CN104989634B - Monitoring system and method for compressor - Google Patents

Monitoring system and method for compressor Download PDF

Info

Publication number
CN104989634B
CN104989634B CN201510402643.3A CN201510402643A CN104989634B CN 104989634 B CN104989634 B CN 104989634B CN 201510402643 A CN201510402643 A CN 201510402643A CN 104989634 B CN104989634 B CN 104989634B
Authority
CN
China
Prior art keywords
equipment
compressor
status information
compressor application
application equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510402643.3A
Other languages
Chinese (zh)
Other versions
CN104989634A (en
Inventor
徐海龙
任新杰
冯建宏
宋万杰
王世超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Meizhi Compressor Co Ltd
Anhui Meizhi Precision Manufacturing Co Ltd
Original Assignee
Guangdong Meizhi Compressor Co Ltd
Anhui Meizhi Precision Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Meizhi Compressor Co Ltd, Anhui Meizhi Precision Manufacturing Co Ltd filed Critical Guangdong Meizhi Compressor Co Ltd
Priority to CN201510402643.3A priority Critical patent/CN104989634B/en
Publication of CN104989634A publication Critical patent/CN104989634A/en
Application granted granted Critical
Publication of CN104989634B publication Critical patent/CN104989634B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention proposes a kind of monitoring system and method for compressor, the monitoring system for being used for compressor includes acquisition module, memory module and data center module, wherein, the acquisition module, status information of equipment for collect and process machine application apparatus, and by the transmission rule pre-set, the status information of equipment is sent to the data center module;The memory module, the status information of equipment for storing the compressor application equipment;The data center module, for collecting and storing the status information of equipment, monitors the status information of equipment, excavates and analyze the status information of equipment, and draw rule according to the status information of equipment.The monitoring system for being used for compressor can effectively improve the monitoring effect of compressor.

