CN105033517B - Welding machine used for building construction and facilitating unloading of reinforcement cage - Google Patents

Welding machine used for building construction and facilitating unloading of reinforcement cage Download PDF

Info

Publication number
CN105033517B
CN105033517B CN201510468451.2A CN201510468451A CN105033517B CN 105033517 B CN105033517 B CN 105033517B CN 201510468451 A CN201510468451 A CN 201510468451A CN 105033517 B CN105033517 B CN 105033517B
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
arcuate member
muscle
rotating disk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510468451.2A
Other languages
Chinese (zh)
Other versions
CN105033517A (en
Inventor
青志刚
王�锋
李军
李胜
卢振龙
黄先滨
张云祺
苏焕全
陈应基
陈博文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Jiaojian Engineering Construction Group Co ltd
Original Assignee
GUANGXI CHANGCHANG ROAD & BRIDGE CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI CHANGCHANG ROAD & BRIDGE CONSTRUCTION Co Ltd filed Critical GUANGXI CHANGCHANG ROAD & BRIDGE CONSTRUCTION Co Ltd
Priority to CN201510468451.2A priority Critical patent/CN105033517B/en
Priority to CN201610403046.7A priority patent/CN105904124A/en
Publication of CN105033517A publication Critical patent/CN105033517A/en
Application granted granted Critical
Publication of CN105033517B publication Critical patent/CN105033517B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work

Abstract

The invention discloses a welding machine used for building construction and facilitating unloading of a reinforcement cage. A movable trolley is arranged outside a second arc part and moves in the direction perpendicular to a core wire of the reinforcement cage. The movable trolley is provided with a material guide surface used for unloading the reinforcement cage. The material guide surface inclines relative to the moving direction of the movable trolley, the end, close to a first arc part, of the material guide surface is an end a, and the end, far from the first arc part, of the material guide surface is an end b. The end a is as high as a tenth articulated shaft and higher than the end b. By means of the welding machine used for building construction and facilitating unloading of the reinforcement cage, the reinforcement cage can be effectively assembled and welded.

