CN105063328A CN201510559230.6A CN201510559230A CN105063328A CN 105063328 A CN105063328 A CN 105063328A CN 201510559230 A CN201510559230 A CN 201510559230A CN 105063328 A CN105063328 A CN 105063328A
Authority
CN
China
Prior art keywords
axletree
temperature
axle
normalizing
soaking time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510559230.6A
Other languages
Chinese (zh)
Inventor
白翔宇
钱胜峰
王勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Changchun Railway Vehicles Co Ltd
Original Assignee
Changchun Railway Vehicles Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Railway Vehicles Co Ltd filed Critical Changchun Railway Vehicles Co Ltd
Priority to CN201510559230.6A priority Critical patent/CN105063328A/en
Publication of CN105063328A publication Critical patent/CN105063328A/en
Pending legal-status Critical Current

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention provides a DZ1 1 axle heat treatment technique, relating to the technical field of treatment techniques of motor train unit axles. The heat treatment technique comprises the following steps: carrying out primary normalizing, secondary normalizing, quenching and tempering on the axle to complete the heat treatment on the DZ1 axle. The heat treatment technique can be utilized to produce the acceptable axle product which satisfies the specifications in [2013]49 200-250km/h Motor Train Unit Axle Trial Technical Conditions (Temporary), and fills up the blank in the national DZ1 axle heat treatment technique.

Description

DZ1 axletree thermal treatment process
Technical field
The present invention relates to motor train unit train axletree treatment process technical field, be specifically related to a kind of DZ1 axletree thermal treatment process.
Background technology
Motor train unit train axletree is very important parts in EMUs EEF bogie, but the CRH1 that China runs now, CRH2, what CRH3 and CRH5 type motor train unit shaft material all adopted is imported materials and items, major part adopts steel alloy, and train of high-speed motor train unit axletree standard is also adopt external relevant criterion.
In order to accelerate the progress of motor train unit accessory technology production domesticization, in August, 2012, taken the lead by Metals & Chemistry Research Institute, integrated steel mill and axletree production unit have carried out subject study to axle of motor train unit technological standard, and have issued No. [2013] 49, scientific and technological dress letter " speed per hour 200 ~ 250 kilometer motor vehicle group axletree trial-manufacture technology condition (provisional) " in September, 2013.
Axletree Main Mechanical index in " speed per hour 200-250 kilometer motor vehicle group axletree trial-manufacture technology condition (provisional) " after thermal treatment is as follows:
The metallographic structure of thermal treatment axletree is the ferritic structure of bainite+martensitic tempered structure and a small amount of (being not more than 5%), and should be shown as uniform fine grain structure in whole detection faces, and grain fineness number should be not less than 6 grades, is differentially less than 2 grades.
The material great majority of current overseas high speed EMUs axle steel adopt EA4T, and perform European standard EN13261, thermal treatment process is quenching+high tempering (modified).EA4T axle steel thermal treatment process is adopted to carry out technological test to DZ1 material axletree, test-results can not meet " speed per hour 200-250 kilometer motor vehicle group axletree trial-manufacture technology condition (provisional) ", in metallographic structure after axletree thermal treatment, ferrite content is greater than 5%, overproof.
Summary of the invention
In order to solve prior art exist axletree thermal treatment after cause the underproof technical problem of product because ferrite content is higher, the invention provides a kind of DZ1 axletree thermal treatment process.
The technical scheme that technical solution problem of the present invention is taked is as follows:
DZ1 axletree thermal treatment process, comprises the steps:
The first step, temperature is put into the continuous normalizing furnace of stepped start-stop system lower than the axletree of 500 DEG C, a normalizing and secondary normalizing process are carried out to axletree, one time normalizing holding temperature is 880 DEG C ± 10 DEG C, soaking time is 3.6 ~ 4.0h, secondary normalizing holding temperature 790 DEG C ± 10 DEG C, soaking time is 3.6 ~ 4.0h, and step duration is 9 minutes, and axletree carries out forced air cooling process after coming out of the stove;
Second step, the temperature after the first step process is put into well formula gas heating furnace lower than the axletree of 200 DEG C, every stove dress number of axle is not more than 6, carry out Quench heating process to axletree, quenching and preserving heat temperature is 890 DEG C ± 10 DEG C, and soaking time is 4.5 ~ 5.0h; Put into tank water-cooled after axletree Quench heating completes fast 30 minutes, in Cooling Process, axletree needs to swing, and cooling tank water temperature controls at 15 ~ 40 DEG C;
3rd step, the temperature after second step process is put into electric pit-type heating furnace lower than the axletree of 200 DEG C, every stove dress number of axle is not more than 6, and carry out tempering heat treated to axletree, tempering holding temperature is 650 DEG C ± 10 DEG C, and soaking time is 6 ~ 6.5h; Axletree tempering has been heated rear employing air cooling mode and has been carried out cooling process, and then completes DZ1 axletree thermal treatment process.
The invention has the beneficial effects as follows: the qualified axletree product meeting science and technology dress No. [2013] 49, letter " speed per hour 200 ~ 250 kilometer motor vehicle group axletree trial-manufacture technology condition (provisional) " and specify can be produced by this thermal treatment process, fill up the blank of domestic DZ1 material axletree thermal treatment process, lay a good foundation for my company enters axle of motor train unit market, also for the production domesticization of motor train unit accessory product is laid a good foundation.
Embodiment
Below in conjunction with embodiment, the present invention is described in further details.
DZ1 axletree thermal treatment process of the present invention comprises the steps:
The first step, temperature is put into the continuous normalizing furnace of stepped start-stop system lower than the axletree of 500 DEG C, a normalizing and secondary normalizing process are carried out to axletree, one time normalizing holding temperature is 880 DEG C ± 10 DEG C, soaking time is 3.6 ~ 4.0h, secondary normalizing holding temperature 790 DEG C ± 10 DEG C, soaking time is 3.6 ~ 4.0h, and step duration is 9 minutes, and axletree carries out forced air cooling process after coming out of the stove;
Second step, the temperature after the first step process is put into well formula gas heating furnace lower than the axletree of 200 DEG C, every stove dress number of axle is not more than 6, carry out Quench heating process to axletree, quenching and preserving heat temperature is 890 DEG C ± 10 DEG C, and soaking time is 4.5 ~ 5.0h; Put into tank water-cooled after axletree Quench heating completes fast 30 minutes, in Cooling Process, axletree needs to swing, and cooling tank water temperature controls at 15 ~ 40 DEG C;
3rd step, the temperature after second step process is put into electric pit-type heating furnace lower than the axletree of 200 DEG C, every stove dress number of axle is not more than 6, and carry out tempering heat treated to axletree, tempering holding temperature is 650 DEG C ± 10 DEG C, and soaking time is 6 ~ 6.5h; Axletree tempering has been heated rear employing air cooling mode and has been carried out cooling process, and then completes DZ1 axletree thermal treatment process.
Adopt thermal treatment process of the present invention, will by the full special steel in north, Taiyuan Iron and Steel Co., the CRH3 type axle of motor train unit volume that the blank of Ma Gangsan producer is forged is a stove, carry out same furnace treatment reason, then three producer's blank axletrees are all sampled and carried out test load-efficiency, test-results shows: the mechanical property of three producer's blank axletrees, metallographic structure and grain fineness number all meet the requirement of science and technology dress No. [2013] 49, letter " speed per hour 200 ~ 250 kilometer motor vehicle group axletree trial-manufacture technology condition (provisional) ", the underproof difficult problem of product is caused because ferrite content is higher after successfully solving axletree thermal treatment.

