set, is arranged during each node deployment;
Stop_listener.sh: use srvctl to stop RAC monitoring;
Stop_source_process.sh: detect and stop extracting, delivering process, and start AEXTCHK and extract process, with check whether exist GOLDENGATE synchronous outside operation;
Stop_target_process.sh: detect and stop duplicating process;
Switch_ogg_SZtoBJ.sh: main script, above script all thus script calls.
Concrete implementation method is as follows:
1. forward and reverse synchronized process all configures, and reverse process is in stop state;
2. the process that extracts uses E beginning, and the parameter extracting process can with reference to as follows:
EXTRACTxxxxxx
obey/opt/oracle/product/rdbms/11.2.0/ogg/gg_ddb2_param.oby
EXTTRAIL./dirdat/xxxxxx/ss
TRANLOGOPTIONSLOGRETENTIONDISABLED
TRANLOGOPTIONSBUFSIZE2048000
TRANLOGOPTIONSDBLOGREADER,DBLOGREADERBUFSIZE2048000
TRANLOGOPTIONSALTARCHIVELOGDEST+DGDDB2_2
TRANLOGOPTIONSEXCLUDEUSERGOLDENGATE
DDLINCLUDEMAPPED
DDLOPTIONSADDTRANDATA
CACHEMGRCACHESIZE8192MB
BRBRDIR/opt/oracle/ogg/ggddb,BRINTERVAL4h
DISCARDFILE./dirrpt/xxxxxx.dsc,APPEND,MEGABYTES100
DISCARDROLLOVERAT6:00
REPORTCOUNTEVERY1HOURS,RATE
FETCHOPTIONSMISSINGROWABEND
STATOPTIONSREPORTFETCH
WARNLONGTRANS1H,CHECKINTERVAL10m
DYNAMICRESOLUTION
TABLEOWNER.*;
3. process of delivering uses D beginning, and the parameter of delivering process can with reference to as follows:
extractyyyyyy
passthru
dynamicresolution
rmthost10.254.9.61,mgrport7959,compress
rmttrail/opt/oracle/ogg/ggndb/dirdat/zzzzzz/ss
discardfile./dirrpt/yyyyyy.dsc,append,megabytes1024
discardrolloverat6:00
reportrolloverat6:00
reportcountevery1hours,rate
TABLEowner.*;
4. duplicating process uses R beginning, and the parameter of duplicating process can with reference to as follows:
REPLICATzzzzzz
obey/opt/oracle/product/rdbms/11.2.0/ogg/gg_ndb2_param.oby
assumetargetdefs
SQLEXEC"ALTERSESSIONSETCOMMIT_WRITE=NOWAIT"
SQLEXEC"ALTERSESSIONSETCONSTRAINTS=DEFERRED"
DBOPTIONSDEFERREFCONST
DBOPTIONSSUPPRESSTRIGGERS
--aaaa
--bbbb
--cccc
--dddd
DISCARDFILE./dirrpt/zzzzzz.dsc,APPEND,MEGABYTES1024
DISCARDROLLOVERAT6:00
reperror(default,abend)
reperror(24344,discard)
DDLINCLUDEMAPPED
DDLOPTIONSREPORT
REPORTROLLOVERAT6:00
REPORTCOUNTEVERY1HOURS,RATE
NUMFILES150
APPLYNOOPUPDATES
GROUPTRANSOPS1000
batchsqlopsperqueue5000,opsperbatch5000
MAPOWNER.*,TARGETOWNER.*;
5. usage data pump or other modes do the initialization of full dose data;
6. increase AEXTCHK in destination end and extract process, check whether except OGG synchronously except operation;
7. the configuration of reverse sync and aforesaid way are roughly the same;
8. intelligence is switched script to dispose in each node, advise that the path of each node is consistent;
9. in set_env.sh, configure environmental variance, the configuration on each node may be different;
10. before switching, first check whether data synchronously complete, handoff procedure script is understood and oneself is gone to judge, if synchronously do not complete, so its can cycle criterion, until data syn-chronization completes;
11. use root user to perform script: shswitch_ogg_SZtoBJ.sh $ ORACLE_SID.
If source and calamity exist Multi-instance on the node host of destination end, then at every turn perform switching example by script, adopt above-mentioned script executive mode, can complete switching at short notice, about 1 minute, the business that substantially reduces stops the time of producing.Please continue see Fig. 2, assumptions' environment is as follows: 1. production system is the RAC of two nodes, and server, in Shenzhen, each node exists four examples; 2. disaster recovery and backup systems are RAC of two nodes, and server, in Beijing, each node exists four examples; 3. be the data syn-chronization realized by GOLDENGATE between production system and disaster recovery and backup systems.After adopting control method of the present invention, any one node in any one and disaster recovery and backup systems of production system, all can realize switching and switchback; Any one example in system, is all realized by a set of script.Suppose that the service connection of dba is in Shenzhen, so, perform shswitch_ogg_SZtoBJ.shdba1 and database can be switched to Beijing end, now, service connection can use to Beijing end.
Calamity based on GoldenGate provided by the invention cuts control method for intelligence, not only safe and reliable, effectively avoid loss of data, and switching can be completed at short notice, the business that substantially reduces stops the time of producing, and has robotization, intellectuality, integrality, conforming feature.Concrete advantage is as follows: robotization: each switching example, only need execution script, all working completes all automatically.Intelligent: the switching that can be realized a storehouse Multi-instance by configuration parameter file set_env.sh, substantially increases transportable property simultaneously, when other storehouses using this switch script, only need configure set_env.sh Parameter File.Integrality: whole switching flow, it is thorough to consider, from monitoring, process, extraction, delivers, copies and all take into account, and also uses to add AEXTCHK and extract process simultaneously, with obtain group GOLDENGATE synchronous outside the data that produce.Consistance: the entire work flow that script switches is complete, so can guarantee that data syn-chronization is consistent, synchronously, after switching if occur, also have data to produce in source, so also obtain these data by AEXTCHK process, therefore improve the guarantee of data consistency.
Although the present invention discloses as above with preferred embodiment; so itself and be not used to limit the present invention, any those skilled in the art, without departing from the spirit and scope of the present invention; when doing a little amendment and perfect, therefore protection scope of the present invention is when being as the criterion of defining with claims.

