CN105032687B - A kind of equipment for anode stub brushing - Google Patents

A kind of equipment for anode stub brushing Download PDF

Info

Publication number
CN105032687B
CN105032687B CN201510509055.XA CN201510509055A CN105032687B CN 105032687 B CN105032687 B CN 105032687B CN 201510509055 A CN201510509055 A CN 201510509055A CN 105032687 B CN105032687 B CN 105032687B
Authority
CN
China
Prior art keywords
bar
coating
pipe
sleeve pipe
moved
Prior art date
Application number
CN201510509055.XA
Other languages
Chinese (zh)
Other versions
CN105032687A (en
Inventor
胡克玉
陈玲
李院花
Original Assignee
重庆丰银包装材料有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 重庆丰银包装材料有限公司 filed Critical 重庆丰银包装材料有限公司
Priority to CN201510509055.XA priority Critical patent/CN105032687B/en
Publication of CN105032687A publication Critical patent/CN105032687A/en
Application granted granted Critical
Publication of CN105032687B publication Critical patent/CN105032687B/en

Links

Abstract

The invention discloses a kind of equipment for anode stub brushing, support and frame junction are provided with level detecting apparatus;The sensor for detecting moved cross beam position is provided with above support;Annular nozzle is set on the inner tubal wall of sleeve pipe, annular nozzle is coated by wear-resisting sponges cover, annular nozzle includes first and second nozzle that interleaved is set on ring pipe and ring pipe, the coating flow direction that first jet sprays is direction of the sensing away from sleeve pipe inner tubal wall side obliquely, the coating flow direction that second nozzle sprays is direction of the sensing away from sleeve pipe inner tubal wall side obliquely, ring pipe is located at the middle part of sleeve pipe, and the inlet of the liquid outlet of flusher and each ring pipe is attached by flexible pipe respectively;The painting device provided in above-mentioned technical proposal, it quickly can coat coating to Surface of Rod Bar, improve the surface quality and coating efficiency of coating.