Description

It is easy to the bonding machine that steel reinforcement cage is unloaded for construction
Technical field
The present invention relates to civil engineering field is and in particular to a kind of be easy to what steel reinforcement cage was unloaded for construction Bonding machine.
Background technology
The field such as building pile foundation and road and bridge construction is frequently necessary to welded reinforcement cage, and the structure of steel reinforcement cage is specifically as Figure 14 institute Show, including spaced steel ring, enclose be located at steel ring the spaced vertical muscle in periphery and on vertical muscle helically line Shape be wound around around muscle, vertical muscle and steel ring perpendicular shape arrangement.It is complete that built human weld is mainly passed through in the welding of steel reinforcement cage at present Become, its welding efficiency is low, and need workman's cooperation of at least more than four to complete.Also some are had to carry out steel reinforcement cage welding at present Equipment, such as entitled " rotary welding device of tapered electric pole reinforcing bar cage seam welding " (application number: in 201410413871.6) A kind of following technical scheme: rotary welding device of tapered electric pole reinforcing bar cage seam welding is arrived, including vertical described in state's patent documentation To rebar fixing device, welder and circumferential reinforcement fixing device;Described longitudinal reinforcement fixing device is used for fixing gradually The longitudinal reinforcement of reducing, described circumferential reinforcement fixing device is used for fixing circumferential reinforcement, circumferential reinforcement is vertically fixed on vertical To on reinforcing bar, circumferential reinforcement fixing device and welder rotate around longitudinal reinforcement fixing device, by welder by ring Reinforcing bar is wound around and is welded on longitudinal reinforcement;Described longitudinal reinforcement fixing device includes fixed disk, and fixing disk center is provided with cone The reducing mold of annular, reducing mold and fixed disk concentric;Described reducing mold excircle is evenly equipped with reducing slide block, described Reducing slide block radially slide in fixing panel surface under reducing mold driving;There is through hole, institute on described reducing slide block The through hole stated is used for penetrating longitudinal reinforcement;Described reducing slide block is powered for longitudinal reinforcement;Described circumferential reinforcement fixing device Lead muscle arm including rotating disk and arc, rotating disk be arranged on fixed disk excircle and with fixed disk concentric, rotating disk is around circle The heart rotates;Lead muscle arm to install on the rotating pan, circumferential reinforcement passes in muscle arm one end from leading and reaches below welder;Described Welder include welding electrode and pressure mechanism, described welding electrode include weld copper coin, weld copper coin positioning sleeve It is fixed on conductive electrode, conductive electrode is connected with movable conductor, described movable conductor is connected with power supply;Described forcing press Structure applies constant pressure to welding electrode so that welding electrode butt welding contact keeps constant pressure.
The said equipment can be used for realizing the welding of different size steel reinforcement cage, and the welding of tapered electric pole steel reinforcement cage, but It is that it goes back Shortcomings on being applied to automatic welding device, such as cannot realize effective assembling of steel ring and vertical muscle it is difficult to fit Different size is answered to indulge the welding of muscle it is therefore necessary to be optimized further to it.
Content of the invention
It is easy to the bonding machine that steel reinforcement cage is unloaded it is an object of the invention to provide a kind of for construction, it can Effectively solving the problems referred to above, realize the erection welding of steel reinforcement cage.
For achieving the above object, the present invention employs the following technical solutions and is implemented:
A kind of for construction be easy to bonding machine that steel reinforcement cage unloaded it is characterised in that: include positioned opposite Fixed mounting and active mount, active mount is arranged on the first slide rail, and the first slide rail is along fixed mounting and work Spacing direction arrangement between dynamic mounting seat, the first drive mechanism is ordered about active mount and is moved;Fixed mounting and work First and second rotating disk positioned opposite with one heart is respectively provided with dynamic mounting seat, first and second rotating disk is rotatably installed in fixed installation respectively On seat and active mount, the second drive mechanism is ordered about first and second rotating disk and is rotated;First rotating disk is near active mount one Side card on be provided with the 3rd fixing device for fixing steel ring, arrange between fixed mounting and active mount Have for the cloth bracket being wound around muscle being laid on vertical muscle and to steel ring, vertical muscle, the weldering welded between muscle Connection device;Welding equipment also includes special operations mounting seat, and fixed mounting is located at special operations mounting seat and active mount Between, special operations mounting seat is provided with rotating shaft near the side of fixed mounting, and the axle head of rotating shaft is provided with the 3rd rotating disk, the The third through-hole passing through for vertical muscle, third through-hole ringwise radial arrangement are offered on three rotating disks, the diameter of third through-hole is big In the diameter of vertical muscle, first, second and third rotating disk arranged concentric, special operations mounting seat is arranged on the first slide rail, the 9th driving machine Structure orders about special operations mounting seat and moves, and the movement of special operations mounting seat and active mount is consistent;Activity peace It is provided with the device for discharging for being unloaded the steel reinforcement cage being welded, device for discharging includes between dress seat and fixed mounting First and second support base below steel reinforcement cage, first and second support base is oppositely arranged along the axially spaced-apart of steel reinforcement cage, and first and second The upper end of support base is provided with the curved support assembly for spacer bar cage, the profile of curved support assembly and steel reinforcement cage bottom Outline consistent, curved support assembly is made up of first and second arcuate member, and the mutually close one end of first and second arcuate member is passed through Tenth jointed shaft composition is articulated and connected, and the tenth jointed shaft is arranged parallel to steel reinforcement cage heart line, and the first arcuate member and first and second supports Seat is fixedly connected, and the second arcuate member is connected with the tenth drive mechanism, and the tenth drive mechanism adjusts arcuate member and is in two states, One is: the vertical guide that first and second arcuate member is located along steel reinforcement cage heart line is arranged symmetrically the support level for spacer bar cage, It two is: the second arcuate member turns to the lower section of the tenth jointed shaft to keeping away that the unloading of steel reinforcement cage is avoided around the tenth jointed shaft Step down;The outside of the second arcuate member is provided with moving cart, and moving cart, along moving perpendicular to steel reinforcement cage heart line direction, is moved Guide face for steel reinforcement cage discharging is provided with dynamic dolly, guide face is obliquely arranged along the direction of travel of moving cart, Guide face is a end near one end of the first arcuate member, and guide face is b end away from one end of the first arcuate member, the height at a end and the The height of ten jointed shafts consistent and more than b end height.
What technique scheme provided is easy to, for construction, the bonding machine that steel reinforcement cage is unloaded, and it is right that it can achieve The rapid automatized welding of steel reinforcement cage.