Claims (5)

1. the calamity based on GoldenGate cuts a control method for intelligence, it is characterized in that, comprises the steps:
S1: carry out data syn-chronization backup for the node host of destination end being disposed respectively GoldenGate software in source and calamity;
S2: before each switching, stops Real Application Clusters monitoring in source, avoids application system to be connected in example;
S3: obtain source and the calamity SPID for example each on the node host of destination end, and automatically generate the SPID that KILL script stops each example, disconnect session, ensure inert business process in example;
S4: detect extraction process in the cocycle of source end node main frame, to judge whether data pick-up all completes, completes and then stops extraction process;
S5: deliver process in source end node main frame cycle detection, to judge whether data delivery all completes, completes and then stops delivery process;
S6: at the duplicating process of source end node host-initiated reverse sync, and get out the data receiving reverse sync in advance;
S7: at destination end node host cycle detection duplicating process, to judge whether data Replica all completes, complete the duplicating process then stopping forward synchronous, and peek starts the extraction process of reverse sync from current time;
S8: finally start delivery process on destination end node host.
2. cut control method based on the calamity of GoldenGate for intelligence as claimed in claim 1, it is characterized in that, after the duplicating process of described source end node host-initiated reverse sync, also start AEXTCHK extraction process for subsequent use, to extract the data that GoldenGate produces synchronously, the deposit data extracted, in this locality, determines whether by data syn-chronization to destination end according to user's request again, avoids loss of data.
3. cut control method based on the calamity of GoldenGate for intelligence as claimed in claim 1, it is characterized in that, if source and calamity exist Multi-instance on the node host of destination end, then each by script execution switching example.
4. cut control method based on the calamity of GoldenGate for intelligence as claimed in claim 1, it is characterized in that, GoldenGate in described step S1 on source end node main frame utilizes extraction process and database journal to obtain the increment change of data, incremental data is converted into GoldenGate form and after adopting the compressibility compressing data of 10:1, utilize delivery process on disaster tolerance link directly by TCP/IP Internet Transmission to calamity for destination end node host; GoldenGate on described destination end node host, by transaction restructuring, loads the speed accelerating data delivery and efficiency in batches, realizes copying of incremental data in submicrosecond level.
5. cut control method based on the calamity of GoldenGate for intelligence as claimed in claim 1, it is characterized in that, No. SCN that in described step S7, destination end node host acquisition calamity is finally applied for destination end, inquire about this No. SCN corresponding time point, and peek starts the extraction process of reverse sync from this time point.
CN201510458516.5A 2015-07-30 2015-07-30 The standby intelligence of calamity based on GoldenGate cuts control method Active CN105068886B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510458516.5A CN105068886B (en) 2015-07-30 2015-07-30 The standby intelligence of calamity based on GoldenGate cuts control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510458516.5A CN105068886B (en) 2015-07-30 2015-07-30 The standby intelligence of calamity based on GoldenGate cuts control method