Description

A kind of equipment for anode stub brushing
Technical field
The present invention relates to bar production field, and in particular to a kind of equipment for anode stub brushing.
Background technology
In chemical field, it is often necessary to some materials are coated on the surface of bar, such as produce the sun for protecting negative electrode Pole rod, one layer of metal oxide containing precious metals are coated on the surface of stud, such as coat ruthenium-oxide, yttrium oxide, palladium oxide platinum group metal oxygen Compound, main at present using artificial coating, its efficiency is slow, and the lack of homogeneity coated, and easily causes Precious metal oxidation The coating liquid of thing is trickled down, and influences the quality and increase production cost of product.
The content of the invention
It is an object of the invention to provide a kind of equipment for anode stub brushing, and it quickly can be coated to Surface of Rod Bar Coating, and the uniformity coated is good.
To achieve the above object, the present invention is implemented using following technical scheme:
A kind of equipment for anode stub brushing, it is characterised in that:Including frame and for fixing the fixing device of bar, The support of vertical shape arrangement is provided with the middle part of frame, bar founds shape and fixed on the securing means, and bar includes bar body and rod The gudgeon that material body upper and lower end is set respectively, fixing device include working plate, are arranged at intervals on working plate for fixing bar Mounting seat, fixing hole is offered in mounting seat, the gudgeon of bar lower end is plugged in fixing hole, and the first conveying is provided with frame Mechanism, the first conveying mechanism are supported and conveyed to the both ends of working plate, are provided with support for being applied to bar outer surface The coating mechanism of coating is covered, coating mechanism includes setting moved cross beam on support, and moved cross beam arrangement parallel with working plate is living Dynamic crossbeam forms slide-and-guide along vertical with support and coordinated, and the first drive mechanism drives moved cross beam to move up and down, activity The set brush for coating coating is arranged at intervals with crossbeam, set brush includes the sleeve pipe installed on moved cross beam, and sleeve pipe passes through bearing Rotation is fixed on moved cross beam, and each sleeve pipe is with driving its 5th drive mechanism rotated to be connected;The inner tubal wall of sleeve pipe On be embedded with wear-resisting sponges cover for coating from coating to bar outer surface, be adsorbed with coating, wear-resisting sponge on wear-resisting sponges cover The internal orifice dimension of set is less than the diameter of bar body;Mounting seat is that the pipe of vertical shape arrangement is formed, and guide is also set up on working plate, Guide is formed for a batten, and the sets of holes passed through for bar, the aperture of sets of holes and the external diameter phase of bar body are offered on batten Unanimously, the diameter of bar body is more than or equal to the external diameter of pipe, and the thickness of guide is less than the height of pipe, and guide is with rising Falling unit is connected, and lowering or hoisting gear adjustable guiding part moves up and down;Support and frame junction are provided with level detecting apparatus;Branch The sensor for detecting moved cross beam position is provided with above frame;Annular nozzle, annular spray are set on the inner tubal wall of sleeve pipe Head is coated by wear-resisting sponges cover, first and second nozzle that annular nozzle is set including interleaved on ring pipe and ring pipe, and first The coating flow direction that nozzle sprays is direction of the sensing away from sleeve pipe inner tubal wall side obliquely, the coating flow direction that second nozzle sprays To point to the direction away from sleeve pipe inner tubal wall side obliquely, ring pipe be located at the middle part of sleeve pipe, the liquid outlet of flusher and The inlet of each ring pipe is attached by flexible pipe respectively;The signal of detection is delivered to control device, control dress by sensor Put the running status of regulation and control flusher;The first set pipeline section of sleeve upper end protrudes from the upper surface of moved cross beam, fixed cross beam Lower surface on be arranged at intervals annular groove for housing first set pipeline section, be provided with annular groove for inserting wear-resisting sponges cover The circular projection of inner chamber, the diameter of circular projection is consistent with the internal diameter of wear-resisting sponges cover, and the groove width of annular groove is more than first set The wall thickness of pipeline section, the bottom land of annular groove set sensor and open up annular groove for installing annular nozzle, and sensor is set Put in the periphery of annular nozzle.
The painting device provided in above-mentioned technical proposal, it quickly can coat coating to Surface of Rod Bar, improve coating Surface quality and coating efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of bar;
Fig. 2 is the front view of the present invention;
Fig. 3 is the side view of support;
Fig. 4 is the structural representation of fixed cross beam;
Fig. 5,6,7 are respectively the structural representation of three kinds of embodiments of moved cross beam;
Fig. 8 is the structural representation of the second plate body;
Fig. 9 is the structural representation of mounting seat;
Figure 10 is enlarged diagram at A in Fig. 4;
Figure 11 is enlarged diagram at B in Fig. 5;
Figure 12 is enlarged diagram at C in Fig. 6;
Figure 13 is enlarged diagram at D in Fig. 7;
Figure 14 is the structural representation of clamping device;
Figure 15 is the assembling schematic diagram of stock stop;
Figure 16 is stock stop partial structural diagram;
Figure 17 is axis body, stop collar, block, the assembling schematic diagram of limited block;
Figure 18 is the top view of working plate.
Embodiment
In order that objects and advantages of the present invention are more clearly understood, the present invention is carried out specifically with reference to embodiments It is bright.It should be appreciated that following word only to describe the present invention one or more of specific embodiments, not to the present invention The protection domain specifically asked carries out considered critical.
