CN104990723A - Simplified load damaged cable identification method through hybrid monitoring under generalized displacement - Google Patents

Simplified load damaged cable identification method through hybrid monitoring under generalized displacement Download PDF

Info

Publication number
CN104990723A
CN104990723A CN201510437388.6A CN201510437388A CN104990723A CN 104990723 A CN104990723 A CN 104990723A CN 201510437388 A CN201510437388 A CN 201510437388A CN 104990723 A CN104990723 A CN 104990723A
Authority
CN
China
Prior art keywords
load
cable structure
vector
evaluation object
initial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510437388.6A
Other languages
Chinese (zh)
Inventor
韩玉林
韩佳邑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201510437388.6A priority Critical patent/CN104990723A/en
Publication of CN104990723A publication Critical patent/CN104990723A/en
Pending legal-status Critical Current

Links

Abstract

Provided is a simplified load damaged cable identification method through hybrid monitoring under generalized displacement. Based on hybrid monitoring and by monitoring the generalized displacement of a support, whether there is a need to update a mechanical calculation reference model of a cable structure is decided, and a mechanical calculation reference model of the cable structure taking the generalized displacement of the support into account is obtained. Calculation is performed based on the obtained model to obtain a unit damage monitored variable value change matrix. The non-inferior solution of an evaluated object current nominal damage vector is worked out based on the approximate linear relationship of a monitored variable current value vector, a monitored variable current initial value vector, the unit damage monitored variable value change matrix and the to-be-solved evaluated object current nominal damage vector, and accordingly, the health status of a core evaluated object can be identified.