Publications (2)

Publication Number Publication Date
CN105068886A true CN105068886A (en) 2015-11-18
CN105068886B CN105068886B (en) 2018-03-30

Family

ID=54498263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510458516.5A Active CN105068886B (en) 2015-07-30 2015-07-30 The standby intelligence of calamity based on GoldenGate cuts control method

Country Status (1)

Country Link
CN (1) CN105068886B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105867978A (en) * 2016-04-11 2016-08-17 平安科技(深圳)有限公司 OGG version deployment method and system
CN106209451A (en) * 2016-07-08 2016-12-07 深圳前海微众银行股份有限公司 DCN changing method and system
CN106603640A (en) * 2016-12-05 2017-04-26 北京中交兴路信息科技有限公司 Data synchronizing method and device
CN106649577A (en) * 2016-11-17 2017-05-10 杭州沃趣科技股份有限公司 Method for detecting running state of synchronous software of Oracle database
CN111966530A (en) * 2020-07-21 2020-11-20 招联消费金融有限公司 Disaster recovery switching method and device for application system, computer equipment and storage medium
CN112764967A (en) * 2020-12-29 2021-05-07 中国人寿保险股份有限公司上海数据中心 ORACLE database system, DataGuard environment deployment method and database switching method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101212458A (en) * 2006-12-25 2008-07-02 中兴通讯股份有限公司 Database system backup method
US20080195672A1 (en) * 2002-05-09 2008-08-14 International Business Machines Corporation System and program product for sequential coordination of external database application events with asynchronous internal database events
US20130085998A1 (en) * 2011-10-04 2013-04-04 Nec Laboratories America, Inc. Latency-aware live migration for multitenant database platforms
CN104346454A (en) * 2014-10-30 2015-02-11 上海新炬网络技术有限公司 Data consistency verification method based on Oracle database

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080195672A1 (en) * 2002-05-09 2008-08-14 International Business Machines Corporation System and program product for sequential coordination of external database application events with asynchronous internal database events
CN101212458A (en) * 2006-12-25 2008-07-02 中兴通讯股份有限公司 Database system backup method
US20130085998A1 (en) * 2011-10-04 2013-04-04 Nec Laboratories America, Inc. Latency-aware live migration for multitenant database platforms
CN104346454A (en) * 2014-10-30 2015-02-11 上海新炬网络技术有限公司 Data consistency verification method based on Oracle database