The technical scheme that the present invention takes as shown in Figure 1,2,3, 4, a kind of equipment for anode stub brushing, including frame A20 and the fixing device for fixing bar, the support A10 of vertical shape arrangement is provided with the middle part of frame A20, and bar A1 founds shape and consolidated It is fixed that bar A1 includes the gudgeon A12 that bar body A11 and bar body A11 upper and lower ends are set respectively on the securing means, Gu Determining device includes working plate 20, and the mounting seat 21 for fixing bar A1 is arranged at intervals on working plate 20, is opened up in mounting seat 21 There is fixing hole, the gudgeon A12 of bar A1 lower ends is plugged in fixing hole, and the first conveying mechanism A201 is provided with frame A20, the One conveying mechanism A201 is supported and conveyed to the both ends (both ends being transversely to the conveying direction) of working plate 20, on support A10 The coating mechanism for coating coating to bar A1 outer surfaces is provided with, coating mechanism includes setting moved cross beam on support A10 40, moved cross beam 40 and 20 parallel arrangement of working plate, moved cross beam 40 and support A10 form slide-and-guide along vertical and matched somebody with somebody Close, the first drive mechanism drives moved cross beam 40 to move up and down, the set for coating coating is arranged at intervals with moved cross beam 40 Brush, set brush include the sleeve pipe 41 installed on moved cross beam 40, and sleeve pipe 41 is rotated by bearing 44 and is fixed on moved cross beam 40, respectively Sleeve pipe 41 is with driving its 5th drive mechanism rotated to be connected;It is embedded with and is used for bar A1 on the inner tubal wall of sleeve pipe 41 Outer surface coats the wear-resisting sponges cover 42 of coating, is adsorbed with coating on wear-resisting sponges cover 42, the internal orifice dimension of wear-resisting sponges cover 42 is small In bar body A11 diameter;Mounting seat 21 is that the pipe of vertical shape arrangement is formed, and also sets up guide 50 on working plate 20, leads It is that a batten is formed to part 50, offers the sets of holes passed through for bar A1 on batten, the apertures of sets of holes is outer with bar body A11's Footpath is consistent, and bar body A11 diameter is more than or equal to the external diameter of pipe, and the thickness of guide 50 is less than the height of pipe, Guide 50 is connected with lowering or hoisting gear, and lowering or hoisting gear adjustable guiding part 50 moves up and down;Support A10 and frame A20 junctions It is provided with level detecting apparatus (can be that infrared sensor or proximity switch are formed to level detecting apparatus).To level detecting apparatus pair The position of working plate 20 carries out signal acquisition, and the signal that control device receives level detecting apparatus collection is analyzed and processed, and The running status of the mechanisms such as result regulation and control lowering or hoisting gear, stop gauge, the first conveying mechanism A201 according to analyzing and processing.Control Device can be that PLC industrial computers are formed or computer is formed, and control program, the control operation of whole equipment are write by programming language Regulated and controled by control device.
The equipment for anode stub brushing provided in above-mentioned technical proposal, by the way that bar A1 arrangements are fixed on into working plate On 20, when working plate 20 is delivered to at level detecting apparatus by the first conveying mechanism A201, then regulation working plate 20 stops movement, Moved cross beam 40 is descending, set brush is set on bar A1 to bar A1 surface coating paint, passes through the continuous conveying of pipeline Operation, it quickly to bar A1 surface coating paints, can improve the surface quality and coating efficiency of coating, and guide 50 is set Put it is very necessary, its brush when to bar A1 carry out righting, ensure each sleeve pipe 41 and each bar A1 brush when it is upper and lower right Just, when moved cross beam 40 is descending, each sleeve pipe 41 can be accurately sheathed with each bar A1.Guide 50 is in two states, One is:Guide 50 is located at bar A1 working position of the upper end to bar A1 progress rightings;Secondly it is:Bar A1 starts to apply The descending avoidance position being superimposed on working plate 20 of guide 50 during brush, due to the pilot hole and the bar body that are opened up on guide 50 A11's is substantially uniform-diameter, therefore guide 50 is come downwards to after avoiding position, when brushing is risen without lifting, is avoided Scratch the surface after bar A1 coatings of colliding with.
The internal orifice dimension of wear-resisting sponges cover 42 is less than bar A1 diameter, and both differ 1~2mm or so, support A10 top Fixed cross beam 30 is set, and the sensor 32 being provided with fixed cross beam 30 for detecting the position of moved cross beam 40 (can be close open Close, contact-making switch) and for the charging mechanism of each set brush addition coating, charging mechanism, which includes being spaced on fixed cross beam 30, to be set The annular nozzle 31 put, annular nozzle 31 include spaced nozzle on ring pipe and ring pipe, each ring pipe (feed liquor Mouthful) be connected with flusher (liquid outlet), the signal of detection is delivered to control device by sensor 32, and control device is adjusted The running status of flusher is controlled, moved cross beam 40 and support A10 forms slide-and-guide along vertical and coordinated, the first driving Mechanism drives moved cross beam 40 to be moved along vertical, and (the first drive mechanism can be that motor and driving-chain band are formed, driving-chain band Moved cross beam 40 is driven to be moved along vertical), annular nozzle 31, set brush, mounting seat corresponding arrangement about 21.Pass through The set brush that sleeve pipe 41 and wear-resisting sponges cover 42 are formed, coating can uniformly be coated in bar A1 outer surface by it, and coating will not Drip in coating procedure, multiple bar A1 are coated because single can be realized, therefore production efficiency is high.When sensor 32 When detecting that moved cross beam 40 rises to highest order, each annular nozzle 31 and wear-resisting 42 corresponding arrangement of sponges cover, now control Device regulates and controls flusher and the coating supplemented needed for single application is sprayed to wear-resisting sponge, so ensures all bar A1 coatings Coat thickness afterwards is consistent.Coating is supplemented by sprinkling/spraying, coating can uniformly infiltrate into wear-resisting sponges cover 42 Everywhere, realize that assured uniform feeds.