Description

Simplify the recognition methods of generalized displacement hybrid monitoring load damaged cable
Technical field
Cable-stayed bridge, suspension bridge, the structures such as truss-frame structure have a common ground, be exactly that they have many parts bearing tensile load, as suspension cable, main push-towing rope, hoist cable, pull bar etc., the common ground of this class formation is with rope, cable or the rod member only bearing tensile load are support unit, for simplicity, such structure representation is " Cable Structure " by this method, and by all ropeway carrying-ropes of Cable Structure, carrying cable, and all rod members (being also called two power rod members) only bearing axial tension or axial compression load, be collectively referred to as simplicity " cable system ", ropeway carrying-rope is censured with " support cable " this noun in this method, carrying cable and only bear the rod member of axial tension or axial compression load, sometimes referred to as " rope ", so when using " rope " this word below, two power rod members are just referred to truss-frame structure reality.In structure military service process, the correct identification of the health status of support cable or cable system is related to the safety of whole Cable Structure.In Cable Structure military service process, may generalized displacement be there is in Cable Structure bearing, the load that Cable Structure is born also may change, the health status of Cable Structure also may change simultaneously, at this complex condition, based on hybrid monitoring, (this method to judge the health status of Cable Structure to this method by the hybrid monitoring of the change of the measurable parameter to the aforementioned dissimilar Cable Structure of this section, all monitored Cable Structure characteristic parameters are referred to as " monitored amount " by this method, because now monitored amount is made up of the dissimilar measurable parameter mixing of Cable Structure, this method claims this to be hybrid monitoring) identify damaged cable, belong to engineering structure health monitoring field.
Background technology
Reject load change, Cable Structure generalized displacement of support to the impact of Cable Structure health status recognition result, thus identify the change of the health status of structure exactly, be problem in the urgent need to address at present, this method discloses a kind of effective, the cheap method addressed this problem.
Summary of the invention
Technical matters: this method discloses a kind of method, under the condition that cost is lower, when bearing has generalized displacement, when the load change that structure is born, generalized displacement of support and load change can be rejected on the impact of Cable Structure health status recognition result, thus identify the health status of support cable exactly.
Technical scheme: this method is made up of three parts.Method, knowledge based storehouse (containing parameter) and actual measurement the structural health conditions appraisal procedure of monitored amount, the software and hardware part of health monitoring systems of setting up knowledge base needed for structural healthy monitoring system and parameter respectively.
In the method, the coordinate of bearing about the X, Y, Z axis of Descartes's rectangular coordinate system is censured with " bearing volume coordinate ", alternatively becoming is the volume coordinate of bearing about X, Y, Z axis, bearing is called the volume coordinate component of bearing about this axle about the concrete numerical value of the volume coordinate of some axles, and a volume coordinate component also with bearing in this method expresses the concrete numerical value of bearing about the volume coordinate of some axles; The angular coordinate of bearing about X, Y, Z axis is censured with " bearing angular coordinate ", bearing is called the angular coordinate component of bearing about this axle about the concrete numerical value of the angular coordinate of some axles, and an angular coordinate component also with bearing in this method expresses the concrete numerical value of bearing about the angular coordinate of some axles; Censure bearing angular coordinate and bearing volume coordinate entirety with " bearing generalized coordinate ", a generalized coordinate component also with bearing in this method expresses the volume coordinate of bearing about an axle or the concrete numerical value of angular coordinate; Bearing is called support wire displacement about the change of the coordinate of X, Y, Z axis, and alternatively the change of bearing volume coordinate is called support wire displacement, and a translational component also with bearing in this method expresses the concrete numerical value of bearing about the displacement of the lines of some axles; Bearing is called angular displacement of support about the change of the angular coordinate of X, Y, Z axis, and an angular displacement component also with bearing in this method expresses the concrete numerical value of bearing about the angular displacement of some axles; Generalized displacement of support censures support wire displacement and angular displacement of support is all, and a generalized displacement component also with bearing in this method expresses the displacement of the lines of bearing about some axles or the concrete numerical value of angular displacement; Support wire displacement also can be described as translational displacement, and support settlement is support wire displacement or the translational displacement component at gravity direction.
The Part I of this method: the method setting up knowledge base needed for structural healthy monitoring system and parameter.Specific as follows:
1. the external force that object, structure are born can be described as load, and load comprises face load and volume load.Face load, also known as surface load, is the load acting on body surface, comprises centre-point load and distributed load two kinds.Volume load be continuous distribution in the load of interior of articles each point, as deadweight and the inertial force of object.
Centre-point load is divided into concentrated force and concentrated couple two kinds, in a coordinate system, such as in Descartes's rectangular coordinate system, a concentrated force can resolve into three components, same, a concentrated couple also can resolve into three components, if load is actually centre-point load, in the method a concentrated force component or a concentrated couple component are called a load, the now change of load is embodied as the change of a concentrated force component or a concentrated couple component.
Distributed load is divided into line distributed load and EDS maps load, the description of distributed load at least comprises the zone of action of distributed load and the size of distributed load, the size distribution intensity of distributed load is expressed, distribution intensity distribution characteristics is (such as uniform, sine function equal distribution feature) and amplitude is expressed, and (such as two distributed loads are all uniform, but its amplitude is different, can well-distributed pressure be example so that the concept of amplitude to be described: same structure bears two different well-distributed pressures, two distributed loads are all uniformly distributed loads, but the amplitude of a distributed load is 10MPa, the amplitude of another distributed load is 50MPa).If load is actually distributed load, when this method talks about the change of load, in fact refer to the change of the amplitude of distributed load distribution intensity, and the distribution characteristics of the zone of action of distributed load and distribution intensity is constant.In a coordinate system, a distributed load can resolve into several components, if the amplitude of the respective distribution intensity of several components of this distributed load changes, and the ratio of change is all not identical, so in the method the component of these several distributed loads is regarded as the independently distributed load of same quantity, now load just represents the component of a distributed load, also component identical for the amplitude changing ratio of the intensity that wherein distributes can be synthesized a distributed load or be called a load.
Volume load is that continuous distribution is in the load of interior of articles each point, as deadweight and the inertial force of object, the description of volume load at least comprises the zone of action of volume load and the size of volume load, the size distribution intensity of volume load is expressed, distribution intensity distribution characteristics is (such as uniform, linear function equal distribution feature) and amplitude is expressed, and (such as two individual stow lotuses are all uniform, but its amplitude is different, can conduct oneself with dignity for example is to illustrate the concept of amplitude: the material of two parts of same structure is different, therefore density is different, so although this volume load suffered by two parts is all uniform, but the amplitude of the volume load suffered by a part may be 10kN/m 3, the amplitude of the volume load suffered by another part is 50kN/m 3).If load is actually volume load, actual treatment is the change of the amplitude of volume load diatibution intensity in the method, and the distribution characteristics of the zone of action of volume load and distribution intensity is constant, in fact the change of the amplitude of the distribution intensity of volume load is referred to when now mentioning the change of load in the method, now, the load changed refers to the volume load that the amplitude of those distribution intensities changes.In a coordinate system, one individual stow lotus can resolve into several components (such as in Descartes's rectangular coordinate system, volume load can resolve into the component of three axles about coordinate system, that is, in Descartes's rectangular coordinate system, volume load can resolve into three components), if the amplitude of the respective distribution intensity of several components of this volume load changes, and the ratio of change is all not identical, so in the method the component of this several body stow lotus is regarded as the independently load of same quantity, also the volume sharing part of the load identical for the amplitude changing ratio of the intensity that wherein distributes can be synthesized an individual stow lotus or be called a load.
When load is embodied as centre-point load, in the method, " load unit change " in fact refers to " unit change of centre-point load ", similar, " load change " specifically refers to " change of the size of centre-point load ", " load change amount " specifically refers to " variable quantity of the size of centre-point load ", " load change degree " specifically refers to " intensity of variation of the size of centre-point load ", " the actual change amount of load " refers to " the actual change amount of the size of centre-point load ", " load changed " refers to " centre-point load that size changes ", briefly, now " so-and-so load so-and-so change " refers to " size of so-and-so centre-point load so-and-so change ".
When load is embodied as distributed load, in the method, " load unit change " in fact refers to " unit change of the amplitude of the distribution intensity of distributed load ", and the distribution characteristics of distributed load is constant, similar, " load change " specifically refers to " change of the amplitude of the distribution intensity of distributed load ", and the distribution characteristics of distributed load is constant, " load change amount " specifically refers to " variable quantity of the amplitude of the distribution intensity of distributed load ", " load change degree " specifically refers to " intensity of variation of the amplitude of the distribution intensity of distributed load ", " the actual change amount of load " specifically refers to " the actual change amount of the amplitude of the distribution intensity of distributed load ", " load changed " refers to " distributed load that changes of amplitude of distribution intensity ", briefly, now " so-and-so load so-and-so change " refers to " amplitude of the distribution intensity of so-and-so distributed load so-and-so change ", and the distribution characteristics of the zone of action of all distributed loads and distribution intensity is constant.
When load is embodied as volume load, in the method, " load unit change " in fact refers to " unit change of the amplitude of the distribution intensity of volume load ", similar, " load change " refers to " change of the amplitude of the distribution intensity of volume load ", " load change amount " refers to " variable quantity of the amplitude of the distribution intensity of volume load ", " load change degree " refers to " intensity of variation of the amplitude of the distribution intensity of volume load ", " the actual change amount of load " refers to " the actual change amount of the amplitude of the distribution intensity of volume load ", " load changed " refers to " the volume load that changes of amplitude of distribution intensity ", briefly, " so-and-so load so-and-so change " refers to " amplitude of the distribution intensity of so-and-so volume load so-and-so change ", and the distribution characteristics of the zone of action of all volume load and distribution intensity is constant.
First the quantity of the load that may change that Cable Structure is born is confirmed.According to the feature of the load that Cable Structure is born, confirm wherein " load likely changed ", or all load is considered as " load likely changed ", if total JZW the load that may change, i.e. total JZW secondary evaluation object.If the quantity sum of the quantity of the quantity of angular displacement of support component of Cable Structure, the support cable of Cable Structure and JZW " load likely changed " is N, i.e. total N number of evaluation object.To evaluation object serial number, this numbering will be used for generating vector sum matrix in subsequent step.
Monitored multiclass parameter can comprise: Suo Li, strain, angle and volume coordinate, be described below respectively:
If total Q root support cable in cable system, i.e. total Q core evaluation object, the monitored rope force data of Cable Structure is by M in Cable Structure 1the M of individual appointment rope 1individual rope force data describes, and the change of Cable Structure Suo Li is exactly the change of the Suo Li of all appointment ropes.Each total M 1individual cable force measurement value or calculated value characterize the rope force information of Cable Structure.M 1it is an integer being not less than 0.
The monitored strain data of Cable Structure can by K in Cable Structure 2the L of individual specified point and each specified point 2the strain of individual assigned direction describes, and the change of Cable Structure strain data is exactly K 2the change of all tested strain of individual specified point.Each total M 2(M 2=K 2× L 2) individual strain measurement value or calculated value characterize Cable Structure strain.M 2it is an integer being not less than 0.
The monitored angle-data of Cable Structure is by K in Cable Structure 3individual specified point, cross the L of each specified point 3the H of individual appointment straight line, each appointment straight line 3individual angle coordinate component describes, and the change of Cable Structure angle is exactly the change of all specified points, all appointment straight line, all angle coordinate component of specifying.Each total M 3(M 3=K 3× L 3× H 3) individual angle coordinate component measurement value or calculated value characterize the angle information of Cable Structure.M 3it is an integer being not less than 0.
The monitored shape data of Cable Structure is by K in Cable Structure 4the L of individual specified point and each specified point 4the volume coordinate of individual assigned direction describes, and the change of Cable Structure shape data is exactly K 4the change of all coordinate components of individual specified point.Each total M 4(M 4=K 4× L 4) individual coordinates measurements or calculated value characterize Cable Structure shape.M 4it is an integer being not less than 0.
Comprehensive above-mentioned monitored amount, whole Cable Structure has M (M=M 1+ M 2+ M 3+ M 4) individual monitored amount, definition parameter K (K=M 1+ K 2+ K 3+ K 4), the quantity that M must not be less than core evaluation object adds the quantity N that 4, M is less than evaluation object.
For simplicity, in the method by " monitored all parameters of Cable Structure " referred to as " monitored amount ".To M monitored amount serial number, this numbering will be used for generating vector sum matrix in subsequent step.This method represents this numbering, j=1,2,3 with variable j ..., M.
2. set up the initial mechanical Calculation Basis model A of Cable Structure o(such as finite element benchmark model) and current initial mechanical Calculation Basis model A t othe method of (such as finite element benchmark model), sets up and A ocorresponding monitored amount initial value vector C omethod, set up and A t ocorresponding monitored amount current initial value vector C t omethod.A in the method o, C o, A t oand C t oconstantly update.Set up and upgrade A o, C o, A t oand C t omethod as follows.Monitored amount initial value vector C othe coding rule of coding rule and M monitored amount identical.