Description

Monitoring system and method for compressor
Technical field
The present invention relates to technical field of software development, more particularly to a kind of monitoring system and method for compressor.
Background technology
With the development of science and technology, electronic device processing speed, information transfer means and the development of memory space technology are fast The new technological means such as speed, internet and big data has had influence on many daily lives and operation.As compressor this Plant traditional industrial products, it is possible to use the means of internet and big data, to collect and analyze the information that compressor uses end, And then for instructing or improving the working method of industrial chain various pieces, to improve the performance and quality of product.
The quality evaluation of current compressor, not compressor using end data powerful support and feedback guidance, it is impossible to Sufficiently reply compressor uses the various complex environments at end, cumbersome using end collection service condition data step from compressor, Compressor service condition data are stored without corresponding data center, monitoring effect is poor.
The content of the invention
It is contemplated that at least solving one of technical problem in correlation technique to a certain extent.
Therefore, it is an object of the present invention to propose a kind of monitoring system for compressor, the system can be effective Improve the monitoring effect of compressor.
It is another object of the present invention to propose a kind of monitoring method for compressor.
To reach above-mentioned purpose, the monitoring system for compressor that first aspect present invention embodiment is proposed, including:Adopt Collect module, memory module and data center module, wherein, the acquisition module, the equipment for collect and process machine application apparatus Status information, and by the transmission rule pre-set, the status information of equipment is sent to the data center module;It is described Memory module, the status information of equipment for storing the compressor application equipment;The data center module, for receiving Collect and store the status information of equipment, monitor the status information of equipment, excavate and analyze the status information of equipment, and root Rule is drawn according to the status information of equipment.
The monitoring system for compressor that first aspect present invention embodiment is proposed, acquisition module passes through collect and process machine The status information of equipment of application apparatus, and status information of equipment is sent to data center's mould by the transmission rule pre-set Block, memory module storage device status information, data center module is collected and storage device status information, monitoring device state letter Breath, excavation and analytical equipment status information, and rule is drawn according to the status information of equipment, effectively improve the monitoring of compressor Effect.
To reach above-mentioned purpose, the monitoring method for compressor that second aspect of the present invention embodiment is proposed, including:Adopt Collect the status information of equipment of compressor application equipment, and by the transmission rule pre-set, the status information of equipment is transmitted To data center module;And monitor the status information of equipment, excavate and analyze the status information of equipment, and according to described Status information of equipment draws rule.
The monitoring method for compressor that second aspect of the present invention embodiment is proposed, passes through collect and process machine application apparatus Status information of equipment, and status information of equipment is sent to data center module by the transmission rule pre-set, monitoring is set Standby status information, excavation and analytical equipment status information, and rule is drawn according to the status information of equipment, effectively improve compression The monitoring effect of machine.
The additional aspect of the present invention and advantage will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
Of the invention above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments Substantially and be readily appreciated that, wherein:
Fig. 1 is the structural representation for the monitoring system for compressor that one embodiment of the invention is proposed;
Fig. 2 is the functional schematic of capture program in acquisition module in the embodiment of the present invention;
Fig. 3 is the functional schematic of data center module in the embodiment of the present invention;
Fig. 4 is the schematic flow sheet for the monitoring method for compressor that another embodiment of the present invention is proposed.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached The embodiment of figure description is exemplary, is only used for explaining the present invention, and is not considered as limiting the invention.On the contrary, this All changes in the range of spirit and intension that the embodiment of invention includes falling into attached claims, modification and equivalent Thing.
Fig. 1 is the structural representation for the monitoring system for compressor that one embodiment of the invention is proposed, the system 10 is wrapped Acquisition module 101, memory module 102 and data center module 103 are included, wherein, acquisition module 101 should for collect and process machine With the status information of equipment of equipment, and by the transmission rule pre-set, status information of equipment is sent to data center module 103;Memory module 102, the status information of equipment for storing compressor application equipment;Data center module 103, for collecting And storage device status information, monitoring device status information, excavation and analytical equipment status information, and believed according to equipment state Breath draws rule.
Acquisition module 101, is advised for the status information of equipment of collect and process machine application apparatus, and by the transmission pre-set Then, status information of equipment is sent to data center module 103.