Lowering or hoisting gear can specifically use the technical scheme in following S1 and S2 to be implemented:
S1 schemes are:The lifting air set on the support base 60 and support base 60 that lowering or hoisting gear includes setting on frame A20 Cylinder 61, is provided with horizontally disposed lifter plate 62 on the piston rod of lift cylinder 61, lifter plate 62 be located at working plate, support base it Between, each push rod 63 arranged vertically is provided with lifter plate 62, the upper end of each push rod 63 is arranged in concordant shape, is opened on working plate 20 If the perforation 22 passed through for the upper end of push rod 63, the upper end of push rod 63 through being jacked to guide 50 after perforation 22, as Fig. 2, 3rd, shown in 18.
It is specifically:Perforation 22 and push rod 63 can set 3 respectively, and three perforation 22 are located at three apexes of triangle, this Righting best results of the sample to bar A1.
S2 schemes are:The screw mandrel liter set on the support base 60 and support base 60 that lowering or hoisting gear includes setting on frame A20 Drop machine, horizontally disposed lifter plate 62 is provided between working plate, support base, connecting shaft is provided with the lower face of lifter plate 62 Hold, connect outer ring and the Joint of lifter plate 62 of bearing, it is in point to connect the inner ring upper surface of bearing with the lower face of lifter plate 62 Arranged from shape, the elevating screw of screw lift is arranged in vertical shape, and the upper end of elevating screw is fixed on the inner ring of connection bearing It is interior, each push rod 63 arranged vertically is provided with lifter plate 62, the upper end of each push rod 63 is arranged in concordant shape, is opened on working plate 20 If the perforation 22 passed through for the upper end of push rod 63, the upper end of push rod 63 to guide 50 through jacking after perforation 22.
First conveying mechanism can be the pipeline of any one composition in chain, belt, roller, and preferably chain is formed Pipeline, the first conveying mechanism A201 are made up of two first and second identical and positioned opposite delivery sections, first and second transport portion The other both ends to working plate 20 are supported and conveyed.Side to level detecting apparatus is provided with for the conveying to working plate 20 The stock stop 80 stopped, stock stop 80 is between first and second delivery section.Stock stop 80 includes and working plate 20 Two axis bodies 81 that both ends are oppositely arranged respectively, the cored wire of two axis bodies 81 coincide and perpendicular to the conveying directions of the first conveying mechanism Arrangement, axis body 81 are rotated and are fixed on frame A20, the inner of axis body 81 extend to the first conveying mechanism A201 inner side and The end sets block 82, and the outer end that axis body 81 is extended on the outside of frame A20 is provided with limited block 84 and runner 85, on frame A20 Stop collar 83 is provided with, stop collar 83 is that body of the empty set on axis body 81 is formed.Limited location sky is opened up on the tube wall of body Portion 831 is lacked, limited block 84 and block 82 are respectively along the setting that radially extends of axis body 81, limited block 84 and spacing 831 groups of vacancy portion Closing the composition position-limit mechanism spacing to the rotation progress of axis body 81, (limited block 84 is located in spacing vacancy portion 831, and limited block 84 exists The scope moved in spacing vacancy portion 831 is 81 rotatable angular range of axis body), runner 85 passes through transmission mechanism and the 3rd Drive mechanism is connected.Runner on two axis bodies can be connected by synchronous drive mechanism with motor, motor and control Device processed is connected.Block 82 is in two states, and one is:The end of block 82 protrudes from the defeated of the first conveying mechanism A201 Face is sent to be used to stop the backgauge position that working plate 20 is conveyed, secondly being:Block 82 bounces back to the defeated of the first conveying mechanism A201 Send the avoidance position below face;Specifically as shown in Figure 15,16,17.Conveying of the setting of stock stop 80 mainly to working plate is entered Row temporary spacing, it is positioned on the first conveying mechanism and is conveyed after the bar A1 brushed is assembled on working plate, passed through Level detecting apparatus is set, is so detecting that working plate 20 (refers to that the device is transported in place in place to level detecting apparatus Predetermined opening position) start stock stop 80 afterwards so that and block 82, which is in conveying of the working position to working plate 20, to be stopped, is made The 22 corresponding arrangement of perforation for obtaining the upper end of push rod 63 and being opened up on working plate, push rod 63,22 corresponding cloth of perforation postpone startup Lowering or hoisting gear so that guide 50 rises to working position and carries out righting to individual bar so that fixed on each set brush and working plate 20 Bar A1 with core arrange.Guide 50 carries out wiping operation after rising to working position, and each set brush and each bar A1 can be the same as core cloth Put, be to ensure to brush reliable an important factor for carrying out.