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105867978A (en) * 2016-04-11 2016-08-17 平安科技(深圳)有限公司 OGG version deployment method and system
WO2017177769A1 (en) * 2016-04-11 2017-10-19 平安科技(深圳)有限公司 Ogg version deployment method and system, server, and storage medium
CN105867978B (en) * 2016-04-11 2018-12-11 平安科技(深圳)有限公司 OGG version dispositions method and system
CN106209451A (en) * 2016-07-08 2016-12-07 深圳前海微众银行股份有限公司 DCN changing method and system
CN106209451B (en) * 2016-07-08 2019-08-20 深圳前海微众银行股份有限公司 DCN switching method and system
CN106649577A (en) * 2016-11-17 2017-05-10 杭州沃趣科技股份有限公司 Method for detecting running state of synchronous software of Oracle database
CN106649577B (en) * 2016-11-17 2020-02-07 杭州沃趣科技股份有限公司 Method for detecting running state of synchronous software of Oracle database
CN106603640A (en) * 2016-12-05 2017-04-26 北京中交兴路信息科技有限公司 Data synchronizing method and device
CN111966530A (en) * 2020-07-21 2020-11-20 招联消费金融有限公司 Disaster recovery switching method and device for application system, computer equipment and storage medium
CN112764967A (en) * 2020-12-29 2021-05-07 中国人寿保险股份有限公司上海数据中心 ORACLE database system, DataGuard environment deployment method and database switching method
CN112764967B (en) * 2020-12-29 2023-11-14 中国人寿保险股份有限公司上海数据中心 ORACLE database system, database environment deployment method and database switching method

Also Published As

Publication number Publication date
CN105068886B (en) 2018-03-30

Similar Documents

Publication Publication Date Title
CN105068886A (en) Disaster backup intelligent switching control method based on GoldenGate
CN102769626B (en) A kind of session information synchronous method, device and system
KR101904786B1 (en) Apparatus and method for replicating changed data in a source database management system to a target database management system in real time
WO2017219557A1 (en) Data transmission method and data transmission apparatus
CN103020242B (en) Based on the method for data synchronization of oracle database
CN105162855A (en) Incremental data synchronization method and device
WO2021057438A1 (en) Main/standby switching method and apparatus, bras device, and storage medium
CN105354108A (en) Data backup method and node
CN108897641B (en) Log analysis service real-time synchronization system under database master-slave environment
CN104954153A (en) Method and device for node fault detection
CN103532753A (en) Double-computer hot standby method based on memory page replacement synchronization
CN102223378B (en) File synchronization method and system
CN104954101A (en) Multi-terminal data synchronization method based on ACK synchronization
CN102289469A (en) Method for supporting universal database to synchronize data based on physical isolating equipment
CN107104822B (en) Server disaster recovery processing method and device, storage medium and electronic equipment
CN105956207A (en) Binlog-based configurable mysql database real-time synchronization method
CN102355371A (en) Implementation method for dual hot redundancy of splicing wall control system
CN105049263A (en) Data processing method and data processing system
CN102710356B (en) A kind of real time redundancy master station data synchronization method
CN104504172A (en) Main-standby scheduling model data synchronization method for electricity SCADA (supervisory control and data acquisition) system
CN111200524B (en) Switch configuration method and server
CN102819252B (en) Method for realizing multi-redundancy of process control station in distributed control system
CN103530205A (en) Method and device for processing fault duplicate in multiple duplicates
CN103888283A (en) SCTP communication method and device
CN108600004B (en) Video server configuration management method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Qingpu 201707 waiqingsong road Shanghai City, No. 588 Lane 7548 Building 1 R zone 1 room 113

Applicant after: Shanghai new torch network information technology Limited by Share Ltd

Address before: 200063 Shanghai, Zhongshan North Road, No. 2000, building, building No. 3, B

Applicant before: SHANGHAI XINJU NETWORK INFORMATION TECHNOLOGY CO., LTD.

GR01 Patent grant
GR01 Patent grant