Brief description
Fig. 1 is the top view of the present invention;
Fig. 2 is the top view of the 3rd fixing device;
Fig. 3 is the structural representation that the 3rd body of rod is in working position;
Fig. 4 is that the 3rd body of rod is in the structural representation avoiding position;
Fig. 5 is the structural representation of the second fixing device;
Fig. 6 is a kind of structural representation of embodiment of the first rotating disk;
Fig. 7 is the assembling schematic diagram of locating part;
Fig. 8 is the structural representation of the another embodiment of the first rotating disk;
Fig. 9 is the structural representation of the first fixing device;
Figure 10 is the attachment structure schematic diagram between the first slide block and the first support arm;
Figure 11 is the structural representation of poking device;
Figure 12 is the side view of deviation correction mechanism;
Figure 13 is the front view of deviation correction mechanism;
Figure 14 is the structural representation of steel reinforcement cage;
Figure 15 is the side view of device for discharging;
Figure 16 is that the second arcuate member is in the structural representation avoiding position;
Figure 17 is the scheme of installation of locating part.
Specific embodiment
In order that objects and advantages of the present invention become more apparent, with reference to embodiments the present invention is carried out specifically Bright.It should be appreciated that following word is only in order to describe one or more specific embodiments of the present invention, not to the present invention The protection domain of concrete request carries out considered critical.
The municipal works that the present invention provides are with the welding equipment that steel reinforcement cage is welded, as shown in figure 1, including cloth relatively The fixed mounting 10 put and active mount 20, active mount 20 is arranged on the first slide rail 201, the first slide rail 201 edge Spacing direction arrangement between fixed mounting 10 and active mount 20, the first drive mechanism is ordered about active mount 20 and is carried out Mobile, the first drive mechanism can be Motor drive or air cylinder driven;Set respectively on fixed mounting 10 and active mount 20 Put first and second rotating disk 11,21 positioned opposite with one heart, first and second rotating disk 11,21 is rotatably installed in fixed mounting 10 and respectively On active mount 20, the second drive mechanism is ordered about first and second rotating disk 11,21 and is rotated, and the second drive mechanism can be motor Drive mechanism, the first rotating disk 11 is provided with the 3rd solid for fix steel ring a1 in the card of active mount 20 side Determine device 40, be provided between fixed mounting 10 and active mount 20 and be wound on vertical muscle a2 around muscle a3 for laying Cloth bracket 80 and to steel ring a1, vertical muscle a2, the welder being welded between muscle a3.
The present invention is the welding realizing different size is indulged muscle a2, that is, needs to adjust the clamping hole being adapted to vertical muscle a2 Clamped, the present invention can take the following two kinds technical scheme to be implemented:
The first scheme as shown in Figure 8,9, 10, that is, the first rotating disk 11 has been provided at circumferentially spaced for supporting along it First fixing device 11a of vertical muscle a2, the first fixing device 11a and the first rotating disk 11 constitute slip along the radial direction of the first rotating disk 11 Guiding cooperation, the 3rd drive mechanism is connected with the first fixing device 11a and orders about the first fixing device 11a along the first rotating disk 11 Radial direction move, the 3rd drive mechanism can be constituted for cylinder, and the second rotating disk 21 is provided for the end of steel reinforcement cage is entered Second fixing device 50 of row clamping;First fixing device 11a includes first slide 11a, along the first rotating disk in first slide 11a 11 axial direction opens up first through hole 11h passing through for vertical muscle a2, and first slide 11a is extended to the outside of the first rotating disk 11 There are three the first support arms, the first support arm 11b is arranged in the peripheral uniform intervals of first through hole 11h, the first support arm 11b's One end and first slide 11a constitute first and are articulated and connected and constitute first the first jointed shaft 60 ° of angles of two twenty percents being articulated and connected Arrangement, the other end of the first support arm 11b is rotatablely equipped with the first deflector roll 11c, heart line two twenty percent of the first deflector roll 11c respectively 60 ° of angle arrangements, the middle part of the first support arm 11b is hinged by one end composition second of the second jointed shaft and the first body of rod 11e Connect, first slide 11a is additionally provided with three the first slide block 11d, the first slide block 11d is located at the first support arm 11b's respectively Outside, the first slide block 11d passes through the first chute of setting in first slide 11a, the first guide rod 11f and first slide 11a along the The radial direction of one through hole 11h constitutes slide-and-guide cooperation, the first guide rod 11f is arranged with and orders about the first slide block 11d near first The first compression spring 11g that through hole 11h center moves, the other end of the first body of rod 11e and the first slide block 11d pass through the 3rd Jointed shaft constitutes the 3rd and is articulated and connected, and first, second and third jointed shaft is all corresponding with the first deflector roll 11c to be arranged in parallel.Above-mentioned technology The first fixing device 11a that scheme provides, adjusts the first fixing device 11a and the first rotating disk 11 center of circle by the 3rd drive mechanism Distance, realize welding to different size steel reinforcement cage;In addition, by the first fixing device 11a of said structure, it can be fitted The size of muscle a2 should be indulged and adaptable change occurs, realize different size is indulged with fixation and the conveying of muscle a2.
More specifically scheme is: the middle part of the first deflector roll 11c is arranged to convex, the roller of vertical muscle a2 and the first deflector roll 11c Face is linear contact lay.First rotating disk 11 offers the second chute in the card of fixed mounting 10 side, and first slide 11a is led to Cross the second chute and the first rotating disk 11 constitutes slide-and-guide cooperation, the 3rd drive mechanism includes the first cylinder, the work of the first cylinder Stopper rod is connected with first slide 11a, and first slide 11a is provided with the latch assembly locked that it is slided, locking group Part can be constituted for latch.
Second technical scheme as shown in Figure 6,7, that is: offer on the first rotating disk 11 and lead to for vertical muscle a2 passes through second Hole 112, the second through hole 112 ringwise radial arrangement (the second through hole 112 is provided with some circles on the first rotating disk, and each encloses Second through hole 112 arranged concentric), the diameter with diameter greater than vertical muscle a2 of the second through hole 112, the first rotating disk 11 is installed away from activity It is provided with the second axle body 111, the second axle body 111 and the first rotating disk 11 arranged concentric, on the second axle body 111 in seat 20 side cards It is arranged with and may make up the locating part of detachable connection cooperation with it, locating part by internal ring 113, outer shroud 114 and connects inner and outer rings 113rd, 114 the second connecting rod composition, the internal diameter of outer shroud 114 is consistent with the diameter of the circle that muscle a2 vertical on steel reinforcement cage encloses. This kind of scheme carries out a2 support by different the second through hole 112 away from the first rotating disk 11 center of circle of setting to vertical muscle, because second is logical The aperture in hole 112 be more than vertical muscle a2 diameter it is therefore desirable to setting locating part carry out spacing, can on the ring wall of internal ring 113 with Groove is opened up, the flute length direction of groove is consistent with the length direction of vertical muscle a2, groove at second through hole 112 opposite position Section is semicircle.So by locating part, vertical muscle is carried out spacing, vertical muscle a2 is constrained on internal ring 113 ring wall and the second through hole Region between 112 hole walls, vertical muscle a2 is also linear contact lay with internal ring 113 ring wall and the second through hole 112 hole wall, therefore indulges muscle a2 The friction slided is little, adapts to the welding that different size indulges muscle.