In addition, clamping device can be set on support base 60, as shown in figure 14, clamping device includes first and second rim portion First and second claw 64,65 not set, first and second edge are two edge positioned opposite on support base 60, first and second edge With the first conveying mechanism A201 perpendicular arrangement of conveying direction, first and second claw 64,65 is formed for bar, the lower end of bar It is articulated and connected by the first jointed shaft and support base 60, the first jointed shaft cloth vertical with the first conveying mechanism A201 conveying direction Put, the upper end of bar bends l-shaped or hook-shaped to the inner side of support base 60, and two-way gas is provided between first and second claw 64,65 Cylinder 66, the piston rod at the two-way both ends of cylinder 66 connect by the way that the middle part of the second jointed shaft and first and second claw 64,65 is be hinged respectively Connect, the parallel arrangement of first and second jointed shaft.Working plate, support base are integrally connected by clamping device, avoid lifting from filling Putting to lift working plate 20 when jacking guide 50 and rising causes each set brush and bar A1 can not to be arranged with core.Therefore, to After level detecting apparatus detects working plate 40 in place, first start stock stop 80 and stopped, then start clamping device to work Loading board 40 is gripped, and is restarted lowering or hoisting gear after gripping and is directed to part 50 and is pushed into working position.
Specific operation is, as shown in Fig. 4,5,10,11:41 sections of the first sleeve of the upper end of sleeve pipe 41 protrudes from movable transverse The upper surface of beam 40, the annular groove for housing 41 sections of first sleeve, annular groove are arranged at intervals on the lower surface of fixed cross beam 30 Inside it is provided with the circular projection 33 for inserting the wear-resisting inner chamber of sponges cover 42, the diameter of circular projection 33 and wear-resisting sponges cover 42 Internal diameter it is consistent, the groove width of annular groove is more than the wall thickness of 41 sections of first sleeve, the bottom land of annular groove set sensor 32 and The annular recess for installing annular nozzle 31 is opened up, sensor 32 is arranged on the periphery of annular nozzle 31.41 sections of first sleeve Trigger sensor 32 so that control device regulates and controls flusher spray paint.Do not plugged in sleeve pipe 41 during due to spray paint Bar A1, therefore blocked by the circular projection 33 of setting to the vestibule of wear-resisting sponges cover 42, prevent the coating of sprinkling from Dripped in vestibule, circular projection 33 protrudes from the lower surface of fixed cross beam 30, and flusher can be that dress is sprayed water or sprayed in general Composition is put, the shower nozzle of spray equipment is removed, the inlet 34 of the liquid outlet of spray equipment and ring pipe is then passed through into flexible pipe It is attached, so can be achieved with the feeding sprinkling to each annular nozzle 31., can be on the tube wall of sleeve pipe 41 for such a scheme Open up a circle aspirating hole 49, as shown in Fig. 7,13, aspirating hole 49 be located at aperture height on the inner tube wall of sleeve pipe 41 be less than it is another End aperture height (that is,:Aspirating hole 49 is in tilted layout, and height of the aspirating hole 49 close to wear-resisting one end of sponges cover 42 is less than another End height, aspirating hole 49 is provided at circumferentially spaced along sleeve pipe 41), aspirating hole 49 be located at aperture on the inner tube wall of sleeve pipe 41 with it is resistance to The corresponding arrangement in bottom of sponges cover 42 is ground, the air entry of air extractor is connected with aspirating hole 49, can so ensure to spray Coating can rapidly penetrate into wear-resisting sponges cover 42, ensure follow-up coating and improve production efficiency.
Implemented in addition, coating supplementing device can also adopt the following technical scheme that:Set on the inner tubal wall of sleeve pipe 41 Annular nozzle 31, annular nozzle 31 are coated by wear-resisting sponges cover 42, and annular nozzle 31, which includes being spaced on ring pipe and ring pipe, to be handed over First and second nozzle that mistake is set, the coating flow direction that first jet sprays are to point to obliquely away from the inner tubal wall side of sleeve pipe 41 Direction, to point to the direction away from the inner tubal wall side of sleeve pipe 41 obliquely, ring pipe is located at the coating flow direction that second nozzle sprays The middle part of sleeve pipe 41, the inlet of the liquid outlet of flusher and each ring pipe are attached by flexible pipe respectively.
Coat coating when must ensure mounting seat 21, bar A1, set brush with core arrange, if bar A1 lower ends gudgeon A12 with Mounting seat 21, which assembles tension, can then influence to unload, and therefore, further adopt the following technical scheme that and implemented in the present invention, such as scheme Shown in 9, mounting seat 21 is that the pipe of vertical shape arrangement is formed, and the mounting hole of closing in shape, mounting hole are offered on the inner tubal wall of pipe Hole core direction it is consistent with the radial direction of pipe, mounting hole is provided at circumferentially spaced in the sustained height of pipe along it, mounting hole edge The short transverse of pipe is in layered arrangement, and the mounting hole of adjacent layer is arranged in interleaved shape, and steel ball 212 is provided with mounting hole With spring 211, spring 211 against steel ball 212 causes the Local Convex of steel ball 212, and for the inner tubal wall of pipe, the external diameter of pipe is small In the diameter of first through hole.When so in the gudgeon A12 insertion pipes of bar A1 lower ends, pass through spring 211 and the work of steel ball 212 With so that bar A1 is self-regulated, and ensures that mounting seat 21, bar A1, set brush are arranged with core, so as to ensure the uniform of coating Property.