Wherein, compressor application equipment carries out the principle design of heat exchange operation according to kind of refrigeration cycle principle and compression refrigerant.
Optionally, acquisition module 101 includes information acquisition program.
Specifically, information acquisition program can be the program in the automatically controlled chip of compressor application equipment.
Wherein, status information when status information of equipment is the compressor application equipment operation of information acquisition program collection, The run time of compressor application equipment can be included, when occurring event set in advance, the current value of compressor application equipment, The status information of magnitude of voltage, environmental information and compressor application equipment.
Optionally, the run time of compressor application equipment can include the Startup time of compressor application equipment, stop Moment, and set compressor application equipment run in fixed frequency Startup time, the one or more in the stop timing.
It is the functional schematic of information acquisition program in acquisition module 101, wherein information acquisition program for example, with reference to Fig. 2 Function include:Status information when collect and process machine application apparatus is run;Compressor during event set in advance occurs for collection The status information of application apparatus;Letter during trigger collection compressor application unit exception run case during compressor cancel closedown Breath;Status information of equipment is sent to data center module 103.
For example, the status information during operation of information acquisition program collect and process machine application apparatus, including but not limited to compresses At the start moment of machine application apparatus, shut down moment, the start/stop time that compressor application equipment is run in specific frequency, specific frequency Such as 200Hz/s, compressor application equipment specific frequency section average current value, in the average ring of indoor and outdoor of specific frequency section Border temperature.
In another example, referring to Fig. 2, the electric current of compressor application equipment during event set in advance occurs for capture program collection The status information of value, magnitude of voltage, environmental information, and compressor application equipment.
Optionally, event set in advance can include compressor application unit exception run case, influence compressor should With the one or more in the event of service life of equipment, and harsh environmental conditions event.
For example, event set in advance includes but is not limited to event described in following A-H, it is specifically, as described below when occurring During event, the current value of triggering collection programmed acquisition compressor application equipment, magnitude of voltage, environmental information, and compressor application Status information of equipment etc..
If A, compressor demagnetization protective current are IAA, when running current is more than (IA-I1) A when, triggering collection pattern is adopted Collection information includes but is not limited to electric current more than (IA-I1) A when start/stop time, maximum running frequency, outdoor environment mean temperature, This section of highest delivery temperature, this section of maximum current value.
If B, compressor design highest delivery temperature are TBDEG C, when delivery temperature is more than (TB-T1) DEG C when, triggering collection Pattern, collection information includes but is not limited to delivery temperature more than (TB-T1) DEG C start/stop time, maximum running frequency, outdoor is average Environment temperature, runs maximum current value, this section of highest delivery temperature.
If highest standard temperature T outside C, design compressor roomCDEG C, when outdoor temperature is more than (TC-T2) DEG C when, triggering is adopted Integrated mode, collection information includes but is not limited to outdoor temperature more than (TC-T2) DEG C start/stop time, maximum running frequency, suction and discharge Mean temperature, the maximum current value of this section of operation, this section of highest outdoor temperature.
If minimum standard temperature T outside D, design compressor roomDDEG C, when outdoor temperature is higher than (TD+T3) DEG C when, triggering is adopted Integrated mode, outdoor temperature when collection information includes but is not limited to compressor start, start to delivery temperature reach certain value when Between, start maximum current value.
If E, design compressor minimum operating frequency SEHZ, when compressor operating frequency is less than (SE+S1)HZWhen, triggering is adopted Integrated mode, collection information includes but is not limited to running frequency less than (SE+S1)HZStart/stop time, average running current is residing Outdoor average ambient temperature.
If F, design compressor maximum running frequency SFHZ, when compressor operating frequency is higher than (SF-S2)HZWhen, triggering is adopted Integrated mode, collection information includes but is not limited to running frequency higher than (SF-S2)HZStart/stop time, maximum running current, maximum row Temperature degree, residing outdoor average ambient temperature.
G, in one section of stipulated time length, compressor operating frequency undulate quantity be more than (SG-S3)HZWhen, triggering collection mould Formula, collection information include but not limited to this section start/stop time, target frequency, now average current value.
H, when busbar voltage be less than (VG-V1) V when, triggering collection pattern, collection information include but not limited to this event rise Only moment, target frequency and actual maximum frequency error, maximum current value, highest delivery temperature, residing outdoor average environment Temperature.
In another example, referring to Fig. 2, capture program can be with compressor during trigger collection compressor application unit exception run case Information during cancel closedown, wherein compressor application unit exception run case include but is not limited to current protection, voltage protection, Exhaust protection, module protection, and press step-out, the information of capture program collection include but is not limited to failure code, during shutdown Carve, delivery temperature, current value, outdoor temperature, and the speed of service.
