CN105064697A - Roof grid elevating method - Google Patents
Roof grid elevating method Download PDFInfo
- Publication number
- CN105064697A CN105064697A CN201510420050.XA CN201510420050A CN105064697A CN 105064697 A CN105064697 A CN 105064697A CN 201510420050 A CN201510420050 A CN 201510420050A CN 105064697 A CN105064697 A CN 105064697A
- Authority
- CN
- China
- Prior art keywords
- lifting
- rod
- lift unit
- place
- roof grid
- Prior art date
Links
- 230000003028 elevating Effects 0.000 title abstract 5
- 238000009434 installation Methods 0.000 claims description 8
- 239000000725 suspensions Substances 0.000 claims description 6
- 239000010410 layers Substances 0.000 claims description 3
- 230000001737 promoting Effects 0.000 claims description 3
- 230000003014 reinforcing Effects 0.000 claims description 3
- 238000000034 methods Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 238000007689 inspection Methods 0.000 abstract 1
- 238000010586 diagrams Methods 0.000 description 5
- 238000005516 engineering processes Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000002349 favourable Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Abstract
Description
Technical field:
The present invention relates to a kind of roof grid structure method for improving.
Background technology:
In engineer operation, large for span, highly high building, building lifting platform is one of first-selection of convenient construction, and suitable lifting platform must take into account cost, safety and easy construction.
Summary of the invention:
In order to solve the problem existing for background technology, the present invention is by the following technical solutions:
A kind of roof grid structure method for improving, comprises the steps:
(1) structure ± roof grid structure lift unit is assemblied into entirety by 0.000 absolute altitude place, only assembled design elevation place and with the rod member of upper part of truss place, gate, utilize space truss structure post that lifting platform is set, and between structural column and falsework, set up 5 groups of connecting rods, hydraulic synchronizing lifting system is installed;
(2) hydraulic synchronizing lifting system is debugged, and check lift unit and promote temporary measure whether meet design requirement, confirm errorless after start examination promote, after utilizing hydraulic synchronizing lifting system that roof grid structure lift unit Integral lifting is about 150mm, suspend promote;
(3) leave standstill after 12 hours, again check lift unit and promote temporary measure whether meet design requirement, confirm errorless after utilize hydraulic synchronizing lifting system that roofing lift unit Integral lifting is about 7.0m after, suspend and promote and start gate truss the latter half structure (design elevation sentences the rod member of lower part) is installed, and the lifting at truss place, gate interim ball and reinforcing rod member are replaced to lower edge layer plane;
(4), after utilizing hydraulic synchronizing lifting system that roofing lift unit is overall increased to design elevation, install and the rear dress rod member at the bearing place of suspension centre and the rear dress rod member at truss place, gate are not set;
(5) after installation, remove after the release of hydraulic synchronizing lifting system level, the rear dress rod member being provided with the bearing place promoting suspension centre is installed, complete the installation work of roof grid structure.
It is low that the present invention has installation cost, the advantage that efficiency of construction is high, and operation platform is safe and reliable, greatly reduces installation difficulty, all favourable in quality, safety and duration etc.
Accompanying drawing illustrates:
Fig. 1 is step (1) schematic diagram;
Fig. 2 is step (2) schematic diagram;
Fig. 3 is step (3) schematic diagram;
Fig. 4 is step (4) schematic diagram;
Fig. 5 is step (5) schematic diagram.
Detailed description of the invention:
For certain experiment hall engineering, engineering design absolute altitude is 28.300m, and truss place, gate absolute altitude is 20.300m:
A kind of roof grid structure method for improving, comprises the steps:
(1) structure ± roof grid structure lift unit 1 is assemblied into entirety by 0.000 absolute altitude place, truss place, gate is assembled+28.300m and the rod member with upper part only, utilize space truss structure post 2 that lifting platform 3 is set, and between structural column 2 and falsework 4, set up 5 groups of connecting rods 5, install hydraulic synchronizing lifting system (comprise hydraulic rockshaft 6, be connected with lifting platform by special-purpose steel twisted wire 73 interim ball 8 etc.);
(2) check roof grid structure lift unit 1 and promote temporary measure and whether meet designing requirement, after confirming to meet designing requirement, hydraulic pressure lift synchro system takes the method for hierarchical loading to carry out prestrain, namely load successively with the order of design lifting force 20%, 40%, 60%, 70%, 80%, 90%, 95%, 100%, until rack lift unit 1 departs from assembled moulding bed 10 and promotes about 150mm, suspend and promote;
(3) leave standstill after 12 hours, again check lift unit 1 and promote temporary measure whether meet design requirement, confirm errorless after utilize hydraulic synchronizing lifting system that roofing lift unit 1 Integral lifting is about 7.0m after, suspend and promote and start gate truss the latter half structure (+28.300m is with the rod member of lower part) is installed, and the lifting at truss place, gate interim ball 8 and reinforcing rod member 9 are replaced to lower edge layer plane;
(4), after utilizing hydraulic synchronizing lifting system that roofing lift unit 1 is overall increased to+28.300m, install and the rear dress rod member at the bearing place of suspension centre and the rear dress rod member at truss place, gate are not set;