Set up initial mechanical Calculation Basis model A otime, when Cable Structure is completed, or before setting up structural healthy monitoring system, use the direct survey calculation of conventional method to obtain the initial value of all monitored amount of Cable Structure.Conventional method (consult reference materials or survey) is used to obtain physical parameter and the mechanical property parameters (such as elastic modulus, Poisson ratio) of the various materials that Cable Structure uses; Meanwhile, conventional method Actual measurement is used to obtain the Actual measurement data of Cable Structure.First the Actual measurement data of Cable Structure are the data can expressing the health status of rope of the Non-destructive Testing Data comprising support cable, and the Actual measurement data of Cable Structure still comprise the measured data of the initial geometric data of Cable Structure, rope force data, draw-bar pull data, initial Cable Structure bearing generalized coordinate data, Cable Structure modal data, structural strain data, structural point measurement data, structure space measurement of coordinates data and load data.The initial geometric data of Cable Structure can be the spatial data that the spatial data of the end points of all ropes adds a series of point in structure, and object is the geometric properties according to these coordinate data determination Cable Structure.For cable-stayed bridge, initial geometric data can be the spatial data that the spatial data of the end points of all ropes adds some points on bridge two ends, so-called bridge type data that Here it is.The variable quantity of " load likely changed " is setting up initial mechanical Calculation Basis model A otime be all 0, the variable quantity of " load likely changed " that is identifies below is relative to setting up initial mechanical Calculation Basis model A otime the structure variable quantity of corresponding load that bears.The variable quantity data of the data and " load likely changed " that utilize the Non-destructive Testing Data etc. of support cable can express the health status of support cable set up evaluation object initial damage vector d o(such as formula (1) Suo Shi), uses d orepresent that Cable Structure is (with initial mechanical Calculation Basis model A orepresent) the initial health of evaluation object.If there is no the Non-destructive Testing Data of support cable and other are when can express the data of the health status of support cable, or can think structure original state be not damaged without relaxed state time, vectorial d oin each element numerical value relevant to support cable get 0.Vector d oin each element numerical value relevant to the variable quantity of load get 0.The physical and mechanical properties parameter of the various materials utilizing the measured data of the design drawing of Cable Structure, as-constructed drawing and initial Cable Structure, the Non-destructive Testing Data of support cable, Cable Structure to use, utilizes mechanics method (such as finite element method) to set up initial mechanical Calculation Basis model A o.Corresponding to A ocable Structure bearing generalized coordinate data form initial Cable Structure bearing generalized coordinate vector U o.
d o=[d o1d o2···d ok···d oN] T(1)
D in formula (1) ok(k=1,2,3 ...., N) represent initial mechanical Calculation Basis model A oin the original state of a kth evaluation object, if this evaluation object is a rope (or pull bar) in cable system, so d okrepresent its initial damage, d okrepresent not damaged when being 0, when being 100%, represent that this rope thoroughly loses load-bearing capacity, time between 0 and 100%, represent the load-bearing capacity losing corresponding proportion; If this evaluation object is one " load that may change ", so d okrepresent its initial value, d okbe 0, the variable quantity of " load likely changed " that is identifies below is relative to setting up initial mechanical Calculation Basis model A otime the structure variable quantity of corresponding load that bears.Subscript T represents the transposition (same afterwards) of vector.
The initial value of all monitored amount of the Cable Structure using the direct survey calculation of conventional method to obtain before utilization, forms monitored amount initial value vector C o(see formula (2)).Require at acquisition A owhile obtain C o, monitored amount initial value vector C orepresent and correspond to A othe concrete numerical value of " monitored amount ".Because of subject to the foregoing, the Calculation Basis model based on Cable Structure calculates the monitored amount of gained reliably close to the measured data of initial monitored amount, in describing below, will represent this calculated value and measured value with prosign.
C o=[C o1C o2···C oj···C oM] T(2)
C in formula (2) oj(j=1,2,3 ...., M) be the original bulk of jth monitored amount in Cable Structure, this component corresponds to a specific jth monitored amount according to coding rule.
No matter which kind of method to obtain initial mechanical Calculation Basis model A by o, based on A othe Cable Structure that calculates calculates data must closely its measured data, and error generally must not be greater than 5%.Like this can utility A othe Suo Li calculated under the analog case of gained calculates data, strain calculation data, Cable Structure shapometer count certificate and displacement meter counts certificate, Cable Structure angle-data, Cable Structure spatial data etc., measured data when reliably truly occurring close to institute's analog case.Model A othe health status evaluation object initial damage vector d of middle evaluation object orepresent, model A othe vectorial U of middle bearing generalized coordinate orepresent.Due to based on A othe initial value (actual measurement obtains) of the evaluation calculating all monitored amounts closely all monitored amounts, so also can be used in A obasis on, carry out Mechanics Calculation obtains, A othe evaluation of each monitored amount form monitored amount initial value vector C o.U o, d oa oparameter, alternatively C oby A omechanics Calculation result composition.
Set up and upgrade current initial mechanical Calculation Basis model A t omethod be: initial time (namely first time set up A t otime), A t ojust equal A o.Corresponding to the current initial mechanical Calculation Basis model A of Cable Structure t ocable Structure bearing generalized coordinate data composition current initial Cable Structure bearing generalized coordinate vector U t o, the current initial mechanical Calculation Basis model A of Cable Structure is namely set up for the first time at initial time t otime, U t ojust equal U o.A t othe initial health of evaluation object and A othe health status of evaluation object identical, also use evaluation object initial damage vector d orepresent, A in cyclic process below t othe initial health of evaluation object use evaluation object initial damage vector d all the time orepresent; Cable Structure is in A t oduring state, this method monitored amount current initial value vector C t orepresent the concrete numerical value of all monitored amounts, C t oelement and C oelement one_to_one corresponding, represent that all monitored amounts are in A in Cable Structure respectively t oand A oconcrete numerical value during two states.At initial time, C t ojust equal C o, U t oand d oa t oparameter, C t oby A t omechanics Calculation result composition; In Cable Structure military service process, continuous Actual measurement obtains Cable Structure bearing generalized coordinate current data, all Cable Structure bearing generalized coordinate current data composition current cable structure actual measurement bearing generalized coordinate vector U t; If U tequal U t o, then do not need A t oupgrade, otherwise need A t oand U t oupgrade, update method is: the first step calculates U twith U odifference, U twith U odifference be exactly the generalized displacement of support of Cable Structure bearing about initial position, generalized displacement of support is represented with generalized displacement of support vector V, be one-to-one relationship between element in generalized displacement of support vector V and generalized displacement of support component, in generalized displacement of support vector V, the numerical value of an element corresponds to the generalized displacement of an assigned direction of an appointment bearing; Second step is to A oin Cable Structure bearing apply generalized displacement of support constraint, the numerical value of generalized displacement of support constraint just takes from the numerical value of corresponding element in generalized displacement of support vector V, to A omiddle Cable Structure bearing obtains the current initial mechanical Calculation Basis model A upgraded after applying generalized displacement of support constraint t o, upgrade A t owhile, U t oall elements numerical value also uses U tall elements numerical value correspondence replaces, and namely have updated U t o, so just obtain and correctly correspond to A t ou t o; Upgrade C t omethod be: when renewal A t oafter, obtain A by Mechanics Calculation t oin all monitored amounts, current concrete numerical value, these concrete numerical value composition C t o.
In Cable Structure, the currency of all monitored amounts forms monitored amount current value vector C (formula (3) is shown in definition).
C=[C 1C 2···C j···C M] T(3)
C in formula (3) j(j=1,2,3 ...., M) be the currency of jth monitored amount in Cable Structure, this component C jaccording to coding rule and C ojcorresponding to same " monitored amount ".In Cable Structure military service process, constantly actual measurement obtains the current measured value of all monitored amount of Cable Structure, forms monitored amount current value vector C.
3. set up and upgrade the method for Cable Structure unit damage monitored numerical quantity transformation matrices Δ C.
Cable Structure unit damage monitored numerical quantity transformation matrices Δ C constantly updates, namely at the current initial mechanical Calculation Basis model A of renewal t owith monitored amount current initial value vector C t owhile, upgrade Cable Structure unit damage monitored numerical quantity transformation matrices Δ C.Concrete grammar is as follows:
At the current initial mechanical Calculation Basis model A of Cable Structure t obasis on carry out several times calculating, calculation times numerically equals the quantity of all evaluation objects.Calculating hypothesis each time only has an evaluation object (to use vectorial d at initial damage ocorresponding element represent) basis on increase again unit damage or load unit change, concrete, if this evaluation object is a support cable in cable system, so just suppose that this support cable has unit damage (such as getting 5%, 10%, 20% or 30% equivalent damage is unit damage), if this evaluation object is a load, just suppose that this load is at vectorial d othe basis that this load represented has a variable quantity increases again load unit change (if this load is distributed load, and this distributed load is line distributed load, load unit change can get 1kN/m, 2kN/m, 3kN/m or 1kNm/m, 2kNm/m, 3kNm/m etc. for unit change; If this load is distributed load, and this distributed load is EDS maps load, and load unit change can get 1MPa, 2MPa, 3MPa or 1kNm/m 2, 2kNm/m 2, 3kNm/m 2deng be unit change; If this load is centre-point load, and this centre-point load is couple, and load unit change can get 1kNm, 2kNm, 3kNm etc. for unit change; If this load is centre-point load, and this centre-point load is concentrated force, and load unit change can get 1kN, 2kN, 3kN etc. for unit change; If this load is volume load, load unit change can get 1kN/m 3, 2kN/m 3, 3kN/m 3deng be unit change), use D ukrecord this unit damage or load unit change, wherein k represents the numbering of the evaluation object that unit damage or load unit change occur.With " evaluation object unit change vector D u" (such as formula (4) Suo Shi) records all unit damage or load unit changes.Occur in calculating each time that the evaluation object of unit damage or load unit change is different from during other time calculates the evaluation object occurring unit damage or load unit change, calculate the current calculated value all utilizing mechanics method (such as finite element method) to calculate all monitored amount of Cable Structure each time, the current calculated value of all monitored amount calculated each time forms a monitored amount calculation current vector, and (when supposing that a kth evaluation object has unit damage or load unit to change, available formula (5) represents monitored amount calculation current vector C t k); Calculate monitored amount calculation current vector C each time t kdeduct monitored amount current initial value vector C t oafter calculate the unit damage supposed or load unit change numerical value D divided by this time again uk, gained vector is exactly that the monitored amount unit change vector of (being numbered mark with what have an evaluation object of unit damage or load unit change) (when a kth evaluation object has unit damage or load unit changes, uses δ C under this condition krepresent monitored amount unit change vector, formula (6) is shown in definition), the Unit alteration amount of the monitored amount corresponding to this element that each element representation of monitored amount unit change vector causes owing to suppose there is the unit damage of that evaluation object of unit damage or load unit change or load unit change when calculating; N number of evaluation object is had just to have N number of monitored amount unit change vector, owing to there being M monitored amount, so each monitored amount unit change vector has M element, the definition of monitored amount unit change matrix Δ C, the Δ C that have M × N number of element is made up of successively such as formula shown in (6) this N number of monitored amount unit change vector.
D u=[D u1D u2···D uk···D uN] T(4)
Evaluation object unit change vector D in formula (4) uelement D uk(k=1,2,3 ...., N) represent that the unit damage of a kth evaluation object or load unit change numerical value.
C t k = C t 1 k C t 2 k · · · C t j k · · · C t M k T - - - ( 5 )
Elements C in formula (5) tj k(k=1,2,3 ...., N; J=1,2,3 ...., M) represent due to a kth evaluation object have unit damage or a load unit change time, according to the current calculated amount of the individual monitored amount of the jth corresponding to coding rule.
δC k = C t k - C o t D u k - - - ( 6 )
Δ C = ΔC 1 , 1 ΔC 1 , 2 · ΔC 1 , k · ΔC 1 , N ΔC 2 , 1 ΔC 2 , 2 · ΔC 2 , k · ΔC 2 , N · · · · · · ΔC j , 1 ΔC j , 2 · ΔC j , k · ΔC j , N · · · · · · ΔC M , 1 ΔC M , 2 · ΔC M , k · ΔC M , N - - - ( 7 )
Δ C in formula (7) j,k(k=1,2,3 ...., N; J=1,2,3 ...., M) represent only due to a kth evaluation object have unit damage or load unit change to cause, according to the unit change (algebraic value) of the calculating current value of the monitored amount of the jth corresponding to coding rule, the vectorial δ C of monitored amount unit change kbe actually the row in matrix Δ C.
4. monitored amount current value vector C (calculating or actual measurement) is with monitored amount current initial value vector C t o, unit damage monitored numerical quantity transformation matrices Δ C, evaluation object unit change vector D uand the linear approximate relationship between evaluation object current nominal fatigue vector d, shown in (8) or formula (9).The definition of evaluation object current nominal fatigue vector d is see formula (10).
C = C o t + Δ C · d - - - ( 8 )
C - C o t = Δ C · d - - - ( 9 )
d=[d 1d 2···d k···d N] T(10)
D in formula (10) k(k=1,2,3 ...., N) be the current health state of a kth evaluation object in Cable Structure, if this evaluation object is a rope (or pull bar) in cable system, so d krepresent its current damage, d krepresent not damaged when being 0, when being 100%, represent that this rope thoroughly loses load-bearing capacity, represent the load-bearing capacity losing corresponding proportion time between 0 and 100%, if this evaluation object is load, so a d krepresent its variable quantity.
The error of the linear relationship error vector e expression (8) that available formula (11) defines or the shown linear relationship of formula (9).
e = a b s ( Δ C · d - C + C o t ) - - - ( 11 )
In formula (11), abs () is the function that takes absolute value, and takes absolute value to each element of the vector of trying to achieve in bracket.
The Part II of this method: the structural health conditions appraisal procedure of knowledge based storehouse (containing parameter) and the monitored amount of actual measurement.
There is certain error in the linear relationship represented by formula (8) or formula (9), therefore simply can not carry out direct solution according to formula (8) or formula (9) and actual measurement monitored amount current value vector C and obtain evaluation object current nominal fatigue vector d.If this has been doned, the element in the evaluation object obtained current nominal fatigue vector d even there will be larger negative value, namely negative damage, and this is obviously irrational.Therefore the acceptable solution of evaluation object current nominal fatigue vector d is obtained (namely with reasonable error, but position and the degree of injury thereof of damaged cable can be determined more accurately from cable system) become a rational solution, available formula (12) expresses this method.
a b s ( Δ C · d - C + C o t ) ≤ g - - - ( 12 )
In formula (12), abs () is the function that takes absolute value, and vectorial g describes the legitimate skew departing from ideal linearity relation (formula (8) or formula (9)), is defined by formula (13).
g=[g 1g 2···g j···g M] T(13)
G in formula (13) j(j=1,2,3 ...., M) describe the maximum allowable offset departing from formula (8) or the ideal linearity relation shown in formula (9).The error vector e tentative calculation that vector g can define according to formula (11) is selected.
At monitored amount current initial value vector C t o, unit damage monitored numerical quantity transformation matrices Δ C, survey monitored amount current value vector C known time, suitable algorithm (such as multi-objective optimization algorithm) can be utilized to solve formula (12), obtain the acceptable solution of evaluation object current nominal fatigue vector d.