Optionally, the transmission rule pre-set can include the one or more in situations below:
If the danger classes of status information of equipment is height, send in real time.
If for example, the danger classes of status information of equipment is " high-risk ", setting for memory module 102 will be currently stored in Standby status information is sent to data center module 103 in real time.
If status information of equipment is periodical information, it is transmitted according to predetermined period.
For example, the cycle is 7 days, then every 7 days, the status information of equipment for being currently stored in memory module 102 is sent to Data center module 103.
When compressor application equipment is using terminating, the status information of equipment for being currently stored in memory module 102 is sent to Data center module 103.
Memory module 102, the status information of equipment for storing compressor application equipment.
Specifically, referring to Fig. 2, status information of equipment periodically can be sent to data center module 103 by capture program, fixed After phase transmission, memory module 102 originally can store new status information of equipment.
Data center module 103, referring to Fig. 3, for collecting and storage device status information, monitoring device status information, Excavate and analytical equipment status information, and rule is drawn according to status information of equipment.
Wherein, data center module 103 includes database and data handling system, and data center module 103 is by wireless Transmission, wire transmission, and artificially the method such as contact scene collects the status information of equipment of compressor application equipment, and be based on Big data is filed and analyzed to the information of collection, to draw the influential conclusion of the use on compressor application equipment, is used Come instruct improve compressor application equipment whole industrial chain working method.
Optionally, industrial chain can include research and development, buying, quality, the logistics of compressor application equipment, and the ring such as use Section.
Specifically, referring to Fig. 3, data center module 103 is excavated and the working method of analytical equipment status information can be wrapped Include but be not limited to situation described in following 1-4.
1st, by being wirelessly transferred, wire transmission, and the method such as artificial contact scene collects setting for compressor application equipment Standby status information, lifelong archives are set up to all compressor application equipment used in industrial chain.
If the 2, compressor application equipment projected life is N, the compressor that will be used before the N+N1 time limits occurs bad Event, by the species of adverse events, carry out statistic of classification.
If the 3, the adverse events incidence of compressor application equipment is set as R%, and the probability of occurrence of adverse events is big It is ranked up from high to low in (R-R0) % adverse events.
4th, the high event of the probability of occurrence for the adverse events for counting situation 3, is analyzed and data mining, by statistics Learn principle and find out its common feature relevant with each link in compressor application equipment industrial chain, these common features are included but not It is limited to situation described in following a-f.
A, the part of defective products mostly come from a certain supplier.
B, to analysis of rejects after, find product design have certain general character.
C, the date of manufacture of defective products, production line, even production station have general character.
D, defective products have been concentrated through the quality restriction link of targeted design.
E, defective products embody the bad feature of logistics, and concentrate on some link or some period hair of logistics It is raw.
F, defective products embody the feature in use, and concentrate generation in some customers' place.
Situation described in event and a-f according to the A-H of statistics, draws the conclusion of regularity, whole to improve compressor The working method of industrial chain, to improve the overall service efficiency of compressor.
In the present embodiment, acquisition module is by the status information of equipment of collect and process machine application apparatus, and by pre-setting Transmission rule status information of equipment is sent to data center module, memory module storage device status information, data center Module collection and storage device status information, monitoring device status information, excavation and analytical equipment status information, and draw rule Rule, effectively improves the monitoring effect of compressor.
Fig. 4 is the schematic flow sheet for the monitoring method for compressor that another embodiment of the present invention is proposed, this method bag Include:
S41:The status information of equipment of collect and process machine application apparatus, and by the transmission rule pre-set, by equipment shape State information transmission is to data center module.
Wherein, status information when status information of equipment is the compressor application equipment operation of information acquisition program collection, The run time of compressor application equipment can be included, when occurring event set in advance, the current value of compressor application equipment, The status information of magnitude of voltage, environmental information and compressor application equipment.
Optionally, the run time of compressor application equipment can include the Startup time of compressor application equipment, stop Moment, and set compressor application equipment run in fixed frequency Startup time, the one or more in the stop timing.
It is the functional schematic of information acquisition program for example, with reference to Fig. 2, the function of wherein information acquisition program includes:Adopt Collect the status information during operation of compressor application equipment;The state of compressor application equipment during event set in advance occurs for collection Information;Information during trigger collection compressor application unit exception run case during compressor cancel closedown;Equipment state is believed Breath is sent to data center module 103.