In addition, in order to improve the uniformity of coating, sleeve pipe 41 is rotated in the present invention and is fixed on moved cross beam 40, each set Pipe 41 is connected with the 5th drive mechanism for driving it to rotate.So when moved cross beam 40 is run to minimum point, the 5th drives Motivation structure drives sleeve pipe 41 to rotate 90 ° or 180 °, then runs up again, lifts the uniformity of coating.More specifically side Case is, as shown in Fig. 6,8,12:41 sections of upper surfaces for protruding from moved cross beam 40 of first sleeve of the upper end of sleeve pipe 41, first set It is provided with travelling gear 43 on 41 sections of pipe, travelling gear 43 forms transmission with rack and coordinated, and rack is along the length side of moved cross beam 40 To arrangement, rack is connected with the 5th drive mechanism, and (such a situation rack is formed along its length direction and moved cross beam 40 and slided It is oriented to and coordinates, the 5th drive mechanism can be that cylinder is formed);Sleeve pipe 41 is fixed on moved cross beam 40 by bearing 44, movable transverse First and second batten 401,402 that beam 40 is put by upper and lower folded plaiting is spliced to form, and interval is opened up for installing on the first batten 401 The pilot hole of sleeve pipe 41, interval opens up the second through hole passed through for bar A1 on the second batten 402, and pilot hole and the second through hole are same Core arranges that the diameter of the second through hole is less than the external diameter of sleeve pipe 41, distinguishes on the upper face of the second batten 402 of the second through hole periphery Annular protrusion 402b and annular groove 402a are provided with, annular protrusion 402b, annular groove 402a and the second through hole are arranged with core, Annular groove 402a is located at annular protrusion 402b periphery, annular groove 402a and bearing corresponding arrangement, convex annular about 44 The diameter for playing 402b is less than the external diameter of sleeve pipe 41, and each annular groove 402a is by a drainage trough 402c by the tank liquor in annular groove It is drained to the outer end of moved cross beam 40.The setting of bearing 44 ensures the reliability that bearing 44 rotates, it is necessary to inject lubricating oil, still Lubricating oil can drip the surface for being doped into and bar A1 being coated in coating, influence bar A1 quality, therefore, in the present invention, lead to Cross setting annular protrusion 402b to stop lubricating oil, avoid Contamination Coatings, while annular groove 402a and drainage trough will drip The lubricating oil fallen is drained to the end discharge of moved cross beam 40.
Other 5th drive mechanism can also be implemented using following two kinds of technical schemes of M1, M2:
M1 kind technical schemes are:41 sections of upper surfaces for protruding from moved cross beam 40 of first sleeve of the upper end of sleeve pipe 41, first Sprocket wheel is provided with 41 sections of sleeve pipe, sprocket wheel forms drive connection with chain and coordinated, and chain is connected with the 5th drive mechanism, such a The drive mechanism of situation the 5th can be that the stepper motor installed on moved cross beam 40 is formed, and the output shaft of stepper motor sets driving-chain Wheel, drive sprocket form drive connection by chain with sprocket wheel and coordinated, the output shaft of stepper motor and the length direction of sleeve pipe 41 Parallel arrangement;
M2 kind technical schemes are:41 sections of upper surfaces for protruding from moved cross beam 40 of first sleeve of the upper end of sleeve pipe 41, first Crank is provided with 41 sections of sleeve pipe, each crank is connected as a single entity by connecting rod, and connecting rod is connected with the 5th drive mechanism, and crank includes The parallel bar being arranged in parallel with 41 vertical rod connected vertically of sleeve pipe and with sleeve pipe 41, connecting rod form the company of being rotatably assorted with parallel bar Connect.5th drive mechanism can be that the 5th cylinder is formed, and the 5th cylinder is arranged perpendicular to sleeve pipe 41, the cylinder body and piston of the 5th cylinder Bar is connected and formed the length direction of the jointed shaft that is articulated and connected each parallel to sleeve pipe 41 with moved cross beam 40, rod hinge connection respectively Arrangement.
It is using the idiographic flow of the invention operated:
Feed status:The upper end of sleeve pipe 41 leans with sensor 32, control device regulation and control flusher sprayed coating, leads Overlayed to part 50 on working plate 20, each bar A1 to be brushed is stood into shape is fixed in each mounting seat 21, then will assemble Working plate 20 be pushed into be conveyed on the first conveying mechanism, after detecting working plate 20 in place to level detecting apparatus, control Device starts stock stop 80 and performs backgauge operation so that the perforation 22 opened up on the upper end of push rod 63 and working plate 20 is corresponding Working plate 20 is fixed for arrangement, subsequent start-up clamping device, and control device starts lowering or hoisting gear and held after working plate 20 is fixed Row operation so that the upper end of push rod 63 jacks guide 50 through working plate 20 and rises to working position;Guide 50 rises to work Position carries out righting to bar A1;
Brushing state:The same core arrangement of each bar A1 and each set brush is realized after bar righting, the first drive mechanism drives work Dynamic crossbeam 40 is descending, and when covering brush and being set in bar body A11 upper ends, it is descending that lowering or hoisting gear starts adjustable guiding part 50, with this Cover to brush to continue traveling downwardly simultaneously and bar A1 surface is from top to bottom brushed, guide 50 drops to avoidance position and is superimposed on frock Ensure that bar body A11 lateral surface can be coated completely on plate 20, when moved cross beam 40 drops to minimum point, the 5th driving Mechanism drives set brush to rotate 90 ° or 180 °, and then the first drive mechanism drives moved cross beam 40 to move upwards again, moved cross beam 40 operation to highest order, upper end and the sensors 32 of sleeve pipe 41 are leant, and bar A1, which is brushed, to be terminated;Subsequent control device regulation and control gear Expect that mechanism 80 is recovered to position is avoided, the first conveying mechanism continues to convey working plate, and bar A1 enters next work after brushing Operation is dried in sequence, and drying can use natural air drying or be placed in baking oven and dry.
So continuously repeat execution aforesaid operations.
The plant equipment brushed provided by the present invention for bar A1, as shown in Fig. 1~18, it can realize that bar A1 is high-quality Amount, quickly brush.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, after content described in the present invention is known, under the premise without departing from the principles of the invention, it can also be made some Equal conversion and replacement, these, which convert and substituted on an equal basis, also should be regarded as belonging to protection scope of the present invention.