In above two technical scheme, the first is more complicated than second structure, but second needs the different chi of setting Very little locating part is mated, and can be implemented using that technical scheme according to concrete selection the in scene.First and second rotating disk 11, 21 structure is identical, the structure of first and second fixing device may be the same or different.
The municipal works that the present invention provides with the welding equipment that steel reinforcement cage is welded, its can achieve to steel ring a1, Vertical muscle a2 and around the welding between muscle a3 it is not necessary to artificial to it between overlap.Therefore realize between steel ring and vertical muscle And the reliability overlap joint between vertical muscle and steel ring is particularly important.The further scheme of the therefore present invention is, as Fig. 2,3,4 institute Show, the first rotating disk 11 is extended the first axle body 41 of suspension shape, the first axle body in the card of active mount 20 side 41 and the first rotating disk 11 arranged concentric, the 3rd fixing device 40 includes the sleeve being removably mounted on the first axle body 41, set Cylinder is made up of the head rod of inner tube 472, outer tube 471 and connection inner and outer pipe, and steel ring a1 arrangement shape is set in outer tube 471 Tube wall on, the first axle body 41 suspension end be provided with the second cylinder 42 arranged along its length, the work of the second cylinder 42 First collar 43 is provided with stopper rod, the end of the first axle body 41 is provided with second collar 44, along its circumference on first and second collar Uniform intervals arrange second and third body of rod respectively, and one end of second body of rod 45 and first collar 43 pass through the 4th jointed shaft and constitute the Four are articulated and connected, and one end of the 3rd body of rod 46 and second collar 44 pass through the 5th jointed shaft composition the 5th and be articulated and connected, the second bar Pass through the 6th jointed shaft and constitute the 6th to be articulated and connected in the middle part of the other end of body 45 and the 3rd body of rod 46, the 3rd body of rod 46 another End is in two states, and one is: the 3rd body of rod 46 and the end phase of sleeve recline, the other end end of the 3rd body of rod 46 extends To the working position of outer tube 471 periphery, as shown in Figure 2,3;It two is: the 3rd body of rod 46 and the end of sleeve are separated, the 3rd bar The other end of body 46 is located at the avoidance position within outer tube 471, as shown in Figure 4;The top of the first axle body 41 is provided with perpendicular The first crossbeam 60 of arrangement, the two ends of first crossbeam 60 are provided with poking device, and poking device includes suspending the first of shape arrangement in midair Column, the lower end of the first column is provided with the first axial arranged longeron 61 along the first axle body 41, and the first longeron 61 is arranged There is walking dolly 62, along axially spaced-apart setting first and second driving lever 63,64 of the first axle body 41 on walking dolly 62, first and second group Spacing between bar 63,64 is consistent with the bar diameter constituting steel ring a1, and first and second driving lever 63,64 is along the first axle body 41 Radial arrangement, poking device along first crossbeam 60 height direction with its constitute slide-and-guide cooperation, the 4th drive mechanism with Poking device is connected, and the 6th drive mechanism is ordered about walking dolly 62 and moved on the first longeron 61, the seven, the eight driving machines Structure adjusts first and second driving lever 63,64 and is stretched along the radial direction of the first axle body 41, the four, the seven, eight drive mechanisms can be cylinder structure Become, the 6th drive mechanism can be constituted for motor, first and second driving lever 63,64 can be that the piston rod of cylinder is constituted.By setting the First, two driving lever 63,64 realizes steel ring a1 is stirred.During initial operation, steel ring a1 is arranged on sleeve away from the 3rd One end of the body of rod 46, during material toggling, first rod for stiring materials 63 is in convex liter of state, second rod for stiring materials 64 is in retracted state, the first material toggling The tube wall gap cooperation of the end of bar 63 and outer tube 471, now walking dolly 62 is to the side shifting away from the 3rd body of rod 46, directly Material toggling end to first rod for stiring materials 63 is leant with the steel ring a1 being set on sleeve, and walking dolly 62 cannot continue to move to, Now second rod for stiring materials 64 is converted between the convex liter of state adjacent steel ring a1 of insertion by retracted state, simultaneously: first rod for stiring materials 63 switch to retracted state by convex liter of state, and the moving direction of walking dolly 62 changes, to the side near the 3rd body of rod 46 Mobile, such second rod for stiring materials 64 promotes the steel ring a1 between first and second rod for stiring materials 63,64 to be translated, and steel ring a1 puts down Move to and lean with the 3rd body of rod 46 being in working position, now start the first welding mechanism between steel ring a1 and vertical muscle a2 Welded, after welding terminates, poking device is moved to the side away from sleeve, the 3rd body of rod 46 is switched to by working position Avoid position, active mount 20 pulls steel reinforcement cage to be translated, until need to carry out welded reinforcement circle a1 and vertical muscle a2 next time Shi Chongfu aforesaid operations, so repeatedly, for adapting to the welding of different steel reinforcement cages, need to arrange various sizes of sleeve and carry out coupling makes With.
Specific scheme is: the tube wall of outer tube 471 is followed successively by steel layer, elastic layer and gel coating resin from the inside to the outside, this structure Outer tube 471 can be easy to rod for stiring materials and stir steel ring a1 translated, prevent steel ring a1 stuck in moving process;Welding Device includes the first welding mechanism with the corresponding arrangement of first collar 43, and the first welding mechanism is used for indulging muscle a2 and steel ring a1 Between welding, the first welder can adopt existing cantilevered welding mechanism.
The municipal works that the present invention provides, with the welding equipment that steel reinforcement cage is welded, need to pull the reinforcing bar being welded Cage is translated so that unwelded part moves to the weld part of welder.Second rotating disk 21 is near fixed mounting 10 1 First body 51 and the 3rd cylinder 52 are provided with the card of side, the outer tube wall of the first body 51 are provided with the 3rd collar 54, The end that the piston rod of the 3rd cylinder 52 extends to the first body 51 outer end is provided with the 4th collar 53, the external diameter of the 4th collar 53 Consistent with the external diameter of the first body 51, on third and fourth collar, along its circumference, uniform intervals arrange fourth, fifth body of rod respectively, the One end of four bodies of rod 56 and the 3rd collar 54 pass through the 7th jointed shaft and constitute the 7th to be articulated and connected, one end of the 5th body of rod 55 and the Four collars 53 pass through the 8th jointed shaft composition the 8th and are articulated and connected, and the other end of the 4th body of rod 56 and the middle part of the 5th body of rod 55 lead to Cross the 9th jointed shaft and constitute and the 9th be articulated and connected, the other end of the 5th body of rod 55 is provided with short along the first body 51 radial arrangement Bar 57, quarter butt 57 is in two states, and one is: the periphery that quarter butt 57 extends to steel ring a1 is used for pulling steel reinforcement cage to enter every trade The working position walked;It two is: the avoidance position that quarter butt 57 bounces back in steel ring a1, specifically as shown in Figure 5.By said structure Pull unit, it can pull steel reinforcement cage be translated in welding, impact will not be produced on the unloading of steel reinforcement cage simultaneously it is ensured that Steel reinforcement cage automatic welding.