Claims (1)

1.DZ1 axletree thermal treatment process, is characterized in that, this technique comprises the steps:
The first step, temperature is put into the continuous normalizing furnace of stepped start-stop system lower than the axletree of 500 DEG C, a normalizing and secondary normalizing process are carried out to axletree, one time normalizing holding temperature is 880 DEG C ± 10 DEG C, soaking time is 3.6 ~ 4.0h, secondary normalizing holding temperature 790 DEG C ± 10 DEG C, soaking time is 3.6 ~ 4.0h, and step duration is 9 minutes, and axletree carries out forced air cooling process after coming out of the stove;
Second step, the temperature after the first step process is put into well formula gas heating furnace lower than the axletree of 200 DEG C, every stove dress number of axle is not more than 6, carry out Quench heating process to axletree, quenching and preserving heat temperature is 890 DEG C ± 10 DEG C, and soaking time is 4.5 ~ 5.0h; Put into tank water-cooled after axletree Quench heating completes fast 30 minutes, in Cooling Process, axletree needs to swing, and cooling tank water temperature controls at 15 ~ 40 DEG C;
3rd step, the temperature after second step process is put into electric pit-type heating furnace lower than the axletree of 200 DEG C, every stove dress number of axle is not more than 6, and carry out tempering heat treated to axletree, tempering holding temperature is 650 DEG C ± 10 DEG C, and soaking time is 6 ~ 6.5h; Axletree tempering has been heated rear employing air cooling mode and has been carried out cooling process, and then completes DZ1 axletree thermal treatment process.
CN201510559230.6A 2015-09-06 2015-09-06 DZ1 axle heat treatment technique Pending CN105063328A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510559230.6A CN105063328A (en) 2015-09-06 2015-09-06 DZ1 axle heat treatment technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510559230.6A CN105063328A (en) 2015-09-06 2015-09-06 DZ1 axle heat treatment technique

Publications (1)

Publication Number Publication Date
CN105063328A true CN105063328A (en) 2015-11-18