Definition evaluation object current actual damage vector d a(see formula (14)), can by d adetermine the health status of evaluation object.
d a = d 1 a d 2 a · · · d k a · · · d N a T - - - ( 14 )
D in formula (14) a k(k=1,2,3,., N) represent eliminate Cable Structure generalized displacement of support and load change on after the impact of health status recognition result, the current actual health status of a kth evaluation object, if this evaluation object is a rope (or pull bar) in cable system, so d a krepresent its current actual damage, its definition is shown in formula (15), d a krepresent not damaged when being 0, when being 100%, represent that this rope thoroughly loses load-bearing capacity, time between 0 and 100%, represent the load-bearing capacity losing corresponding proportion; If this evaluation object is a load, its definition is shown in formula (15), so d a krepresent that it is relative to setting up initial mechanical Calculation Basis model A otime the structure variable quantity of corresponding load that bears.Vector d athe coding rule of element and formula (1) in vectorial d othe coding rule of element identical.
D in formula (15) ok(k=1,2,3 ...., N) be vectorial d oa kth element, d kit is a kth element of vectorial d.
So far this method achieves the accurate identification of the health status of core evaluation object with a kind of effective, cheap method.May exact value be departed to the recognition result of the health status of secondary evaluation object more, only require the correct health status identifying core evaluation object in the method.
The Part III of this method: the software and hardware part of health monitoring systems.
Hardware components comprises monitoring system (comprising monitored amount monitoring system, Cable Structure bearing generalized coordinate monitoring system), signal picker and computing machine etc.Require that Real-Time Monitoring obtains the measured data of Cable Structure bearing generalized coordinate, require each monitored amount of Real-Time Monitoring simultaneously.
Software should to complete in this method required, can by functions such as computer implemented monitoring, record, control, storage, calculating, notice, warnings.
This method specifically comprises:
Though the load of a. bearing when Cable Structure changes, when the load that Cable Structure is being born does not exceed Cable Structure initial allowable load, this method is suitable for; The initial allowable load of Cable Structure refers to the allowable load of Cable Structure when being completed, and can be obtained by conventional Mechanics Calculation; This method unitedly calls evaluated support cable and load to be " evaluation object ", if the quantity sum of the quantity of evaluated support cable and load is N, namely the quantity of " evaluation object " is N; This method title " core evaluation object " specially refers to the evaluated support cable in " evaluation object ", and this method title " secondary evaluation object " specially refers to the evaluated load in " evaluation object "; Determine the coding rule of evaluation object, evaluation objects all in Cable Structure numbered by this rule, this numbering will be used for generating vector sum matrix in subsequent step; This method variable k represents this numbering, k=1,2,3 ..., N; Specify when determining hybrid monitoring by the support cable of monitored Suo Li, if total Q root support cable in cable system, the quantity of obvious core evaluation object is exactly Q; The monitored rope force data of Cable Structure is by M in Cable Structure 1the M of individual appointment support cable 1individual rope force data describes, and the change of Cable Structure Suo Li is exactly the change of the Suo Li of all appointment support cables; Each total M 1individual cable force measurement value or calculated value characterize the rope force information of Cable Structure; M 1it is an integer being not less than that 0 is not more than Q; Specify when determining hybrid monitoring by the measured point of monitored strain, the monitored strain data of Cable Structure can by K in Cable Structure 2the L of individual specified point and each specified point 2the strain of individual assigned direction describes, and the change of Cable Structure strain data is exactly K 2the change of all tested strain of individual specified point; Each total M 2individual strain measurement value or calculated value characterize Cable Structure strain, M 2for K 2and L 2long-pending; M 2be be not less than 0 integer; Specify when determining hybrid monitoring by the measured point of monitored angle, the monitored angle-data of Cable Structure is by K in Cable Structure 3individual specified point, cross the L of each specified point 3the H of individual appointment straight line, each appointment straight line 3individual angle coordinate component describes, and the change of Cable Structure angle is exactly the change of all specified points, all appointment straight line, all angle coordinate component of specifying; Each total M 3individual angle coordinate component measurement value or calculated value characterize the angle information of Cable Structure, M 3for K 3, L 3and H 3long-pending; M 3it is an integer being not less than 0; Specify when determining hybrid monitoring by monitored shape data, the monitored shape data of Cable Structure is by K in Cable Structure 4the L of individual specified point and each specified point 4the volume coordinate of individual assigned direction describes, and the change of Cable Structure shape data is exactly K 4the change of all coordinate components of individual specified point; Each total M 4individual coordinates measurements or calculated value characterize Cable Structure shape, M 4for K 4and L 4long-pending; M 4it is an integer being not less than 0; The monitored amount of comprehensive above-mentioned hybrid monitoring, whole Cable Structure has M monitored amount, and M is M 1, M 2, M 3and M 4sum, definition parameter K, K is M 1, K 2, K 3and K 4sum, M must be greater than the quantity of core evaluation object, and M is less than the quantity of evaluation object; For simplicity, in the method by the monitored amount of the M listed by this step referred to as " monitored amount "; The external force that object, structure are born can be described as load, and load comprises face load and volume load; Face load, also known as surface load, is the load acting on body surface, comprises centre-point load and distributed load two kinds; Volume load be continuous distribution in the load of interior of articles each point, comprise deadweight and the inertial force of object; Centre-point load is divided into concentrated force and concentrated couple two kinds, tie up in interior coordinate system comprising Descartes's rectangular coordinate, a concentrated force can resolve into three components, same, a concentrated couple also can resolve into three components, if load is actually centre-point load, in the method a concentrated force component or a concentrated couple component being counted or added up is a load, and the now change of load is embodied as the change of a concentrated force component or a concentrated couple component; Distributed load is divided into line distributed load and EDS maps load, and the description of distributed load at least comprises the zone of action of distributed load and the size of distributed load, and the size distribution intensity of distributed load is expressed, and distribution intensity distribution characteristics and amplitude are expressed; If load is actually distributed load, when this method talks about the change of load, in fact refer to the change of the amplitude of distributed load distribution intensity, and the distribution characteristics of the zone of action of all distributed loads and distribution intensity is constant; Tie up in interior coordinate system comprising Descartes's rectangular coordinate, a distributed load can resolve into three components, if the amplitude of the respective distribution intensity of three of this distributed load components changes, and the ratio of change is all not identical, so in the method three of this distributed load components being counted or added up is three distributed loads, and now load just represents the one-component of distributed load; Volume load be continuous distribution in the load of interior of articles each point, the description of volume load at least comprises the zone of action of volume load and the size of volume load, and the size distribution intensity of volume load is expressed, distribution intensity distribution characteristics and amplitude express; If load is actually volume load, actual treatment is the change of the amplitude of volume load diatibution intensity in the method, and the distribution characteristics of the zone of action of all volume load and distribution intensity is constant, in fact the change of the amplitude of the distribution intensity of volume load is referred to when now mentioning the change of load in the method, now, the load changed refers to the volume load that the amplitude of those distribution intensities changes; Tie up in interior coordinate system comprising Descartes's rectangular coordinate, one individual stow lotus can resolve into three components, if the amplitude of the respective distribution intensity of three of this volume load components changes, and the ratio of change is all not identical, so in the method three of this volume load components being counted or added up is three distributed loads;
B. survey or consult reference materials and obtain the physical and mechanical properties parameter of the various materials that Cable Structure uses;
C. actual measurement or consult reference materials obtain the various materials that Cable Structure uses physical and mechanical properties parameter while, direct survey calculation obtains the measured data of initial Cable Structure, the measured data of initial Cable Structure comprises Cable Structure centre-point load measurement data, Cable Structure distributed load measurement data, Cable Structure volume load measurement data, the initial value of all monitored amounts, the Initial cable force data of all support cables, initial Cable Structure modal data, initial Cable Structure strain data, initial Cable Structure geometric data, initial Cable Structure bearing generalized coordinate data, initial Cable Structure angle-data, initial Cable Structure spatial data is in interior measured data, initial Cable Structure bearing generalized coordinate data comprise initial Cable Structure bearing spatial data and initial Cable Structure bearing angular data, while the measured data obtaining initial Cable Structure, survey calculation obtains the data can expressing the health status of support cable of the Non-destructive Testing Data comprising support cable, the data can expressing the health status of support cable are now called support cable initial health data, the initial value of all monitored amounts forms monitored amount initial value vector C o, monitored amount initial value vector C othe coding rule of coding rule and M monitored amount identical, support cable initial health data and Cable Structure load measurement data are utilized to set up evaluation object initial damage vector d o, vectorial d orepresent with initial mechanical Calculation Basis model A othe initial health of the evaluation object of the Cable Structure represented, evaluation object initial damage vector d oelement number equal N, d oelement and evaluation object be one-to-one relationship, vectorial d othe coding rule of element identical with the coding rule of evaluation object, if d oevaluation object corresponding to some elements be support cable, so a d in cable system othe numerical value of this element represent the initial damage degree of corresponding support cable, if the numerical value of this element is 0, represent that the support cable corresponding to this element is intact, do not damage, if its numerical value is 100%, then represent that the support cable corresponding to this element completely loses load-bearing capacity, if its numerical value is between 0 and 100%, then represent that this support cable loses the load-bearing capacity of corresponding proportion, if d oevaluation object corresponding to some elements be some load, get d in this method othis element numerical value be 0, the initial value representing the change of this load is 0, if there is no the Non-destructive Testing Data of support cable and other are when can express the data of the health status of support cable, or can think structure original state be not damaged without relaxed state time, vectorial d oin each element numerical value relevant to support cable get 0, initial Cable Structure bearing generalized coordinate data form initial Cable Structure bearing generalized coordinate vector U o,
Physical and mechanical properties parameter, the initial Cable Structure bearing generalized coordinate vector U of the various materials d. used according to the measured data of the design drawing of Cable Structure, as-constructed drawing and initial Cable Structure, support cable initial health data, Cable Structure centre-point load measurement data, Cable Structure distributed load measurement data, Cable Structure volume load measurement data, Cable Structure owith all Cable Structure data that preceding step obtains, set up the initial mechanical Calculation Basis model A of Cable Structure o, based on A othe Cable Structure that calculates calculates data must closely its measured data, and difference therebetween must not be greater than 5%; Corresponding to A oevaluation object health status with evaluation object initial damage vector d orepresent; Corresponding to A othe initial value monitored amount initial value vector C of all monitored amount orepresent; Set up the current initial mechanical Calculation Basis model A of Cable Structure for the first time t owith monitored amount current initial value vector C t o; Set up the current initial mechanical Calculation Basis model A of Cable Structure for the first time t owith monitored amount current initial value vector C t otime, the current initial mechanical Calculation Basis model A of Cable Structure t ojust equal the initial mechanical Calculation Basis model A of Cable Structure o, monitored amount current initial value vector C t ojust equal monitored amount initial value vector C o; Corresponding to the current initial mechanical Calculation Basis model A of Cable Structure t ocable Structure bearing generalized coordinate data composition current initial Cable Structure bearing generalized coordinate vector U t o, set up the current initial mechanical Calculation Basis model A of Cable Structure for the first time t otime, U t ojust equal U o; A t othe initial health of evaluation object and A othe health status of evaluation object identical, also use evaluation object initial damage vector d orepresent, A in cyclic process below t othe initial health of evaluation object use evaluation object initial damage vector d all the time orepresent; U oand d oa oparameter, by A othe initial value of all monitored amount that obtains of Mechanics Calculation result and C othe initial value of all monitored amount represented is identical, therefore alternatively C oby A omechanics Calculation result composition; U t oand d oa t oparameter, C t oby A t omechanics Calculation result composition;
E. from entering the circulation being walked to m step by e here; In structure military service process, constantly actual measurement obtains Cable Structure bearing generalized coordinate current data, all Cable Structure bearing generalized coordinate current data composition current cable structure actual measurement bearing generalized coordinate vector U t, vectorial U tdefinition mode and vectorial U odefinition mode identical;
F. according to current cable structure actual measurement bearing generalized coordinate vector U t, upgrade current initial mechanical Calculation Basis model A according to step f1 to f3 t o, current initial Cable Structure bearing generalized coordinate vector U t owith monitored amount current initial value vector C t o;
F1. U is compared twith U t oif, U tequal U t o, then A t o, U t oand C t oremain unchanged, otherwise need to follow these steps to A t o, U t oand C t oupgrade;
F2. U is calculated twith U odifference, U twith U odifference be exactly the generalized displacement of support of Cable Structure bearing about initial position, with generalized displacement of support vector V represent generalized displacement of support, V equals U tdeduct U o, be one-to-one relationship between the element in generalized displacement of support vector V and generalized displacement of support component, in generalized displacement of support vector V, the numerical value of an element corresponds to the generalized displacement of an assigned direction of an appointment bearing;
F3. to A oin Cable Structure bearing apply generalized displacement of support constraint, the numerical value of generalized displacement of support constraint just takes from the numerical value of corresponding element in generalized displacement of support vector V, to A omiddle Cable Structure bearing obtains the current initial mechanical Calculation Basis model A upgraded after applying generalized displacement of support constraint t o, upgrade A t owhile, U t oall elements numerical value also uses U tall elements numerical value correspondence replaces, and namely have updated U t o, so just obtain and correctly correspond to A t ou t o; Upgrade C t omethod be: when renewal A t oafter, obtain A by Mechanics Calculation t oin all monitored amounts, current concrete numerical value, these concrete numerical value composition C t o; A t othe initial health of support cable use evaluation object initial damage vector d all the time orepresent;
G. at current initial mechanical Calculation Basis model A t obasis on carry out several times Mechanics Calculation according to step g 1 to g4, by calculate obtain Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and evaluation object unit change vector D u;