Around muscle winding to vertical muscle a3 peripheral when may there is certain error, so may result in around muscle a3 and vertical muscle Actual welding point between a2 is not consistent with the soldering turret of welder it is therefore desirable to the winding of opposing connection muscle a3 is rectified a deviation, this Invention is specifically implemented using technical scheme shown in Figure 12,13, that is: around muscle a3 on drum, drum rotates to be fixed On cloth bracket 80, the axial direction of drum parallels arrangement with vertical muscle a2, and the side of cloth bracket 80 is provided with and exists for opposing connection muscle a3 The deviation correcting device that winding on vertical muscle a2 is rectified a deviation, deviation correcting device includes above steel reinforcement cage the second cross beam 70 of setting, and second Lifting platform 73 is provided with crossbeam 70, lifting platform 73 is provided with the correction bar 71 of three suspention shape arrangements, under correction bar 71 End sets gradually correction part 72 along the pitch being wound around around muscle a3, and correction part 72 is prong downwards and prong is gradually increased Y-piece is constituted, by the arrangement circuit of three correction parts 72 of three correction bar 71 lower end setting and the shape around the wanted winding of muscle a3 Consistent, therefore, it can be rectified a deviation in winding on vertical muscle a2 for the opposing connection muscle a3;Deviation correcting device is in two states, and one is: Lifting platform 73 is descending, is located at the correction position rectified a deviation in the prong of correction part 72 around muscle a3, and it two is that deviation correcting device is located at and indulges The avoidance position that the outside of muscle a2 is avoided to the rotation of steel reinforcement cage.Thus ensureing that the reliability around muscle a3 is wound around it is ensured that welding matter Amount.Welder includes the second welding mechanism of arrangement corresponding with deviation correcting device, the second welding mechanism be used for indulging muscle a2 with around Welding between muscle a3, the second welder can adopt existing cantilevered welding mechanism, and lifting platform 73 can be adjusted using cylinder It is lifted.
In addition, when steel reinforcement cage is longer, in order to ensure the movement of vertical muscle a2, can adopting the following technical scheme that further and carry out reality Apply, as shown in figure 1, welding equipment also includes special operations mounting seat 30, fixed mounting 10 is located at special operations mounting seat 30 And active mount 20 between, special operations mounting seat 30 is provided with rotating shaft, the axle of rotating shaft near the side of fixed mounting 10 End is provided with the 3rd rotating disk 31, and the 3rd rotating disk 31 offers the third through-hole passing through for vertical muscle a2, third through-hole ringwise spoke Penetrate shape arrangement (third through-hole is provided with some circles on the 3rd rotating disk, and respectively encloses third through-hole arranged concentric), third through-hole With diameter greater than the diameter of vertical muscle a2, first, second and third rotating disk arranged concentric, special operations mounting seat 30 is arranged on the first slide rail 201 On, the 9th drive mechanism is ordered about special operations mounting seat 30 and is moved, special operations mounting seat 30 and active mount 20 Movement is consistent, and the 9th drive mechanism can be consistent with the first drive mechanism, and both operations are consistent.In addition also may be used Some support bases are set between active mount 20 and fixed mounting 10 and fixed mounting and special operations mounting seat, Avoid the hanging of steel reinforcement cage long spacing, the setting of support base should meet the not translation on steel reinforcement cage and rotate generation impact.
Secondly as the steel reinforcement cage volume being welded is larger, for the ease of the unloading of steel reinforcement cage, the present invention is also in activity peace Be provided with device for discharging 90 for being unloaded the steel reinforcement cage being welded between dress seat and fixed mounting, such as Figure 15,16, Shown in 17, device for discharging 90 includes first and second support base 91 below steel reinforcement cage, and first and second support base 91 is along steel reinforcement cage Axially spaced-apart be oppositely arranged, (first and second support base 91 can be separately fixed on first and second lifting platform 92, first and second liter Fall platform 92 can adjust it using cylinder and be lifted), the upper end of first and second support base 91 is provided with the arc for spacer bar cage Shape support component, the profile of curved support assembly is consistent with the outline of steel reinforcement cage bottom, and curved support assembly is by first and second Arcuate member 93,94 is constituted, and the vertical guide that first and second arcuate member 93,94 is located along steel reinforcement cage heart line is arranged symmetrically, and first and second The mutually close one end of arcuate member 93,94 is passed through the tenth jointed shaft composition and is articulated and connected, and the tenth jointed shaft is parallel to steel reinforcement cage heart line Arrangement, the first arcuate member 93 is fixedly connected with first and second support base 91, and the second arcuate member 94 is connected with the tenth drive mechanism, Tenth drive mechanism adjusts arcuate member and is in two states, and one is: first and second arcuate member 93,94 is located along steel reinforcement cage heart line Vertical guide be arranged symmetrically support level for spacer bar cage, it two is: the second arcuate member 94 rotates around the tenth jointed shaft The avoidance position unloading of steel reinforcement cage being avoided to the lower section of the tenth jointed shaft;The outside of the second arcuate member 94 is provided with movement Dolly 95, moving cart 95 moves along perpendicular to steel reinforcement cage heart line direction, and moving cart 95 is provided with for steel reinforcement cage The guide face 951 of discharging, guide face 951 is obliquely arranged along the direction of travel of moving cart 95, and guide face 951 is near first One end of arcuate member 93 is a end, and guide face 951 is b end away from one end of the first arcuate member 93, and the height at a end is hinged with the tenth The height of axle consistent and more than b end height.The steel reinforcement cage being so welded passes through guide face 951 rolling and is unloaded.The First, two support bases 91 can be fixed or can be lifted, and when it is fixed, it can be used for unloading of steel reinforcement cage Material, and in welding, steel reinforcement cage can be supported, prevent the hanging of steel reinforcement cage large span.
More detailed scheme is to be provided with circular rib 931 on the concave surface of curved support assembly, and circular rib 931 is flat Row is spaced along the circumference of steel reinforcement cage in the heart line direction arrangement of steel reinforcement cage, circular rib 931 on the concave surface of curved support assembly Setting, the length of circular rib 931 is consistent with the length of curved support assembly, circular rib 931 can be reinforcing bar or other The circular thin bar construction of material.Guide face 951 is constituted for the two guide rail pole 95a that relative tilt is arranged, the section of guide rail pole 95a is Circle, the angle of inclination in guide face 951 is 2~2.5 °, be provided between two guide rail pole 95a for steel reinforcement cage in guide face The bolster 96 being scrolled into row buffering on 951, bolster 96 is along the length direction interval setting of guide rail pole 95a, bolster 96 It is rod member or plate composition, bolster 96 is in tilted layout and incline direction is contrary with the incline direction in guide face 951, bolster 96 Middle part be articulated and connected by the 11st jointed shaft with moving cart 95, the 11st jointed shaft is parallel to the heart line direction of steel reinforcement cage Arrangement, the lower end of bolster 96 is connected with extension spring 98, and the upper end that bolster 96 is ordered about in extension spring 98 protrudes from the upper of guide face 951 Side, is provided with the rotation to bolster 96 and carries out spacing gag lever post 97 between two guide rail pole 95a, gag lever post 97 is located at bolster 96 upside, gag lever post 97 is arranged perpendicular to guide rail pole 95a.Tenth drive mechanism can be cylinder composition, the cylinder body of cylinder and work Stopper rod is articulated and connected with the second arcuate member respectively, and first and second arcuate member can be plate or rod member bending is welded.