Claims (4)

  1. A kind of 1. equipment for anode stub brushing, it is characterised in that:Including frame and for fixing the fixing device of bar, machine The support of vertical shape arrangement is provided with the middle part of frame, bar founds shape and fixed on the securing means, and bar includes bar body and bar The gudgeon that body upper and lower end is set respectively, fixing device include working plate, the peace for fixing bar are arranged at intervals on working plate Seat is filled, offers fixing hole in mounting seat, the gudgeon of bar lower end is plugged in fixing hole, and the first conveyer is provided with frame Structure, the first conveying mechanism are supported and conveyed to the both ends of working plate, are provided with support for being coated to bar outer surface The coating mechanism of coating, coating mechanism include setting moved cross beam on support, moved cross beam arrangement parallel with working plate, activity Crossbeam forms slide-and-guide along vertical with support and coordinated, and the first drive mechanism drives moved cross beam to move up and down, movable transverse The set brush for coating coating is arranged at intervals with beam, set brush includes the sleeve pipe installed on moved cross beam, and sleeve pipe is turned by bearing Dynamic to be fixed on moved cross beam, each sleeve pipe is with driving its 5th drive mechanism rotated to be connected;On the inner tubal wall of sleeve pipe The wear-resisting sponges cover for coating coating to bar outer surface is embedded with, coating, wear-resisting sponges cover are adsorbed with wear-resisting sponges cover Internal orifice dimension be less than bar body diameter;Mounting seat is that the pipe of vertical shape arrangement is formed, and also sets up guide on working plate, leads Formed to part for a batten, the sets of holes passed through for bar, the aperture of sets of holes and the external diameter phase one of bar body are offered on batten Cause, the diameter of bar body is more than or equal to the external diameter of pipe, and the thickness of guide is less than the height of pipe, guide and lifting Device is connected, and lowering or hoisting gear adjustable guiding part moves up and down;Support and frame junction are provided with level detecting apparatus;Support Top be provided with sensor for detecting moved cross beam position;Annular nozzle, annular nozzle are set on the inner tubal wall of sleeve pipe Coated by wear-resisting sponges cover, annular nozzle includes first and second nozzle that interleaved is set on ring pipe and ring pipe, the first spray To point to the direction away from sleeve pipe inner tubal wall side obliquely, the coating flow direction that second nozzle sprays is the coating flow direction that mouth sprays Point to the direction away from sleeve pipe inner tubal wall side obliquely, ring pipe be located at the middle part of sleeve pipe, the liquid outlet of flusher with respectively The inlet of ring pipe is attached by flexible pipe respectively;The signal of detection is delivered to control device, control device by sensor Regulate and control the running status of flusher;The first set pipeline section of sleeve upper end protrudes from the upper surface of moved cross beam, fixed cross beam The annular groove for housing first set pipeline section is arranged at intervals on lower surface, is provided with annular groove for inserting in wear-resisting sponges cover The circular projection of chamber, the diameter of circular projection is consistent with the internal diameter of wear-resisting sponges cover, and the groove width of annular groove is more than first sleeve The wall thickness of section, the bottom land of annular groove set sensor and open up annular groove for installing annular nozzle, and sensor is set In the periphery of annular nozzle.
  2. 2. the equipment according to claim 1 for anode stub brushing, it is characterised in that:Lowering or hoisting gear include support base and The lift cylinder set on support base, horizontally disposed lifter plate is provided with the piston rod of lift cylinder, lifter plate is located at work Each push rod arranged vertically is provided between loading board, support base, on lifter plate, the upper end of each push rod is arranged in concordant shape, frock The perforation passed through for push rod upper end is opened up on plate, the upper end of push rod jacks through after perforating to guide.
  3. 3. the equipment according to claim 1 for anode stub brushing, it is characterised in that:Lowering or hoisting gear include support base and The screw lift set on support base, horizontally disposed lifter plate, the lower plate of lifter plate are provided between working plate, support base Connection bearing is provided with face, connects outer ring and the lifter plate Joint of bearing, connects inner ring upper surface and the lifter plate of bearing The separated arrangement of lower face, the elevating screw of screw lift arranges that the upper end of elevating screw is fixed on company in vertical shape Each push rod arranged vertically is provided with the inner ring of joint bearing, on lifter plate, the upper end of each push rod is arranged in concordant shape, working plate On open up the perforation passed through for push rod upper end, the upper end of push rod to guide through jacking after perforation.
  4. 4. the equipment for anode stub brushing according to Claims 2 or 3, it is characterised in that:It is additionally provided with support base Clamping device, clamping device include first and second claw that first and second edge is set respectively, and first and second edge is phase on support base To two edge of arrangement, first and second edge and the perpendicular arrangement of conveying direction of the first conveying mechanism, first and second claw is bar Bar is formed, and the lower end of bar is connected by the first jointed shaft with support seat hinge, and the first jointed shaft is defeated with the first conveying mechanism Direction is sent to be arranged vertically, the upper end of bar bends l-shaped to the inner side of support base, and two-way gas is provided between first and second claw Cylinder, the piston rod at two-way cylinder both ends in the middle part of first and second claw respectively by the second jointed shaft with being articulated and connected, and first and second The parallel arrangement of jointed shaft.
CN201510509055.XA 2015-08-17 2015-08-17 A kind of equipment for anode stub brushing CN105032687B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510509055.XA CN105032687B (en) 2015-08-17 2015-08-17 A kind of equipment for anode stub brushing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510509055.XA CN105032687B (en) 2015-08-17 2015-08-17 A kind of equipment for anode stub brushing