For example, the status information during operation of information acquisition program collect and process machine application apparatus, including but not limited to compresses At the start moment of machine application apparatus, shut down moment, the start/stop time that compressor application equipment is run in specific frequency, specific frequency Such as 200Hz/s, compressor application equipment specific frequency section average current value, in the average ring of indoor and outdoor of specific frequency section Border temperature.
In another example, referring to Fig. 2, the electric current of compressor application equipment during event set in advance occurs for capture program collection The status information of value, magnitude of voltage, environmental information, and compressor application equipment.
Optionally, event set in advance can include compressor application unit exception run case, influence compressor should With the one or more in the event of service life of equipment, and harsh environmental conditions event.
For example, event set in advance includes but is not limited to event described in following A-H, it is specifically, as described below when occurring During event, the current value of triggering collection programmed acquisition compressor application equipment, magnitude of voltage, environmental information, and compressor application Status information of equipment etc..
If A, compressor demagnetization protective current are IAA, when running current is more than (IA-I1) A when, triggering collection pattern is adopted Collection information includes but is not limited to electric current more than (IA-I1) A when start/stop time, maximum running frequency, outdoor environment mean temperature, This section of highest delivery temperature, this section of maximum current value.
If B, compressor design highest delivery temperature are TBDEG C, when delivery temperature is more than (TB-T1) DEG C when, triggering collection Pattern, collection information includes but is not limited to delivery temperature more than (TB-T1) DEG C start/stop time, maximum running frequency, outdoor is average Environment temperature, runs maximum current value, this section of highest delivery temperature.
If highest standard temperature T outside C, design compressor roomCDEG C, when outdoor temperature is more than (TC-T2) DEG C when, triggering is adopted Integrated mode, collection information includes but is not limited to outdoor temperature more than (TC-T2) DEG C start/stop time, maximum running frequency, suction and discharge Mean temperature, the maximum current value of this section of operation, this section of highest outdoor temperature.
If minimum standard temperature T outside D, design compressor roomDDEG C, when outdoor temperature is higher than (TD+T3) DEG C when, triggering is adopted Integrated mode, outdoor temperature when collection information includes but is not limited to compressor start, start to delivery temperature reach certain value when Between, start maximum current value.
If E, design compressor minimum operating frequency SEHZ, when compressor operating frequency is less than (SE+S1)HZWhen, triggering is adopted Integrated mode, collection information includes but is not limited to running frequency less than (SE+S1)HZStart/stop time, average running current is residing Outdoor average ambient temperature.
If F, design compressor maximum running frequency SFHZ, when compressor operating frequency is higher than (SF-S2)HZWhen, triggering is adopted Integrated mode, collection information includes but is not limited to running frequency higher than (SF-S2)HZStart/stop time, maximum running current, maximum row Temperature degree, residing outdoor average ambient temperature.
G, in one section of stipulated time length, compressor operating frequency undulate quantity be more than (SG-S3)HZWhen, triggering collection mould Formula, collection information include but not limited to this section start/stop time, target frequency, now average current value.
H, when busbar voltage be less than (VG-V1) V when, triggering collection pattern, collection information include but not limited to this event rise Only moment, target frequency and actual maximum frequency error, maximum current value, highest delivery temperature, residing outdoor average environment Temperature.
In another example, referring to Fig. 2, capture program can be with compressor during trigger collection compressor application unit exception run case Information during cancel closedown, wherein compressor application unit exception run case include but is not limited to current protection, voltage protection, Exhaust protection, module protection, and press step-out, the information of capture program collection include but is not limited to failure code, during shutdown Carve, delivery temperature, current value, outdoor temperature, and the speed of service.
Optionally, the transmission rule pre-set can include the one or more in situations below:
If the danger classes of status information of equipment is height, send in real time.
If for example, the danger classes of status information of equipment is " high-risk ", setting for memory module 102 will be currently stored in Standby status information is sent to data center module 103 in real time.
If status information of equipment is periodical information, it is transmitted according to predetermined period.
For example, the cycle is 7 days, then every 7 days, the status information of equipment for being currently stored in memory module 102 is sent to Data center module 103.
When compressor application equipment is using terminating, the status information of equipment for being currently stored in memory module 102 is sent to Data center module 103.
S42:Monitoring device status information, excavation and analytical equipment status information, and rule are drawn according to status information of equipment Rule.
Wherein, the information of collection is filed and analyzed based on big data, compressor application equipment is made with drawing Influential conclusion is used, for the working method for the whole industrial chain for instructing to improve compressor application equipment.