During concrete operations, first and second support base may be provided at 70 between active mount 20 and second cross beam, the first support Seat is arranged between active mount 20 and the second support base, and the first support base and the first slide rail 201 are along the heart line side of steel reinforcement cage It is connected to constituting slide-and-guide, the 12nd drive mechanism is ordered about the first support base and moved, outside first and second support base Side is respectively provided with moving cart, moving cart 95 and cloth bracket 80 be placed in steel reinforcement cage two outside.
Carry out steel reinforcement cage welding using the municipal works that the present invention provides with the welding equipment that steel reinforcement cage is welded Concrete grammar is as follows:
Assembling steel ring, vertical muscle, around muscle: the size according to steel reinforcement cage to be welded is arranged on the from the sleeve of corresponding size On one axis body 41, the 3rd drive mechanism is adjusted to the position of the first fixing device 11a, and steel ring a1 arrangement is set in set On cylinder, then vertical muscle a2 is passed through the first fixing device and the 3rd rotating disk 31 to be fixed, the end of vertical muscle a2 extends to sleeve Outside, will be fixed on cloth bracket 80 around muscle a3, preparation completes;
Or: the size according to steel reinforcement cage to be welded is arranged on the first axle body 41 from the set jacket casing of corresponding size, choosing The locating part taking adaptable size is arranged on the second axle body 111, then carries out vertical muscle a2 through first and third rotating disk 11,31 Fixing, the end of vertical muscle a2 extends to the outside of sleeve, will be fixed on cloth bracket 80 around muscle a3, preparation completes;
Welding between steel ring a1 and vertical muscle a2: before a steel ring a1 starts welding, the 3rd body of rod 46 is in work Position, poking device moves to the side near outer tube 471, and first rod for stiring materials 63 is in convex liter of state, second rod for stiring materials 64 It is in retracted state, the end of first rod for stiring materials 63 is coordinated with the tube wall gap of outer tube 471, and walking dolly 62 is to away from the 3rd bar One side shifting of body 46, until the material toggling end of first rod for stiring materials 63 and the steel ring a1 being set on sleeve lean, (walking is little Car 62 cannot continue to move to), now, second rod for stiring materials 64 by retracted state be converted to convex liter of state insert adjacent steel ring a1 it Between, first rod for stiring materials 63 switchs to retracted state by convex liter of state, and the moving direction of walking dolly 62 changes, to the close 3rd One side shifting of the body of rod 46, the steel ring a1 between first and second rod for stiring materials 63,64 of second rod for stiring materials 64 promotion simultaneously is moved Dynamic, until steel ring a1 is mobile extremely leaning with the 3rd body of rod 46 being in working position, now start the first welding mechanism to steel Welded between rib ring a1 and vertical muscle a2, during welding, the second drive mechanism is ordered about steel reinforcement cage and rotated it is ensured that every vertical muscle A2 and steel ring a1 reliably welds, and during welded reinforcement circle a1 and vertical muscle a2, steel reinforcement cage is not translated, and after welding terminates, will dial Material device moves to the side away from sleeve, and the 3rd body of rod 46 is switched to avoid position by working position, and steel reinforcement cage is translated, when When the distance of steel reinforcement cage translation reaches the spacing between two steel rings, repeat aforesaid operations and carry out steel ring a1 and vertical muscle next time Welding between a2, so repeatedly;When welding between steel ring a1 and vertical muscle a2, deviation correction mechanism is in avoidance position;
Welding between muscle a3 and vertical muscle a2: when first steel ring a1 being welded runs to deviation correcting device, will It is bent into, around the end of muscle a3, the weld that hook is fixed on steel ring a1 and vertical muscle a2, start the second fixing device so that quarter butt 57 are in working position, are wrapped on vertical muscle a2 around muscle a3, and startup deviation correction mechanism is at correction position to be carried out for opposing connection muscle a3 Correction, starts after the completion of correction and is welded between the second welding mechanism opposing connection muscle and vertical muscle;Welding terminates rear deviation correction mechanism and returns It is multiple that to avoiding position, first and second drive mechanism is ordered about steel reinforcement cage and is rotated and translate, when run to next around muscle and vertical muscle weldering During contact, repeat aforesaid operations and carry out the welding between muscle a3 and vertical muscle a2 next time, so repeatedly;Around muscle a3 and vertical muscle a2 Between weld when, poking device be in avoidance position.
Welding between one steel ring a1 and each vertical muscle a2 executes the welding between muscle a3 and vertical muscle a2 after terminating;Hold During welding between muscle a3 and vertical muscle a2 for the row, if the translation distance of steel reinforcement cage reaches default spacing between two steel ring a1 When, then the welding between execution steel ring a1 and each vertical muscle a2, so it is repeated up to whole steel reinforcement cage welding and finishes, welding finishes Using cutting device, vertical muscle a2 is blocked afterwards;
The unloading of steel reinforcement cage: during steel reinforcement cage welding, the second arcuate member is in support level, and the 12nd drive mechanism orders about first Support base moves with the movement of steel reinforcement cage, and after steel reinforcement cage welding terminates, the first support base stops moving, and adjusts at quarter butt In avoiding position, the first drive mechanism is ordered about active mount and is continued to move to until the second fixing device is completely de- from steel reinforcement cage From, adjust moving cart near steel reinforcement cage one side shifting until guide face a end arrangement corresponding with the tenth jointed shaft, the tenth Drive mechanism adjusts the second arcuate member and is in avoidance position, and steel reinforcement cage rolls unloading from guide face 951, and unloading terminates rear each device RestPose, carry out the welding of next steel reinforcement cage.During discharging, two moving carts 95 are located between two second arcuate members, and two Moving cart 95 is along the heart line direction interval setting of steel reinforcement cage.
With the welding equipment that steel reinforcement cage is welded, it can achieve fast to steel reinforcement cage for the municipal works that the present invention provides Fast automatic welding.
The above is only the preferred embodiment of the present invention it is noted that ordinary skill people for the art For member, after knowing content described in the present invention, under the premise without departing from the principles of the invention, it can also be made some Equal conversion and replacement, these convert on an equal basis and substitute and also should be regarded as belonging to protection scope of the present invention.