G1. Cable Structure unit damage monitored numerical quantity transformation matrices Δ C constantly updates, namely at the current initial mechanical Calculation Basis model A of renewal t o, current initial Cable Structure bearing generalized coordinate vector U t owith monitored amount current initial value vector C t oafterwards, Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and evaluation object unit change vector D must then be upgraded u;
G2. at the current initial mechanical Calculation Basis model A of Cable Structure t obasis on carry out several times Mechanics Calculation, calculation times numerically equals the quantity N of all evaluation objects, has N number of evaluation object just to have N calculating; According to the coding rule of evaluation object, calculate successively; Calculating hypothesis each time only has an evaluation object on the basis of original damage or load, increase unit damage or load unit change again, concrete, if this evaluation object is a support cable in cable system, so just supposes that this support cable is at vectorial d othe basis that this support cable represented has a damage increases unit damage again, if this evaluation object is a load, just supposes that this load is at vectorial d othe basis that this load represented has a variable quantity increases load unit change again, use D ukrecord unit damage or the load unit change of this increase, wherein k represents the numbering of the evaluation object increasing unit damage or load unit change, D ukevaluation object unit change vector D uan element, evaluation object unit change vector D uthe coding rule of element and vectorial d othe coding rule of element identical; The evaluation object increasing unit damage or load unit change in calculating each time is different from during other time calculates the evaluation object increasing unit damage or load unit change, calculate the current calculated value all utilizing mechanics method to calculate all monitored amount of Cable Structure each time, the current calculated value of all monitored amount calculated each time forms a monitored amount calculation current vector, element number rule and the monitored amount initial value vector C of monitored amount calculation current vector oelement number rule identical;
G3. the monitored amount calculation current vector calculated each time deducts monitored amount current initial value vector C t oobtain a vector, then each element of this vector is calculated the unit damage or load unit change numerical value supposed divided by this time, obtain a monitored amount unit change vector, have N number of evaluation object just to have N number of monitored amount unit change vector;
G4. by the vectorial coding rule according to N number of evaluation object of this N number of monitored amount unit change, the Cable Structure unit damage monitored numerical quantity transformation matrices Δ C having N to arrange is formed successively; Each row of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C correspond to a monitored amount unit change vector; Every a line of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C corresponds to the different unit change amplitude of same monitored amount when different evaluation object increases unit damage or load unit change; The coding rule of the row of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and vectorial d othe coding rule of element identical, the coding rule of the row of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C is identical with the coding rule of M monitored amount;
H. current cable structure actual measurement bearing generalized coordinate vector U is obtained in actual measurement twhile, actual measurement obtains the current measured value of all monitored amount of Cable Structure, forms monitored amount current value vector C; Monitored amount current value vector C and monitored amount current initial value vector C t owith monitored amount initial value vector C odefinition mode identical, the same monitored amount of element representation of three vectorial identical numberings is at not concrete numerical value in the same time;
I. evaluation object current nominal fatigue vector d is defined, the element number of evaluation object current nominal fatigue vector d equals the quantity of evaluation object, be one-to-one relationship between the element of evaluation object current nominal fatigue vector d and evaluation object, the element numerical value of evaluation object current nominal fatigue vector d represents nominal fatigue degree or the nominal load variable quantity of corresponding evaluation object; The coding rule of the element of vector d and vectorial d othe coding rule of element identical;
J. according to monitored amount current value vector C with monitored amount current initial value vector C t o, the linear approximate relationship that exists between Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and evaluation object to be asked current nominal fatigue vector d, this linear approximate relationship can be expressed as formula 1, other amount in formula 1 except d is known, solves formula 1 and just can calculate evaluation object current nominal fatigue vector d;
C = C o t + Δ C · d Formula 1
K. evaluation object current actual damage vector d is defined a, evaluation object current actual damage vector d aelement number equal the quantity of evaluation object, evaluation object current actual damage vector d aelement and evaluation object between be one-to-one relationship, evaluation object current actual damage vector d aelement numerical value represent actual damage degree or the real load variable quantity of corresponding evaluation object; Vector d athe coding rule of element and vectorial d othe coding rule of element identical;
L. the evaluation object utilizing formula 2 to express current actual damage vector d aa kth element d a kwith evaluation object initial damage vector d oa kth element d okwith a kth element d of evaluation object current nominal fatigue vector d kbetween relation, calculate evaluation object current actual damage vector d aall elements;
K=1 in formula 2,2,3 ...., N, d a krepresent the current actual health status of a kth evaluation object, if this evaluation object is support cable, so a d in cable system a krepresent its current actual damage, d a krepresent not damaged when being 0, when being 100%, represent that this support cable thoroughly loses load-bearing capacity, time between 0 and 100%, represent the load-bearing capacity losing corresponding proportion; So according to evaluation object current actual damage vector d athe health status of core evaluation object can be determined;
M. get back to e step, start the circulation next time being walked to m step by e.
Beneficial effect: structural healthy monitoring system is first by using sensor to carry out long-term on-line monitoring to structural response, after obtaining Monitoring Data, (or off-line) analysis is online carried out to it and obtain structural health conditions data, due to the complicacy of structure, structural healthy monitoring system needs to use a large amount of sensor equipment to carry out monitoring structural health conditions, therefore its cost is usually quite high, and therefore cost problem is a subject matter of limit structural health monitoring technique application.On the other hand, the correct identification of the health status of core evaluation object (such as suspension cable) is the indispensable ingredient of the correct identification of structural health conditions, or even they are whole, and the impact of correct identification on the correct identification of the health status of Cable Structure of the change (such as by the change of the quality and quantity of the automobile of cable-stayed bridge) of secondary evaluation object (load that such as structure is born) is very little, or even unwanted.But the quantity of the quantity of secondary evaluation object and core evaluation object is normally suitable, the quantity of secondary evaluation object is also usually greater than the quantity of core evaluation object, and the quantity of such evaluation object is usually many times of the quantity of core evaluation object.When secondary evaluation object (load) changes, in order to accurately identify core evaluation object, conventional method requires that the quantity of monitored amount (using sensor device measuring to obtain) must be more than or equal to the quantity of evaluation object, when the number ratio of the secondary evaluation object changed is larger (in fact often so), the quantity of the sensor equipment required for structural healthy monitoring system is very huge, therefore the cost of structural healthy monitoring system will become very high, unacceptablely even high.Inventor studies discovery, in the secondary evaluation object (normal load that such as structure is born, the normal load of structure refers to that the load that structure is being born is no more than the structure allowable load limited according to structural design book or structure completion book) change less time (be exactly that structure only bears normal load for load, whether the load that structure is born is normal load, can be observed by methods such as naked eyes and determine, if find that the load that structure is born is not normal load, so artificially remove, after removing improper load, structure just only bears normal load), the amplitude of variation (this instructions is called " secondary response ") of the structural response caused by them much smaller than core evaluation object change (such as support cable is impaired) caused by the amplitude of variation (this instructions is called " core response ") of structural response, secondary response and core respond total change (this instructions is called " global response ") that sum is structural response, obvious core response dominate in global response, based on this, find to choose when determining monitored amount quantity to be a bit larger tham core evaluation object quantity even if inventor studies, but much smaller than the numerical value (this method is exactly do like this) of evaluation object quantity, even if that is adopt the relatively few a lot of sensor equipment of quantity, still the state of health data of core evaluation object can accurately be obtained, meet the core demand of structural health conditions monitoring, therefore this method cost of structural healthy monitoring system of advising is more much lower than the cost of the structural healthy monitoring system required by conventional method apparently, that is this method can realize to the health status of the core evaluation object of Cable Structure with the much lower condition of cost assessment, can this benefit be used structural health monitoring technology is very important.
Embodiment
The following describes of embodiment of this method is in fact only exemplary, and object is never the application or the use that limit this method.
The first step: the quantity first confirming the load that may change that Cable Structure is born.According to the feature of the load that Cable Structure is born, confirm wherein " load likely changed ", or all load is considered as " load likely changed ", if total JZW the load that may change, i.e. total JZW secondary evaluation object.If the quantity sum of the quantity of the support cable of Cable Structure and JZW " load likely changed " is N, i.e. total N number of evaluation object.To evaluation object serial number, this numbering will be used for generating vector sum matrix in subsequent step.
Monitored multiclass parameter can comprise: Suo Li, strain, angle and volume coordinate, be described below respectively:
If total Q root support cable in cable system, i.e. total Q core evaluation object, the monitored rope force data of Cable Structure is by M in Cable Structure 1the M of individual appointment rope 1individual rope force data describes, and the change of Cable Structure Suo Li is exactly the change of the Suo Li of all appointment ropes.Each total M 1individual cable force measurement value or calculated value characterize the rope force information of Cable Structure.M 1it is an integer being not less than 0.
The monitored strain data of Cable Structure can by K in Cable Structure 2the L of individual specified point and each specified point 2the strain of individual assigned direction describes, and the change of Cable Structure strain data is exactly K 2the change of all tested strain of individual specified point.Each total M 2(M 2=K 2× L 2) individual strain measurement value or calculated value characterize Cable Structure strain.M 2it is an integer being not less than 0.
The monitored angle-data of Cable Structure is by K in Cable Structure 3individual specified point, cross the L of each specified point 3the H of individual appointment straight line, each appointment straight line 3individual angle coordinate component describes, and the change of Cable Structure angle is exactly the change of all specified points, all appointment straight line, all angle coordinate component of specifying.Each total M 3(M 3=K 3× L 3× H 3) individual angle coordinate component measurement value or calculated value characterize the angle information of Cable Structure.M 3it is an integer being not less than 0.
The monitored shape data of Cable Structure is by K in Cable Structure 4the L of individual specified point and each specified point 4the volume coordinate of individual assigned direction describes, and the change of Cable Structure shape data is exactly K 4the change of all coordinate components of individual specified point.Each total M 4(M 4=K 4× L 4) individual coordinates measurements or calculated value characterize Cable Structure shape.M 4it is an integer being not less than 0.
Comprehensive above-mentioned monitored amount, whole Cable Structure has M (M=M 1+ M 2+ M 3+ M 4) individual monitored amount, definition parameter K (K=M 1+ K 2+ K 3+ K 4), the quantity that M must not be less than core evaluation object adds the quantity N that 4, M is less than evaluation object.
For simplicity, in the method by " monitored all parameters of Cable Structure " referred to as " monitored amount ".To M monitored amount serial number, this numbering will be used for generating vector sum matrix in subsequent step.This method represents this numbering, j=1,2,3 with variable j ..., M.
Second step: set up initial mechanical Calculation Basis model A o.
When Cable Structure is completed, or before setting up health monitoring systems, conventional method (consult reference materials or survey) is used to obtain physical parameter (such as density) and the mechanical property parameters (such as elastic modulus, Poisson ratio) of the various materials that Cable Structure uses, use the direct survey calculation of conventional method to obtain the initial value of all monitored amount of Cable Structure simultaneously, form monitored amount initial value vector C o.
Monitored amount initial value vector C is obtained at Actual measurement osynchronization, use conventional method Actual measurement to obtain the Actual measurement data of Cable Structure.The Non-destructive Testing Data etc. that the Actual measurement data of Cable Structure comprise support cable can express the data of the health status of rope, the initial geometric data of Cable Structure, rope force data, draw-bar pull data, initial Cable Structure bearing generalized coordinate data (comprise bearing about Descartes rectangular coordinate system X, Y, the volume coordinate of Z axis and angular coordinate and initial Cable Structure bearing spatial data and initial Cable Structure bearing angular data), Cable Structure centre-point load measurement data, Cable Structure distributed load measurement data, Cable Structure volume load measurement data, Cable Structure modal data, structural strain data, structural point measurement data, the measured datas such as structure space measurement of coordinates data.Initial Cable Structure bearing generalized coordinate data form initial Cable Structure bearing generalized coordinate vector U o.The initial geometric data of Cable Structure can be the spatial data that the spatial data of the end points of all ropes adds a series of point in structure, and object is the geometric properties according to these coordinate data determination Cable Structure.For cable-stayed bridge, initial geometric data can be the spatial data that the spatial data of the end points of all ropes adds some points on bridge two ends, so-called bridge type data that Here it is.Utilize the Non-destructive Testing Data etc. of support cable can express the data of the health status of support cable and Cable Structure load measurement data set up evaluation object initial damage vector d o(such as formula (1) Suo Shi), uses d orepresent that Cable Structure is (with initial mechanical Calculation Basis model A orepresent) the initial health of evaluation object.If there is no the Non-destructive Testing Data of support cable and other are when can express the data of the health status of support cable, or can think structure original state be not damaged without relaxed state time, vectorial d oin each element numerical value relevant to support cable get 0; If d oevaluation object corresponding to some elements be some load, get d in this method othis element numerical value be 0, the initial value representing the change of this load is 0.The physical and mechanical properties parameter of the various materials utilizing the measured data of the design drawing of Cable Structure, as-constructed drawing and initial Cable Structure, the Non-destructive Testing Data of support cable, Cable Structure to use and initial Cable Structure bearing generalized coordinate vector U o, utilize mechanics method (such as finite element method) to set up initial mechanical Calculation Basis model A o.