Publications (2)

Publication Number Publication Date
CN105032687A CN105032687A (en) 2015-11-11
CN105032687B true CN105032687B (en) 2017-11-24

Family

ID=54439997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510509055.XA CN105032687B (en) 2015-08-17 2015-08-17 A kind of equipment for anode stub brushing

Country Status (1)

Country Link
CN (1) CN105032687B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109655210A (en) * 2018-12-05 2019-04-19 海宁市英德赛电子有限公司 Ultra-pure ammonia pipeline leakage testing device applied to LED

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761648A (en) * 2008-11-20 2010-06-30 无锡五冶金属压延有限公司 Sealing device of rotating shaft
CN201597770U (en) * 2010-01-08 2010-10-06 山东西王特钢有限公司 Tight-holding device for bundling machine
CN103354404A (en) * 2013-07-03 2013-10-16 合肥凯邦电机有限公司 Magnetic tile guiding device
CN203253577U (en) * 2013-05-09 2013-10-30 常州常宝精特能源管材有限公司 Device for coating antirust agent on outer surface of cold rolled tube on line
CN203620904U (en) * 2013-12-09 2014-06-04 翟星辰 Cylindrical object painting device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008034810A2 (en) * 2006-09-18 2008-03-27 Agfa Graphics Nv A device and a process for coating a peripheral surface of a sleeve body
US20140272164A1 (en) * 2013-03-14 2014-09-18 General Electric Company Tube coaters and methods of using same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761648A (en) * 2008-11-20 2010-06-30 无锡五冶金属压延有限公司 Sealing device of rotating shaft
CN201597770U (en) * 2010-01-08 2010-10-06 山东西王特钢有限公司 Tight-holding device for bundling machine
CN203253577U (en) * 2013-05-09 2013-10-30 常州常宝精特能源管材有限公司 Device for coating antirust agent on outer surface of cold rolled tube on line
CN103354404A (en) * 2013-07-03 2013-10-16 合肥凯邦电机有限公司 Magnetic tile guiding device
CN203620904U (en) * 2013-12-09 2014-06-04 翟星辰 Cylindrical object painting device

Also Published As

Publication number Publication date
CN105032687A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN205436125U (en) Valve application autogiration linkage
TWI275418B (en) Coating pressure feed roller, roller coating device, curved-surface operable roller coating device, automated coating apparatus using those devices, and coating method
RU2442665C2 (en) Paint application device and its operational method
US8561571B2 (en) Apparatus and method of applying a coating solution
CN1321748C (en) Substrate processing device
KR101163308B1 (en) Film forming system and method using application nozzle
US6478874B1 (en) System for catalytic coating of a substrate
ES2373735T3 (en) CORRESPONDING COATING AND INSTALLATION PROCEDURE.
US7521087B2 (en) Method for catalyst coating of a substrate
DE202014104613U1 (en) applicator
CN102177002B (en) Painting device and corresponding operation method
CN104602867B (en) Facility for spraying coating material
CN205501444U (en) Automatic roll plate wire
CN101163559B (en) Manufacturing method of seamless pipe and cleaning equipment
US9339670B1 (en) Vertical pole spraying system
CN1767904A (en) Coating method and system for forming protective layer
CA2753204A1 (en) Systems and methods of reinforcing a pipe using fiber bundles
CN106695830A (en) Intelligent robot for spraying outer wall of high-rise building
US20040112284A1 (en) Painting equipment and painting method
CA1331723C (en) Painting method
US6372107B1 (en) Process and conveyor device for conveying vehicle bodies through a treatment tank
CN106150051B (en) A kind of automatic plastering apparatus
CN105944894B (en) The plank spray-painting plant of drying function
CN205518366U (en) Post insulators RTV paint spraying of transformer substation equipment
CA2851472C (en) Method for the application of an aqueous treatment solution on the surface of a moved steel strip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20171026

Address after: 400056 Baihe Village, Banan District, Chongqing

Applicant after: Chongqing silver packing material Co., Ltd.

Address before: 246600 Sanhe street, Sanhe Town, Yuexi County, Anqing, Anhui

Applicant before: Cheng Yehong

Effective date of registration: 20171026

Address after: 400056 Baihe Village, Banan District, Chongqing

Applicant after: Chongqing silver packing material Co., Ltd.

Address before: 246600 Sanhe street, Sanhe Town, Yuexi County, Anqing, Anhui

Applicant before: Cheng Yehong

CB03 Change of inventor or designer information

Inventor after: Hu Keyu

Inventor after: Chen Ling

Inventor after: Li Yuanhua

Inventor before: Cheng Yehong

Inventor after: Hu Keyu

Inventor after: Chen Ling

Inventor after: Li Yuanhua

Inventor before: Cheng Yehong

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180117

Address after: 401320 Banan District, Banan District, Chongqing, No. 8-29, Yu Nan Road, No. 8-29

Patentee after: Chongqing Boshi Intellectual Property Service Co., Ltd.

Address before: 400056 Baihe Village, Banan District, Chongqing

Patentee before: Chongqing silver packing material Co., Ltd.

Effective date of registration: 20180117

Address after: 401320 Banan District, Banan District, Chongqing, No. 8-29, Yu Nan Road, No. 8-29

Patentee after: Chongqing Boshi Intellectual Property Service Co., Ltd.

Address before: 400056 Baihe Village, Banan District, Chongqing

Patentee before: Chongqing silver packing material Co., Ltd.

TR01 Transfer of patent right

Effective date of registration: 20201119

Address after: 410300 No.177 Jianshou Avenue, economic development zone, Liuyang City, Changsha City, Hunan Province

Patentee after: Liuyang Huarui Intellectual Property Operation Co., Ltd

Address before: 401320 No. 249 Yunan Avenue, Banan District, Chongqing, 8-29

Patentee before: Chongqing Boshi Intellectual Property Service Co.,Ltd.

TR01 Transfer of patent right