Claims (1)

1. a kind of for construction be easy to bonding machine that steel reinforcement cage unloaded it is characterised in that: include positioned opposite Fixed mounting and active mount, active mount is arranged on the first slide rail, and the first drive mechanism orders about active mount Move;First and second rotating disk positioned opposite with one heart is respectively provided with fixed mounting and active mount, the first rotating disk turns Move and be arranged on fixed mounting, the second rotating disk is rotatably installed on active mount, and the second drive mechanism orders about first and second turn Disk is rotated;First rotating disk is provided with the 3rd fixing dress for fixing steel ring in the card of active mount side Put, be provided between fixed mounting and active mount for the cloth bracket being wound around muscle and right is laid on vertical muscle Steel ring, vertical muscle, the welder being welded between muscle;Welding equipment also includes special operations mounting seat, fixed installation Seat is located between special operations mounting seat and active mount, and special operations mounting seat is provided near the side of fixed mounting Rotating shaft, the axle head of rotating shaft is provided with the 3rd rotating disk, and the 3rd rotating disk offers the third through-hole passing through for vertical muscle, and third through-hole is in Ring radiation shape is arranged, the diameter with diameter greater than vertical muscle of third through-hole, first, second and third rotating disk arranged concentric, and special operations are pacified Dress seat be arranged on the first slide rail, the 9th drive mechanism is ordered about special operations mounting seat and is moved, special operations mounting seat and The movement of active mount is consistent;It is provided between active mount and fixed mounting for by the steel reinforcement cage being welded The device for discharging being unloaded, device for discharging includes first and second support base below steel reinforcement cage, first and second support base edge The axially spaced-apart of steel reinforcement cage is oppositely arranged, and the upper end of first and second support base is provided with the curved support group for spacer bar cage Part, the profile of curved support assembly is consistent with the outline of steel reinforcement cage bottom, and curved support assembly is by first and second arcuate member structure Become, the mutually close one end of first and second arcuate member is passed through the tenth jointed shaft composition and is articulated and connected, and the tenth jointed shaft is parallel to steel reinforcement cage Heart line is arranged, the first arcuate member is fixedly connected with first and second support base, and the second arcuate member is connected with the tenth drive mechanism, the Ten drive mechanisms adjust arcuate member and are in two states, and one is: the vertical guide that first and second arcuate member is located along steel reinforcement cage heart line It is arranged symmetrically the support level for spacer bar cage, it two is: it is hinged that the second arcuate member turns to the tenth around the tenth jointed shaft The avoidance position that the lower section of axle is avoided to the unloading of steel reinforcement cage;The outside of the second arcuate member is provided with moving cart, and movement is little Car, along moving perpendicular to steel reinforcement cage heart line direction, moving cart is provided with the guide face for steel reinforcement cage discharging, guide Face is obliquely arranged along the direction of travel of moving cart, guide face near one end of the first arcuate member be a end, guide face away from One end of first arcuate member be b end, the height at a end consistent with the height of the tenth jointed shaft and be more than b end height.
CN201510468451.2A 2015-07-29 2015-07-29 Welding machine used for building construction and facilitating unloading of reinforcement cage Active CN105033517B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510468451.2A CN105033517B (en) 2015-07-29 2015-07-29 Welding machine used for building construction and facilitating unloading of reinforcement cage
CN201610403046.7A CN105904124A (en) 2015-07-29 2015-07-29 Welding machine capable of achieving convenient unloading of reinforcing cage and used for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510468451.2A CN105033517B (en) 2015-07-29 2015-07-29 Welding machine used for building construction and facilitating unloading of reinforcement cage