Family

ID=54492831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510559230.6A Pending CN105063328A (en) 2015-09-06 2015-09-06 DZ1 axle heat treatment technique

Country Status (1)

Country Link
CN (1) CN105063328A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108823491A (en) * 2018-06-06 2018-11-16 西王金属科技有限公司 A kind of high speed motor car axle steel and its manufacturing method
CN109022744A (en) * 2018-08-03 2018-12-18 中国科学院金属研究所 A kind of high-speed train axle surface modifying method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060006861A (en) * 2006-01-05 2006-01-19 진성중공업 주식회사 The processing apparatus using inducting heating of the part in the main shaft and a method thereof
CN101857914A (en) * 2010-05-24 2010-10-13 清华大学 Heat treatment method for materials of 25CrMo alloy steel hollow car axle for high-speed railway passenger trains
CN102268527A (en) * 2011-08-02 2011-12-07 长春轨道客车装备有限责任公司 Thermal treatment method of AAR (Association of American railroads) F grade axle
CN104233108A (en) * 2014-10-11 2014-12-24 马钢(集团)控股有限公司 Heat-treating process of high-speed train axle containing niobium and titanium
CN104404224A (en) * 2014-12-15 2015-03-11 南车长江车辆有限公司 Heat treatment process method for EA1N-material urban rail car axle

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060006861A (en) * 2006-01-05 2006-01-19 진성중공업 주식회사 The processing apparatus using inducting heating of the part in the main shaft and a method thereof
CN101857914A (en) * 2010-05-24 2010-10-13 清华大学 Heat treatment method for materials of 25CrMo alloy steel hollow car axle for high-speed railway passenger trains
CN102268527A (en) * 2011-08-02 2011-12-07 长春轨道客车装备有限责任公司 Thermal treatment method of AAR (Association of American railroads) F grade axle
CN104233108A (en) * 2014-10-11 2014-12-24 马钢(集团)控股有限公司 Heat-treating process of high-speed train axle containing niobium and titanium
CN104404224A (en) * 2014-12-15 2015-03-11 南车长江车辆有限公司 Heat treatment process method for EA1N-material urban rail car axle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘曙蓉等: "电力机车车轴热处理工艺的研究", 《电力机车与城轨车辆》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108823491A (en) * 2018-06-06 2018-11-16 西王金属科技有限公司 A kind of high speed motor car axle steel and its manufacturing method
CN109022744A (en) * 2018-08-03 2018-12-18 中国科学院金属研究所 A kind of high-speed train axle surface modifying method

Similar Documents

Publication Publication Date Title
CN107988550B (en) Steel for pressurized water reactor nuclear power station pressure vessel support and manufacturing method thereof
CN103343200B (en) Short-process thermal treatment method of large 35CrNi3MoV steel forgings
CN103966411B (en) A kind of manufacture method of medium carbon cold heading steel Bar Wire Product
CN102899460A (en) Heat treatment method for martensitic stainless steel forging module
CN108546878B (en) Steel for supporting thick nuclear power steam generator and production method thereof
CN102021301B (en) Thermal treatment method of high-carbon steel railway wheels
CN103757172A (en) Method for preparing nodular cast iron
CN102560255B (en) High-temperature vacuum carburized gear steel
CN101250665A (en) Method for preparing high-power AC transmission power car axle
CN102534417A (en) High-performance bridge weathering steel containing Mo and preparation method thereof
CN103469092A (en) Production method for main shaft of fan by using 34CrNiMo6 steel as raw material
CN104328359A (en) High-toughness ultrahigh-strength D506A steel easy for rotary extrusion and easy to weld and preparation method thereof
CN109694988A (en) Steel for third-generation pressurized water reactor nuclear power station support hanger and manufacturing method thereof
CN104805258A (en) 42CrMo steel fast spheroidizing annealing method
CN104878296A (en) High vanadium anti-wear alloy material for rolling mill guide roller and rolling mill guide roller heat treatment method
CN106435332A (en) Manufacturing method for 40CrNiMoA medium-carbon alloy steel wind power main shaft of low wind speed wind power unit
CN102560229A (en) Low chrome multielement alloy cast ball and preparing method thereof
CN104018082A (en) Medium-carbon low-alloy wheel steel for metro and manufacturing method of wheel steel
CN103045965A (en) Technique for manufacturing steel plate for 600MPa hydropower steel penstock
CN113802063A (en) Production method of medium-high carbon conditioning-free cold heading steel wire rod
CN101818236B (en) Method for manufacturing high carbon steel wheel
CN105063328A (en) DZ1 axle heat treatment technique
CN101871076A (en) Manufacturing method of 500Mpa-grade cold-rolled magnetic steel
CN104232859A (en) Heat treatment method for GCr15SiMn steel
CN102699645B (en) Isothermal normalizing process for gear of wind driven generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151118

WD01 Invention patent application deemed withdrawn after publication