No matter which kind of method to obtain initial mechanical Calculation Basis model A by o, based on A othe Cable Structure that calculates calculates data must closely its measured data, and error generally must not be greater than 5%.Like this can utility A othe Suo Li calculated under the analog case of gained calculates data, strain calculation data, Cable Structure shapometer count certificate and displacement meter counts certificate, Cable Structure angle-data, Cable Structure spatial data etc., measured data when reliably truly occurring close to institute's analog case.Model A othe health status evaluation object initial damage vector d of middle support cable orepresent.Due to based on A othe initial value (actual measurement obtains) of the evaluation calculating all monitored amounts closely all monitored amounts, so also can be used in A obasis on, carry out Mechanics Calculation obtains, A othe evaluation of each monitored amount form monitored amount initial value vector C o.Corresponding to A oevaluation object health status with evaluation object initial damage vector d orepresent, corresponding to A othe initial value monitored amount initial value vector C of all monitored amount orepresent, corresponding to A ocable Structure bearing generalized coordinate data initial Cable Structure bearing generalized coordinate vector U orepresent, U oand d oa oparameter, C oby A omechanics Calculation result composition.
3rd step: first time sets up current initial mechanical Calculation Basis model A t o, monitored amount current initial value vector C t o" current initial Cable Structure bearing generalized coordinate vector U t o", concrete grammar is: at initial time, and namely first time sets up current initial mechanical Calculation Basis model A t owith monitored amount current initial value vector C t otime, A t ojust equal A o, C t ojust equal C o, corresponding to the current initial mechanical Calculation Basis model A of Cable Structure t ocable Structure bearing generalized coordinate data composition current initial Cable Structure bearing generalized coordinate vector U t o, set up the current initial mechanical Calculation Basis model A of Cable Structure for the first time t otime, U t ojust equal U o.A t othe health status of evaluation object and A oevaluation object health status (evaluation object initial damage vector d orepresent) identical, A in cyclic process t othe health status of evaluation object use evaluation object initial damage vector d all the time orepresent.U t oand d oa t oparameter, C t oby A t omechanics Calculation result composition.
4th step: in Cable Structure military service process, continuous actual measurement obtains the current measured value of all monitored amount of Cable Structure, composition " monitored amount current value vector C ", actual measurement simultaneously obtains Cable Structure bearing generalized coordinate current data, all data composition current cable structure actual measurement bearing generalized coordinate vector U t, vectorial U tdefinition mode and vectorial U odefinition mode identical.
5th step: according to current cable structure actual measurement bearing generalized coordinate vector U t, upgrade current initial mechanical Calculation Basis model A where necessary t o, current initial Cable Structure bearing generalized coordinate vector U t owith monitored amount current initial value vector C t o.Current cable structure actual measurement bearing generalized coordinate vector U is obtained in the 4th step actual measurement tafter, compare U tand U t oif, U tequal U t o, then do not need A t oand U t oupgrade, otherwise need A t oand U t oupgrade, update method is carried out to c step by following a step:
A walks, and calculates U twith U odifference, U twith U odifference be exactly the generalized displacement of support of Cable Structure bearing about initial position, with generalized displacement of support vector V represent generalized displacement of support, V equals U tdeduct U o, be one-to-one relationship between the element in generalized displacement of support vector V and generalized displacement of support component, in generalized displacement of support vector V, the numerical value of an element corresponds to the generalized displacement of an assigned direction of an appointment bearing.
B walks, first to A oin Cable Structure bearing apply generalized displacement of support constraint, the numerical value of generalized displacement of support constraint just takes from the numerical value of corresponding element in generalized displacement of support vector V, to A omiddle Cable Structure bearing applies the current initial mechanical Calculation Basis model A that generalized displacement of support constraint obtains upgrading t o.
D walks, and upgrades A t owhile, U t oall elements numerical value also uses U tall elements numerical value correspondence replaces, and namely have updated U t o, so just obtain and correctly correspond to A t ou t o; Upgrade C t omethod be: when renewal A t oafter, obtain A by Mechanics Calculation t oin all monitored amounts, current concrete numerical value, these concrete numerical value composition C t o.6th step: at current initial mechanical Calculation Basis model A t obasis on carry out several times Mechanics Calculation, by calculate obtain Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and evaluation object unit change vector D u.Concrete grammar is: Cable Structure unit damage monitored numerical quantity transformation matrices Δ C constantly updates, namely at the current initial mechanical Calculation Basis model A of renewal t owhile, Cable Structure unit damage monitored numerical quantity transformation matrices Δ C must be upgraded simultaneously; At the current initial mechanical Calculation Basis model A of Cable Structure t obasis on carry out several times Mechanics Calculation, calculation times numerically equals the quantity of all evaluation objects, N number of evaluation object is had just to have N calculating, calculating hypothesis each time only has an evaluation object on the basis of original damage or load, increase unit damage or load unit change again, concrete, if this evaluation object is a support cable in cable system, so just suppose that this support cable is at vectorial d othe basis that this support cable represented has a damage increases unit damage (such as getting 5%, 10%, 20% or 30% equivalent damage is unit damage) again, if this evaluation object is a load, just suppose that this load is at vectorial d othe basis that this load represented has a variable quantity increases again load unit change (if this load is distributed load, and this distributed load is line distributed load, load unit change can get 1kN/m, 2kN/m, 3kN/m or 1kNm/m, 2kNm/m, 3kNm/m etc. for unit change; If this load is distributed load, and this distributed load is EDS maps load, and load unit change can get 1MPa, 2MPa, 3MPa or 1kNm/m 2, 2kNm/m 2, 3kNm/m 2deng be unit change; If this load is centre-point load, and this centre-point load is couple, and load unit change can get 1kNm, 2kNm, 3kNm etc. for unit change; If this load is centre-point load, and this centre-point load is concentrated force, and load unit change can get 1kN, 2kN, 3kN etc. for unit change; If this load is volume load, load unit change can get 1kN/m 3, 2kN/m 3, 3kN/m 3deng be unit change), use D ukrecord this unit damage or load unit change, wherein k represents the numbering of evaluation object unit damage occurring or load unit change occurs; Occur in calculating each time that the evaluation object of unit damage or load unit change is different from during other time calculates the evaluation object occurring unit damage or load unit change, calculate the current calculated value all utilizing mechanics method to calculate all monitored amount of Cable Structure each time, the current calculated value of all monitored amount calculated each time forms a monitored amount calculation current vector C, element number rule and the monitored amount initial value vector C of monitored amount calculation current vector oelement number rule identical; The monitored amount calculation current vector C calculated each time deducts monitored amount current initial value vector C t oafter calculate the unit damage supposed or load unit change numerical value divided by this time again, obtain a monitored amount unit change vector, have N number of evaluation object just to have N number of monitored amount unit change vector; The unit damage monitored numerical quantity transformation matrices Δ C having N to arrange is formed successively by this N number of monitored amount unit change vector; Each row of unit damage monitored numerical quantity transformation matrices correspond to a monitored amount unit change vector, and every a line of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C corresponds to the different unit change amplitude of same monitored amount when different evaluation object generation unit damage or load unit change; The coding rule of the row of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and vectorial d othe coding rule of element identical, the coding rule of the row of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C is identical with the coding rule of M monitored amount.
7th step: set up linear relationship error vector e and vectorial g.Utilize (the monitored amount current initial value vector C of data above t o, unit damage monitored numerical quantity transformation matrices Δ C), while the 6th step calculates each time, namely only have the increase unit damage of an evaluation object or load unit change D calculating each time in hypothesis evaluation object ukthe evaluation object increasing unit damage or load unit change in calculating each time is different from during other time calculates the evaluation object increasing unit damage or load unit change, calculate the current value all utilizing mechanics method (such as adopting finite element method) to calculate all monitored amounts in Cable Structure each time, while calculating the monitored amount calculation current vector C of composition one each time, calculate composition injury vector d each time, originally walk out of existing injury vector d only to use in this step, in all elements of injury vector d, only have the numerical value of an element to get D uk, the numerical value of other element gets 0, the coding rule of the element of injury vector d and vectorial d othe coding rule of element identical; By C, C t o, Δ C, D u, d brings formula (12) into, obtain a linear relationship error vector e, calculate a linear relationship error vector e each time; N number of evaluation object is had just to have N calculating, just there is N number of linear relationship error vector e, obtaining a vector after being added by this N number of linear relationship error vector e, is exactly final linear relationship error vector e by each element of this vector divided by the new vector obtained after N.Vector g equals final error vector e.
8th step: the hardware components of pass line structural healthy monitoring system.Hardware components at least comprises: monitored amount monitoring system (such as measuring subsystem, signal conditioner etc. containing measurement of angle subsystem, cable force measurement subsystem, strain measurement subsystem, volume coordinate), Cable Structure bearing generalized coordinate monitoring system (containing total powerstation, angle measuring sensor, signal conditioner etc.), signal (data) collector, computing machine and communication alert equipment.Each bearing generalized coordinate of each monitored amount, Cable Structure must arrive by monitored system monitoring, monitoring system by the Signal transmissions that monitors to signal (data) collector; Signal is delivered to computing machine through signal picker; The health monitoring software of the evaluation object running Cable Structure is then responsible for by computing machine, comprises the signal that the transmission of tracer signal collector comes; When monitoring evaluation object health status and changing, computer control communication panalarm is reported to the police to monitor staff, owner and (or) the personnel that specify.
9th step: by current for monitored amount initial value vector C t o, unit damage monitored numerical quantity transformation matrices Δ C, evaluation object unit change vector D uparameter is kept on the hard disc of computer of operation health monitoring systems software in the mode of data file.
Tenth step: establishment installation and operation this method system software on computers, the function (i.e. all work that can complete with computing machine in this specific implementation method) such as monitoring, record, control, storage, calculating, notice, warning that this software will complete this method required by task and wants
11 step: according to monitored amount current value vector C with monitored amount current initial value vector C t o, unit damage monitored numerical quantity transformation matrices Δ C, evaluation object unit change vector D uand the linear approximate relationship (formula (8)) existed between evaluation object current nominal fatigue vector d (being made up of all Suo Dangqian nominal fatigue amounts), calculate the noninferior solution of evaluation object current nominal fatigue vector d according to multi-objective optimization algorithm, namely can determine the position of damaged cable and the solution of nominal fatigue degree thereof more exactly with reasonable error from all ropes.
The multi-objective optimization algorithm that can adopt has a variety of, such as: the multiple-objection optimization based on genetic algorithm, the multiple-objection optimization based on artificial neural network, the multi-objective optimization algorithm based on population, the multiple-objection optimization based on ant group algorithm, leash law (Constrain Method), weighted method (Weighted Sum Method), Objective Programming (Goal AttainmentMethod) etc.Because various multi-objective optimization algorithm is all conventional algorithm, can realize easily, this implementation step only provides the process solving current injury vector d for Objective Programming, the specific implementation process of other algorithm can realize in a similar fashion according to the requirement of its specific algorithm.
According to Objective Programming, formula (8) can transform the multi-objective optimization question shown in an accepted way of doing sth (16) and formula (17), in formula (16), γ is a real number, R is real number field, area of space Ω limits the span (each element of the present embodiment requirements vector d is not less than 0, is not more than 1) of each element of vectorial d.Formula (16) be meant to the minimum real number γ of searching one, formula (17) is met.In formula (17), G (d) is defined by formula (18), the middle deviation allowed between G (d) and vectorial g of the product representation formula (17) of weighing vector W and γ in formula (17), the definition of g is see formula (13), and its value calculates in the 7th step.During actual computation, vector W can be identical with vectorial g.The concrete programming realization of Objective Programming has had universal program directly to adopt.Use Objective Programming just can in the hope of evaluation object current nominal fatigue vector d.
min i m i z e γ γ ∈ R , d ∈ Ω - - - ( 16 )
G(d)-Wγ≤g (17)
G ( d ) = a b s ( Δ C · d - C + C o t ) - - - ( 18 )
The element number of evaluation object current nominal fatigue vector d equals the quantity of evaluation object, be one-to-one relationship between the element of evaluation object current nominal fatigue vector d and evaluation object, the element numerical value of evaluation object current nominal fatigue vector d represents nominal fatigue degree or the nominal load intensity of variation of corresponding evaluation object; The coding rule of the element of vector d and vectorial d othe coding rule of element identical.
12 step: definition evaluation object current actual damage vector d a, evaluation object current actual damage vector d aelement number equal the quantity of evaluation object, evaluation object current actual damage vector d aelement and evaluation object between be one-to-one relationship, evaluation object current actual damage vector d aelement numerical value represent actual damage degree or the real load intensity of variation of corresponding evaluation object; Vector d athe coding rule of element and vectorial d othe coding rule of element identical.The evaluation object utilizing formula (15) to express current actual damage vector d aa kth element d a kwith evaluation object initial damage vector d oa kth element d okwith a kth element d of evaluation object current nominal fatigue vector d kbetween relation, calculate evaluation object current actual damage vector d aall elements.
D a krepresent the current actual health status of a kth evaluation object, if this evaluation object is support cable, so a d in cable system a krepresent its current actual damage, d a krepresent not damaged when being 0, when being 100%, represent that this support cable thoroughly loses load-bearing capacity, time between 0 and 100%, represent the load-bearing capacity losing corresponding proportion.
So far this method achieves the accurate identification of the health status of core evaluation object with a kind of effective, cheap method.May exact value be departed to the recognition result of the health status of secondary evaluation object more, only require the correct health status identifying core evaluation object in the method.
13 step: the computing machine in health monitoring systems regularly generates cable system health condition form automatically or by human users's health monitoring systems.
14 step: under specified requirements, the computing machine automatic operation communication alert equipment in health monitoring systems is reported to the police to monitor staff, owner and (or) the personnel that specify.
15 step: get back to the 4th step, starts by the circulation of the 4th step to the 15 step.