Optionally, industrial chain can include research and development, buying, quality, the logistics of compressor application equipment, and the ring such as use Section.
Specifically, referring to Fig. 3, excavate and the working method of analytical equipment status information can include but is not limited to following 1- Situation described in 4.
1st, by being wirelessly transferred, wire transmission, and the method such as artificial contact scene collects setting for compressor application equipment Standby status information, lifelong archives are set up to all compressor application equipment used in industrial chain.
If the 2, compressor application equipment projected life is N, the compressor that will be used before the N+N1 time limits occurs bad Event, by the species of adverse events, carry out statistic of classification.
If the 3, the adverse events incidence of compressor application equipment is set as R%, and the probability of occurrence of adverse events is big It is ranked up from high to low in (R-R0) % adverse events.
4th, the high event of the probability of occurrence for the adverse events for counting situation 3, is analyzed and data mining, by statistics Learn principle and find out its common feature relevant with each link in compressor application equipment industrial chain, these common features are included but not It is limited to situation described in following a-f.
A, the part of defective products mostly come from a certain supplier.
B, to analysis of rejects after, find product design have certain general character.
C, the date of manufacture of defective products, production line, even production station have general character.
D, defective products have been concentrated through the quality restriction link of targeted design.
E, defective products embody the bad feature of logistics, and concentrate on some link or some period hair of logistics It is raw.
F, defective products embody the feature in use, and concentrate generation in some customers' place.
Situation described in event and a-f according to the A-H of statistics, draws the conclusion of regularity, whole to improve compressor The working method of industrial chain, to improve the overall service efficiency of compressor.
In the present embodiment, advised by the status information of equipment of collect and process machine application apparatus, and by the transmission pre-set Status information of equipment is then sent to data center module, monitoring device status information, excavation and analytical equipment status information, and Rule is drawn according to the status information of equipment, the monitoring effect of compressor is effectively improved.
It should be noted that in the description of the invention, term " first ", " second " etc. are only used for describing purpose, without It is understood that to indicate or imply relative importance.In addition, in the description of the invention, unless otherwise indicated, the implication of " multiple " It is two or more.
Any process described otherwise above or method description are construed as in flow chart or herein, represent to include Module, fragment or the portion of the code of one or more executable instructions for the step of realizing specific logical function or process Point, and the scope of the preferred embodiment of the present invention includes other realization, wherein can not be by shown or discussion suitable Sequence, including according to involved function by it is basic simultaneously in the way of or in the opposite order, carry out perform function, this should be of the invention Embodiment person of ordinary skill in the field understood.
It should be appreciated that each several part of the present invention can be realized with hardware, software, firmware or combinations thereof.Above-mentioned In embodiment, the software that multiple steps or method can in memory and by suitable instruction execution system be performed with storage Or firmware is realized.If, and in another embodiment, can be with well known in the art for example, realized with hardware Any one of row technology or their combination are realized:With the logic gates for realizing logic function to data-signal Discrete logic, the application specific integrated circuit with suitable combinational logic gate circuit, programmable gate array (PGA), scene Programmable gate array (FPGA) etc..
Those skilled in the art are appreciated that to realize all or part of step that above-described embodiment method is carried Rapid to can be by program to instruct the hardware of correlation to complete, described program can be stored in a kind of computer-readable storage medium In matter, the program upon execution, including one or a combination set of the step of embodiment of the method.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing module, can also That unit is individually physically present, can also two or more units be integrated in a module.Above-mentioned integrated mould Block can both be realized in the form of hardware, it would however also be possible to employ the form of software function module is realized.The integrated module is such as Fruit is realized using in the form of software function module and as independent production marketing or in use, can also be stored in a computer In read/write memory medium.
Storage medium mentioned above can be read-only storage, disk or CD etc..
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means to combine specific features, structure, material or the spy that the embodiment or example are described Point is contained at least one embodiment of the present invention or example.In this manual, to the schematic representation of above-mentioned term not Necessarily refer to identical embodiment or example.Moreover, specific features, structure, material or the feature of description can be any One or more embodiments or example in combine in an appropriate manner.
Although embodiments of the invention have been shown and described above, it is to be understood that above-described embodiment is example Property, it is impossible to limitation of the present invention is interpreted as, one of ordinary skill in the art within the scope of the invention can be to above-mentioned Embodiment is changed, changed, replacing and modification.