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201610403046.7A Division CN105904124A (en) 2015-07-29 2015-07-29 Welding machine capable of achieving convenient unloading of reinforcing cage and used for building construction

Publications (2)

Publication Number Publication Date
CN105033517A CN105033517A (en) 2015-11-11
CN105033517B true CN105033517B (en) 2017-01-25

Family

ID=54440795

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610403046.7A Withdrawn CN105904124A (en) 2015-07-29 2015-07-29 Welding machine capable of achieving convenient unloading of reinforcing cage and used for building construction
CN201510468451.2A Active CN105033517B (en) 2015-07-29 2015-07-29 Welding machine used for building construction and facilitating unloading of reinforcement cage

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610403046.7A Withdrawn CN105904124A (en) 2015-07-29 2015-07-29 Welding machine capable of achieving convenient unloading of reinforcing cage and used for building construction

Country Status (1)

Country Link
CN (2) CN105904124A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109807510B (en) * 2019-01-30 2020-09-29 山东建筑大学 Framework forming and discharging device
CN110370022B (en) * 2019-07-11 2021-01-15 沈阳北方建设股份有限公司 Steel reinforcement framework forming system

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3422420A1 (en) * 1984-06-16 1985-12-19 Mbk Maschinenbau Gmbh, 7964 Kisslegg MACHINE FOR PRODUCING REINFORCEMENT BODIES FOR CONCRETE PIPES
DE3809420C1 (en) * 1988-03-21 1989-08-10 Ed. Zueblin Ag, 7000 Stuttgart, De Machine for producing reinforcing cages for reinforced-concrete pipes in vertical type of fabrication
JPH06126363A (en) * 1992-10-15 1994-05-10 Shigematsu Kogyo:Kk Device for manufacturing assembly reinforcing bar
JP2587905B2 (en) * 1994-04-12 1997-03-05 株式会社松村組 Reinforcing cage manufacturing equipment
JP2001314997A (en) * 2000-04-28 2001-11-13 Mitsubishi Heavy Ind Ltd Automatic welding machine
CN100398228C (en) * 2006-01-06 2008-07-02 东邦工程株式会社 Machine for manufacturing structural part by reinforcing bar
CN102009296A (en) * 2010-09-30 2011-04-13 江苏江桥机械制造有限公司 Wire-releasing type automatic reducing seam welder
CN201940767U (en) * 2010-12-27 2011-08-24 广州市裕丰建筑工程机械制造有限公司 Reinforcing cage welding molding machine
CN103273232B (en) * 2013-05-24 2015-04-08 建科机械(天津)股份有限公司 Novel automatic welding device of reinforcing cage forming machine
CN203936514U (en) * 2014-06-30 2014-11-12 深圳市康振机械科技有限公司 Online docking reinforcing bar cage seam welding
CN204135537U (en) * 2014-09-16 2015-02-04 广东华盟路桥工程有限公司 A kind of steel reinforcement cage forming machine system

Also Published As

Publication number Publication date
CN105904124A (en) 2016-08-31
CN105033517A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN106078042A (en) A kind of construction pile foundation steel bar cage welding equipment
CN104972237A (en) Welding machine for steel reinforcement cage of building pile foundation
CN106363311A (en) Reinforcement cage welding machine for road and bridge construction
CN105728973A (en) Welding equipment of reinforcing cage
CN105033517B (en) Welding machine used for building construction and facilitating unloading of reinforcement cage
CN104959762B (en) High speed road and bridge mix earth load-bearing pillar cylinder steel reinforcement cage welding equipment
CN105033518B (en) Welding device enabling building pile foundation reinforcement cage to be conveniently unloaded
CN105033479B (en) A kind of municipal administration road and bridge engineering cylinder steel reinforcement cage welding equipment
CN104942491B (en) A kind of road and bridge cylinder steel reinforcement cage welding equipment
CN108500550A (en) A kind of displacement device of boiler body heat exchanger tube and drum welding
CN105033541B (en) Municipal works pile foundation steel reinforcement cage welding equipment
CN105033519B (en) It is easy to the road and bridge load-bearing pillar steel reinforcement cage welding equipment of steel reinforcement cage unloading
CN104985344A (en) Welding device for welding reinforcement cage for building pile foundation
CN106514088A (en) Welding machine for road and bridge pile foundation steel reinforcement cages
CN105033482A (en) Method for welding support pillar reinforcement cage for municipal engineering
CN105033543B (en) A kind of bonding machine being easy to the unloading of building pile foundation steel reinforcement cage
CN104985345A (en) Building pile foundation reinforcement cage welding device
CN104985347A (en) Welding machine for welding steel reinforcement cage of pile foundation in building construction
CN104985342A (en) Welding method for welding high-speed road and bridge support pillar reinforcement cage
CN105033481B (en) Welding device for pile foundation reinforcement cage for municipal engineering construction
CN105195911A (en) Welding method for conveniently unloading steel bar cage for concrete pile foundation
CN105081657B (en) A kind of municipal works pile foundation steel bar cage welding equipment
CN104972238A (en) Steel reinforcement cage welding equipment for civil engineering concrete pile foundation
CN104985346A (en) Welding machine for road and bridge construction and for welding supporting column reinforcement cage
CN105689952A (en) Welding machine for building pile foundation reinforcement cages

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Inventor after: Qing Zhigang

Inventor after: Chen Bowen

Inventor after: Wang Feng

Inventor after: Li Jun

Inventor after: Li Sheng

Inventor after: Lu Zhenlong

Inventor after: Huang Xianbin

Inventor after: Zhang Yunqi

Inventor after: Su Huanquan

Inventor after: Chen Yingji

Inventor before: Zhu Yubing

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20161221

Address after: 530000 the Guangxi Zhuang Autonomous Region, Nanning Branch Park Road, No. 7, building 4, building 68

Applicant after: GUANGXI CHANGCHANG ROAD & BRIDGE CONSTRUCTION Co.,Ltd.

Address before: Anqing City, Anhui province 246004 Township Yuexi County Yao Shen Qiao Cun Nan Chong Group No. 4

Applicant before: Zhu Yubing

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Building F3, Group F, Nanning ASEAN Enterprise Headquarters Port, No. 10, Xinji Road, Gaoxin District, Nanning City, Guangxi Zhuang Autonomous Region, 530000

Patentee after: Guangxi Jiaojian Engineering Construction Group Co.,Ltd.

Address before: 530000, 4th Floor, Building 7, No. 68 Keyuan Avenue, Nanning City, Guangxi Zhuang Autonomous Region

Patentee before: GUANGXI CHANGCHANG ROAD & BRIDGE CONSTRUCTION Co.,Ltd.