Claims (1)

1. simplify the recognition methods of generalized displacement hybrid monitoring load damaged cable, it is characterized in that described method comprises:
Though the load of a. bearing when Cable Structure changes, when the load that Cable Structure is being born does not exceed Cable Structure initial allowable load, this method is suitable for; The initial allowable load of Cable Structure refers to the allowable load of Cable Structure when being completed, and can be obtained by conventional Mechanics Calculation; This method unitedly calls evaluated support cable and load to be " evaluation object ", if the quantity sum of the quantity of evaluated support cable and load is N, namely the quantity of " evaluation object " is N; This method title " core evaluation object " specially refers to the evaluated support cable in " evaluation object ", and this method title " secondary evaluation object " specially refers to the evaluated load in " evaluation object "; Determine the coding rule of evaluation object, evaluation objects all in Cable Structure numbered by this rule, this numbering will be used for generating vector sum matrix in subsequent step; This method variable k represents this numbering, k=1,2,3 ..., N; Specify when determining hybrid monitoring by the support cable of monitored Suo Li, if total Q root support cable in cable system, the quantity of obvious core evaluation object is exactly Q; The monitored rope force data of Cable Structure is by M in Cable Structure 1the M of individual appointment support cable 1individual rope force data describes, and the change of Cable Structure Suo Li is exactly the change of the Suo Li of all appointment support cables; Each total M 1individual cable force measurement value or calculated value characterize the rope force information of Cable Structure; M 1it is an integer being not less than that 0 is not more than Q; Specify when determining hybrid monitoring by the measured point of monitored strain, the monitored strain data of Cable Structure can by K in Cable Structure 2the L of individual specified point and each specified point 2the strain of individual assigned direction describes, and the change of Cable Structure strain data is exactly K 2the change of all tested strain of individual specified point; Each total M 2individual strain measurement value or calculated value characterize Cable Structure strain, M 2for K 2and L 2long-pending; M 2be be not less than 0 integer; Specify when determining hybrid monitoring by the measured point of monitored angle, the monitored angle-data of Cable Structure is by K in Cable Structure 3individual specified point, cross the L of each specified point 3the H of individual appointment straight line, each appointment straight line 3individual angle coordinate component describes, and the change of Cable Structure angle is exactly the change of all specified points, all appointment straight line, all angle coordinate component of specifying; Each total M 3individual angle coordinate component measurement value or calculated value characterize the angle information of Cable Structure, M 3for K 3, L 3and H 3long-pending; M 3it is an integer being not less than 0; Specify when determining hybrid monitoring by monitored shape data, the monitored shape data of Cable Structure is by K in Cable Structure 4the L of individual specified point and each specified point 4the volume coordinate of individual assigned direction describes, and the change of Cable Structure shape data is exactly K 4the change of all coordinate components of individual specified point; Each total M 4individual coordinates measurements or calculated value characterize Cable Structure shape, M 4for K 4and L 4long-pending; M 4it is an integer being not less than 0; The monitored amount of comprehensive above-mentioned hybrid monitoring, whole Cable Structure has M monitored amount, and M is M 1, M 2, M 3and M 4sum, definition parameter K, K is M 1, K 2, K 3and K 4sum, M must be greater than the quantity of core evaluation object, and M is less than the quantity of evaluation object; For simplicity, in the method by the monitored amount of the M listed by this step referred to as " monitored amount "; The external force that object, structure are born can be described as load, and load comprises face load and volume load; Face load, also known as surface load, is the load acting on body surface, comprises centre-point load and distributed load two kinds; Volume load be continuous distribution in the load of interior of articles each point, comprise deadweight and the inertial force of object; Centre-point load is divided into concentrated force and concentrated couple two kinds, tie up in interior coordinate system comprising Descartes's rectangular coordinate, a concentrated force can resolve into three components, same, a concentrated couple also can resolve into three components, if load is actually centre-point load, in the method a concentrated force component or a concentrated couple component being counted or added up is a load, and the now change of load is embodied as the change of a concentrated force component or a concentrated couple component; Distributed load is divided into line distributed load and EDS maps load, and the description of distributed load at least comprises the zone of action of distributed load and the size of distributed load, and the size distribution intensity of distributed load is expressed, and distribution intensity distribution characteristics and amplitude are expressed; If load is actually distributed load, when this method talks about the change of load, in fact refer to the change of the amplitude of distributed load distribution intensity, and the distribution characteristics of the zone of action of all distributed loads and distribution intensity is constant; Tie up in interior coordinate system comprising Descartes's rectangular coordinate, a distributed load can resolve into three components, if the amplitude of the respective distribution intensity of three of this distributed load components changes, and the ratio of change is all not identical, so in the method three of this distributed load components being counted or added up is three distributed loads, and now load just represents the one-component of distributed load; Volume load be continuous distribution in the load of interior of articles each point, the description of volume load at least comprises the zone of action of volume load and the size of volume load, and the size distribution intensity of volume load is expressed, distribution intensity distribution characteristics and amplitude express; If load is actually volume load, actual treatment is the change of the amplitude of volume load diatibution intensity in the method, and the distribution characteristics of the zone of action of all volume load and distribution intensity is constant, in fact the change of the amplitude of the distribution intensity of volume load is referred to when now mentioning the change of load in the method, now, the load changed refers to the volume load that the amplitude of those distribution intensities changes; Tie up in interior coordinate system comprising Descartes's rectangular coordinate, one individual stow lotus can resolve into three components, if the amplitude of the respective distribution intensity of three of this volume load components changes, and the ratio of change is all not identical, so in the method three of this volume load components being counted or added up is three distributed loads;
B. survey or consult reference materials and obtain the physical and mechanical properties parameter of the various materials that Cable Structure uses;
C. actual measurement or consult reference materials obtain the various materials that Cable Structure uses physical and mechanical properties parameter while, direct survey calculation obtains the measured data of initial Cable Structure, the measured data of initial Cable Structure comprises Cable Structure centre-point load measurement data, Cable Structure distributed load measurement data, Cable Structure volume load measurement data, the initial value of all monitored amounts, the Initial cable force data of all support cables, initial Cable Structure modal data, initial Cable Structure strain data, initial Cable Structure geometric data, initial Cable Structure bearing generalized coordinate data, initial Cable Structure angle-data, initial Cable Structure spatial data is in interior measured data, initial Cable Structure bearing generalized coordinate data comprise initial Cable Structure bearing spatial data and initial Cable Structure bearing angular data, while the measured data obtaining initial Cable Structure, survey calculation obtains the data can expressing the health status of support cable of the Non-destructive Testing Data comprising support cable, the data can expressing the health status of support cable are now called support cable initial health data, the initial value of all monitored amounts forms monitored amount initial value vector C o, monitored amount initial value vector C othe coding rule of coding rule and M monitored amount identical, support cable initial health data and Cable Structure load measurement data are utilized to set up evaluation object initial damage vector d o, vectorial d orepresent with initial mechanical Calculation Basis model A othe initial health of the evaluation object of the Cable Structure represented, evaluation object initial damage vector d oelement number equal N, d oelement and evaluation object be one-to-one relationship, vectorial d othe coding rule of element identical with the coding rule of evaluation object, if d oevaluation object corresponding to some elements be support cable, so a d in cable system othe numerical value of this element represent the initial damage degree of corresponding support cable, if the numerical value of this element is 0, represent that the support cable corresponding to this element is intact, do not damage, if its numerical value is 100%, then represent that the support cable corresponding to this element completely loses load-bearing capacity, if its numerical value is between 0 and 100%, then represent that this support cable loses the load-bearing capacity of corresponding proportion, if d oevaluation object corresponding to some elements be some load, get d in this method othis element numerical value be 0, the initial value representing the change of this load is 0, if there is no the Non-destructive Testing Data of support cable and other are when can express the data of the health status of support cable, or can think structure original state be not damaged without relaxed state time, vectorial d oin each element numerical value relevant to support cable get 0, initial Cable Structure bearing generalized coordinate data form initial Cable Structure bearing generalized coordinate vector U o,
Physical and mechanical properties parameter, the initial Cable Structure bearing generalized coordinate vector U of the various materials d. used according to the measured data of the design drawing of Cable Structure, as-constructed drawing and initial Cable Structure, support cable initial health data, Cable Structure centre-point load measurement data, Cable Structure distributed load measurement data, Cable Structure volume load measurement data, Cable Structure owith all Cable Structure data that preceding step obtains, set up the initial mechanical Calculation Basis model A of Cable Structure o, based on A othe Cable Structure that calculates calculates data must closely its measured data, and difference therebetween must not be greater than 5%; Corresponding to A oevaluation object health status with evaluation object initial damage vector d orepresent; Corresponding to A othe initial value monitored amount initial value vector C of all monitored amount orepresent; Set up the current initial mechanical Calculation Basis model A of Cable Structure for the first time t owith monitored amount current initial value vector C t o; Set up the current initial mechanical Calculation Basis model A of Cable Structure for the first time t owith monitored amount current initial value vector C t otime, the current initial mechanical Calculation Basis model A of Cable Structure t ojust equal the initial mechanical Calculation Basis model A of Cable Structure o, monitored amount current initial value vector C t ojust equal monitored amount initial value vector C o; Corresponding to the current initial mechanical Calculation Basis model A of Cable Structure t ocable Structure bearing generalized coordinate data composition current initial Cable Structure bearing generalized coordinate vector U t o, set up the current initial mechanical Calculation Basis model A of Cable Structure for the first time t otime, U t ojust equal U o; A t othe initial health of evaluation object and A othe health status of evaluation object identical, also use evaluation object initial damage vector d orepresent, A in cyclic process below t othe initial health of evaluation object use evaluation object initial damage vector d all the time orepresent; U oand d oa oparameter, by A othe initial value of all monitored amount that obtains of Mechanics Calculation result and C othe initial value of all monitored amount represented is identical, therefore alternatively C oby A omechanics Calculation result composition; U t oand d oa t oparameter, C t oby A t omechanics Calculation result composition;
E. from entering the circulation being walked to m step by e here; In structure military service process, constantly actual measurement obtains Cable Structure bearing generalized coordinate current data, all Cable Structure bearing generalized coordinate current data composition current cable structure actual measurement bearing generalized coordinate vector U t, vectorial U tdefinition mode and vectorial U odefinition mode identical;
F. according to current cable structure actual measurement bearing generalized coordinate vector U t, upgrade current initial mechanical Calculation Basis model A according to step f1 to f3 t o, current initial Cable Structure bearing generalized coordinate vector U t owith monitored amount current initial value vector C t o;
F1. U is compared twith U t oif, U tequal U t o, then A t o, U t oand C t oremain unchanged, otherwise need to follow these steps to A t o, U t oand C t oupgrade;
F2. U is calculated twith U odifference, U twith U odifference be exactly the generalized displacement of support of Cable Structure bearing about initial position, with generalized displacement of support vector V represent generalized displacement of support, V equals U tdeduct U o, be one-to-one relationship between the element in generalized displacement of support vector V and generalized displacement of support component, in generalized displacement of support vector V, the numerical value of an element corresponds to the generalized displacement of an assigned direction of an appointment bearing;
F3. to A oin Cable Structure bearing apply generalized displacement of support constraint, the numerical value of generalized displacement of support constraint just takes from the numerical value of corresponding element in generalized displacement of support vector V, to A omiddle Cable Structure bearing obtains the current initial mechanical Calculation Basis model A upgraded after applying generalized displacement of support constraint t o, upgrade A t owhile, U t oall elements numerical value also uses U tall elements numerical value correspondence replaces, and namely have updated U t o, so just obtain and correctly correspond to A t ou t o; Upgrade C t omethod be: when renewal A t oafter, obtain A by Mechanics Calculation t oin all monitored amounts, current concrete numerical value, these concrete numerical value composition C t o; A t othe initial health of support cable use evaluation object initial damage vector d all the time orepresent;
G. at current initial mechanical Calculation Basis model A t obasis on carry out several times Mechanics Calculation according to step g 1 to g4, by calculate obtain Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and evaluation object unit change vector D u;
G1. Cable Structure unit damage monitored numerical quantity transformation matrices Δ C constantly updates, namely at the current initial mechanical Calculation Basis model A of renewal t o, current initial Cable Structure bearing generalized coordinate vector U t owith monitored amount current initial value vector C t oafterwards, Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and evaluation object unit change vector D must then be upgraded u;
G2. at the current initial mechanical Calculation Basis model A of Cable Structure t obasis on carry out several times Mechanics Calculation, calculation times numerically equals the quantity N of all evaluation objects, has N number of evaluation object just to have N calculating; According to the coding rule of evaluation object, calculate successively; Calculating hypothesis each time only has an evaluation object on the basis of original damage or load, increase unit damage or load unit change again, concrete, if this evaluation object is a support cable in cable system, so just supposes that this support cable is at vectorial d othe basis that this support cable represented has a damage increases unit damage again, if this evaluation object is a load, just supposes that this load is at vectorial d othe basis that this load represented has a variable quantity increases load unit change again, use D ukrecord unit damage or the load unit change of this increase, wherein k represents the numbering of the evaluation object increasing unit damage or load unit change, D ukevaluation object unit change vector D uan element, evaluation object unit change vector D uthe coding rule of element and vectorial d othe coding rule of element identical; The evaluation object increasing unit damage or load unit change in calculating each time is different from during other time calculates the evaluation object increasing unit damage or load unit change, calculate the current calculated value all utilizing mechanics method to calculate all monitored amount of Cable Structure each time, the current calculated value of all monitored amount calculated each time forms a monitored amount calculation current vector, element number rule and the monitored amount initial value vector C of monitored amount calculation current vector oelement number rule identical;
G3. the monitored amount calculation current vector calculated each time deducts monitored amount current initial value vector C t oobtain a vector, then each element of this vector is calculated the unit damage or load unit change numerical value supposed divided by this time, obtain a monitored amount unit change vector, have N number of evaluation object just to have N number of monitored amount unit change vector;
G4. by the vectorial coding rule according to N number of evaluation object of this N number of monitored amount unit change, the Cable Structure unit damage monitored numerical quantity transformation matrices Δ C having N to arrange is formed successively; Each row of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C correspond to a monitored amount unit change vector; Every a line of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C corresponds to the different unit change amplitude of same monitored amount when different evaluation object increases unit damage or load unit change; The coding rule of the row of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and vectorial d othe coding rule of element identical, the coding rule of the row of Cable Structure unit damage monitored numerical quantity transformation matrices Δ C is identical with the coding rule of M monitored amount;
H. current cable structure actual measurement bearing generalized coordinate vector U is obtained in actual measurement twhile, actual measurement obtains the current measured value of all monitored amount of Cable Structure, forms monitored amount current value vector C; Monitored amount current value vector C and monitored amount current initial value vector C t owith monitored amount initial value vector C odefinition mode identical, the same monitored amount of element representation of three vectorial identical numberings is at not concrete numerical value in the same time;
I. evaluation object current nominal fatigue vector d is defined, the element number of evaluation object current nominal fatigue vector d equals the quantity of evaluation object, be one-to-one relationship between the element of evaluation object current nominal fatigue vector d and evaluation object, the element numerical value of evaluation object current nominal fatigue vector d represents nominal fatigue degree or the nominal load variable quantity of corresponding evaluation object; The coding rule of the element of vector d and vectorial d othe coding rule of element identical;
J. according to monitored amount current value vector C with monitored amount current initial value vector C t o, the linear approximate relationship that exists between Cable Structure unit damage monitored numerical quantity transformation matrices Δ C and evaluation object to be asked current nominal fatigue vector d, this linear approximate relationship can be expressed as formula 1, other amount in formula 1 except d is known, solves formula 1 and just can calculate evaluation object current nominal fatigue vector d;
C = C o t + Δ C · d Formula 1
K. evaluation object current actual damage vector d is defined a, evaluation object current actual damage vector d aelement number equal the quantity of evaluation object, evaluation object current actual damage vector d aelement and evaluation object between be one-to-one relationship, evaluation object current actual damage vector d aelement numerical value represent actual damage degree or the real load variable quantity of corresponding evaluation object; Vector d athe coding rule of element and vectorial d othe coding rule of element identical;
L. the evaluation object utilizing formula 2 to express current actual damage vector d aa kth element d a kwith evaluation object initial damage vector d oa kth element d okwith a kth element d of evaluation object current nominal fatigue vector d kbetween relation, calculate evaluation object current actual damage vector d aall elements;
K=1 in formula 2,2,3 ...., N, d a krepresent the current actual health status of a kth evaluation object, if this evaluation object is support cable, so a d in cable system a krepresent its current actual damage, d a krepresent not damaged when being 0, when being 100%, represent that this support cable thoroughly loses load-bearing capacity, time between 0 and 100%, represent the load-bearing capacity losing corresponding proportion; So according to evaluation object current actual damage vector d athe health status of core evaluation object can be determined;
M. get back to e step, start the circulation next time being walked to m step by e.
CN201510437388.6A 2015-07-23 2015-07-23 Simplified load damaged cable identification method through hybrid monitoring under generalized displacement Pending CN104990723A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510437388.6A CN104990723A (en) 2015-07-23 2015-07-23 Simplified load damaged cable identification method through hybrid monitoring under generalized displacement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510437388.6A CN104990723A (en) 2015-07-23 2015-07-23 Simplified load damaged cable identification method through hybrid monitoring under generalized displacement

Publications (1)

Publication Number Publication Date
CN104990723A true CN104990723A (en) 2015-10-21

Family

ID=54302565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510437388.6A Pending CN104990723A (en) 2015-07-23 2015-07-23 Simplified load damaged cable identification method through hybrid monitoring under generalized displacement

Country Status (1)

Country Link
CN (1) CN104990723A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006337144A (en) * 2005-06-01 2006-12-14 Kawasaki Heavy Ind Ltd Fatigue life diagnostic method and diagnostic support device of bridge
CN103913328A (en) * 2014-03-10 2014-07-09 东南大学 Generalized displacement hybrid monitoring damaged cable load progressive identification method
CN103913329A (en) * 2014-03-10 2014-07-09 东南大学 Generalized displacement hybrid monitoring damaged cable load identification method
CN103913321A (en) * 2014-03-10 2014-07-09 东南大学 Generalized displacement hybrid monitoring defective cable load identification method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006337144A (en) * 2005-06-01 2006-12-14 Kawasaki Heavy Ind Ltd Fatigue life diagnostic method and diagnostic support device of bridge
CN103913328A (en) * 2014-03-10 2014-07-09 东南大学 Generalized displacement hybrid monitoring damaged cable load progressive identification method
CN103913329A (en) * 2014-03-10 2014-07-09 东南大学 Generalized displacement hybrid monitoring damaged cable load identification method
CN103913321A (en) * 2014-03-10 2014-07-09 东南大学 Generalized displacement hybrid monitoring defective cable load identification method

Similar Documents

Publication Publication Date Title
CN101813570B (en) Health monitoring method for recognizing damaged cable and support displacement based on mixed monitoring
CN101782472B (en) Health monitoring method of rope system based on angle monitoring during support settlement
CN101819098B (en) Mixed monitoring based progressive method for identifying damaged cables and support displacement
CN101799373B (en) Health monitor method for identifying damaged cable and support seat displacement based on angle monitor
CN101806663B (en) Health monitoring method of cable system based on mixed monitoring in presence of support seat settlement
CN101793628A (en) Cable structure health monitoring method based on hybrid monitoring
CN104990723A (en) Simplified load damaged cable identification method through hybrid monitoring under generalized displacement
CN105115752A (en) Method for identifying damaged cable based on space coordinate monitoring through simplified generalized displacement and load change
CN105115748A (en) Identification method for damaged cable based on angle monitoring through simplified generalized displacement and load change
CN105067349A (en) Method for recognizing damaged cable of load based on cable force monitoring process of streamlined and generalized displacement
CN104990753A (en) Simplified method of recognizing load damage cable and generalized displacement through mixed monitoring
CN105115756A (en) Identification method for damaged cable and generalized displacement based on angle monitoring through simplified load change
CN105067301A (en) Simplified strain-monitoring load damaged cable generalized displacement identifying method
CN102305723A (en) Health monitoring method based on mixed monitoring and identification of damaged cable and generalized displacement of support
CN105136496A (en) Simplified generalized displacement hybrid monitoring load damaged cable progressive identification method
CN105067303A (en) Simplified generalized displacement angle-monitoring load damaged cable progressive identifying method
CN105067310A (en) Method for recognizing damaged cable generalized displacement of load based on streamlined space coordinate monitoring process
CN105004557A (en) Method for recognizing damaged cable of load based on streamlined angle monitoring process of generalized displacement
CN105004563A (en) Method for recognizing damaged cable of load based on streamlined hybrid monitoring process of generalized displacement
CN104990577A (en) Simplified load damaged cable generalized displacement progressive-identification method through hybrid monitoring
CN104990749A (en) Simplified method of progressively recognizing load damage cable through generalized displacement space coordinate monitoring
CN105004545A (en) Method for progressively recognizing damaged cable of load based on streamlined strain monitoring process of generalized displacement
CN105067340A (en) Method for recognizing damaged cable of load based on space coordinate monitoring process of streamlined and generalized displacement
CN105136504A (en) Simplified generalized displacement strain monitoring load faulty cable progressive identification method
CN105067309A (en) Simplified cable-force-monitoring load damaged cable generalized displacement identifying method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021