Claims (9)

1. a kind of monitoring system for compressor, it is characterised in that including acquisition module, memory module and data center die Block, wherein,
The acquisition module, for the status information of equipment of collect and process machine application apparatus, and by the transmission rule pre-set, The status information of equipment is sent to the data center module, wherein, the transmission rule pre-set includes following One or more in situation:If the danger classes of the status information of equipment is height, send in real time;If the equipment Status information is periodical information, then is transmitted according to predetermined period;, ought when the compressor application equipment is using terminating Before be stored in the status information of equipment of the memory module and be sent to the data center module;
The memory module, the status information of equipment for storing the compressor application equipment;
The data center module, for collecting and storing the status information of equipment, monitors the status information of equipment, excavation With analyze the status information of equipment, and rule is drawn according to the status information of equipment;
It is described to excavate and analyze the status information of equipment, including:
By being wirelessly transferred, wire transmission, and artificial contact situ method collects the equipment shape of the compressor application equipment State information, and archives are set up to the compressor application equipment used in industrial chain;
If the compressor application equipment projected life is N, by the compressor application equipment used before the N+N1 time limits, Occur the compressor application equipment of adverse events, according to the species of the adverse events, carry out statistic of classification;
If the adverse events incidence of the compressor application equipment is set as R%, by the probability of occurrence of the adverse events Adverse events more than (R-R0) % are ranked up from high to low;
Adverse events after sequence are analyzed and data mining, according to Principle of Statistics determine the adverse events with it is described The related common feature of each link in the industrial chain of compressor application equipment.
2. the monitoring system according to claim 1 for compressor, it is characterised in that the acquisition module includes information Capture program, wherein, the status information of equipment is the compressor application equipment operation that described information capture program is gathered When status information.
3. the monitoring system according to claim 2 for compressor, it is characterised in that the status information of equipment includes The run time of the compressor application equipment, occur event set in advance when the compressor application equipment current value, The status information of magnitude of voltage, environmental information and the compressor application equipment.
4. the monitoring system according to claim 3 for compressor, it is characterised in that the compressor application equipment Run time includes the Startup time of the compressor application equipment, stop timing, and sets the compressor application equipment Startup time in fixed frequency operation, the one or more in the stop timing.
5. the monitoring system according to claim 3 for compressor, it is characterised in that the event package set in advance Include the compressor application unit exception run case, the event of the influence compressor application service life of equipment, Yi Jihuan One or more in the inclement condition event of border.
6. a kind of monitoring method for compressor, it is characterised in that comprise the following steps:
The status information of equipment of collect and process machine application apparatus, and by the transmission rule pre-set, the equipment state is believed Breath is sent to data center module, wherein, the transmission rule pre-set includes the one or more in situations below:Such as The danger classes of really described status information of equipment is height, then sends in real time;If the status information of equipment is periodical information, Then it is transmitted according to predetermined period;When the compressor application equipment is using terminating, the institute of memory module will be currently stored in State status information of equipment and be sent to the data center module;And
The status information of equipment is monitored, excavate and analyzes the status information of equipment, and is obtained according to the status information of equipment Go out rule;
It is described to excavate and analyze the status information of equipment, including:
By being wirelessly transferred, wire transmission, and artificial contact situ method collects the equipment shape of the compressor application equipment State information, and archives are set up to the compressor application equipment used in industrial chain;
If the compressor application equipment projected life is N, by the compressor application equipment used before the N+N1 time limits, Occur the compressor application equipment of adverse events, according to the species of the adverse events, carry out statistic of classification;
If the adverse events incidence of the compressor application equipment is set as R%, by the probability of occurrence of the adverse events Adverse events more than (R-R0) % are ranked up from high to low;
Adverse events after sequence are analyzed and data mining, according to Principle of Statistics determine the adverse events with it is described The related common feature of each link in the industrial chain of compressor application equipment.
7. the monitoring method according to claim 6 for compressor, it is characterised in that the status information of equipment includes The run time of the compressor application equipment, occur event set in advance when the compressor application equipment current value, The status information of magnitude of voltage, environmental information and the compressor application equipment.
8. the monitoring method according to claim 7 for compressor, it is characterised in that the compressor application equipment Run time includes the Startup time of the compressor application equipment, stop timing, and sets the compressor application equipment Startup time in fixed frequency operation, the one or more in the stop timing.
9. the monitoring method according to claim 7 for compressor, it is characterised in that the event package set in advance Include the compressor application unit exception run case, the event of the influence compressor application service life of equipment, Yi Jihuan One or more in the inclement condition event of border.
CN201510402643.3A 2015-07-09 2015-07-09 Monitoring system and method for compressor Active CN104989634B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510402643.3A CN104989634B (en) 2015-07-09 2015-07-09 Monitoring system and method for compressor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510402643.3A CN104989634B (en) 2015-07-09 2015-07-09 Monitoring system and method for compressor