(5) after installation, remove after the release of hydraulic synchronizing lifting system level, the rear dress rod member being provided with the bearing place promoting suspension centre is installed, complete the installation work of roof grid structure.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510420050.XA CN105064697A (en) | 2015-07-15 | 2015-07-15 | Roof grid elevating method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510420050.XA CN105064697A (en) | 2015-07-15 | 2015-07-15 | Roof grid elevating method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105064697A true CN105064697A (en) | 2015-11-18 |
Family
ID=54494182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510420050.XA CN105064697A (en) | 2015-07-15 | 2015-07-15 | Roof grid elevating method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105064697A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532767A (en) * | 2018-05-09 | 2018-09-14 | 中建七局安装工程有限公司 | Lifting construction method after space Reticulated dome is first pushed up by ring expansion |
CN110185151A (en) * | 2019-05-22 | 2019-08-30 | 三箭建设工程集团有限公司 | More hydraulic device synchronization of jacking up construction methods of wide span steel roof frame |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04111829A (en) * | 1990-08-30 | 1992-04-13 | Shimizu Corp | Method for constructing large-span roof |
JPH04161566A (en) * | 1990-10-24 | 1992-06-04 | Tokyu Constr Co Ltd | Constructing apparatus for large space building |
CN103075016A (en) * | 2013-01-22 | 2013-05-01 | 北京工业大学 | Installing method of extendable latticed shell structure |
CN103225408A (en) * | 2013-04-18 | 2013-07-31 | 成军 | Construction method for long-span net rack multiple-mast independent type integral lifting |
CN104389433A (en) * | 2014-10-21 | 2015-03-04 | 北京建工土木工程有限公司 | Integral hoisting system and construction method for steel truss support concrete heavy roof system |
-
2015
- 2015-07-15 CN CN201510420050.XA patent/CN105064697A/en not_active Application Discontinuation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04111829A (en) * | 1990-08-30 | 1992-04-13 | Shimizu Corp | Method for constructing large-span roof |
JPH04161566A (en) * | 1990-10-24 | 1992-06-04 | Tokyu Constr Co Ltd | Constructing apparatus for large space building |
CN103075016A (en) * | 2013-01-22 | 2013-05-01 | 北京工业大学 | Installing method of extendable latticed shell structure |
CN103225408A (en) * | 2013-04-18 | 2013-07-31 | 成军 | Construction method for long-span net rack multiple-mast independent type integral lifting |
CN104389433A (en) * | 2014-10-21 | 2015-03-04 | 北京建工土木工程有限公司 | Integral hoisting system and construction method for steel truss support concrete heavy roof system |
Non-Patent Citations (2)
Title |
---|
178288706LIN: "网架提升施工方案", 《百度文库HTTP://WENKU.BAIDU.COM/LINK?URL=DAAGA6EZIFWOGQXYU-U5MI_H2GFIPZCNUZX889YKR9QZEKW-OIYO0KIU_CDTLDKFYFONT0_J88ST9AEBTSED4OWG-GGVXJSE0GKLWORPNEI》 * |
邹森: "网架结构的整体提升技术研究与应用", 《中国学位论文全文数据库》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532767A (en) * | 2018-05-09 | 2018-09-14 | 中建七局安装工程有限公司 | Lifting construction method after space Reticulated dome is first pushed up by ring expansion |
CN110185151A (en) * | 2019-05-22 | 2019-08-30 | 三箭建设工程集团有限公司 | More hydraulic device synchronization of jacking up construction methods of wide span steel roof frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204019700U (en) | Stair prefabricated components mould | |
CN101672011B (en) | Steel tube arch rib vertical lifting method | |
CN104141383B (en) | A kind of Bailey beam pendent form support system and construction thereof | |
CN103821376B (en) | Single-layer latticed shell high-altitude oblique rail accumulation slippage construction | |
CN102108786B (en) | Overall lifting construction method of ultra-large type building member and device thereof | |
CN103243930B (en) | System and method for modularized construction of super high-rise steel structures | |
CN102936962A (en) | Construction method of slanting cantilever steel structure supported by temporary steel frame | |
CN204024676U (en) | A kind of novel tunnel concrete steel form carrier | |
CN104099871A (en) | Arching structure of high large-span bridge bailey beams and construction method thereof | |
CN103991773A (en) | Design and installation method of assembly-type modularized steel structure elevator shaft | |
CN103306208A (en) | Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier | |
CN103075025A (en) | Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building | |
CN103195256B (en) | Hanging column type steel structure jig frame construction method | |
CN203947771U (en) | A kind of Bailey beam pendent form support system | |
CN103669885B (en) | Super-span steel truss sections hoisting | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN104675125A (en) | Large-span roof high bracket supporting system with inclination angle and slide moving construction method thereof | |
CN105672665B (en) | A kind of large-span double-layer cylindrical reticulated shell installation method | |
CN104018434B (en) | The replacing options of architectural vibration-insulation rubber supporting seat | |
CN103437563B (en) | A kind of mounting method for large steel-strctrue building steel frame | |
CN103030061A (en) | Circular ring lifting tool based on satellite bearing cylinder lifting | |
CN102926546A (en) | Installation method of inclined net rack of roof | |
CN103205526A (en) | Pushing installation method for large converter | |
CN105544984A (en) | Large-span steel structure jig frame integrity slip construction process | |
CN101294443A (en) | High altitude platform mounting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151118 |
|
WD01 | Invention patent application deemed withdrawn after publication |