Publications (2)

Publication Number Publication Date
CN104989634A CN104989634A (en) 2015-10-21
CN104989634B true CN104989634B (en) 2017-10-27

Family

ID=54301497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510402643.3A Active CN104989634B (en) 2015-07-09 2015-07-09 Monitoring system and method for compressor

Country Status (1)

Country Link
CN (1) CN104989634B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107765658B (en) * 2017-09-08 2020-07-28 深圳市智物联网络有限公司 Compressor control method, device and system based on Internet of things
CN108204358B (en) * 2018-02-01 2019-08-23 克莱门特捷联制冷设备(上海)有限公司 A kind of balancing management system of multicomputer compressor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102034150A (en) * 2010-11-29 2011-04-27 韩世良 Overhaul management system and service life management method for important compressor parts in coal chemical industry
CN103246265A (en) * 2013-04-26 2013-08-14 河海大学常州校区 Detection and maintenance system and method for electromechanical device
CN103573604A (en) * 2013-10-31 2014-02-12 广东美芝制冷设备有限公司 Measuring device and oil-in-refrigerant content measuring method for compressor system
CN203476683U (en) * 2013-07-05 2014-03-12 安庆市佰联无油压缩机有限公司 Laboratory monitoring system for running state of compressor
JP2014105671A (en) * 2012-11-29 2014-06-09 Azbil Corp Operation efficiency estimation device and program

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9157434B2 (en) * 2013-01-22 2015-10-13 PumpSpy Technology, LLC Sump pump system with automated system monitoring and data collection

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102034150A (en) * 2010-11-29 2011-04-27 韩世良 Overhaul management system and service life management method for important compressor parts in coal chemical industry
JP2014105671A (en) * 2012-11-29 2014-06-09 Azbil Corp Operation efficiency estimation device and program
CN103246265A (en) * 2013-04-26 2013-08-14 河海大学常州校区 Detection and maintenance system and method for electromechanical device
CN203476683U (en) * 2013-07-05 2014-03-12 安庆市佰联无油压缩机有限公司 Laboratory monitoring system for running state of compressor
CN103573604A (en) * 2013-10-31 2014-02-12 广东美芝制冷设备有限公司 Measuring device and oil-in-refrigerant content measuring method for compressor system

Also Published As

Publication number Publication date
CN104989634A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
JP5736881B2 (en) Log collection system, apparatus, method and program
US10824139B2 (en) Equipment maintenance method, equipment maintenance device, and storage medium for the same
CN104076770B (en) production line monitoring method and system
CN101582195B (en) Method for generating alarm in dynamic environment monitoring system
CN107765658A (en) A kind of compressor control method based on Internet of Things, apparatus and system
CN104989634B (en) Monitoring system and method for compressor
CN101509839A (en) Cluster industrial robot failure diagnosis method based on outlier excavation
EP3309682B1 (en) Data collection system and method, and method for reducing the quantity of measurement data
CN105889054A (en) Air compressor working environment monitoring system capable of being remotely monitored
CN112163297A (en) Equipment health prediction system
JP6176377B1 (en) Equipment management system, equipment management method and program
CN105142235A (en) Communication method and communication device of air conditioning unit
CN105743721A (en) Data uploading method, and method and device for processing uploaded data
GB2563508A (en) Refrigerant shortage prediction apparatus, refrigerant shortage prediction method, and program
CA2976355A1 (en) Method of determining availability and reliability of facility equipment
CN116345691B (en) Power equipment operation monitoring system
CN115981199A (en) Sine screen monitoring data transmission system based on Internet of things
CN115660288A (en) Analysis management system based on internet big data
CN115239227A (en) Production station monitoring method and system
CN110889395B (en) Machine learning-based mechanical motion recognition method and system
CN203816935U (en) Automatic betel nut seed sorting equipment
JP6139149B2 (en) Analysis method and analysis apparatus
CN107066424A (en) For the System and method for for the risk for determining operation turbine
CN113627885A (en) Power grid power supply abnormity monitoring system and monitoring method thereof
CN106231298B (en) Giant-screen remotely intelligently monitoring method, apparatus and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant